SPECIFICATIONS
AND
CONTRACT DOCUMENTS
FOR
HARMONY ROAD MAINTENANCE PROJECT
COLLEGE AVENUE TO TIMBERLINE ROAD
BID NO. 7366
PURCHASING DIVISION
215 NORTH MASON STREET, 2ND FLOOR, FORT COLLINS
APRIL 17, 2012 – 3:00 P.M. (OUR CLOCK)
CONTRACT DOCUMENTS TABLE OF CONTENTS
Section Pages
BID INFORMATION
00020 Notice Inviting Bids 00020-1 - 00020-2
00100 Instruction to Bidders 00100-1 - 00100-9
00300 Bid Form 00300-1 - 00300-3
00400 Supplements to Bid Forms 00400-1
00410 Bid Bond 00410-1 - 00410-2
00420 Statements of Bidders Qualifications 00420-1 - 00420-3
00430 Schedule of Major Subcontractors 00430-1
CONTRACT DOCUMENTS
00500 Agreement Forms 00500-1
00510 Notice of Award 00510-0
00520 Agreement 00520-1 - 00520-6
00530 Notice to Proceed 00530-1
00600 Bonds and Certificates 00600-1
00610 Performance Bond 00610-1 - 00610-2
00615 Payment Bond 00615-1 - 00615-2
00630 Certificate of Insurance 00630-1
00635 Certificate of Substantial Completion 00635-1
00640 Certificate of Final Acceptance 00640-1
00650 Lien Waiver Release (Contractor) 00650-1 - 00650-2
00660 Consent of Surety 00660-1
00670 Application for Exemption Certificate 00670-1 - 00670-2
CONDITIONS OF THE CONTRACT
00700 General Conditions 00700-1 - 00700-34
Exhibit GC-A GC-A1 - GC-A2
00800 Supplementary Conditions 00800-1 - 00800-2
00900 Addenda, Modifications, and Payment 00900-1
00950 Contract Change Order 00950-1 - 00950-2
00960 Application for Payment 00960-1 - 00960-4
SPECIFICATIONS
SECTION 00020
INVITATION TO BID
SECTION 00020
INVITATION TO BID
Date: March 27, 2012
Sealed Bids will be received by the City of Fort Collins (hereinafter referred to as
OWNER), at the office of the Purchasing Division, 3:00 P.M., our clock, on April 17,
2012, for the Harmony Road Maintenance Project – College Avenue to Timberline
Road; BID NO. 7366. If delivered, they are to be delivered to 215 North Mason Street,
2nd Floor, Fort Collins, Colorado, 80524. If mailed, the mailing address is P. O. Box
580, Fort Collins, CO 80522-0580.
At said place and time, and promptly thereafter, all Bids that have been duly received
will be publicly opened and read aloud.
The Contract Documents provide for the construction of Bid 7366 Harmony Road
Maintenance Project – College Avenue to Timberline Road. The Work consists of
pavement rehabilitation techniques with a two inch asphalt overlay of Harmony Road
from College Avenue to Timberline Road. Three dedicated right turn lanes will be
constructed along the corridor with a box culvert (bridge) removal on Lemay Avenue.
More specifically, the project includes the following: removals as defined in the plans,
utility coordination, earthwork, erosion control, concrete curb and gutter, full depth
asphalt pavement, asphalt mill and inlay, paving fabric, concrete sidewalks, a raised
landscaped median, an irrigation system servicing the proposed median and
construction zone traffic control. Signing, striping, traffic signal pole relocations and
construction staking will be completed by the City of Fort Collins.
All Bids must be in accordance with the Contract Documents on file with the City of Fort
Collins, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80524.
A prebid conference and job walk with representatives of prospective Bidders will
be held at 10:00 AM, on April 3, 2012, in the Community Room at 215 N Mason
Street, Fort Collins.
Prospective Bidders are invited to present their questions relative to this Bid proposal at
this meeting.
The Contract Documents and Construction Drawings may be examined online at:
City of Fort Collins BuySpeed: https://www.fcgov.com/eprocurement
Bids will be received as set forth in the Bidding Documents.
The Work is expected to be commenced within the time as required by Section 2.3 of
General Conditions. Substantial Completion of the Work is required as specified in the
Agreement.
The successful Bidder will be required to furnish a Performance Bond and a Payment
Bond guaranteeing faithful performance and the payment of all bills and obligations
arising from the performance of the Contract.
No Bid may be withdrawn within a period of forty-five (45) days after the date fixed for
opening Bids.
The OWNER reserves the right to reject any and all Bids, and to waive any informalities
and irregularities therein.
Bid security in the amount of not less than 5% of the total Bid must accompany each Bid
in the form specified in the Instructions to Bidders.
Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council,
shall have a financial interest in the sale to the City of any real or personal property,
equipment, material, supplies or services where such officer or employee exercises
directly or indirectly any decision-making authority concerning such sale or any
supervisory authority over the services to be rendered. This rule also applies to
subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment,
kickback or any items of monetary value from any person who has or is seeking to do
business with the City of Fort Collins is prohibited.
City of Fort Collins
James B. O'Neill, II, CPPO, FNIGP
Purchasing & Risk Management Director
SECTION 00100
INSTRUCTIONS TO BIDDERS
SECTION 00100
INSTRUCTIONS TO BIDDERS
1.0 DEFINED TERMS
Terms used in these Instructions to Bidders which are defined in the Standard
General Conditions of the Construction Contract (No. 1910-8, 1990 ed.) have the
meanings assigned to them in the General Conditions. The term "Bidder" means
one who submits a Bid to OWNER, as distinct from a sub-bidder, who submits a
Bid to Bidder. The terms "Successful Bidder" means the lowest, qualified,
responsible and responsive Bidder to whom OWNER (on basis of OWNER's
evaluation as hereinafter provided) makes an award. The term "Bidding
Documents" includes the Advertisement or Invitation to Bid, Instructions to
Bidders, the Bid Form, and the proposed Contract Documents (including all
Addenda issued prior to receipt of Bids).
2.0 COPIES OF BIDDING DOCUMENTS
2.1. Complete sets of Bidding Documents may be obtained as stated in the
Invitation to Bid. No partial sets will be issued. The Bidding Documents may be
examined at the locations identified in the Invitation to Bid.
2.2. Complete sets of Bidding Documents shall be used in preparing Bids; neither
OWNER nor Engineer assumes any responsibility for errors or misinterpretations
resulting from the use of incomplete sets of Bidding Documents.
2.3. The submitted Bid proposal shall include Sections 00300, 00410, 00420, and
00430 fully executed.
2.4. OWNER and Engineer, in making copies of Bidding Documents available on
the above terms, do so only for the purpose of obtaining Bids on the Work and do
not confer a license or grant for any other use.
3.0 QUALIFICATION OF BIDDERS
3.1 To demonstrate qualifications to perform the Work, each Bidder must submit
at the time of the Bid opening, a written statement of qualifications including
financial data, a summary of previous experience, previous commitments and
evidence of authority to conduct business in the jurisdiction where the Project is
located. Each Bid must contain evidence of Bidder's qualification to do business
in the state where the Project is located or covenant to obtain such qualification
prior to award of the contract. The Statement of Qualifications shall be prepared
on the form provided in Section 00420.
3.2. In accordance with Section 8-160 of the Code of the City of Fort Collins in
determining whether a bidder is responsible, the following shall be considered:
(1) The ability, capacity and skill of the bidder to perform the contract or provide
the services required, (2) whether the bidder can perform the contract or provide
the service promptly and within the time specified without delay or interference,
(3) the character, integrity, reputation, judgment, experience and efficiency of the
bidder, (4) the quality of the bidder's performance of previous contracts or
services, (5) the previous and existing compliance by the bidder with laws and
ordinances relating to the contract or service, (6) the sufficiency of the financial
resources and ability of the bidder to perform the contract or provide the service,
(7) the quality, availability and adaptability of the materials and services to the
particular use required, (8) the ability of the bidder to provide future maintenance
and service for the use of the subject of the contract, and
(9) any other circumstances which will affect the bidder's performance of the
contract.
3.3. Each Bidder may be required to show that he has handled former Work so
that no just claims are pending against such Work. No Bid will be accepted from
a Bidder who is engaged on any other Work which would impair his ability to
perform or finance this Work.
3.4 No Bidder shall be in default on the performance of any other contract with
the City or in the payment of any taxes, licenses or other monies due to the City.
4.0 EXAMINATION OF CONTRACT DOCUMENTS AND SITE
4.1. It is the responsibility of each Bidder, before submitting a Bid, to (a) examine
the Contract Documents thoroughly, (b) visit the site to familiarize himself with
local conditions that may in any manner affect cost, progress or performance of
the Work, (c) familiarize himself with federal, state and local laws, ordinances,
rules and regulations that may in any manner affect cost, progress or
performance of the Work, (d) study and carefully correlate Bidder's observations
with the Contract Documents, and (e) notify Engineer of all conflicts, errors or
discrepancies in the Contract Documents.
4.2. Reference is made to the Supplementary Conditions for identification of:
Subsurface and Physical Conditions SC-4.2.
4.3. The submission of a Bid will constitute an incontrovertible representation by
Bidder that Bidder has complied with every requirement of this Article 4, that
without exception the Bid is premised upon performing and furnishing the Work
required by the Contract Documents and such means, methods, techniques,
sequences or procedures of construction as may be indicated in or required by
the Contract Documents, and that the Contract Documents are sufficient in scope
and detail to indicate and convey understanding of all terms and conditions for
performance and furnishing of the Work.
5.0 INTERPRETATIONS AND ADDENDA.
5.1. All questions about the meaning or intent of the Bidding Documents are to
be submitted in writing to the Engineer and the OWNER. Interpretation or
clarifications considered necessary in response to such questions will be issued
only by Addenda. Questions received less than seven days prior to the date for
opening of the Bids may not be answered. Only questions answered by formal
written Addenda will be binding. Oral and other interpretations or clarifications will
be without legal effect.
5.2. All questions concerning the scope of this project should be directed to the
Engineer. Questions regarding submittal of bids should be directed to the City of
Fort Collins' Purchasing Division.
5.3. Addenda may also be issued to modify the Bidding Documents as deemed
advisable by OWNER or Engineer.
5.4. Addenda will be mailed or delivered to all parties recorded by the OWNER
as having received the Bidding documents.
6.0 BID SECURITY
6.1. Each Bid must be accompanied by Bid Security made payable to OWNER in
the amount stated in the Invitation to Bid. The required security must be in the
form of a certified or bank cashier's check payable to OWNER or a Bid Bond on
the form enclosed herewith. The Bid Bond must be executed by a surety meeting
the requirements of the General Conditions for surety bonds.
6.2. The Bid Security of the successful Bidder will be retained until such Bidder
has executed the Agreement and furnished the required contract security,
whereupon Bid Security will be returned. If the successful Bidder fails to execute
and deliver the Agreement and furnish the required contract security within 15
days of the Notice of Award, OWNER may annul the Notice of Award and the Bid
Security of that Bidder will be forfeited. The Bid Security of other Bidders whom
OWNER believes to have reasonable chance receiving the award may be
retained by OWNER until the earlier of the seventh day after the effective date of
the Agreement or the thirty-first day after the Bid Opening, whereupon Bid
Security furnished by such Bidders will be returned. Bid Security with Bids which
are not competitive will be returned within seven days after the Bid opening.
7.0 CONTRACT TIME.
The number of days within which, or the date by which the Work is to be
substantially complete and also completed and ready for Final Payment (the
Contract Times) are set forth in the Agreement.
8.0 LIQUIDATED DAMAGES.
Provisions for liquidated damages are set forth in the Agreement.
9.0 SUBSTITUTE ("OR EQUAL") MATERIAL AND EQUIPMENT
The Contract, if awarded, will be on the basis of material and equipment
described on the Drawings or specified in the Specifications without
consideration of possible substitute or "or equal" items. Whenever it is indicated
on the Drawings or specified in the Specifications that a substitute or "or equal"
item of material or equipment may be furnished or used by CONTRACTOR if
acceptable to Engineer, application for such acceptance will not be considered
by Engineer until after the "effective date of the Agreement". The procedure for
submittal of any such application by CONTRACTOR and consideration by
Engineer is set forth in the General Conditions which may be supplemented in
the General Requirements.
10.0 SUBCONTRACTORS, SUPPLIERS AND OTHERS
10.1. Each Bidder shall submit at the Bid opening to OWNER a list of principal
subcontractors he proposes to use in the Work. Refer to Section 00430
contained within these Documents.
10.2. If OWNER or Engineer after due investigation has reasonable objection to
any proposed Subcontractor, either may, before the Notice of Award is given,
request the apparent successful Bidder to submit an acceptable substitute
without an increase in Bid price. If the apparent successful Bidder declines to
make any substitution, OWNER may award the contract to the next lowest
responsive and responsible Bidder that proposes to use acceptable
subcontractors. Subcontractors, suppliers, other persons or organization listed
and to whom OWNER or Engineer does not make written objection prior to the
giving of the Notice of Award will be deemed acceptable to OWNER and
ENGINEER subject to revocation of such acceptance after the effective date of
the Agreement as provided in the General Conditions.
10.3. CONTRACTOR shall not be required to employ any subcontractor, supplier
or other persons or organizations against whom he has reasonable objection.
The use of subcontractors listed by the Bidder and accepted by OWNER prior to
the Notice of Award will be required in the performance of the Work.
11.0 BID FORM.
11.1. A copy of the Bid Form is bound in the Contract Documents which may be
retained by the Bidder. A separate unbound copy is enclosed for submission with
the Bid.
11.2. Bid Forms must be complete in ink or typed. All lump sum prices on the
form must be stated in words and numerals; in case of conflict, words will take
precedence. Unit prices shall govern over extensions of sums.
11.3. Bids by corporations must be executed in the corporate name by the
president or a vice-president (or other appropriate officer accompanied by
evidence of authority to sign) and the corporate seal shall be affixed and attested
by the secretary or an assistant secretary. The corporate address and state of
incorporation shall be shown below the corporate name.
11.4. Bids by partnerships must be executed in the partnership name and signed
by a partner, his title must appear under his signature and the official address of
the partnership must be shown below the signature.
11.5. Bids by joint venture shall be signed by each participant in the joint venture
or by an authorized agent of each participant. The full name of each person or
company interested in the Bid shall be listed on the Bid Form.
11.6. The Bid shall contain an acknowledgement of receipt of all Addenda (the
numbers of which must be filled in on the Bid Form).
11.7. No alterations in Bids, or in the printed forms therefore, by erasures,
interpolations, or otherwise will be acceptable unless each such alteration is
signed or initialed by the Bidder; if initialed, OWNER may require the Bidder to
identify any alteration so initialed.
11.8. The address and telephone number for communications regarding the Bid
shall be shown.
12.0 BID PRICING.
Bids must be priced as set forth in the Bid Schedule or Schedules.
13.0 SUBMISSION OF BIDS.
13.1. Bids shall be submitted at the time and place indicated in the Invitation to
Bid and shall be enclosed in an opaque sealed envelope marked with the Project
title, Bid No., and name and address of the Bidder and accompanied by the Bid
Security, Bid Form, Bid Bond, Statement of Bidders Qualifications, and Schedule
of Subcontractors as required in Section 00430. If the Bid is sent through the mail
or other delivery system, the sealed envelope shall be enclosed in a separate
envelope with the notation "BID ENCLOSED" on the face of it.
13.2. Bids shall be deposited at the designated location prior to the time and date
for receipt of Bids indicated in the Invitation to Bid, or any extension thereof made
by addendum. Bids received after the time and date for receipt of Bids will be
returned unopened. Bidder shall assume full responsibility for timely delivery at
the location designated for receipt of Bids.
13.3. Oral, telephonic, telegraphic, or facsimile Bids are invalid and will not
receive consideration.
13.4. No Bidder may submit more than one Bid. Multiple Bids under different
names will not be accepted from one firm or association.
14.0 MODIFICATION AND WITHDRAWAL OF BIDS.
14.1. Bids may be modified or withdrawn by an appropriate document duly
executed (in a manner that a Bid must be executed) and delivered to the place
where Bids are to be submitted at any time prior to the opening of Bids.
14.2. Bids may also be modified or withdrawn in person by the Bidder or an
authorized representative provided he can prove his identity and authority at any
time prior to the opening of Bids.
