HomeMy WebLinkAboutRFP - 7321 APP 2012 COMMUNITY TRANSFORMER CABINET MURAL PROJECT (2)PROJECT
DESCRIPTION
The Art in Public Places Program of Fort Collins, Colorado is requesting proposals in an open
competition for individuals or teams from local non-profit organizations to create two-dimensional
murals on identified electrical equipment (transformer cabinets) sited within the City of Fort Collins.
The goal of the project is to mitigate the use of graffiti upon these existing structures and to make
them artful objects within the site. As an organization team, please create a preliminary concept
drawing for the cabinet mural. Submit your concept image using the form at the end of this proposal
request. We are looking for murals that are visually active/busy, so as not to leave large open spaces.
Make the design picture -based, not word -based. If you choose to include text in your design, it should
be incidental to the design. Do not use text over 3" in height, and do not make it the focal point of the
design. Designs that include logos, copyrighted or trademarked images, advertisements, or political,
commercial, religious, or sexual symbols, themes or messages will not be accepted. Designs should be
appropriate for a diverse, broad -based audience of all ages. The transformer cabinets are functioning
units and need to be opened periodically by utility personnel. Final artwork must incorporate the
inclusion of the existing required labeling for each electrical/utility unit. Selected individuals/teams will
receive an honorarium for paint and supplies.
Safety & Durability - The work is intended to be a permanent addition to the City of Fort Collins.
Design and installation must consider that the work will be situated in a public location and subject
to the elements and potential vandalism. Access to the boxes and to the contents of the boxes must
be possible at any time. The contents of the boxes have the potential to generate extreme levels of
heat.
Site — The project area is within the city limits of Fort Collins, Colorado.
Please visit the Image Gallery at www.fcgov.com/artsl2ublic to see previously completed
transformer cabinet mural projects.
ELIGIBILITY
This project is open to all tax-exempt, non-profit organizations located within the Growth
Management Area of Fort Collins, Colorado. Organizations must be a corporation, LLC or other
business entity in good standing with and authorized to do business in the State of Colorado.
Individuals/team members participating in the project on behalf of a non-profit should reside in or
attend schools within Fort Collins, Colorado growth management area. The non-profit organization
must be willing to work with the design team selected by the City of Fort Collins. All organizations
must have a designated leader/mentor that is on site at all times during the execution of the mural.
MEDIA
The team is looking for murals to be painted on working transformer cabinets. The surface
treatment should allow the box to be opened and worked on by the utility crews. The City will
prepare the surface for painting and add a final protective anti -graffiti coating to the piece. APP
staff will be available for consultation on the materials needed for the project.
Page 2 of 5
BUDGET
The City will provide a total honorarium in the amount of $450 to cover all applicable expenses,
including all fees for consulting with the design team, the design, supplies and execution of all
artwork selected.
SELECTION PROCESS
A selection committee may consist of members of the APP Board, representatives from the
Transformer Cabinet b4ura! Projects team, and a City Purchasing Department representative. The
committee will review application materials and make a final recommendation. The Fort Collins
City Council gives final approval. The selection committee reserves the right to reject any or all
entries at any time in the review and selection process. If your organization's preliminary concept is
selected, the City will assign a cabinet site to you.
Designs will be chosen during an initial review process. if an organization's design is selected, that
organization's team will work with the project team to develop a detailed final design and timeline.
Upon final approval from the APP Board and the Fort Collins City Council, the organization will be
awarded a contract and honorarium for this project.
SELECTION CRITERIA
1. Qualification of the organization to the project as demonstrated in letter of intent.
2. Quality and suitability of submitted concept image.
CONTRACT
Upon selection and final design approval, the organization must complete a contract with the City of
Fort Collins. The organization will be responsible for the appropriate supervision of the persons
participating in the project on its behalf. All finished work shall be faithful to the drawings, design,
and concept as approved by the APP Board and the Fort Collins City Council. Progress reports and
honorarium will be made as contracted. All designs submitted become the property of the City of
Fort Collins.
APPLICATION MATERIALS TO BE SUBMITTED
Please submit one (1) coL2y of the following materials:
1. A one -page letter of intent that includes a list of team members.
2. One full color concept image drawn or printed on the form at the end of this proposal request.
3. Name and phone number of contact/mentor/team leader.
4. A self-addressed stamped envelope for return of notification.
Submissions must be complete or will not be reviewed.
The Art in Public Places Program is not responsible for lost or damaged artist materials.
Materials will not be returned.
Page 3 of 5
NOTICE
All proposals submitted must meet all applicable city codes and charter requirements. The City of
Fort Collins reserves the right to reject all proposals and to waive irregularities or informalities.
Individuals/teams are not to contact the project community/neighborhoods for an APP project
unless arranged through Ellen Martin, APP Coordinator for the City.
Sincerely,
James B. O'Neill II, CPPO, FNIGP
Director of Purchasing & Risk Management
row 4 of 5
CITY OF FORT COLLINS ART IN PUBLIC PLACES PROGRAM
2012 COMMUNITY TRANSFORMER CABINET PRELIMINARY CONCEPT IMAGE
NAME: MENTOR/LEADER
IMAGE:DESCRIPTI ON/NARRATI VE
Nge 5 ,es