Loading...
HomeMy WebLinkAboutRESPONSE - RFP - 7358 PHOTO SIMULATIONS FOR MAX RAPID TRANSIT STATIONSIBI Group 1411 1Street, Suite 610 IBI Denver, COC80202 GROUP tel 303 713 1013 fax 303 713 1014 March 28, 2012 City of Fort Collins Purchasing Division 215 North Mason Street, 2nd Floor Fort Collins, Colorado 80524 Re: REQUEST FOR PROPOSAL - 7358 Photo Simulations For MAX Bus Rapid Transit Stations Dear Mr. O'Neill and Selection Committee Members: Thank you for the opportunity to respond to this Request for Proposal. The IBI Group team has the interest, capacity and experience to assist the City of Fort Collins with the production of Photo Simulations for MAX Bus Rapid Transit (BRT) Stations. IBI Group, a North American leader in urban design planning and transit -oriented design (TOD), has customized a local -based graphics design team to assist with this important photo simulation project. Our team brings the following benefits to the process • IBI Group is assisting the City of Fort Collins with the final design of the MAX BRT system. As responsible party for station architecture, we have an in depth understanding of the details related to the stations and shelter designs that cannot be matched. • An established team of project management and graphic design professionals that bring a history of creative graphic design as well as delivering well -managed project control processes. • Proven experience with successful completion of similar services as well as local Fort Collins experience. IBI Group provided photo simulations for Troutman and Mountain Stations for MAX BRT and also prepares renderings for other projects regularly. • An understanding of all the requirements, terms and conditions contained in the RFP. We look forward to the opportunity to provide requested services. We look forward to hearing from you soon at 303-713-1013. Sincerely, IBI Group Peter a wel, Director Salvatore Birritteri, Associate pzura el@ibigroup.com sbirritteri 7r7ga ibigroup.com City of Cort Collins I I RFP No. 7358 11 � I A SECTION 2 Please find the cost estimate matrix on the following page. MARCH 28, 2012 10 • • • • • Role • Proposed Tasks Project Management • • • • • P. Zurawel S. Birritteri C. Varela T. Silvernail R. Bright $205.54 $108.79 $85.00 $55.00 $55.00 Project Director Project Manager 3D Modeling Graphic Design Administration Fee Per Task General project management and administration 2 8 4 $ 1,501.40 Kickoff Meeting 4 $ 435.16 $ - • Labor Sub -Total • • Project Initiation • • • • $ 1,936.56 Meet with City to select 4 stations 1 2 $ 423.12 Photograph sites 2 $ 217.58 Analysis of photos and selecting final view (Assume one view per station) 1 2 2 4 $ 813.12 $ - • • Phase 1 Labor Sub -Total • • 3d Modeling and Mock-ups • • • • $ 1,453.82 Update station area models to include all details 2 24 8 $ 2,697.58 Prepare mock-up of photo simulation 2 16 $ 1,050.00 First client review of proposed photo simulation -first review 2 $ 217.58 • • Phase 2 Labor Sub -Total Finalizing Photo Simulation • • • • • $ 3,965.16 Render model with photorealistic materials and lighting 2 12 4 $ 1,457.58 Prepare draft photo simulation image assume one image per station 2 4 24 $ 1,877.58 Meeting with client for final review -second review 1 2 $ 423.12 Finalize photo simulation image 4 4 $ 560.00 • • Phase 3 Labor Sub -Total • • • $ 4,318.28 Total Hours Per Staff 5 28 48 60 4 145 Photo Simulations Labor Total $1,027.70 $3,046.12 $4,080.00 $3,300.00 $220.00 $ 11,673.82 Other Direct Costs $ 300.00 Total for Photo Simulations $ 11,973.82 Hours Per Task 14 4 0 0 0 18 3 2 9 0 0 14 34 18 2 0 0 54 18 30 3 8 0 145 City of Cort Collins r. , r,.;. l n r,.,,,.,.,I„ RFP No. 7168 Table of Contents Section 1 Qualifications 1.2 Examples of 3D Renderings and photo simulations 1.3 Availability 1.2 Project Understanding and Approach Cost Estimate MARCH 28, 2012 • • • City of Con Collins I -: _ I RFP No. 7358 111110 SECTION 1 IBI Group is an international multi -disciplinary Ak consulting firm primarily offering services in four areas of practice: Urban Land, Facilities, Transportation and Systems. �� y The integration of these disciplines allows for the provision of comprehensive professional services for the creation of sustainable social and economic environments, while project --�- management services ensure quality control and cost efficiency in project implementation. In addition IBI Group offers critical satellite services such as 3D computer modeling, graphic design and photography. Established in 1974, over the past 38 years IBI Group has grown steadily and now has over 75 offices throughout Canada, the United States, Europe, Asia and the Middle East, employing more than 3,100 professionals and support staff. The firm has built a solid reputation for successfully completing projects for both the private and public sectors; having served a broad range of clients with varying needs and requirements. The IBI Group Denver office was established in 1997 and has provided successful projects for clients throughout the region. This includes working with the City of Fort Collins on the final design of the MAX BRT system. The same staff that has been working on this very important project for the City will complete this project. Example: Original image and photo simulation of Colfax Blvd. I Denver, Colorado MARCH 28. 