14.3. Withdrawn Bids may be resubmitted up to the time designated for the
receipt of Bids provided that they are then fully in conformance with these
Instructions to Bidders.
15.0 OPENINGS OF BIDS.
Bids will be opened and (unless obviously non-responsive) read aloud publicly as
indicated in the Invitation to Bid. An abstract of the amounts of the Base Bids and
major alternates (if any) will be made available after the opening of Bids.
16.0 BIDS TO REMAIN OPEN SUBJECT TO ACCEPTANCE.
All Bids shall remain open for forty-five (45) days after the day of the Bid
Opening, but OWNER may, in his sole discretion, release any Bid and return the
Bid Security prior to that date.
17.0 AWARD OF CONTRACT.
17.1. OWNER reserves the right to reject any and all Bids, to waive any and all
informalities not involving price, time or changes in the Work, to negotiate
contract terms with the Successful Bidder, and the right to disregard all
nonconforming, nonresponsive, unbalanced or conditional Bids. Also, OWNER
reserves the right to reject the Bid of any Bidder if OWNER believes that it would
not be in the best interest of the Project to make an award to that Bidder, whether
because the Bid is not responsive or the Bidder is unqualified or of doubtful
financial ability or fails to meet any other pertinent standard or criteria established
by OWNER. Discrepancies between the indicated sum of any column of figures
and the correct sum thereof will be resolved in favor of the correct sum.
17.2. In evaluating Bids, OWNER will consider the qualifications of the Bidders,
whether or not the Bids comply with the prescribed requirements, and such
alternates, unit prices and other data, as may be requested in the Bid Form or
prior to the Notice of Award.
17.3. OWNER may consider the qualification and experience of Subcontractors,
Suppliers, and other persons and organizations proposed for those portions of
the Work as to which the identity of Subcontractors, Suppliers, and other persons
and organizations is submitted as requested by OWNER. OWNER also may
consider the operating costs, maintenance requirements, performance data and
guarantees of major items of materials and equipment proposed for incorporation
in the Work when such data is required to be submitted prior to the Notice of
Award.
17.4. OWNER may conduct such investigations as OWNER deems necessary to
assist in the evaluation of any Bid and to establish the responsibility,
qualifications and financial ability of the Bidder's proposed Subcontractors,
Suppliers and other persons and organizations to do the Work in accordance
with the Contract Documents to OWNER's satisfaction within the prescribed time.
17.5. If the Contract is to be awarded, it will be awarded to the lowest responsive
and responsible Bidder whose evaluation by OWNER indicates to OWNER that
the award will be in the best interest of the OWNER. Award shall be made on the
evaluated lowest base bid excluding alternates. The basis for award shall be the
lowest Bid total for the Schedule or, in the case of more than one schedule, for
sum of all schedules. Only one contract will be awarded.
17.6. If the Contract is to be awarded, OWNER will give the Successful Bidder a
Notice of Award within forty-five (45) days after the date of the Bid opening.
18.0 CONTRACT SECURITY.
The General Conditions and the Supplementary Conditions set forth OWNER's
requirements as to performance and other Bonds. When the Successful Bidder
delivers the executed Agreement to the OWNER, it shall be accompanied by the
required Contract Security.
19.0 SIGNING OF AGREEMENT.
When OWNER gives a Notice of Award to the Successful Bidder, it will be
accompanied by the required number of unsigned counterparts of the Agreement
with all other written Contract Documents attached. Within fifteen (15) days
thereafter, CONTRACTOR shall sign and deliver the required number of
counterparts of the Agreement and attached documents to OWNER with the
required Bonds. Within ten (10) days thereafter, OWNER hall deliver one fully
signed counterpart to CONTRACTOR. Each counterpart is to be accompanied by
a complete set of the Drawings with appropriate identification.
20.0 TAXES.
OWNER is exempt from Colorado State Sales and Use Taxes on materials and
equipment to be incorporated in the Work. Said taxes shall not be included in the
Contract Price. Reference is made to the General and Supplementary
Conditions.
21.0 RETAINAGE.
Provisions concerning retainage are set forth in the Agreement.
22.0 PURCHASING RESTRICTIONS.
Purchasing restrictions: The Bidder's authorized signature of this Bid assures the
Bidder's compliance with the City's purchasing restrictions. A copy of the
resolutions is available for review in the Purchasing and Risk Management
Division or the City Clerk's office.
A. Cement Restrictions: City of Fort Collins Resolution 91-121 requires
that suppliers and producers of cement or products containing cement
to certify that the cement was not made in cement kilns that burn
hazardous waste as a fuel.
23.0 COLLUSIVE OR SHAM BIDS.
Any Bid deemed by the City in its sole discretion to be a collusive or sham Bid
will be rejected and reported to authorities as such. Your authorized signature of
this Bid assures that such Bid is genuine and is not a collusive or sham Bid.
24.0 BID RESULTS.
For information regarding results for individual Bids send a self-addressed, self-
stamped envelope and a Bid tally will be mailed to you. Bid results will be posted
in the Purchasing office seven (7) days after the Bid Opening.
END OF SECTION
SECTION 00300
BID FORM
SECTION 00300
BID FORM
PROJECT: 7366 Harmony Road Maintenance Project – College Avenue to Timberline Road
Place:
Date:
1. In compliance with your Invitation to Bid dated , 20 and subject to all
conditions thereof, the undersigned a (Corporation, Limited Liability Company,
Partnership, Joint Venture, or Sole Proprietor) authorized to do business in the
State of Colorado hereby proposes to furnish and do everything required by the
Contract Documents to which this refers for the construction of all items listed on
the following Bid Schedule or Bid Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal is
made in good faith, without collusion or connection with any other person or
persons Bidding for the same Work, and that it is made in pursuance of and
subject to all the terms and conditions of the Invitation to Bid and Instructions to
Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining
to the Work to be done, all of which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in
the sum of
($ ) in accordance with the Invitation To Bid and Instructions to
Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within fifteen
(15) calendar days from the date when the written notice of the award of the
contract is delivered to him at the address given on this Bid. The name and
address of the corporate surety with which the Bidder proposes to furnish the
specified performance and payment Bonds is as follows:
.
5. All the various phases of Work enumerated in the Contract Documents with their
individual jobs and overhead, whether specifically mentioned, included by
implication or appurtenant thereto, are to be performed by the CONTRACTOR
under one of the items listed in the Bid Schedule, irrespective of whether it is
named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or Bid
Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.
through .
8. BID SCHEDULE (Base Bid)
Unit Total
Cost Cost
1 201-01 Clearing and Grubbing (1 Acre) 1 LS
2 202-01 Removal of Tree 1 EA
3 202-02 Removal of Pipe (24 Inch RCP) 49 LF
4 202-03 Removal of Pipe (18 Inch RCP) 73 LF
5 202-04 Removal of Pipe (15 Inch ADS) 43 LF
6 202-05 Removal of Pipe (19 Inch x 30 Inch Elliptical) 8 LF
7 202-06 Removal of End Section (24 Inch RCP) 2 EA
8 202-07 Removal of Inlet (5' Type R) 1 EA
9 202-08 Removal of Sidewalk 701 SY
10 202-09 Removal of Curb and Gutter 754 LF
11 202-10 Removal of Asphalt Mat (Sawcut) (Full Depth) 2,905 SY
12 202-11 Removal of Asphalt Mat (Planing) (0-4" Depth) 21,050 SY
13 202-12 Removal of Asphalt Mat (Planing) Additional Inch Thickness 4,000 SY / IN
14 202-13 Removal of Asphalt Mat (Planing) (Taper 0-2" Depth) (6' Wide) 7,400 SY
15 202-14 Removal of Pavement Markings 1 LS
16 202-15 Removal of Structure (Bridge) 1 LS
17 202-16 Removal of Fence (3 Rail) 40 LF
18 203-01 Unclassified Excavation (Complete In Place) 2,831 CY
19 203-02 Muck Excavation 200 CY
20 203-03 Borrow 300 CY
21 203-04 Shouldering (Recycled Asphalt) (Haul and Place) 530 TON
22 203-05 Flowable Fill (Utility Backfill) 150 CY
23 207-01 Topsoil (Stockpile and Redistribute) 835 CY
Ref # Item # Item Description Quantity Unit
24 207-02 Pre-Amended Topsoil (Median) 250 CY
25 208-01 Erosion Log (12 Inch) 610 LF
26 208-02 Storm Drain Inlet Protection 2 EA
27 208-03 Concrete Washout Structure 1 EA
28 208-04 Erosion Control Supervisor 60 HR
29 210-01 Adjust Valve Box 15 EA
30 210-02 Adjust Manhole ≤ 24 Inch 6 EA
31 210-03 Adjust Manhole > 24 Inch 12 EA
32 210-04 Relocate Fire Hydrant 1 EA
32 212-01 Seeding (Native) 0.5 ACRE
33 212-02 Sod 41,217 SF
34 212-03 Tree Retention and Protection 1 LS
35 213-01 Mulching (Weed Free Hay) 0.5 ACRE
36 213-02 Mulching (Wood Chip) 4,200 SF
37 213-03 Inorganic Mulch (Rock) (1 1/2 Inch) 1,429 SF
38 213-04 Inorganic Mulch (Rock) (3 - 6 Inch) 857 SF
39 213-05 Inorganic Mulch (Rock) (6 - 12 Inch) 571 SF
40 213-06 Landscape Weed Barrier Fabric 317 SY
41 213-07 Landscape Boulder 21 EA
42 214-01 Deciduous Tree (3 Inch Caliper) 6 EA
43 214-02 Evergreen Tree (6 Foot Height) 6 EA
44 214-03 Evergreen Tree (20 Gallon) 5 EA
45 214-04 Deciduous Tree (6 Foot Clump) 3 EA
46 214-05 Deciduous Tree (8 Foot Clump) 4 EA
47 214-06 Deciduous Tree (10 Foot Clump) 2 EA
48 214-07 Shrub (5 Gallon Container) 184 EA
49 214-08 Perennials and Ornamental Grasses (1 Gallon Container) 470 EA
50 216-01 Soil Retention Blanket (Biodegradable Straw/Coconut) 50 SY
51 304-01 Aggregate Base Course (Class 6) 4,690 TON
52 403-01 Hot Mix Asphalt (Grading S) (100) (PG 64-28) (Modified Binder) 13,030 TON
53 403-02 Hot Mix Asphalt (Grading SG) (100) (PG 58-28) 7,000 TON
54 403-03 Hot Mix Asphalt (Hand Patching) 500 TON
55 412-01 Concrete Pavement (8 Inch) (Colored) (Median) 750 SF
56 420-01 Geotextile Paving Fabric 85,000 SY
57 420-02 Geotextile (Reinforcement) 750 SY
58 603-01 18 Inch Reinforced Concrete Pipe CLIII 64 LF
59 603-02 24 Inch Reinforced Concrete Pipe CLIII 144 LF
60 603-03 19x30 Inch Reinforced Concrete Pipe Elliptical CLIII 24 LF
61 603-04 24 Inch Reinforced Concrete End Section CLIII 2 EA
62 604-01 Inlet. Type R (5 Foot) 1 EA
63 604-02 Inlet, Type D (5 Foot) 1 EA
64 604-03 Manhole (6 Foot) 1 EA
65 605-01 4 Inch Perforated Pipe Underdrain 310 LF
66 606-01 Guardrail Type 3 50 LF
67 606-02 End Anchorage 2 EA
68 607-01 Fence (3 Rail) 40 LF
69 608-01 Concrete Sidewalk (6 Inch) 1,270 SY
70 608-02 Concrete Crosswalk (12 Inch) (Colored) 15 SY
71 608-03 Concrete Curb Ramp w/ Truncated Domes 100 SY
72 609-01 Curb and Gutter, Type 2 (Section I-B) 150 LF
73 609-02 Curb and Gutter, Type 2 (Section II-B) 1,145 LF
74 609-03 Curb and Gutter, Type 2 (Section I-B) (Modified) 700 LF
75 613-01 2 Inch Conduit (Schedule 80) 200 LF
76 620-01 Sanitary Facility 4 EA
77 623-01 Irrigation System (Relay Turfed Areas) 1 LS
78 623-02 Irrigation System (Median) 1 LS
79 626-01 Mobilization 1 LS
80 627-01 Temporary Pavement Marking 1 LS
81 630-01 Construction Zone Traffic Control 1 LS
82 630-02 Traffic Control Management 90 DAY
83 630-03 Flagging 1,200 HR
BID TOTAL:
In Words
______________________________________________________________________________
________________________________
9. PRICES
The foregoing prices shall include all labor, materials, transportation, shoring,
removal, dewatering, overhead, profit, insurance, etc., to cover the complete
Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid or
change quantities at his sole discretion without affecting the Agreement or prices
of any item so long as the deletion or change does not exceed twenty-five
percent (25%) of the total Agreement Price.
RESPECTFULLY SUBMITTED:
CONTRACTOR
BY:
Printed Date
Title
License Number (If Applicable)
(Seal - if Bid is by corporation) Attest:
Address
Telephone
Email
SECTION 00400
SUPPLEMENTS TO BID FORMS
00410 Bid Bond
00420 Statement of Bidder's Qualifications
00430 Schedule of Subcontractors
SECTION 00410
BID BOND
KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned
as Principal, and as Surety, are hereby held and firmly bound unto the City of Fort
Collins, Colorado, as OWNER, in the sum of $ for the payment of
which, well and truly to be made, we hereby jointly and severally bind ourselves,
successors, and assigns.
THE CONDITION of this obligation is such that whereas the Principal has submitted to
the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof
to enter into a Construction Agreement for the construction of Fort Collins Project, 7366
Harmony Road Maintenance Project – College Avenue to Timberline Road.
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver a
Contract in the form of Contract attached hereto (properly completed in
accordance with said Bid) and shall furnish a BOND for his faithful performance
of said Contract, and for payment of all persons performing labor or furnishing
materials in connection therewith, and shall in all other respects perform the
Agreement created by the acceptance of said Bid, then this obligation shall be
void; otherwise the same shall remain in force and effect, it being expressly
understood and agreed that the liability of the Surety for any and all claims
hereunder shall, in no event, exceed the penal amount of this obligation as
herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations of said
Surety and its BOND shall be in no way impaired or affected by any extension of the
time within which the OWNER may accept such Bid; and said Surety does hereby waive
notice of any such extension.
Surety Companies executing bonds must be authorized to transact business in the
State of Colorado and be accepted by the OWNER.
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands
and seals this day of , 20__, and such of them as are corporations have
caused their corporate seals to be hereto affixed and these presents to be signed by
their proper officers, the day and year first set forth above.
PRINCIPAL SURETY
Name:
Address:
By: By:
Title: Title:
ATTEST:
By:
(SEAL) (SEAL)
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and comprehensive.
This statement must be notarized. If necessary, questions may be answered on
separate attached sheets. The Bidder may submit any additional information he desires.
1. Name of Bidder:
2. Permanent main office address:
3. When organized:
4. If a corporation, where incorporated:
5. How many years have you been engaged in the contracting business under your
present firm or trade name?
6. Contracts on hand: (Schedule these, showing the amount of each contract and
the appropriate anticipated dates of completion.)
7. General character of Work performed by your company:
8. Have you ever failed to complete any Work awarded to you?
If so, where and why?
9. Have you ever defaulted on a contract?
If so, where and why?
10. Are you debarred by any government agency?
If yes list agency name.
11. List the more important projects recently completed by your company, stating the
approximate cost of each, and the month and year completed, location and type
of construction.
12. List your major equipment available for this contract.
13. Experience in construction Work similar in importance to this project:
14. Background and experience of the principal members of your organization,
including officers:
15. Credit available: $
16. Bank Reference:
17. Will you, upon request, fill out a detailed financial statement and furnish any other
information that may be required by the OWNER?
18. Are you licensed as a General Contractor?
If yes, in what city, county and state?
What class, license and numbers?
19. Do you anticipate subcontracting Work under this Contract?
If yes, what percent of total contract?
And to whom?
20. Are any lawsuits pending against you or your firm at this time?
IF yes, DETAIL
21. What are the limits of your public liability? DETAIL
What company?
22. What are your company's bonding limitations?
23. The undersigned hereby authorizes and requests any person, firm or corporation
to furnish any information requested by the OWNER in verification of the recital
comprising this Statement of Bidder's Qualifications.
Dated at ________________ this ______ day of __________________, 20__.
