Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 7114 MISCELLANEOUS CONCRETE ANNUAL (11)EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND J.A.R. Concrete Dated: 4/1/2010 Work Order Number: Purchase Order Number: l � 2_- J / 3 Z_ (' � �' () & � 5 _*_ Project Title: F. C. Trail Underpass @ Hwy 287 - Underdrain Improvements Commencement Date: 3/ 19/2012 Completion Date: 3/30/2012 Maximum Fee: (time 8c reimbursable direct costs): S36,322.46 Project Description: Provide all work necessary for the removal and install improvments to the underdrain system for the trail underpass at H WY 287 per drawings provided by the City Scope of Services: Close trail and demo sections of concrete trail. install 6" perforated pipe extensions, 3- 12' pipe culverts, 6" overflow pipe, replace colored concrete Imil w/ curb. adjust manhole. Provide appropriate traffic control Acceptance ��QR�L `PIG1111,.r User Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the patties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms) the Services Agreement shall control. Service Provider C Date: CC: Purchasing The attached forms consisting of pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. City of Fort Collins Date: Director of Purchasing and Risk Management if over S60,000 Payment Application JOB: Fossil Creek Trail Date: 05-15-2012 JAR Invoice # 281 Contact: Jason Stutzman W.O.# Contractor Information Name: J.A.R. Concrete, LLC Address: 11621 County Road 13 Longmont, CO 80504 Phone: 303.678.9727 Item Number Description Unit Price Unit Quantity Total Cost Notes 202.03 Sawcut 6"-8" 2.75 LF 50 137.50 202.04 Sawcut 8"-10" 3.00 LF 30 90.00 200.00 Core drill 240.00 EA 1 240.00 202.06 Remove concrete 2.00 SF 1000 2000.00 202.11 Remove concrete 10" 6.00 SF 180 1080.00 202.11 Remove concrete 12" 8.00 SF 450 3600.00 202.07 Remove curb 6.00 LF 101 606.00 60829 6" color trail 4.20 SF 1000 4200.00 608.29 8" color trail 5.75 SF 290 1667.50 608.29 10" color trail 7.30 SF 180 1314.00 608.29 12" color trail 7.30 SF 450 3285.00 FA-2 Foreman 35.00 HR 14 490.00 FA-1 Laborer 19.00 HR 28 532.00 630.05 Barricades 746.28 LS 1 746.28 FA-7 Dump truck 65.00 HR 53 3445.00 FA-5 Skid loader 65.00 HR 86 5590.00 608.29 Colored curb 3.65 SF 202 737.30 TOTAL Payment Application JOB:Fossil Creek Trail Date: 05-15-2012 JAR Invoice # 281 Contact: Jason Stutzman W.O.# Contractor Information Name: J.A.R. Concrete, LLC Address: 11621 County Road 13 Longmont, CO 80504 Phone: 303.678.9727 Item Number Description Unit Price Unit Quantity Total Cost Notes Mini excavator 1759.39 Pump & hose 579.07 Breaker point long 322.06 Heavy breaker attachment 369.23 Concrete pumping 1310.75 Culvert pipe 342.21 Filter fabric 157.35 10 mill vapor barrier 488.20 1 1/2" rock 788.71 # 4 Re -bar 381.56 Dump charges 63.36 TOTAL $ 36,322.46