2012 3 City of CortCollins I Photo Simulations for MAX Bus Rapid Transit Stallons I RFP No. 7358 l B11V green Peter Zurawel Project Director Mr. Zurawel is the Director of IBI Group's Denver office. He has more than 31 years professional experience on large-scale urban, governmental, corporate, and institutional projects including LRT/BRT station design and transit centers. His vision of concept and design has brought several great transportation projects serving several clients throughout Colorado. Sal Birritteri Project Manager Mr. Birritteri is an Associate with IBI Group and is an urban designer with fourteen It 4) years experience working on a broad base of multi -disciplinary projects. He has a broad understanding of transportation project management from conceptual design to final design phases. His knowledge of MAX BRT will be used to assist the team to a clearer understanding of final design of the station elements. Todd Silvernail Graphic Designer Mr. Silvernail has more than 5 years of graphic design experience in transportation related projects ranging from design documents to public involvement presentations. His CAD/BIM skills along side of his Graphic Design experience has led him towards an understanding of how projects get built through building materials and construction means and presenting the vision and ideas for the public knowledge of what is about to come through photo simulations. Charles Varela 3D Modeler Mr. Varela has more than 10 years experience in computer aided design and utilizing several software applications to enhance 2D linework into 3D massing models. Using several industry standard and enhanced rendering programs, Charles has perfected the art of using high definition RAW photography photos and turning them into realistic Photo Simulations. His experience has led him through an understanding of basic principles of using landscaping true to native use, direct and indirect lighting, textures, and entourage. MARCH 28, 2012 Mason Corridor MAX BRT Station Design I Fort Collins, CO As part of a team, IBI Group is providing a wide range of services including; Final Design for BRT Station Area Planning, Station Architecture of shelters and signage, Transit Operations, Fare Collection Feasibility Studies, and BRT MIS Plans. The station design includes a center island platform with passenger amenities such as a shelter and seating areas. The shelter design provides a unique and easily recognizable identity for the BRT system. The design allows for the Iconic elements of the shelter to remain consistent while allowing for variety of cladding options that reflect the individual site contextual setting. Integrated into the design of shelter and platforms are the features of the BRT system such as fare collection equipment, next bus signs and branding. RTD FasTracks 1-225 LRT Iliff Station Final Design I Aurora, CO The 1-225 Corridor project is a 10.5-mile proposed light rail line that connects the existing Southeast Light Rail Corridor to the future East Corridor Commuter Rail at Smith and Peoria Road within the 1-225 corridor. IBI Group is responsible for the station architecture, urban design, and landscape architecture for the preliminary engineering phase. The team completed final design for an extension of this corridor to a new terminus station at Iliff Avenue. The station area will consist of a new center platform, a four bus bay transfer facility, and a 600-vehicle park-n-ride facility. RTD FasTracks West Corridor LRT 6'" Avenue Bridge) Lakewood, CO The 6th Avenue Bridge will provide a vital link between the communities north of Highway US 6 to the activity centers on the south that will be a mix of residential and employment centers. A steel tied arch structure was selected for bridge design for its ability to span great distances without the need for intermediate piers. The elegant arches frame views of Denver's skyline to the east and the foothills to the west. The basket handle arches are fabricated from a square welded box made from weathering steel. The structural strand cables are configured in a cross pattern and support the shallow deck system. The bridge will be a prominent feature of this corridor and was designed as a landmark structure. Architectural enhancements include articulation of piers and pier caps. An LED lighting system will light the cross pattern cable stands. The lighting pattern is symbolic of the peaks of Rocky Mountains to the west. IBI Group is responsible for the architectural enhancement of 4 City of Cort Collins I Ins fcr NI %X Bus Rapid Transit Gtnro, I RFP No. 7358 f BI10 Mason Corridor MAX BRT Station Photo Simulations Fort Collins, Colorado Y o 3D Massing Model for typical station Photo simulation ofTroutman Station Black line CAD details Model massing for preliminary design 3, Final design rending in projected location - 1 Photo simulation of Mountain Stop MARCH 28, 2012 5 City of Cort Collins I 11 tc - , - _ I , - i, 1,.,, - i I RFP No. 7358 1 1 ; I RTD FasTracks 1-225 LRT Corridor I Iliff Station Final Design Aurora, Colorado O OStation Area Plan OArchitectural Elements Photo Realistic renderings of station area MARCH 28, 2012 City of Coil Collins I Photo Simulations for MAX Bus Rapid Transit .Siahons I RFP No. 7358 13I LFP"1 TIT RTD FasTracks West Corridor LRT 16th Avenue LRT Bridge Aurora, Colorado Photo Simulation Photo of finished LRT bridge MARCH 28, 2012 