Name of Bidder
By:
Title:
State of
County of
being duly sworn deposes and says that he
is of and that
(name of organization)
the answers to the foregoing questions and all statements therein contained are true
and correct.
Subscribed and sworn to before me this _______ day of____________, 20__.
(Seal)
Notary Public
My commission expires: .
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors performing
over 15% of the contract.
ITEM SUBCONTRACTOR
SECTION 00500
AGREEMENT FORMS
00510 Notice of Award
00520 Agreement
00530 Notice to Proceed
SECTION 00510
NOTICE OF AWARD
DATE:
TO:
PROJECT: 7366 Harmony Road Maintenance Project – College Avenue to Timberline Road
OWNER: CITY OF FORT COLLINS (hereinafter referred to as "the OWNER")
You are hereby notified that your Bid dated , 20 for the above project has
been considered. You are the apparent successful Bidder and have been awarded an
Agreement for 7366 Harmony Road Maintenance Project – College Avenue to
Timberline Road.
The Price of your Agreement is ($ ).
Three (3) copies of each of the proposed Contract Documents (except Drawings)
accompany this Notice of Award. Three (3) sets of the Drawings will be delivered
separately or otherwise made available to you immediately.
You must comply with the following conditions precedent within fifteen (15) days of the
date of this Notice of Award, that is by , 20 .
1. You must deliver to the OWNER three (3) fully executed counterparts of the
Agreement including all the Contract Documents. Each of the Contract Documents must
bear your signature on the cover of the page.
2. You must deliver with the executed Agreement the Contract Security (Bonds) as
specified in the Instructions to Bidders, General Conditions (Article 5.1) and
Supplementary Conditions.
Failure to comply with these conditions within the time specified will entitle OWNER to
consider your Bid abandoned, to annul this Notice of Award and to declare your Bid
Security forfeited.
Within ten (10) days after you comply with those conditions, OWNER will return to you
one (1) fully-signed counterpart of the Agreement with the Contract Documents
attached.
City of Fort Collins
OWNER
By:
James B. O’Neill, II, CPPO, FNIGP
Director of Purchasing & Risk Management
SECTION 00520
AGREEMENT
THIS AGREEMENT is dated as of the day of in the year of 20 and
shall be effective on the date this AGREEMENT is signed by the City.
The City of Fort Collins (hereinafter called OWNER) and
(hereinafter called CONTRACTOR)
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set
forth, agree as follows:
ARTICLE 1. WORK
CONTRACTOR shall complete all Work as specified or indicated in the Contract
Documents. The Project for which the Work under the Contract Documents may
be the whole or only a part is defined as the construction of the 7366 Harmony
Road Maintenance Project – College Avenue to Timberline Road and is generally
described in Section 01010.
ARTICLE 2. ENGINEER
The Project has been designed by Atkins, 4601 DTC Boulevard, Suite 700,
Denver, CO 80237. The City Engineering Department, who is hereinafter called
ENGINEER and who will assume all duties and responsibilities and will have the
rights and authority assigned to ENGINEER in the Contract Documents in
connection with completion of the Work in accordance with the Contract
Documents. The Contract will be administered by the City of Fort Collins
Engineering Department.
ARTICLE 3. CONTRACT TIMES
3.1 The Work shall be Substantially Complete within seventy (70) calendar days
after the date when the Contract Times commence to run as provided in the
General Conditions and completed and ready for Final Payment and Acceptance
in accordance with the General Conditions within twenty (20) calendar days after
the date when the Contract Times commence to run.
Substantial Completion is defined as: completion with City acceptance of all
earthwork, concrete curb and gutter, asphalt rehabilitation, asphalt overlay and
concrete sidewalks / curb ramps. Final Acceptance is defined as: completion
with City acceptance of all underdrain, landscape plantings, irrigation system,
median cover material (mulch and stone) and punch list items as determined by
the Engineer.
3.2. Liquidated Damages. OWNER and CONTRACTOR recognize that time is of
the essence of this Agreement and that OWNER will suffer financial loss if the
Work is not completed within the times specified in paragraph 3.1. above, plus
any extensions thereof allowed in accordance with Article 12 of the General
Conditions.
They also recognize the delays, expenses and difficulties involved in proving in a
legal preceding the actual loss suffered by OWNER if the Work is not completed
on time. Accordingly, instead of requiring any such proof, OWNER and
CONTRACTOR agree that as Liquidated damages for delay (but not as penalty)
CONTRACTOR shall pay OWNER the amounts set forth hereafter.
1) Substantial Completion:
Five Thousand Dollars ($5,000.00) for each calendar day or
fraction thereof that expires after the seventy (70) calendar day
period for Substantial Completion of the Work until the Work is
Substantially Complete.
2) Final Acceptance:
After Substantial Completion, Five Thousand Dollars ($5,000.00)
for each calendar day or fraction thereof that expires after the
twenty (20) calendar day period for Final Payment and Acceptance
until the Work is ready for Final Payment and Acceptance.
ARTICLE 4. CONTRACT PRICE
4.1. OWNER shall pay CONTRACTOR for performance of the Work in
accordance with the Contract Documents in current funds as follows:
Dollars ($ ), in accordance with Section 00300, attached and incorporated
herein by this reference.
ARTICLE 5. PAYMENT PROCEDURES
CONTRACTOR shall submit Applications for Payment in accordance with Article
14 of the General Conditions. Applications for Payment will be processed by
ENGINEER as provided in the General Conditions.
5.1. PROGRESS PAYMENTS. OWNER shall make progress payments on
account of the Contract Price on the basis of CONTRACTOR's Application for
Payment as recommended by ENGINEER, once each month during construction
as provided below. All progress payments will be on the basis of the progress of
the Work measured by the schedule of values established in paragraph 2.6 of the
General Conditions and in the case of Unit Price Work based on the number of
units completed, and in accordance with the General Requirements concerning
Unit Price Work.
5.1.1. Prior to Substantial Completion, Owner will be entitled to withhold as
contract retainage five percent (5%) of each progress payment, but, in each
case, less the aggregate of payments previously made and less such amounts
as ENGINEER shall determine, or OWNER may withhold, in accordance with
paragraph 14.7 of the General Conditions. If , in the sole discretion of Owner, on
recommendation of Engineer, Owner determines that the character and progress
of the Work have been satisfactory to OWNER and ENGINEER, OWNER may
determine that as long as the character and progress of the Work remain
satisfactory to them, there will be no additional retainage on account of Work
completed in which case the remaining progress payments prior to Substantial
Completion will be in an amount equal to 100% of the Work completed. 95% of
materials and equipment not incorporated in the Work (but delivered, suitably
stored and accompanied by documentation satisfactory to OWNER as provided
in paragraph 14.2 of the General Conditions) may be included in the application
Section 00520 Page 3 for payment.
5.1.2. Upon Substantial Completion payment will be made in an amount
sufficient, if necessary, to increase total payments to CONTRACTOR to 95% of
the Contract Price, less such amounts as ENGINEER shall determine or
OWNER may withhold in accordance with paragraph 14.7 of the General
Conditions or as provided by law.
5.2. FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in
accordance with paragraph 14.13 of the General Conditions, OWNER shall pay
the remainder of the Contract Price as recommended by ENGINEER as provided
in said paragraph 14.13.
ARTICLE 6. CONTRACTOR'S REPRESENTATION
In order to induce OWNER to enter into this Agreement, CONTRACTOR makes
the following representations:
6.1. CONTRACTOR has familiarized himself with the nature and extent of the
Contract Documents, Work, site, locality, and with all local conditions and Laws
and Regulations that in any manner may affect cost, progress, performance or
furnishing of the Work.
6.2. CONTRACTOR has studied carefully all reports of explorations and tests of
subsurface conditions and drawings of physical conditions which are identified in
the Supplementary Conditions as provided in paragraph 4.2 of the General
Conditions.
6.3. CONTRACTOR has obtained and carefully studied (or assumes
responsibility for obtaining and carefully studying) all such examinations,
investigations, explorations, tests, reports, and studies (in addition to or to
supplement those referred to in paragraph 6.2 above) which pertain to the
subsurface or physical condition at or contiguous to the site or otherwise may
affect the cost, progress, performance or furnishing of the Work as
CONTRACTOR considers necessary for the performance or furnishing of the
Work at the Contract Price, within the Contract Times and in accordance with the
other terms and conditions of the Contract Documents, including specifically the
provisions of paragraph 4.2 of the General Conditions; and no additional
examinations, investigations, explorations, tests, reports, studies or similar
information or data are or will be required by CONTRACTOR for such purposes.
6.4. CONTRACTOR has reviewed and checked all information and data shown
or indicated on the Contract Documents with respect to existing Underground
Facilities at or contiguous to the site and assumes responsibility for the accurate
location of said Underground Facilities. No additional examinations,
investigations, explorations, tests, reports, studies or similar information or data
in respect of said Underground Facilities are or will be required by
CONTRACTOR in order to perform and furnish the Work at the Contract Price,
within the Contract Times and in accordance with the other terms and conditions
of the Contract Documents, including specifically the provision of paragraph 4.3.
of the General Conditions.
6.5. CONTRACTOR has correlated the results of all such observations,
examinations, investigations, tests, reports and data with the terms and
conditions of the Contract Documents.
6.6. CONTRACTOR has given ENGINEER written notice of all conflicts, errors or
discrepancies that he has discovered in the Contract Documents and the written
resolution thereof by ENGINEER is acceptable to CONTRACTOR.
ARTICLE 7. CONTRACT DOCUMENTS
7.1 The Contract Documents which comprise the entire Agreement between
OWNER and CONTRACTOR concerning the Work consist of the General
Conditions, Supplementary Conditions, those items included in the definition of
“Contract Documents” in Article 1.10 of the General Conditions, and such other
items as are referenced in this Article 7, all of which are incorporated herein by
this reference.
7.2 Forms for use by CONTRACTOR in performing the Work and related actions
in carrying out the terms of this Agreement are deemed Contract Documents and
incorporated herein by this reference, and include, but are not limited to, the
following:
7.2.1 Certificate of Substantial Completion
7.2.2 Certificate of Final Acceptance
7.2.3 Lien Waiver Releases
7.2.4 Consent of Surety
7.2.5 Application for Exemption Certificate
7.2.6 Application for Payment
7.3 Drawings, consisting of a cover sheet and sheets numbered as follows:
1 TITLE SHEET
2 GENERAL NOTES AND STANDARD SYMBOLS
3 - 9 ROADWAY TYPICAL SECTIONS / DETAILS
10 SUMMARY OF APPROXIMATE QUANTITIES
11 - 17 TABULATIONS
16 - 28 REMOVAL PLANS
29 - 42 ROADWAY PLANS
43 - 44 FLOWLINE PROFILES
45 - 50 ROADWAY DETAILS
51 RAILROAD CROSSIGN DETAIL
52 - 53 LANDSCAPE PLANS
54 - 56 IRRIGATION PLANS
57 - 67 GRADING, DRAINAGE AND EROSION CONTROL PLANS
68 DRAINAGE PROFILES
69 - 70 SIGNAL PLANS
71 - 83 SIGNING AND STRIPING PLANS
84 - 132 ROADWAY CROSS SECTIONS
P1 – P3 POTHOLES OF EXISTING UTILITIES EXHIBIT
C1 – C13 PAVEMENT CORE SHEETS
B1 – B4 DIXON LATERAL INSPECTION SHEETS
The Contract Drawings shall be stamped "Final for Construction" and dated.
Any revisions made shall be clearly identified and dated.
7.4. Addenda Numbers to , inclusive.
7.5. The Contract Documents also include all written amendments and other
documents amending, modifying, or supplementing the Contract Documents
pursuant to paragraphs 3.5 and 3.6 of the General Conditions.
7.6. There are no Contract Documents other than those listed or incorporated by
reference in this Article 7. The Contract Documents may only be amended,
modified or supplemented as provided in paragraphs 3.5 and 3.6 of the General
Conditions.
ARTICLE 8. MISCELLANEOUS
8.1. Terms used in this Agreement which are defined in Article I of the
General Conditions shall have the meanings indicated in the General Conditions.
8.2. No assignment by a party hereto of any rights under or interests in the
Contract Documents will be binding on another party hereto without the written
consent of the party sought to be bound; and specifically but not without
limitations, moneys that may become due and moneys that are due may not be
assigned without such consent (except to the extent that the effect of this
restriction may be limited by law), and unless specifically stated to the contrary in
any written consent to an assignment no assignment will release or discharge
that assignor from any duty or responsibility under the Contract Document.
8.3. OWNER and CONTRACTOR each binds itself, its partners, successors,
assigns and legal representatives to the other party hereto, its partners,
successors, assigns and legal representatives in respect to all covenants,
Agreement and obligations contained in the Contract Document.
OWNER: CITY OF FORT COLLINS CONTRACTOR:
By:
By:
JAMES B. O’NEILL II, CPPO, FNIGP PRINTED
DIRECTOR OF PURCHASING
AND RISK MANAGEMENT
Title: Title:
Date: Date:
Attest: (CORPORATE SEAL)
City Clerk
Address for giving notices:
P. O. Box 580
Fort Collins, CO 80522 Attest:
Approved as to Form Address for giving notices:
Assistant City Attorney
License No.:
SECTION 00530
NOTICE TO PROCEED
Description of Work: 7366 Harmony Road Maintenance Project – College Avenue to
Timberline Road
To:
This notice is to advise you:
That the contract covering the above described Work has been fully executed by the
CONTRACTOR and the OWNER.
That the required CONTRACTOR's Performance Bond and Payment Bond have been
received by the OWNER.
That the OWNER has approved the said Contract Documents.
Therefore, as the CONTRACTOR for the above described Work, you are hereby
authorized and directed to proceed within ( ) calendar days from receipt of this notice as
required by the Agreement.
Dated this day of , 20 .
The dates for Substantial Completion and Final Acceptance shall be , 20_
and , 20__, respectively.
City of Fort Collins
OWNER
By:
Title:
ACKNOWLEDGMENT OF NOTICE
Receipt of the above Notice to Proceed is hereby acknowledged this day of
, 20__.
CONTRACTOR:
By:
Title:
SECTION 00600
BONDS AND CERTIFICATES
00610 Performance Bond
00615 Payment Bond
00630 Certificate of Insurance
00635 Certificate of Substantial Completion
00640 Certificate of Final Acceptance
00650 Lien Waiver Release (CONTRACTOR)
00660 Consent of Surety
00670 Application for Exemption Certificate
SECTION 00610
PERFORMANCE BOND
Bond No.
KNOW ALL MEN BY THESE PRESENTS: that
(firm)
(address)
(an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and
(Firm)
(Address)
hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300
Laporte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as
the "OWNER", in the penal sum of ____________
in lawful money of the United States, for the payment of which sum well and truly to be made,
we bind ourselves, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a
certain Agreement with the OWNER, dated the day of , 20 , a copy of which
is hereto attached and made a part hereof for the performance of The City of Fort Collins
Project, 7366 Harmony Road Maintenance Project – College Avenue to Timberline
Road.
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the
undertakings, covenants, terms, conditions and agreements of said Agreement during the
original term thereof, and any extensions thereof which may be granted by the OWNER, with or
without Notice to the Surety and during the life of the guaranty period, and if the Principal shall
satisfy all claims and demands incurred under such Agreement, and shall fully indemnify and
save harmless the OWNER from all cost and damages which it may suffer by reason of failure
to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER
may incur in making good any default then this obligation shall be void; otherwise to remain in
full force and effect.
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees
that no change, extension of time, alteration or addition to the terms of the Agreement or to the
Work to be performed thereunder or the Specifications accompanying the same shall in any way
affect its obligation on this bond; and it does hereby waive notice of any such change, extension
of time, alteration or addition to the terms of the Agreement or to the Work or to the
Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR
shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in
the State of Colorado and be acceptable to the OWNER.
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of
which shall be deemed an original, this _____ day of _____ ____, 20__.
IN PRESENCE OF: Principal
(Title) (Title)
(Corporate Seal)
(Address)
IN PRESENCE OF: Other Partners
_____________________________ By:
_____________________________ By:
IN PRESENCE OF: Surety
_____________________________ By:_____________________________________
_____________________________
(Address)
(Surety Seal)
NOTE: Date of Bond must not be prior to date of Agreement.
If CONTRACTOR is Partnership, all partners should execute Bond.
SECTION 00615
PAYMENT BOND
Bond No.
