Loading...
HomeMy WebLinkAboutRESPONSE - BID - 7377 ASPHALT SUPPLYBID SCHEDULE 2012 CITY OF FORT COLLINS ASPHALT SUPPLY CONTRACT Hot Mix Asphalt Pricing (FOB Plant) ITEM ITEM ESTIMATED UNIT NO. DESCRIPTION QUANTITY PRICE 403.10 HMA GR SX (PG 58-28) 20% RAP 100 tons $ `ig °J /ton 403.15 HMA GR SX (PG 64-22) 20% RAP 100 tons $ y8 /ton 403.20 HMA GR S (PG 58-28) 20% RAP 100 tons $ W9 /ton 403.25 HMA GR S (PG 64-22) 20% RAP 12,850 tons $ y /ton 403.30 HMA GR S (PG 64-28) 20% RAP 100 tons $ 6 j ' ov /ton 403.35 HMA GR SG (PG 58-28) 20% RAP 6,675 tons $ `i3' _o /ton 403.40 HMA GR SG (PG 64-22) 20% RAP 36,645 tons $ `�Z �� _ /ton Note: The quantities listed above are estimates only. The City of Fort Collins reserves the right to modify the quantities for any or all items listed. IN ADDITION TO THE BID SCHEDULE PRICES FOR EACH MIX DESIGN LISTED ABOVE, VENDORS MUST SUBMIT THE FOLLOWING COSTS FOR APRIL 2012: Asphalt Cement (PG 58-28) $ S$-O /ton Asphalt Cement (PG 64-22) $ •SyU /ton Asphalt Cement (PG 64-28) $ �'� /ton Price Adjustment Factor: GR SX (PG 58-28) 20% RAP $ `fib /ton GR SX (PG 64-22) 20% RAP $ /ton GR S (PG 58-28) 20% RAP $ .`115- /ton GR S (PG 64-22) 20% RAP $ . ` 57 /ton GR S (PG 64-28) 20% RAP $ • ,42 /ton GR SG (PG 58-28) 20% RAP $ 39 /ton GR SG (PG 64-22) 20% RAP $ • 38 /ton BID 7377 Asphalt Supply Page 4 of 25 GR= I a Z FIRM NAME Conne Are u a SIGNATURE PRINT NAME John M warren, vice President ADDRESS 7785 Highland Meadows Pkwy. Suite 100 Fort Collins, CO 80528 PHONE 970-223-3151 61K4 970-223-3191 BID 7377 Asphalt Supply CELL PHONE EMAIL ] warren@conne 11 resources. com Page 5 of 25 G,gT 2 of?