7 • • • City of Cort Collins I I RFP No. 7358' ` • • Graphic Design Capabilities • IBI Group develops, supports and produces a complete range of graphic design • services including reports, proposals, maps, marketing booklets, advertising • brochures, identity packages, slideshow presentations, charts and graphs, multi -media presentations, tradeshows, posters, brand logo development, presentation boards • and web design. Our graphic design team brings together experienced and creative • Graphic Designers, Photographers, 3D Modelers and Animators and Web Designers. • This unique combination of skills allows us to provide complete graphical services. We are constantly compiling, designing and producing full high resolution images under • tight deadlines and are very experienced in prepress production, coordinating with • printing companies, and preparing graphics to be used on the web and implementing • quality control of the final printed product. We strive to create a perfect balance between functional, aesthetic design and cost-effectiveness; the backbone of every • project. Our firm represents a collection of top designers with creative flair to spare. Artistic and technical talent is commonplace and offers a diverse range of input. Awareness of various methods to produce imagery and graphic styles is imbedded within our office. Project Management & Service Delivery The competitive nature of this specialty service demands strong project management and product delivery, on time and above our clients' expectations. Our team expects top results of ourselves, and equivalently, we seek the same heightened approach from our clients. This leads to a transparent open communication channel where all team members, including client team members, are aware of everyone's roles and responsibilities. Our team is highly energetic, we foster and nurture our client relationships, thereby developing loyalty amongst the group and distributing accountability appropriately. We have assembled a team of key staff members from the MAX BRT Final Design team for this project. Each team member has extensive knowledge of the station area plans and details of amenities such as shelters, bench, bike racks, fare collection equipment and public art that will be integrated into the station design. This team of highly qualified, motivated and capable staff are available to start immediately once notice to proceed is granted. MARCH 28. 2012 8 • • • City of Cort Collins I RFP No. 7358 • • • • IBI Group is fully committed to bring to bear all its 3D modeling and graphic design, • resources to assist the City of Fort Collins with this assignment. Our graphic design team has experience working with the City in producing high quality images and • graphics for the MAX BRT project. We have worked with city staff in completing photo • simulations for Troutman and Mountain Stations. • We are fully versed with the requirements to produce the end product. The extent • of skills and capability necessary to fulfill this assignment is a series of tasks we • perform on a daily basis routinely under stringent budget controls and tight deadlines. Our graphic design team is well versed in a variety of graphic design tools and can • easily adapt or convert previous City of Fort Collins documents to be used in future • assignments. We possess the skills to meet and exceed the RFP requirements. • IBI Group understands the end result of the project will be for Fort Collins to have • photo simulation images for four (4) of the MAX BRT stations. At this time our proposal is based on our understanding that the City of Fort Collins will provide the • high resolution photographs to be used as part of the final rendering. Additional • assumptions include: • IBI Group will assist in station selection and scouting of sites. • Assist with selecting photo perspectives. • Provisions for meeting time with the City. • Allowance of up to 2 formal reviews of photo simulation. • Final deliverable of a layered Photoshop file. • Only one view per station (for a total for 4) will be produced as a final photo simulation images. Approach IBI group is responsible for station architecture for the Mason BRT project. We know that each station relates to its site in a unique way and that each shelter along the corridor was developed with its own character. We have in depth knowledge of the of the shelter details and also civil, ITS, landscape architecture, public art and branding for the BRT systems. As the designers of record, IBI Group has the knowledge and accesses to the many details required to produce the station shelters and are able to accurately and quickly implement these details into any shelter model required. Our approach will be to have the designers of the station work closely with our graphic designers to complete accurate 3d models of all components of the stations area. Once these models are complete with work closely with City staff to select the views that will meet the City's objectives. We have worked with City using the same approach to prepare photo simulation images and numerous graphic images for this project and implement a similar approach in completion of the images for this project. Below is a list of the software we have available to prepare these images: AutoCAD Photoshop 3D Studio MAX Revit Sketchup Lightroom Illustrator V-Ray MARCH 28, 2012 9