KNOW ALL MEN BY THESE PRESENTS: that
(firm)
(address)
(an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and
(Firm)
(Address)
hereinafter referred to as "the Surety", are held and firmly bound unto the City of Fort Collins,
300 Laporte Ave., Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to
as "the OWNER", in the penal sum of
in lawful money of the United States, for the payment of which sum well and truly to be made,
we bind ourselves, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a
certain Agreement with the OWNER, dated the day of , 20 , a copy of which
is hereto attached and made a part hereof for the performance of The City of Fort Collins
project, 7366 Harmony Road Maintenance Project – College Avenue to Timberline
Road.
NOW, THEREFORE, if the Principal shall make payment to all persons, firms, subcontractors,
and corporations furnishing materials for or performing labor in the prosecution of the Work
provided for in such Agreement and any authorized extension or modification thereof, including
all amounts due for materials, lubricants, repairs on machinery, equipment and tools,
consumed, rented or used in connection with the construction of such Work, and all insurance
premiums on said Work, and for all labor, performed in such Work whether by subcontractor or
otherwise, then this obligation shall be void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees
that no change, extension of time, alteration or addition to the terms of the Agreement or to the
Work to be performed thereunder or the Specifications accompanying the same shall in any way
affect its obligation on this bond; and it does hereby waive notice of any such change, extension
of time, alteration or addition to the terms of the Agreement or to the Work or to the
Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR
shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in
the State of Colorado and be acceptable to the OWNER.
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts,
each one of which shall be deemed an original, this day of , 20__.
IN PRESENCE OF: Principal
(Title) (Title)
(Corporate Seal)
(Address)
IN PRESENCE OF: Other Partners
_____________________________ By:
_____________________________ By:
IN PRESENCE OF: Surety
_____________________________ By:_____________________________________
_____________________________
(Address)
(Surety Seal)
NOTE: Date of Bond must not be prior to date of Agreement.
If CONTRACTOR is Partnership, all partners should execute Bond.
SECTION 00630
CERTIFICATE OF INSURANCE
CONTRACTOR shall insert his own standard form for Certificate of Insurance.
SECTION 00635
CERTIFICATE OF SUBSTANTIAL COMPLETION
TO: CITY OF FORT COLLINS (OWNER)
DATE OF SUBSTANTIAL COMPLETION: PROJECT TITLE: 7366 Harmony Road
Maintenance Project – College Avenue
to Timberline Road
PROJECT OR SPECIFIED PART SHALL LOCATION: Fort Collins, Colorado
INCLUDE:
OWNER: City of Fort Collins
CONTRACTOR:
CONTRACT DATE:
The Work performed under this contract has been inspected by authorized
representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project or
specified part of the project, as indicated above) is hereby declared to be substantially
completed on the above date.
A tentative list of items to be completed or corrected is appended hereto. This list may
not be exhaustive, and the failure to include an item on it does not alter the
responsibility of the CONTRACTOR to complete all the Work in accordance with the
Contract Documents.
ENGINEER AUTHORIZED REPRESENTATIVE
DATE
The CONTRACTOR accepts the above Certificate of Substantial Completion and
agrees to complete and correct the items on the tentative list within the time indicated.
CONTRACTOR AUTHORIZED REPRESENTATIVE
DATE
The OWNER accepts the project or specified area of the project as substantially
complete and will assume full possession of the project or specified area of the project
at 12:01 a.m., on . The responsibility for heat, utilities,
security, and insurance under the Contract Documents shall be as set forth under
"Remarks" below.
CITY OF FORT COLLINS, COLORADO By:
OWNER AUTHORIZED REPRESENTATIVE
DATE
REMARKS:
SECTION 00640
CERTIFICATE OF FINAL ACCEPTANCE
, 20__
TO:
Gentlemen:
You are hereby notified that on the day of , 20__, the City of
Fort Collins, Colorado, has accepted the Work completed by for the City of Fort
Collins project, 7366 Harmony Road Maintenance Project – College Avenue to
Timberline Road.
A check is attached hereto in the amount of $ as Final
Payment for all Work done, subject to the terms of the Contract Documents which are
dated , 20 .
In conformance with the Contract Documents for this project, your obligations and
guarantees will continue for the specified time from the following date:____________
__, 20__.
Sincerely,
OWNER: City of Fort Collins
By:
Title:
ATTEST:
Title:
SECTION 00650
LIEN WAIVER RELEASE
(CONTRACTOR)
TO: City of Fort Collins, Colorado (OWNER)
FROM: (CONTRACTOR)
PROJECT: 7366 Harmony Road Maintenance Project – College Avenue to Timberline Road
1. The CONTRACTOR acknowledges having received payment, except retainage from
the OWNER for all work, labor, skill and material furnished, delivered and performed by
the CONTRACTOR for the OWNER or for anyone in the construction, design,
improvement, alteration, addition or repair of the above described project.
2. In consideration of such payment and other good and valuable consideration, the
receipt and adequacy of which are hereby acknowledged, the CONTRACTOR
voluntarily waives all rights, claims and liens, including but not limited to, mechanic's
liens, Miller Act claims (40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor
and material bond rights which the CONTRACTOR may now or may afterward have,
claim or assert for all and any work, labor, skill or materials furnished, delivered or
performed for the construction, design, improvement, alteration, addition or repair of the
above described project, against the OWNER or its officers, agents, employees or
assigns, against any fund of or in the possession or control of the OWNER, against the
project or against all land and the buildings on and appurtenances to the land improved
by the project.
3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or
performed to or for the construction, design, improvement, alteration, addition or repair
of the project were furnished, delivered or performed by the CONTRACTOR or its
agents, employees, and servants, or by and through the CONTRACTOR by various
Subcontractors or materialmen or their agents, employees and servants and further
affirms the same have been paid in full and have released in full any and all existing or
possible future mechanic's liens or rights or claims against the project or any funds in
the OWNER'S possession or control concerning the project or against the OWNER or
its officers, agents, employees or assigns arising out of the project.
4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if
any, and the Surety on the project against and from any claim hereinafter made by the
CONTRACTOR'S Subcontractors, materialmen, employees, servants, agents or
assigns against the project or against the OWNER or its officers, employees, agents or
assigns arising out of the project for all loss, damage and costs, including reasonable
attorneys fees, incurred as a result of such claims.
5. The parties acknowledge that the description of the project set forth above constitutes
and adequate description of the property and improvements to which this Lien Waiver
Release pertains. It is further acknowledged that this Lien Waiver Release is for the
benefit of and may be relied upon by the OWNER, the lender, if any, and Surety on any
labor and material bonds for the project.
Signed this day of , 20__.
CONTRACTOR:
By:
Title:
ATTEST:
Secretary
STATE OF COLORADO )
)ss.
COUNTY OF LARIMER )
Subscribed and sworn to before me this day of 20__, by
.
Witness my hand and official seal.
My Commission Expires: Notary Public
SECTION 00660
CONSENT OF SURETY
TO: City of Fort Collins, Colorado (hereinafter referred to as the "OWNER")
CONTRACTOR:
PROJECT: 7366 Harmony Road Maintenance Project – College Avenue to Timberline Road
CONTRACT DATE:
In accordance with the provisions of the Contract between the OWNER and the
CONTRACTOR as indicated above, for
(Surety)
on bond of
hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final
Payment to the CONTRACTOR shall not relieve the Surety Company of any of its
obligations to the OWNER, as set forth in the said Surety Company's Bond.
IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this
day of , 20____ .
(Surety Company)
By:
ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-Fact.
DR 0172 (12/98)
COLORADO DEPARTMENT OF REVENUE
DENVER CO 80261
(303) 232-2416
DO NOT WRITE IN THIS SPACE
The exemption certificate for which you are applying must be used only for the purpose of purchasing construction and building materials
for the exempt project described below. This exemption does not include or apply to the purchase or rental of equipment, supplies, and
materials which are purchased, rented, or consumed by the contractor and which do not become part of the structure, highway, road,
street, or other public works owned and used by the exempt organization.
Any unauthorized use of the exemption certificate will result in revocation of your exemption certificate and other penalties provided by
law.
A separate certificate is required for each contract.
Subcontractors will not be issued Certificates of Exemption by the Department of Revenue. It is the responsibility of the prime contractor
to issue certificates to each of the subcontractors. (See reverse side).
FAILURE TO ACCURATELY COMPLETE ALL BOXES WILL CAUSE THE APPLICATION TO BE DENIED.
Registration/Account No. (to be assigned by DOR)
89 -
Period 0170-750 (999) $0.00
CONTRACTOR INFORMATION
Trade name/DBA: Owner, partner, or corporate name:
Mailing address (City, State, Zip): Contact Person
E-Mail address: Federal Employer’s Identification Number: Bid amount for your contract:
$
Fax Number:
( )
Business telephone number:
( )
Colorado withholding tax account number:
EXEMPTION INFORMATION Copies of contract or agreement pages (1) identifying the contracting parties
and (2) containing signatures of contracting parties must be attached.
Name of exempt organization (as shown on contract):
Exempt organization’s number:
98 -
Address of exempt organization (City, State, Zip):
Principal contact at exempt organization: Principal contact’s telephone number:
Physical location of project site (give actual address when applicable and Cities and/or County (ies) where project is located)
Scheduled
construction start date:
Month Day Year Estimated
completion date:
Month Day Year
I declare under penalty of perjury in the second degree that the statements made in this application are
true and complete to the best of my knowledge.
Signature of owner, partner or corporate officer: Title of corporate officer: Date:
DO NOT WRITE BELOW THIS LINE
CONTRACTOR APPLICATION
FOR
EXEMPTION CERTIFICATE
Pursuant to Statute
Section 39-26.114(1)(a)(XIX)
6
Special Notice
Contractors who have completed this application in the past, please note the following
changes in procedure:
The Department will no longer issue individual Certificates of exemption to
subcontractors. Only prime contractors will receive a Contractor’s Exemption Certificate
on exempt projects.
Upon receipt of the Certificate, the prime contractor should make a copy for each
subcontractor involved in the project and complete it by filling in the subcontractor’s
name and address and signing it.
The original Certificate should always be retained by the prime contractor. Copies of all
Certificates that the prime contractor issued to subcontractors should be kept at the
prime contractor’s place of business for a minimum of three years and be available for
inspection in the event of an audit.
Once an 89# has been assigned to you, please use the next five numbers following it
for any applications submitted for future projects. This should be your permanent
number. For instance, if you were assigned 89-12345-0001, every application
submitted thereafter should contain 89-12345 on the application. The succeeding
numbers will be issued by the Department of Revenue. DO NOT enter what you
believe to be the next in sequence as this may delay processing of your application.
SECTION 00700
GENERAL CONDITIONS
SECTION 00800
SUPPLEMENTARY CONDITIONS
SECTION 00800
SUPPLEMENTARY CONDITIONS
Conditions of the Contract
These Supplementary Conditions amend or supplement the General Conditions of the
Construction Contract (EJCDC General Conditions 1910-8, 1990 edition with City of
Fort Collins modifications) and other provisions of the Contract Documents as indicated
below.
SC-4.2 Subsurface and Physical Conditions:
A. Add the following language to paragraph 4.2.1 of the General Conditions.
4.2.1.1.1 The following report(s) of exploration and tests of subsurface
conditions at the site of the Work:
None
Contractor may rely upon the accuracy of the technical data contained in
the geotechnical documents, but not upon nontechnical data,
interpretations or opinions contained therein or upon the completeness of
any information in the report.
B. 4.2.1.2.1 No drawing of physical conditions in or relating to existing
surface or subsurface structures (except Underground Facilities referred
to in Paragraph 4.3) which are at or contiguous to the site have been
utilized by the Engineer in preparation of the Contract Documents, except
the following:
None
SC-5.4.8 Limits of Liability
A. Add the following language at the end of paragraph 5.4.8.
The limits of liability for the insurance required by the paragraph
numbers of the General Conditions listed below are as follows:
5.4.1 and 5.4.2
Coverage A - Statutory Limits
Coverage B - $100,000/$100,000/$500,000
5.4.3 and 5.4.5 Commercial General Liability policy will have
limits of $1,000,000 combined single limits (CSL). This policy
will include coverage for Explosion, Collapse, and
Underground coverage unless waived by the Owner.
5.4.6 The Comprehensive Automobile Liability Insurance
policy will have limits of $1,000,000 combined single limits
(CSL).
5.4.9 This policy will include completed operations
coverage/product liability coverage with limits of $1,000,000
combined single limits (CSL).
SECTION 00900
ADDENDA, MODIFICATIONS AND PAYMENT
00950 Contract Change Order
00960 Application for Payment
SECTION 00950
CHANGE ORDER NO.
PROJECT TITLE: Harmony Road Maintenance Project – College Avenue to Timberline Road
CONTRACTOR:
PROJECT NUMBER: 7366
DESCRIPTION:
1. Reason for change:
2. Description of Change:
3. Change in Contract Cost:
4. Change in Contract Time:
ORIGINAL CONTRACT COST $ .00
TOTAL APPROVED CHANGE ORDER 0.00
TOTAL PENDING CHANGE ORDER 0.00
TOTAL THIS CHANGE ORDER 0.00
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O.% OF ORIGNINAL CONTRACT
ADJUSTED CONTRACT COST $ 0.00
(Assuming all change orders approved)
ACCEPTED BY: DATE:
Contractor's Representative
ACCEPTED BY: DATE:
Project Manager
REVIEWED BY: DATE:
Title:
APPROVED BY: DATE:
Title:
APPROVED BY: DATE:
cc: City Clerk Contractor
Project File Architect
Engineer Purchasing
Section 00960
APPLICATION FOR PAYMENT PAGE 1 OF 4
OWNER: City of Fort Collins PROJECT: APPLICATION NUMBER:
APPLICATION DATE:
PERIOD BEGINNING:
ENGINEER: CONTRACTOR: PERIOD ENDING:
PROJECT NUMBER:
CHANGE ORDERS Application is made for Payment as shown below in connection with Contract
NUMBER DATE AMOUNT
The present status of the account for this Contract is as
follows:
1
2 Original Contract Amount:
3 Net Change by Change Order:
Current contract Amount: $0.00
Total Completed and Stored to Date:
Less Previous Applications:
Amount Due this Application - Before Retainage: $0.00
Less Retainage:
Net Change by Change Order $0.00 AMOUNT DUE THIS APPLICATION: $0.00
CERTIFICATION:
The undersigned CONTRACTOR certifies that all obligations of CONTRACTOR incurred in connection with
the Work have been satisfied as required in Paragraph 14.3. of the General Conditions of the Contract.
The above Amount Due This Application is requested by the CONTRACTOR.
Date: By:
Payment of the above Amount Due This Application is recommended by the ENGINEER.
Date: By:
Payment of the above Amount Due This Application has been reviewed by the OWNER'S Project Manager.
Date: By:
Payment of the above Amount Due This Application is approved by the OWNER.
Date: By:
CONTRACT AMOUNTS
APPLICATION FOR
PAYMENT PAGE 2 OF 4
Work
Completed
Work
Completed
Work
Completed Stored
Bid
This
Month
Previous
Periods
To
Date Materials Total
Item This Earned Percent
Number Description Quantity Units
Unit
Price Amount Qty. Amount Qty. Amount Qty. Amount Period To Date Billed
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
TOTALS $0.00 $0.00 $0.00 $0.00 $0.00
CHANGE ORDERS APPLICATION FOR PAYMENT PAGE 3 OF 4
Work Completed
Work
Completed
Work
Completed Stored
Bid
This
Month
Previous
Periods
To
Date Materials Total
Item This Earned Percent
Number Description Quantity Units
Unit
Price Amount Qty. Amount Qty. Amount Qty. Amount Period
To
Date Billed
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
TOTALS CHANGE ORDERS $0.00 $0.00 $0.00 $0.00 $0.00
PROJECT TOTALS $0.00 $0.00 $0.00 $0.00 $0.00
STORED MATERIALS
SUMMARY PAGE 4 OF 4
On Hand Received Installed On Hand
Item Invoice Previous This This This
Number Number Description Application Period Period Application
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTALS $0.00 $0.00 $0.00 $0.00
PROJECT SPECIAL PROVISIONS
Harmony Road Maintenance Project
College Avenue to Timberline Road
City of Fort Collins Bid No. 7366
March, 2012
Prepared By:
City of Fort Collins
Engineering Department
281 North College Avenue
Fort Collins, CO 80522-0580
(970) 221-6605
Harmony Road Maintenance Project
College Avenue to Timberline Road
1
COLORADO DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISIONS
HARMONY ROAD MAINTENANCE PROJECT
COLLEGE AVENUE TO TIMBERLINE ROAD
The 2011 Standard Specifications for Road and Bridge Construction controls construction of this
project. The following special provisions supplement or modify the Standard Specifications and take
precedence over the Standard Specifications and Plans.
PROJECT SPECIAL PROVISIONS
Page
Index Pages 1-2
Notice to Bidders 3
Commencement and Completion of Work 4
Summary of Work 5-6
Revision of Section 106 – Control of Material 7
Revision of Section 109 – Asphalt Cement Cost Adjustment 8
Revision of Section 202 – Removal of Asphalt Mat (Sawcut) (Full Depth) 9
Revision of Section 202 – Removal of Asphalt Mat (Planing) (0-4” Depth)
Removal of Asphalt Mat (Planing) Additional Inch Thickness
Removal of Asphalt Mat (Planing) (Taper 0-2” Depth) (6’ Wide) 10-12
Revision of Section 202 – Removal of Pavement Markings 13
Revision of Section 202 – Removal of Structure (Bridge) 14
Revision of Section 203 – Proof Rolling 15
Revision of Section 203 – Excavation and Embankment 16
Revision of Section 203 – Shouldering (Recycled Asphalt) (Haul and Place) 17
Revision of Section 207 – Topsoil (Stockpile and Redistribute) 18
Revision of Section 207 – Pre-Amended Topsoil (Median) 19-21
Revision of Section 210 – Reset Structures 22-24
Revision of Section 212 – Tree Retention and Protection 25-28
Revision of Section 213 – Mulching 29-30
Revision of Section 214 – Planting 31-38
Revision of Section 403 – Hot Mix Asphalt 39-41
Revision of Section 403 – Hot Mix Asphalt (Hand Patching) 42-43
Revision of Section 420 – Geotextile Paving Fabric 44-45
Revision of Section 601 – Miscellaneous Concrete 46
Revision of Section 605 – Subsurface Drains 47
Revision of Section 608 – Detectable Warnings 48-50
Revision of Section 623 – Irrigation System 51-52
Revision of Section 625 – Construction Surveying 53-54
Revision of Section 627 – Temporary Pavement Marking 55-56
Revision of Section 630 – Construction Zone Traffic Control 57-61
Utilities 62
Harmony Road Maintenance Project
College Avenue to Timberline Road
2
COLORADO DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISIONS
HARMONY ROAD MAINTENANCE PROJECT
COLLEGE AVENUE TO TIMBERLINE ROAD
STANDARD SPECIAL PROVISIONS
Date Page
Title Sheet 63
Revision of Section 103 – Colorado Resident Bid Preference (February 3, 2011) 64
Revision of Section 105 – Construction Drawings (February 3, 2011) 65
Revision of Section 106 – Certificates of Compliance and Certified Test Reports (February 3, 2011) 66
Revision of Section 106 – Hot Mix Asphalt – Verification Testing (July 29, 2011) 67-68
Revision of Section 107 - Responsibility for Damage Claims,
Insurance Types, and Coverage Limits (February 3, 2011) 69
Revision of Section 108 - Critical Path Method (August 19, 2011) 70
Revision of Section 109 – Compensation for Compensable Delays (May 5, 2011) 71
Revision of Section 109 – Measurement of Quantities (February 3, 2011) 72
Revision of Section 401 – Compaction of Hot Mix Asphalt (February 3, 2011) 73
Revision of Section 401 – Composition of Mixtures – Voids Acceptance (February 3, 2011) 74
Revision of Section 401 – Compaction Pavement Test Section (CTS) (February 3, 2011) 75
Revision of Section 401 – Temperature Segregation (February 3, 2011) 76
Revision of Sections 412, 601, and 711 - Liquid Membrane-Forming (May 5, 2011) 77
Compounds for Curing Concrete
Revision of Section 601 – Portland Cement Concrete Pavement Finishing (February 3, 2011) 78
Revision of Section 601 – Concrete Batching (February 3, 2011) 79
Revision of Section 601 – Concrete Finishing (February 3, 2011) 80
Revision of Sections 627 and 708 – Pavement Marking with Waterborne Paint
and Low VOC Solvent Base Paint (February 3, 2011) 81
Revision of Section 630 – Construction Zone Traffic Control (February 3, 2011) 82
Revision of Section 630 – Retroreflective Sheeting (February 3, 2011 83
Revision of Section 630 – Retroreflective Sign Sheeting (February 3, 2011) 84
Revision of Section 703 – Aggregate for Hot Mix Asphalt (June 16, 2011) 85
Revision of Section 703 – Concrete Aggregates (July 28, 2011) 86
Revision of Section 712 – Geotextiles (July 28, 2011) 87
Revision of Section 712 – Water for Mixing or Curing Concrete (February 3, 2011) 88
Railroad Insurance (February 3, 2011) 89-90
Harmony Road Maintenance Project
College Avenue to Timberline Road
3
NOTICE TO BIDDERS
The proposal guaranty shall be a certified check, cashier's check, or bid bond in the amount of 5
percent of the Contractor's total bid.
Pursuant to subsections 102.04 and 102.05, it is recommended that bidders on this project
review the work site and plan details with an authorized City representative. Prospective
bidders shall contact one of the following listed authorized City representatives at least 12 hours
in advance of the time they wish to go over the project.
Program Manager – Tim Kemp, PE Phone: (970) 416-2719
Engineering Department Fax: (970) 221-6378
City of Fort Collins email: tkemp@fcgov.com
281 North College Avenue
Fort Collins, CO 80522-0580
Senior Buyer – John Stephen Phone: (970) 221-6777
Purchasing Department Fax: (970) 221-6707
City of Fort Collins email: jstephen@fcgov.com
The above referenced individuals are the only representatives of the City with authority to
provide any information, clarification, or interpretation regarding the plans, specifications, and
any other contract documents or requirements.
Where reference is made in the plans and specifications to Owner, Department, Chief Engineer,
Resident Engineer, Project Engineer, Engineer, and Inspection and Testing Agency it is
understood to mean the City of Fort Collins, Colorado, representative.
Harmony Road Maintenance Project
College Avenue to Timberline Road
4
COMMENCEMENT AND COMPLETION OF WORK
The Contractor shall commence work under the Contract by the City in the “Notice to Proceed”.
The Contractor shall complete all work in accordance with the Contract.
Section 108 of the Standard Specifications is hereby revised for this project as follows:
Subsection 108.03 shall include the following:
The Contractor's progress schedule shall consist of a Critical Path Method (CPM) schedule
prepared using the Microsoft Project Software and submitted in hand and electronic formats.
Salient features to be shown on the Contractor's Bar Chart Progress Schedule are:
(1) Mobilization
(2) Construction Surveying
(3) Construction Traffic Control
(4) Removals
(5) Roadway Earthwork
(6) Erosion Control
(7) Curb, Gutter and Sidewalk
(8) Asphalt Pavement
(9) Irrigation
(10) Seeding and Landscaping
(11) Utility Coordination and Relocations
Harmony Road Maintenance Project
College Avenue to Timberline Road
5
SUMMARY OF WORK
PART 1 GENERAL
1.25 Modifications to Time of Completion in the Approved Schedule
A. The date of beginning and the time for completion of the work are essential conditions of the
Contract Documents and the work embraced shall be commenced on a date specified in the
Notice to Proceed.
The Contractor will proceed with the work at such rate of progress to ensure full completion
within the contract time. It is expressly understood and agreed, by and between the
Contractor and the Owner that the contract time for the completion of the work described
herein is a reasonable time, taking into consideration the climatic and other factors
prevailing in the locality of the work.
Every effort shall be made by the Contractor to complete the project within the "Contract
Time" shown in the proposal. The "Contract Time" anticipates "Normal" weather and climate
conditions in and around the vicinity of the Project site during the times of year that the
construction will be carried out. Extensions of time based upon weather conditions shall be
granted only if the Contractor demonstrates clearly that such conditions were "unusually
severe," would not have been reasonably anticipated, and that such conditions adversely
affected the Contractor’s work and thus required additional time to complete the work.
The following specifies the procedure for the determination of time extensions for unusually
severe weather. The listing below defines the anticipated number of calendar days lost to
adverse weather for each month and is based upon National Oceanic and Atmospheric
Administration (NOAA) or similar data for the geographic location of the project.
Monthly Anticipated Calendar Days Lost to Adverse Weather Conditions
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
(7) (4) (4) (4) (6) (3) (4) (2) (3) (3) (2) (5)
The above schedule of anticipated adverse weather will constitute the base line for monthly
(or portion thereof) weather time evaluations. Upon acknowledgment of the Notice to
Proceed and continuing throughout the contract on a monthly basis, actual adverse weather
days and the impact of adverse weather days that delay the work will be recorded on a day-
to-day basis. It is assumed that the work will be carried out Mondays through Fridays
(holidays excepted) unless an approved construction schedule or written authorization from
the Owner indicates otherwise. The number of days of delayed work due to adverse weather
or the impact thereof will then be compared to the monthly adverse weather schedule
above.
An actual adverse weather day must prevent work for 50 percent or more of the
Contractor’s workday, delay work critical to the timely completion of the project, and be
documented by the Contractor. The City Representative observing the construction shall
determine on a daily basis whether or not work can proceed or if work is delayed due to
adverse weather or the effects thereof. The Contractor shall notify the Engineer in writing of
Harmony Road Maintenance Project
College Avenue to Timberline Road
6
any disagreement as to whether or not work can proceed on a given date, within 2 calendar
days of that date. The Owner will use the above written notification in determining the
number of working days for which work was delayed during each month.
At the end of each month, if the number of working days for which work was delayed due to
adverse weather exceeds that shown in the above schedule, a Change Order will be
executed which increases the Contract Time. The number of work days delayed due to
adverse weather or the impact thereof will then be converted to Calendar Days based on the
contract completion day and date. This conversion assumes a 5-day work week, Mondays
through Fridays, holidays excepted; should the Contractor have authorization to work
weekends and/or holidays, then the method of conversion of workdays to calendar days
would take this into consideration. The contract time period will then be increased by the
number of calendar days calculated above and a new contract completion day and date will
be set.
The Contractor’s schedule must reflect the above-anticipated adverse weather delays on all
weather-dependent activities. While extensions of time shall be granted for "unusually
severe" weather or climate conditions, the Owner shall make no monetary compensation for
any costs to the Contractor arising out of such delays. The Contractor shall comply with the
portions of the Contract Documents relating to his project schedule and amendments
thereto which result from the "unusually severe" weather condition.
Breakdowns in equipment or lack of performance by the Contractor will not be considered
justification for an extension of time. Liquidated damages will be assessed as delineated
elsewhere.
The Contractor shall not be charged with liquidated damages or any excess cost when the
delay in completion of the work is due to the following, and the Contractor has promptly
given written notice of such delay to the Owner or Engineer.
1. To any preference, priority, or allocation order duly issued by the Owner.
2. To unforeseeable causes beyond the control and without the fault or negligence of the
Contractor, including but not restricted to, acts of God, or of the public enemy, acts of the
Owner, acts of another Contractor in the performance of a contract with the Owner, fires,
floods, epidemics, quarantine restrictions, strikes, freight embargoes, and abnormal and
unforeseeable weather as provided above; and
3. To any delays of Subcontractors occasioned by any of the causes specified in
paragraphs 1 and 2, above.
Harmony Road Maintenance Project
College Avenue to Timberline Road
7
REVISION OF SECTION 106
CONTROL OF MATERIAL
Section 106 of the Standard Special Provisions is hereby revised for this project as follows:
Subsection 106.05 shall include the following:
For this project, Contractor process control testing of hot mix asphalt is voluntary.
Harmony Road Maintenance Project
College Avenue to Timberline Road
8
REVISION OF SECTION 109
ASPHALT CEMENT COST ADJUSTMENT
Section 109 of the Standard Special Provisions is hereby revised for this project as follows:
Subsection 109.06 shall include the following:
Price adjustments will be paid for asphalt cement included in the work according to the following
conditions:
1. Payment will be based upon the pay item quantities per the invoice for the following pay
items when asphalt cement is included in the pay item:
403-01 Hot Mix Asphalt (Grading S) (100) (PG 64-28) (Modified Binder)
403-02 Hot Mix Asphalt (Grading SG) (100) (PG 58-28)
403-03 Hot Mix Asphalt (Hand Patching)
2. Price adjustments may be either positive or negative dollar amounts. The intent of the
monthly price adjustment is to account for direct price increases or decreases due to
asphalt cement costs only. Price adjustments will not be made for any other pay items
contained within this Contract. Any asphalt cement price decreases will be passed on to
the City in the form of a price reduction.
3. The Contractor will be paid the Contract Unit Price per Ton, as accepted on the Bid Tab,
for the remainder of the first month for the “403” pay items. The first month of the project
will be determined when the Notice to Proceed is issued by the City.
4. The vendor will be required to submit Hot Mix Asphalt (HMA) monthly price including the
asphalt cement supplier quote for the upcoming month at least one week prior to, but no
later than, the second to last business day of each month. It is anticipated that there will
be two months where the Contractor is eligible to submit the “Asphalt Cement Cost
Adjustment” documentation.
5. In the event that a vendor does not submit new monthly pricing, according to the above
mentioned timeline for the upcoming month, no payment for “Adjustment” will be made
for the upcoming month.
6. No payment will be made to the vendor without receipt of the asphalt cement suppliers’
invoice as verification of the asphalt cement price deviation from the original per ton bid
prices. The prices submitted for verification shall be for delivered asphalt cement for the
respective month of invoicing.
7. Asphalt cement cost adjustment payment will not be made for any material placed after
the expiration of the allotted Calendar Days per the terms of this Contract.
8. No payment will be made for any HMA material that does not meet the specifications, as
determined by the Engineer.
Harmony Road Maintenance Project
College Avenue to Timberline Road
9
REVISION OF SECTION 202
REMOVAL OF ASPHALT MAT (SAWCUT) (FULL DEPTH)
Section 202 of the Standard Specifications is hereby revised for this project as follows:
Subsection 202.01 shall include the following:
This work includes removal and disposal of existing asphalt mat within the project limits as
shown on the plans or at locations directed by the Engineer.
In subsection 202.02 delete the seventh paragraph and replace with the following:
The existing asphalt mat, which is anticipated to vary in thickness from 5.0 inches to 12.0
inches, shall be removed in a manner that minimizes contamination of the removed mat with
underlying material. The removed mat shall become the property of the Contractor and shall be
disposed of outside the project site.
Subsection 202.11 shall include the following:
The removal of the existing asphalt mat will be measured by the square yard of mat removed to
the required depth and accepted.
Sawcutting will not be paid separately and shall be included in the cost for removal of asphalt
mat.
Subsection 202.12 shall include the following:
Payment will be made under:
Pay Item Pay Unit
Removal of Asphalt Mat (Sawcut) (Full Depth) Square Yard
Harmony Road Maintenance Project
College Avenue to Timberline Road
10
REVISION OF SECTION 202
REMOVAL OF ASPHALT MAT (PLANING) (0-4” DEPTH)
REMOVAL OF ASPHALT MAT (PLANING) ADDITIONAL INCH THICKNESS
REMOVAL OF ASPHALT MAT (PLANING) (TAPER 0-2” DEPTH) (6’ WIDE)
Section 202 of the Standard Specifications is hereby revised for this project as follows:
Subsection 202.01 shall include the following:
The intent of this specification is to identify materials and methods for the planing (grinding) of
existing pavement sections to remove the pavement to a specified depth, the removal and
disposition of the ground material and the preparation of the surface of the base material
disturbed by the grinding process. All workmanship and materials shall be in accordance with
this specification.
Subsection 202.09 shall include the following:
All concrete marked for repair within areas marked for grinding (planing) shall be repaired prior
to commencement of the grinding.
The Contractor shall provide a smooth surface suitable for the installation of new pavement to
follow. The finished surface shall be free from gouges, grooves, ridges, soot, oil film and other
imperfections of workmanship. The completed ground surface shall have a uniform textured
appearance. It is the intent of this specification that the finished cross section of the roadway
will be improved to eliminate excessive crown, excessive lips at the gutter pan areas and that
the overall ride quality of the roadway section will be improved. The existing pavement shall be
ground to the depth specified. Allowable tolerance for the pavement removal shall be ±1/4 Inch
from the specified depth.
In areas where the grinding process disturbs the existing subgrade / base course, the
Contractor shall utilize a rubber tired roller to re-compact the surface. This item will not be
measured and paid for separately but shall be included in the price for Removal of Asphalt Mat
(Planing).
If, in the opinion of the City representative, the subgrade material / base course is unsuitable
and will require additional grinding and / or excavation, the City will direct the Contractor to
perform the work in accordance with the specification (Section 203 – Unclassified Excavation).
Stockpiling of ground materials or cuttings shall not be permitted on the project site. All ground
materials shall become the property of the City and shall be delivered by the Contractor to the
City’s site at 1500 Hoffman Mill Road.
A grinding machine shall be used by the Contractor to perform the grinding operation. The
equipment shall be self-propelled with sufficient power, traction and stability to maintain
adequate depth of cut and slope. The equipment shall be capable of accurately and
automatically establishing a finish profile grade along each edge of the machine within ±1/4 Inch
of the specified depth.
Harmony Road Maintenance Project
College Avenue to Timberline Road
11
The grinding depth along the curb and gutter shall always be one (1) Inch greater than the
specified depth. This item will not be measured and paid for separately but shall be included in
the unit price for grinding to the specified depth.
The grinding machine shall be equipped with an integral loading and reclaiming means to
immediately remove the materials being cut from the surface of the roadway and discharge the
cuttings into a truck, all in one operation. The machine shall be equipped with a means to
control the dust created by the cutting action and shall meet or exceed all local, state and
federal pollution laws.
The Contractor shall also provide adequate backup equipment (mechanical street sweepers,
loaders, water truck, etc.) and adequate personnel shall be provided to insure that all cuttings
are removed from the roadway daily.
It is the intent of this specification that the ground section will be paved back as follows:
On streets where the grinding depth is such that the aggregate base course is to be
replaced, the aggregate base course shall be placed the same day as the grinding and
the bituminous paving (first lift) within 48 hours of the grinding.
The City reserves the right to require that the ground section be paved back immediately
in the case that the grinding work presents a safety hazard and / or inconvenience to the
travelling public.
In the event that the ground section is not paved back the same day as the grinding, the
Contractor shall provide access to the travelling public as directed by the City.
In the event that the ground section is not paved back the same day as the grinding, the
Contractor shall be responsible for the protection of the subgrade / base course until
subsequent courses have been placed.
The City may require that the pavement grade operation be referenced from an independent
grade control in those areas where the existing curb and gutter or roadway surfaces have
deteriorated.
In the event that the entire pavement width along a section of roadway has not been ground to a
uniform surface by the end of the work period resulting in a vertical longitudinal face exceeding
one (1) Inch in height, this longitudinal face shall be sloped in a manner acceptable to the City
so as not to create a hazard to traffic using the roadway during periods when the construction is
not in progress. Transverse faces that are present at the end of the working period shall be
tapered at a 3:1 ratio (three Inches horizontally for each one Inch of vertical drop).
The grinding machine shall not be operated within the close proximity to manholes, inlets, valve
boxes and other obstructions that have not been lowered to avoid damage to these structures.
(See Section 210 – Reset Structures for requirements for referencing structures during
construction). The approaches to and from these structures shall be tapered to allow a smooth
transition over these structures to accommodate traffic flow over the manhole, valve box or
other obstruction. Allowable taper shall not be greater than one-quarter (1/4) Inch vertical rise
per one (1) Foot distance from the structure.
All curbs, gutters and other surfaces shall be cleaned of all debris and left in a neat and
presentable condition at the end of each working day.
The Contractor shall use all means necessary to prevent the spread of dust and debris during
Harmony Road Maintenance Project
College Avenue to Timberline Road
12
the performance of the work. Where equipment comes into contact with tree branches and
other plant material, the Contractor shall exercise suitable caution to avoid damage to all trees,
shrubs and other plant material. All trimming shall be performed under the direction of the City.
Subsection 202.11 shall include the following:
The accepted quantities of Planing (Grinding) will be paid for at the contract unit price per
square yard including haul. The removal of material in areas not accessible to the grinding
machine will be paid for at the contract unit price for Planing.
Removal of Asphalt Mat (Planing) (Taper 0-2” Depth) (6’ Wide) shall consist of cold milling along
the gutter at a depth of two (2) Inches tapered to a depth on the other side of the mill of zero (0)
Inches. The width for Taper Planing shall be primarily six (6) Feet. Taper Planing shall be paid
for at the contract unit price per lineal foot.
Subsection 202.12 shall include the following:
Payment will be made under:
Pay Item Pay Unit
Removal of Asphalt Mat (Planing) (0-4” Depth) Square Yard
Removal of Asphalt Mat (Planing) Additional Inch Thickness Square Yard / Inch
Removal of Asphalt Mat (Planing) (Taper 0-2” Depth) (6’ Wide) Square Yard
The above prices and payments shall include full compensation for furnishing labor, materials,
tools, equipment, incidentals, all required traffic control devices, personnel and related traffic
control incidentals for doing all work involved in the Planing (Grinding); including haul, complete-
in-place, as shown in the contract documents and as directed by the City.
Harmony Road Maintenance Project
College Avenue to Timberline Road
13
REVISION OF SECTION 202
REMOVAL OF PAVEMENT MARKINGS
Section 202 of the Standard Specifications is hereby revised for this project as follows:
Subsection 202.01 shall include the following:
This work includes removal of existing and temporary pavement markings to the satisfaction of
the Engineer.
Subsection 202.05 shall include the following:
Grinding is an acceptable method of removal for the existing pavement mat and / or asphalt
patch areas. Removal of pavement markings will not be allowed on the final asphalt top mat.
Subsection 202.12 shall include the following:
Payment will be made under:
Pay Item Pay Unit
Removal of Pavement Markings Lump Sum
Harmony Road Maintenance Project
College Avenue to Timberline Road
14
REVISION OF SECTION 202
REMOVAL OF STRUCTURE (BRIDGE)
Section 202 of the Standard Specifications is hereby revised for this project as follows:
Subsection 202.01 shall include the following:
This work includes removal of the existing bridge (box culvert) under Lemay Avenue, north of
Harmony Road, to the satisfaction of the Engineer. The existing bridge used to serve as a
conveyance structure for the abandoned Dixon Lateral. The City’s most recent inspection report
for the structure is included as part of these specifications for reference material. The
inspection was conducted on January 10, 2008.
Removal operations shall be conducted so that there will be the least interference with public
traffic using the structure.
Subsection 202.02 shall include the following:
At least 7 days before beginning the bridge removal the Contractor shall submit details of the
removal to the Engineer. The details must include operations, methods and sequence of
removal and equipment to be used.
The demolition shall consist of removing all concrete, steel reinforcing, headwalls and debris
comprised of the bridge deck, sides and bottom slab as directed by the Engineer. The removed
structure shall become the property of the Contractor and shall be disposed of outside the
project site.
Subsection 202.12 shall include the following:
Asphalt removal required for the bridge demolition will be paid for at the contract unit price for
the pay item “Removal of Asphalt Mat (Sawcut) (Full Depth)”. It is anticipated that the existing
asphalt mat sits directly atop the bridge deck with an approximate thickness of 6.0 Inches.
Excavation required for the bridge removal will be incidental to the pay item “Removal of
Structure (Bridge)” and will not be paid for separately.
Backfill used to fill the void up to the bottom of the proposed paving section will consist of
suitable, on-site material as approved by the Engineer. The backfilling operation will be
incidental to the pay item “Removal of Structure (Bridge)” and will not be paid for separately.
Payment will be made under:
Pay Item Pay Unit
Removal of Structure (Bridge) Lump Sum
Harmony Road Maintenance Project
College Avenue to Timberline Road
15
REVISION OF SECTION 203
PROOF ROLLING
Section 203 of the Standard Specifications is hereby revised for this project as follows:
Subsection 203.13 shall include the following:
Proof rolling will not be measured but shall be incidental to the work.
Subsection 203.14 shall include the following:
Proof rolling will not be paid for separately, but shall be included in the work.
Pneumatic tire equipment and load required to achieve the desired weight will not be measured
and paid for separately, but shall be included in the work.
Harmony Road Maintenance Project
College Avenue to Timberline Road
16
REVISION OF SECTION 203
EXCAVATION AND EMBANKMENT
Section 203 of the Standard Specifications is hereby revised for this project as follows:
Subsection 203.05 shall include the following:
(h) Waste. Dispose of excess excavated material off the project site. Obtain disposal site and
obtain all required permitting and environmental clearances necessary for disposal of
excess excavated material.
Subsection 203.13 shall include the following:
(g) Waste. Waste will be measured in its original position by cross-sectioning the area
excavated. When the excavation conforms to the staked lines and grades, use the original
cross-sections and staked sections for the determination of quantities placed on-site and
disposed of off-site as waste. Volumes will be computed from cross-sections by the average
end area or other acceptable method. There will be no adjustment for swell of material to be
hauled off the project as waste.
Subsection 203.14 shall include the following:
Payment will be made under:
Pay Item Pay Unit
Unclassified Excavation (Complete in Place) Cubic Yard
Subsection 203.14 delete the sixth paragraph and replace with the following:
Payment for Unclassified Excavation (Complete in Place) shall be full compensation for all work
necessary to complete the item including construction of unclassified excavation, compaction,
compaction of bases of cuts and fills, all work in available material pits, and disposal of excess
excavated material as waste.
The quantity of excavation and embankment will not be measured but will be the quantity
designated in the Contract Documents unless field changes are ordered. If field changes are
ordered, the quantity will be adjusted using the revised dimensions. The Engineer, prior to
Contractor beginning the work, shall approve the additional or reduced volume of material in
writing.
Harmony Road Maintenance Project
College Avenue to Timberline Road
17
REVISION OF SECTION 203
SHOULDERING (RECYCLED ASPHALT) (HAUL AND PLACE)
Section 203 of the Standard Specifications is hereby revised for this project as follows:
Subsection 203.13 shall include the following:
Material used for the pay item “Shouldering (Recycled Asphalt) (Haul and Place)” will be
provided, loaded and weighed by the City at the Hoffman Mill pit. Payment will be per ton of
material delivered and placed on the project.
This pay item also includes the distribution and fine grading of the recycled asphalt material. At
a minimum, the shouldered area will be two (2) Feet wide by four (4) Inches thick. Field
conditions may warrant a wider or thicker material placement as directed by the City.
Subsection 203.14 shall include the following:
Payment will be made under:
Pay Item Pay Unit
Shouldering (Recycled Asphalt) (Haul and Place) Ton
Harmony Road Maintenance Project
College Avenue to Timberline Road
18
REVISION OF SECTION 207
TOPSOIL (STOCKPILE AND REDISTRIBUTE)
Section 207 of the Standard Specifications is hereby revised for this project as follows:
Subsection 207.01 is hereby revised to include the following:
This work consists of removing existing on-site topsoil material, stockpiling the existing topsoil
material and redistributing the existing topsoil material onto the re-graded slopes at a depth of 4
inches (minimum). The topsoil material shall be generally evenly distributed throughout the
project limits. Any excess topsoil generated from this project shall be disposed of off-site and
shall not be measured and paid for separately, but should be included in the cost of work.
Subsection 207.03, paragraph 3 shall include:
Per City Code, soil shall be loosened to a depth of not less than eight (8) inches. The Engineer
shall be notified if this cannot occur due to existing conditions.
Subsection 207.04 is hereby revised to include the following:
Topsoil will not be remeasured, but payment shall be based on the quantity identified in the bid
tabulation, unless the quantity of Topsoil is significantly changed during construction by an
approved Change Order. Bid tabulation quantity is based on final in-place topsoil required to
complete the construction.
Haul required to redistribute stockpiled topsoil uniformly throughout the project limits shall not be
measured and paid for separately, but shall be included in the work.
Subsection 207.05 is hereby revised to include the following:
The contract unit price for topsoil shall be full compensation for all work necessary to complete
the item including removing existing on-site topsoil material, stockpiling the existing topsoil
material, haul, redistributing the existing topsoil material onto the re-graded slopes.
Payment will be made under:
Pay Item Pay Unit
Topsoil (Stockpile and Redistribute) Cubic Yard
Harmony Road Maintenance Project
College Avenue to Timberline Road
19
REVISION OF SECTION 207
PRE-AMENDED TOPSOIL (MEDIAN)
Section 207 of the Standard Specifications is hereby revised for this project as follows:
Subsection 207.02 shall include the following:
Topsoil for this project shall consist of fertile, friable, well-drained soil of uniform quality, free of
stones over 1 inch diameter (screen as needed), sticks, oils, chemicals, plaster, concrete and
other deleterious materials.
A. Pre-amended Topsoil- Pre-amended topsoil shall have the following characteristics:
1. Shall have a range of three to four percent organic matter as determined by the
ignition of a moisture free sample dried to determine loss in accordance with current
methods of the Association of Official Agriculture Chemists.
2. Shall have a pH between 6.5 to 8.0.
3. Sodium Absorption Rate (SAR) and Electrical Conductivity (EC) readings are not to
exceed three mmhos/cm.
4. Particle Sizes: Topsoil shall be loam to sandy loam.
5. Must be weed-free at the time of spreading operations. This can be achieved by
following Subsection 217.03.
B. Soil Amendment: Amended topsoil shall receive soil amendments at the following rate:
3 cubic yards per 1,000 square feet of organic amendment.
The organic amendment shall include the following:
An organic product containing a mixture of composted cow or sheep manure and wood
residue that has been aerobically and naturally processed in such a manner as to maintain
a consistent temperature of 60 degrees Celsius (140 degrees Fahrenheit) or greater for a
period of time that is long enough to accomplish the following specifications:
1. The windrows of composted organic amendment (cow or sheep manure) have to be
composted for 70 to 90 days. Certification must be provided to prove the product has
gone through this process.
2. Eradicate harmful pathogens, including coliform bacteria.
3. Create a carbon to nitrogen ratio of no less than 15/1 to 25/1.
4. Contain no solid particle greater than 1 1/2 inch in diameter.
5. Have a non-offensive smell similar to fresh turned soil.
6. Contain no significant level of dirt or soil and contain a maximum of 30 percent
composted wood residue (pine or aspen wood).
The pH after composting shall be between 5.0 and 7.5 with an organic matter content of no less
than 30 percent. The Contractor shall submit a 2 lb. sample of the product four weeks before its
use on the project site for the Engineer's approval. A Certificate of Compliance shall be provided
to the Engineer to verify the organic matter content, pH and carbon matter to nitrogen ratio.
Harmony Road Maintenance Project
College Avenue to Timberline Road
20
The Contractor shall submit two samples of topsoil to a soils laboratory for analysis. The cost of
the test shall be at the Contractor's expense; the results will be submitted to the Engineer for
review at least 60 days prior to placement. Based on the results, the Engineer can request soil
amendments appropriate to have topsoil conform to these specifications at no cost to the
project. The organic amendment shall be an organic product containing a mixture of composted
cow or sheep manure and wood residue that has been aerobically and naturally processed in
such a manner as to maintain a consistent temperature of 140 degrees Fahrenheit or greater for
a period of time of 70 to 90 days, and be approved by the Engineer.
Subsection 207.03 shall include the following:
A. Stockpiled Topsoil
Obtain an agricultural suitability analysis of proposed topsoil from an accepted,
accredited Testing Agency and provide one (1) copy of test results direct to Engineer.
Amend soils per analysis report.
B. Weed Control
Contractor shall employ pre-emergence weed control per Section 217.
C. Fertilizers
Commercial fertilizers recommended by the soil test lab may be used. See Section 212.
D. Chemical Components
The following additives may or may not be used depending on outcome of soils report.
a) Ground Limestone: Agricultural limestone containing not less than 85% of total
carbonates,
ground to such fineness that 50% will pass #100 sieve and 90% will pass #20 sieve.
b) Dolomite Lime: Agricultural grade mineral soil conditioner containing 35% minimum
magnesium carbonate and 49% minimum calcium carbonate, 100% passing #65 sieve.
c) Gypsum: Agricultural grade product containing 80% minimum calcium sulphate.
d) Iron Sulfate (Ferric or Ferrous): Supplied by a commercial fertilizer supplier,
containing 20% to 30% iron and 35% to 40% sulphur.
e) Sulphate of Potash: Agricultural grade containing 50% to 53% of water-soluble
potash.
f) Single Superphosphate: Commercial product containing 20% to 25% available
phosphoric acid.
g) Ammonium Sulphate: Commercial product containing approximately 21% ammonia.
h) Ammonium Nitrate: Commercial product containing approximately 34% ammonia.
i) Calcium Nitrate: Agricultural grade containing 15-1/2% nitrogen.
j) Urea Formaldehyde: Granular commercial product containing 38% nitrogen.
Harmony Road Maintenance Project
College Avenue to Timberline Road
21
k) I.B.D.U. (Iso Butyldiene Diurea): Commercial product containing 31% nitrogen.
l) Soil Sulfur: Agricultural grade sulfur containing a minimum of 96% sulfur.
m) Iron Sequestrene
E. Cultivation of Existing Soil
Trees to Remain: Hand cultivate within the dripline of existing trees to remain. Depth of
cultivation shall not exceed 2 in. Cultivate immediately prior to amending existing soil.
F. Spread soil for areas as follows:
a) Perennial/Shrub areas: Minimum Depth of 18”
b) Water Quality Pond/Dry-Land Grass: Minimum Depth of 4”. Combine with
amended native soil.
c) Landscape Parkway: Minimum Depth of 6”.
d) Tree Grates: Structural Soil, Minimum Depth of 3’-0”
Topsoil shall be amended, as required, in accordance with laboratory Soil Analysis Report to
provide satisfactory amended topsoil for planting.
Ten days before notice to proceed, Contractor shall submit a weed mitigation plan to the
Engineer for approval. This plan shall include a graphic time line showing milestone and
completion dates of herbicide treatment, topsoil stockpiling, topsoil spreading and all seeding
and planting times.
Revise subsection 207.05 to include the following:
The accepted quantities measured as provided above will be paid for at the contract unit price
per cubic yard for each of the pay items listed below that appear in the bid schedule.
Payment will be made under:
Pay Item Pay Unit
Pre-Amended Topsoil (Median) Cubic Yard
Payment for topsoil shall include soil and all soil amendments required to produce satisfactory
soil for planting.
Harmony Road Maintenance Project
College Avenue to Timberline Road
22
REVISION OF SECTION 210
RESET STRUCTURES
Section 210 of the Standard Specifications is hereby revised for this project as follows:
Subsection 210.02 is hereby revised to include the following:
Manholes, valve boxes, meter boxes and all other similar structures located in a pavement shall
be adjusted as noted below.
Prior to beginning any construction on existing streets that will receive reconstruction and / or
overlay, the Contractor shall mark paint on the curb and gutter for the location of all existing
structures. Those markings shall be maintained by the Contractor until the work has been
completed and accepted by the City. In those locations where curb and gutter does not exist,
the Contractor will use another suitable method to identify existing structures as approved by
the Engineer.
The Contractor shall do all work needed to ensure that said structures can be readily adjusted
and shall have all necessary materials on hand prior to commencing the work. The Contractor
shall verify that all manholes and valve boxes can be adjusted prior to the overlay. In the event
that can not be adjusted, or properly fitted with rings, the Contractor shall excavate and adjust
prior to the overlay as noted below.
All structures shall be adjusted to be 1/8 Inch to 1/2 Inch below the final pavement grade.
In locations where a structure to be adjusted is surrounded by a concrete collar, the concrete
collar shall be removed and replaced with Hot Mix Asphalt (HMA). HMA Grading SG shall be
used in all locations except as noted below.
In locations where a structure adjustment takes place and no overlay is scheduled, HMA
Grading SG shall be placed in the bottom of the patches and shall be left one and one-half (1 ½)
to two (2) Inches below the existing street surface to allow the patch to be “topped” with a
surface course material. The “topping” material shall be HMA Grading S and paid for at the
contract unit price per ton.
Subsection 210.10 is hereby revised to include the following:
The City shall determine the method of adjustment for each structure. Valve boxes shall be
adjusted by one of the following methods:
1. Adjust by removing the existing pavement (concrete or asphalt), adjusting the valve by
turning it to the proper grade, trimming the asphalt by cutting vertical edges, then
spreading and mechanically compacting the HMA material. This item will be measured
and paid for as “Adjust Valve Box”, not including HMA material.
2. If the valve box cannot be turned up, or can be turned up but not sufficiently to achieve
the proper grade or if the top section of the valve box is in poor condition, the Contractor
shall excavate around the top section of the valve box and remove and replace the top
section with a longer section, provided by the City and / or the Fort Collins-Loveland
Water District. The excavation shall then be backfilled with Flowable Fill to the top of
subgrade, and then material of the same grade and quality as the adjacent pavement
shall be placed. A mix design for Flowable Fill shall be submitted and approved by the
Harmony Road Maintenance Project
College Avenue to Timberline Road
23
Engineer prior to starting work. This item will be measured and paid for as “Adjust Valve
Box”, not including HMA material. Flowable Fill will be incidental to “Adjust Valve Box”
and will not be paid for separately.
Flowable Fill shall be a Portland Cement Concrete Mix. The cement shall conform to the
Standard Specification for Portland Cement, ASTM C 150-85, Type I/II. The minimum
24 hour strength shall be 10 psi and the maximum 28 day strength shall be 60 psi. The
maximum aggregate size shall be one (1) Inch. The minimum slump shall be six (6)
Inches and the maximum eight (8) Inches. The Flowable Fill shall be consolidated with a
mechanical vibrator.
The Contractor shall exercise reasonable care while attempting to adjust the valve
boxes. If the Contractor id negligent and breaks the valve box, said valve box shall be
replaced at the Contractor’s expense.
Manholes shall be adjusted by one of the following methods:
1. Adjust by removing an area of pavement (concrete or asphalt) with a minimum diameter
of one (1) Foot larger than the structure (centered on the structure) by cutting vertical
edges, adjusting the manhole by grouting concrete rings and / or utilizing metal shims to
raise the structure to the proper grade, then spreading and mechanically compacting
HMA material. This item will be paid for under “Adjust Manhole”, not including HMA
material.
2. Adjust with adjusting rings. Standard / non-adjustable paving rings are not permitted on
arterial streets, collector streets or within the wheel path of a travel lane. The Contractor
shall verify that the manhole can properly be adjusted with a ring to the proposed grade
prior to the overlay. The City may allow turnbuckle style paving rings that tighten into
place securely. This item will be paid for under “Adjust Manhole”, not including HMA
material.
When the manhole adjustment is complete, the slope of the top surface of the manhole
cover shall match the slope of the pavement in both the longitudinal and transverse
directions and the inside shall be grouted. Any manhole cover which is unstable or noisy
under traffic shall be replaced by the Contractor.
If a manhole or valve box is located in an area to be patched or cold milled, it may be
adjusted as part of that operation utilizing one of the methods listed in the previous
paragraphs. The adjustment will be paid for under the matching item.
If the structure is adjusted during the grinding or patching operation, the Contractor shall
place HMA material around the structure, as directed by the City, to ensure that it will not
be a hazard to vehicular traffic.
The Contractor shall be responsible for immediately cleaning out all construction
materials that may fall into manholes, valve boxes or any other structure during the
construction process.
In the event that a structure was not properly adjusted (too high or too low), written
notice will be given by the City to the Contractor requiring the Contractor to make the
necessary adjustments within five (5) working days. In the event that the structure id not
Harmony Road Maintenance Project
College Avenue to Timberline Road
24
adjusted within said time frame, the City shall have the right to engage a third party to
complete the work, and to withhold the cost of such work from payments due the
Contractor.
The City will also notify the Contractor in writing of any structures that were covered
during the paving operation. The Contractor shall have five (5) working days to make
said structure accessible or will be subject to the previous paragraph with respect to a
third party completing the work. In the unlikely event that a structure is adjusted after the
overlay is complete, the Contractor must exercise care as not to damage the new
pavement surrounding the structure. The “topping” material shall be Grading S on
arterial and collector streets. Grading SG shall be used for the bottom lifts as described
in Revision of Section 403, Hot Mix Asphalt (Hand Patching).
Subsection 210.12 is hereby revised to include the following:
The accepted quantities of adjustments for Valve Boxes and Manholes will be paid for at the
contract unit price per each. Flowable Fill, concrete, haul and disposal will not be measured
and paid for separately, with this pay item, but shall be included in the contract unit price for
each type of adjustment.
Pay Item Pay Unit
Adjust Valve Box Each
Adjust Manhole ≤ 24 Inch Each
Adjust Manhole > 24 Inch Each
Harmony Road Maintenance Project
College Avenue to Timberline Road
25
SECTION 212
TREE RETENTION AND PROTECTION
Section 212 of the Standard Specifications is hereby revised for this project as follows:
Subsection 212.01 shall include the following:
Tree Retention and protection includes general protection and pruning of existing trees and
plants that are affected by execution of the Work, whether temporary or permanent construction.
The following definitions apply:
1) Caliper: Diameter of a trunk measured by a diameter tape or the average of the smallest
and largest diameters at 6 inches above the ground for trees up to, and including, 4-inch
size; and 12 inches above the ground for trees larger than 4-inch size.
2) Plant-Protection Zone: Area surrounding individual trees, groups of trees, shrubs, or
other vegetation to be protected during construction, and indicated on Drawings.
3) Tree-Protection Zone: Area surrounding individual trees or groups of trees to be
protected during construction, and defined by a circle concentric with each tree with a
radius 1.5 times the diameter of the drip line unless otherwise indicated.
4) Vegetation: Trees, shrubs, groundcovers, grass, and other plants.
Subsection 212.02 shall include the following:
(d) Protection-Zone Fencing: Fencing fixed in position and meeting the following
requirements. Previously used materials may be used when approved by Engineer.
1. Plastic Protection-Zone Fencing: Plastic construction fencing constructed of high-
density extruded and stretched polyethylene fabric with 2-inch maximum opening in
pattern and weighing a minimum of 0.4 lb/ft.; remaining flexible from minus 60 to
plus 200 deg F; inert to most chemicals and acids; minimum tensile yield strength
of 2000 psi and ultimate tensile strength of 2680 psi; secured with plastic bands or
galvanized-steel or stainless-steel wire ties; and supported by tubular or T-shape
galvanized-steel posts spaced not more than 8 feet apart.
a. Height: 4 feet
b. Color: High-visibility orange, nonfading.
Add Subsection 212.061 immediately following Subsection 212.06
212.061 Tree Retention and Protection
A. SUBMITTALS
1) Samples for Verification: For each type of the following:
a. Protection-Zone Fencing: Assembled Samples of manufacturer's standard
size made from full-size components.
2) Existing Conditions: Documentation of existing trees and plantings indicated to
remain, which establishes preconstruction conditions that might be misconstrued as
damage caused by construction activities.
a. Use sufficiently detailed photographs or videotape.
Harmony Road Maintenance Project
College Avenue to Timberline Road
26
b. Include plans and notations to indicate specific wounds and damage
conditions of each tree or other plants designated to remain.
B. QUALITY ASSURANCE
1) Preinstallation Conference: Conduct conference at Project site.
a. Review methods and procedures related to temporary tree and plant
protection including, but not limited to, the following:
1. Construction schedule. Verify availability of materials, personnel,
and equipment needed to make progress and avoid delays.
2. Enforcing requirements for protection zones.
3. Field quality control.
C. PROJECT CONDITIONS
1. The following practices are prohibited within protection zones:
a. Storage of construction materials, debris, or excavated material.
b. Parking vehicles or equipment.
c. Foot traffic.
d. Erection of sheds or structures.
e. Impoundment of water.
f. Excavation or other digging unless otherwise indicated.
g. Attachment of signs to or wrapping materials around trees or plants unless
otherwise indicated.
2. Do not direct vehicle or equipment exhaust toward protection zones.
3. Prohibit heat sources, flames, ignition sources, and smoking within or near
protection zones and organic mulch.
D. PREPARATION
Locate and clearly identify trees, shrubs, and other vegetation to remain or to be relocated.
Tie a 1-inch blue-vinyl tape around each tree trunk at 54 inches above the ground.
Protect tree root systems from damage caused by runoff or spillage of noxious materials
while mixing, placing, or storing construction materials. Protect root systems from ponding,
eroding, or excessive wetting caused by dewatering operations.
E. TREE- AND PLANT-PROTECTION ZONES
Protection-Zone Fencing: Install protection-zone fencing along edges of protection zones
before materials or equipment are brought on the site and construction operations begin in a
manner that will prevent people from easily entering protected. Construct fencing so as not
to obstruct safe passage or visibility at vehicle intersections where fencing is located
adjacent to pedestrian walkways or in close proximity to street intersections, drives, or other
vehicular circulation.
Maintain protection zones free of weeds and trash.
Repair or replace trees, shrubs, and other vegetation indicated to remain or be relocated that
are damaged by construction operations, in a manner approved by Architect.
Maintain protection-zone fencing and signage in good condition as acceptable to Architect
and remove when construction operations are complete and equipment has been removed
from the site.
Harmony Road Maintenance Project
College Avenue to Timberline Road
27
1) Do not remove protection-zone fencing, even temporarily, to allow deliveries or
equipment access through the protection zone.
F. EXCAVATION
General: Excavate at edge of protection zones and for trenches indicated within protection
zones according to requirements in Section 200 Earth Work.
Trenching near Trees: Where utility trenches are required within protection zones, hand
excavate under or around tree roots or tunnel under the roots by drilling, auger boring, or
pipe jacking. Do not cut main lateral tree roots or taproots; cut only smaller roots that
interfere with installation of utilities. Cut roots as required for root pruning.
Redirect roots in backfill areas where possible. If encountering large, main lateral roots,
expose roots beyond excavation limits as required to bend and redirect them without
breaking. If encountered immediately adjacent to location of new construction and
redirection is not practical, cut roots approximately 3 inches back from new construction and
as required for root pruning.
Do not allow exposed roots to dry out before placing permanent backfill. Provide temporary
earth cover or pack with peat moss and wrap with burlap. Water and maintain in a moist
condition. Temporarily support and protect roots from damage until they are permanently
relocated and covered with soil.
G. ROOT PRUNING
Prune roots that are affected by temporary and permanent construction. Prune roots as
shown on Drawings and as follows:
1. Cut roots manually by digging a trench and cutting exposed roots with sharp pruning
instruments; do not break, tear, chop, or slant the cuts. Do not use a backhoe or
other equipment that rips, tears, or pulls roots.
3. Cut Ends: Coat cut ends of roots more than 1-1/2 inches in diameter with an
emulsified asphalt or other coating formulated for use on damaged plant tissues and
that is acceptable to landscape architect.
4. Temporarily support and protect roots from damage until they are permanently
redirected and covered with soil.
5. Cover exposed roots with burlap and water regularly.
6. Backfill as soon as possible according to requirements in Section 200 Earth Work.
Root Pruning at Edge of Protection Zone: Prune roots 12 inches outside of the protection
zone, by cleanly cutting all roots to the depth of the required excavation.
H. CROWN PRUNING
Prune branches that are affected by temporary and permanent construction. Prune
branches as shown on Drawings and as follows:
1. Pruning Standards: Prune trees according to ANSI A300 (Part 1)
Harmony Road Maintenance Project
College Avenue to Timberline Road
28
I. REGRADING
Lowering Grade: Where new finish grade is indicated below existing grade around trees,
slope grade beyond the protection zone. Maintain existing grades within the protection
zone.
Raising Grade: Where new finish grade is indicated above existing grade around trees,
slope grade beyond the protection zone. Maintain existing grades within the protection
zone.
J. REPAIR AND REPLACEMENT
General: Repair or replace trees, shrubs, and other vegetation indicated to remain or be
relocated that are damaged by construction operations, in a manner approved by Architect.
1. Submit details of proposed root cutting and tree and shrub repairs.
2. Treat damaged trunks, limbs, and roots according to arborist's written
instructions.
3. Perform repairs within 24 hours.
4. Replace vegetation that cannot be repaired and restored to full-growth status, as
determined by Landscape Architect.
Trees: Remove and replace trees indicated to remain that are more than 25 percent dead
or in an unhealthy condition before the end of the corrections period or are damaged during
construction operations that Landscape Architect determines are incapable of restoring to
normal growth pattern.
1. Provide new trees of same size and species as those being replaced for each
tree that measures 6 inches or smaller in caliper size.
K. DISPOSAL OF SURPLUS AND WASTE MATERIALS
Disposal: Remove excess excavated material, displaced trees, trash and debris, and legally
dispose of them off Owner's property.
Subsection 212.07 shall include the following:
Tree retention and protection will not be measured, but will be paid for on a lump sum basis.
The lump sum price bid will be full compensation for all work required to complete the item.
Subsection 212.08 shall include the following:
Payment will be made under:
Pay Item Pay Unit
Tree Retention and Protection Lump Sum
Harmony Road Maintenance Project
College Avenue to Timberline Road
29
SECTION 213
MULCHING
Delete Standard Specification 213 and replace with the following:
Subsection 213.01 shall include the following:
This work consists of furnishing and placing organic (wood chip) mulch in the planting beds and
plant saucers, and furnishing and placing in-organic (rock) mulch over weed barrier, in
accordance with the Contract or as directed.
Subsection 213.02 shall include the following:
(a) Organic Mulch (Wood Chips)
Free from deleterious materials and suitable as a top dressing of trees and shrubs,
consisting of the following: Ground or shredded – no weed barrier required. Organic mulch
material to be provided by the City of Fort Collins Forestry Division, located at Parks
Maintenance Shop, 413 S. Bryan Avenue (near the City Park Golf Course), Fort Collins,
80521. Contact the City Forester (Tim Buchanan) at 970.221.6361, to schedule material
pickup. City will load the material into the Contractors vehicle for transport to the site.
Contractor’s itemized pricing to include Contractor pickup at the above address, hauling
material to the site and installation only.
(b) Inorganic Mulch (Rock)
Hard, durable stone, washed free of loam, sand, clay, and other foreign substances, of
following type, size range, and color (weed barrier required):
Rounded river rock / cobble,
Size Range: 50% 1 ½”
30” 3” to 6”
20% 6” to 12”
Color: Tan-beige color range. (No pinks, blacks, reds or whites).
(c) Weed Control Barriers
Mirafi 140, Typar 3341, or Polyspun 300 or approved equivalent.
The Contractor shall submit a sample to the Engineer for approval at least 30 days prior to
placing on the project.
(d) Landscape Boulder
All boulders are to be Buff Sandstone Slab Boulders. Two sizes are required per the
Landscape Plan design, as follows:
24” Wide x 36” Long x 18” High (6 Each)
30” Wide x 48” Long x 24” High (15 Each)
Harmony Road Maintenance Project
College Avenue to Timberline Road
30
Subsection 213.03 shall include the following:
(a) General
Areas not properly mulched, or areas damaged due to the Contractor’s negligence, shall be
repaired and remulched as described above, at the Contractor’s expense.
Mulch removed by circumstances beyond the Contractor’s control shall be repaired and
remulched as ordered. Payment for this ordered corrective work shall be at the contract
prices.
The Engineer may order test sections be established for adjusting the mulching equipment
to assure conformance with the specified application rate. The Engineer may order
equipment readjustment at any time.
(b) Organic (Wood Chip) Mulch
A 4-inch layer, unless otherwise shown in the plans, of wood chip mulch shall be uniformly
applied to all planting beds as shown on the plans or as directed. Wood chip mulch shall be
placed in all tree and shrub saucers in seeded areas. Wood chip mulch shall be capable of
matting together to resist scattering by the wind.
(c) In-Organic (Rock) Mulch
A minimum 3-inch layer of rock mulch placed as shown on plans over weed control barrier.
(d) Landscape Boulder
The landscape boulders shall be placed in accordance with these specifications and the
plans included as part of the Contract Documents. Set a minimum of six (6) Inches into
finished grade and placed so that the top face of boulder is horizontal.
Subsection 213.05 shall include the following:
The accepted quantities will be paid for at the contract unit price for each of the pay items listed
below that appear in the bid schedule.
Payment will be made under:
Pay Item Pay Unit
Mulching (Weed Free Hay) Acre
Mulching (Wood Chip) Square Foot
Inorganic Mulch (Rock) (1 ½ Inch) Square Foot
Inorganic Mulch (Rock) (3 -6 Inch) Square Foot
Inorganic Mulch (Rock) (6 -12 Inch) Square Foot
Landscape Weed Barrier Fabric Square Yard
Landscape Boulder Each
Harmony Road Maintenance Project
College Avenue to Timberline Road
31
SECTION 214
PLANTING
Section 214 of the Standard Specifications is hereby revised for this project as follows:
In subsection 214.01, include the following:
Definitions
Backfill: The earth used to replace or the act of replacing earth in an excavation.
Balled and Burlapped Stock: Exterior plants dug with firm, natural balls of earth in
which they are grown, with ball size not less than diameter and depth recommended
by ANSI Z60.1 for type and size of tree or shrub required; wrapped, tied, rigidly
supported, and drum laced as recommended by ANSI Z60.1.
Balled and Potted Stock: Exterior plants dug with firm, natural balls of earth in which
they are grown and placed, unbroken, in a container. Ball size is not less than
diameter and depth recommended by ANSI Z60.1 for type and size of exterior plant
required.
Clump: Where three (3) or more young trees were planted in a group and have
grown together as a single tree having three (3) or more main stems or trunks.
Container-Grown Stock: Healthy, vigorous, well-rooted exterior plants grown in a
container with well-established root system reaching sides of container and
maintaining a firm ball when removed from container. Container shall be rigid
enough to hold ball shape and protect root mass during shipping and be sized
according to ANSI Z60.1 for type and size of exterior plant required.
Finish Grade: Elevation of finished surface of planting soil.
Multi-Stem: Where three or more main stems arise from the ground from a single
root crown or at a point right above the root crown.
Sub-grade: Surface or elevation of subsoil remaining after completing excavation, or
top surface of a fill or backfill, before placing planting soil.
Sub-soil: All soil beneath the topsoil layer of the soil profile, and typified by the lack
of organic matter and soil organisms.
Submittals
Product Data for each type of product indicated.
Samples for Verification: For each of the following:
1 lb. of in-organic (rock) mulch for each type, color and texture of stone required, in
labeled plastic bags. Provide name of Supplier and product name.
Samples of proposed organic mulch type NOT required. Material specified shall be
provided by the City of Fort Collins Forestry Division. See Section 213 Mulches for
additional information.
Harmony Road Maintenance Project
College Avenue to Timberline Road
32
Pre-Amended Topsoil: Submit sample in a plastic baggie. Provide product type,
supplier and phone number. Product delivered to site shall match the submitted
sample. Submit delivery receipts to Owner's Representative for review.
Organic Amendment: Submit sample in a plastic baggie. Product delivered to site
shall match the submitted sample. Submit organic amendment delivery receipts to
Owner's Representative for review.
Organic Amendment Analysis: Submit copies of amendment analysis from qualified
soil testing laboratory.
Weed barrier: Submit brand name and model number/name of proposed weed
barrier to be used.
Tree Stakes, Webbing and Rubber Protective Cap: Submit sample of each.
Product Certificates: For each type of manufactured product, from Manufacturer,
and complying with the following:
Manufacturer's certified analysis for standard products.
Analysis of other materials by a recognized laboratory made according to
methods established by the Association of Official Analytical Chemists, where
applicable.
Planting Schedule: Indicating anticipated planting dates for exterior plants.
Cleanup and Protection
During planting, keep adjacent paving and construction clean and work area in an orderly
condition. Protect exterior plants from damage due to landscape operations, operations
by other contractors and trades, and others. Maintain protection during installation and
maintenance periods. Treat, repair, or replace damaged plantings.
Project Record (As-Built Drawing)
Maintain one (1) complete set of contract documents on site. Keep documents current.
Record changes in location, quantity and species of plant material. Submit corrected
drawings to the Owner’s Representative prior to final inspection.
Disposal
Remove surplus soil and waste material, including excess subsoil, unsuitable soil, trash,
and debris, and legally dispose of them off Owner’s property.
In subsection 214.02, include the following:
Installer Qualifications: A qualified landscape installer whose work has resulted in
successful establishment of exterior plants.
Installer's Field Supervision: Require Installer to maintain an experienced full-time
supervisor on Project site when planting is in progress.
Harmony Road Maintenance Project
College Avenue to Timberline Road
33
The City of Fort Collins’ Forestry Department Representative will observe trees and shrubs
either at place of growth and/or at site before planting for compliance with requirements for
genus, species, variety, size, and quality. Representative retains right to observe trees
and shrubs further for size and condition of balls and root systems, insects, injuries, and
latent defects and to reject unsatisfactory or defective material at any time during progress
of work. Remove rejected trees or shrubs immediately from Project site. Notify Forestry
Department Representative of sources of planting materials seven (7) days in advance of
delivery to site.
In Subsection 214.02, delete paragraph three and replace with the following:
Measure trees and shrubs according to ANSI Z60.1 with branches and trunks or canes in
their normal position. Do not prune to obtain required sizes. Take caliper measurements
6 inches above the ground for trees up to four-inch (4”) caliper size, and twelve inches
(12”) above the ground for larger sizes. Measure main body of tree or shrub for height and
spread; do not measure branches or roots tip-to-tip.
In Subsection 214.02, delete paragraph seven and replace with the following:
Before any substitutions of Contractor-furnished plant material will be considered, the
Contractor shall make inquiries of all commercial sources at their disposal. Written
statements concerning the availability of the plant species and sizes designated on the
plans shall be obtained. If the designated plant species are available in a size different
than indicated on the plans, this information shall be included in the statement. If the
Contractor fails to locate the designated plant species (or size), the Contractor shall make
inquiries of all sources designated by the Engineer. Written statements concerning the
availability of plant species and sizes shall be submitted by the Contractor to the Engineer
60 days prior to the planting season. Substitutions of other sizes or species will be
considered only after such statements have been submitted or when all sources have
been exhausted.
In Subsection 214.02, include the following under paragraph twelve:
(e) Tree and Shrub Material: Furnish nursery-grown trees and shrubs complying with
ANSI Z60.1, with healthy root systems developed by transplanting or root pruning.
Provide well-shaped, fully branched, healthy, vigorous stock free of disease, insects, eggs,
larvae, and defects such as knots, sun scald, injuries, abrasions, and disfigurement.
Provide trees and shrubs of sizes, grades, and ball or container sizes complying with ANSI
Z60.1 for types and form of trees and shrubs required. Trees and shrubs of a larger size
may be used if acceptable to Owners Representative, with a proportionate increase in size
of root-balls. Furnish trees and shrubs with root-balls measured from top of root-ball,
which shall begin at root flare according to ANSI Z60.1
(f) Street and Flowering Trees: Street Trees: Single-stem trees with straight trunk,
well-balanced crown, and intact leader, of height and caliper indicated, complying with
ANSI Z60.1 for type of trees required. Provide balled and burlapped, spaded trees as
specified on the Plant List on the Drawings. Ornamental Trees: Branched or pruned
naturally according to species and type, with relationship of caliper, height, and branching
according to ANSI Z60.1; stem form as follows: Stem Form shall be Single trunk or Multi-
trunk clump. Provide balled and burlapped, container-grown, spaded trees as specified.
Harmony Road Maintenance Project
College Avenue to Timberline Road
34
(g) Deciduous Shrubs: Furnish shrubs with not less than the minimum number of canes
required by and measured according to ANSI Z60.1 for type, shape, and height of shrub.
Provide container-grown shrubs.
(h) Ornamental Grasses: Provide healthy, disease-free plants of species and variety
shown or listed, with well-established root systems reaching to sides of the container to
maintain a firm ball, but not with excessive root growth encircling the container. Provide
only plants that are acclimated to outdoor conditions before delivery. Plants shall be
healthy, field-grown plants from a commercial nursery, of species and variety shown or
listed, complying with requirements in ANSI Z60.1.
(i) Trunk Wrap Tape: Two (2) layers of crinkled paper cemented together with
bituminous material, 4-inch wide minimum, with stretch factor of thirty-three percent (33%).
Inspect tree trunks for injury, improper pruning, and insect infestation; take corrective
measures required before wrapping. Wrap all deciduous single trunk trees with trunk-wrap
tape in the Autumn of the year installed. Start at base of trunk and spiral cover trunk to
height of first branches. Overlap wrap, exposing half the width, and securely attach
without causing girdling. Trunk wrap should be completely removed by April 15 the
following year.
In Subsection 214.03(a), delete the second paragraph and replace with the following:
Areas to be planted shall be brought to the lines and grades designated and approved.
The locations of trees and shrubs on the planting plans are approximate. The Contractor
shall stake locations as accurately as possible. All locations and layouts shall be approved
by Landscape Architect before preparatory work for planting is started. Locations of all
trees in grates are to be laid out exactly, based on the drawings.
Proceed with planting only when existing and forecasted weather conditions permit
planting to be performed according to written instructions and warranty requirements.
Plant trees and shrubs after finish grades are established and before native seeding
unless otherwise acceptable to Owner’s Representative. When planting trees and shrubs
after native seeding has been completed, protect areas and promptly repair damage
caused by planting operations.
Subsection 214.03(b) shall include the following:
Planting pits for trees within sidewalks shall be dug the entire width of the tree grates
and the depth of the root ball. A 4’-0” wide by 8’-0” long by 6 1/2-foot deep hole
shall be dug or augured at the bottom of the planting pit for drainage. Place tree so that
the tree sits in center of tree grate. Place tree for approval prior to backfilling. After
approval of placement, continue planting and backfilling operations.
Subsection 214.03(c) delete the second paragraph and replace with the following:
For the installation of trees:
Before planting, verify that root flare is visible at top of root ball according to ANSI Z60.1.
Set balled and burlapped stock plumb and in center of pit or trench with top of root ball
two inches (2”) adjacent finish grades.
Harmony Road Maintenance Project
College Avenue to Timberline Road
35
Remove burlap from tops of root-balls and partially from sides, but do not remove from
under root-balls. Remove entire wire basket. The process is as follows: 1) the bottom of
the basket is cut off prior to setting the tree in the planting pit; and 2) once the tree is in
the pit, carefully cut and remove the remainder of the wire basket. If the root-ball seems
unstable, the wire basket may be left on and used to place the tree in the planting pit;
however, once in the pit, the top half of the wire basket must be removed. Remove
pallets, if any, before setting. Do not use planting stock if root-ball is cracked or broken
before or during planting operation.
Place planting soil mix around root ball in layers, tamping to settle mix and eliminate
voids and air pockets. When pit is approximately one-half backfilled, water thoroughly
before placing remainder of backfill. Repeat watering until no more water is absorbed.
Water again after placing and tamping final layer of planting soil mix.
Set container-grown stock plumb and in center of pit or trench with top of root ball two
inches (2”) above adjacent finish grades. Carefully remove root ball from container
without damaging root ball or plant. Place planting soil mix around root ball in layers,
tamping to settle mix and eliminate voids and air pockets. When pit is approximately
one-half backfilled, water thoroughly before placing remainder of backfill. Repeat
watering until no more water is absorbed. Water again after placing and tamping final
layer of planting soil mix.
For the installation of plants:
Prior to planting, stake, flag, or paint proposed beds scaling off the plans to determine
bed configuration and size. Contact the Owner's Representative for review of extent and
configuration. Layout all planting pots prior to planting. Space plants equally within
beds to ensure a uniform appearance. Remove all pots prior to planting including peat
pots. Plant all plant material so that the plants are flush with finish grade (top of mulch)
when complete. This will require slightly mounding each plant. Lightly compact soil
around base of plant to ensure adequate root/ soil contact. Do not vigorously compact.
Re-establish fine grade by hand raking or smoothing grade by hand prior to placing
mulch. Apply specified mulch taking care not to damage plants. Clear excess mulch
from plant foliage.
Subsection 214.03(e) shall include the following:
Remove only dead, dying, or broken branches. Do not prune for shape. Do not prune
trees without prior approval of a City Forester.
Subsection 214.03 shall include the following:
j.) Tree Grates and Frames. Standard size, 4’x8’. Finish: powder coat finish dark gray.
Set grate segments flush with adjoining surfaces as shown on Drawings. Shim from
supporting substrate with soil-resistant plastic. Maintain a 3-inch- minimum growth
radius around base of tree; break away units of casting, if necessary, according to
manufacturer's written instructions.
Subsection 214.04 shall be deleted and replaced with the following:
The Contractor shall be responsible for the following:
Harmony Road Maintenance Project
College Avenue to Timberline Road
36
Abiding by Section 00700 “General Conditions” as it pertains to the Correction Period
associated with landscape maintenance.
After all planting on the project is complete, a plant inspection shall be held including the
Contractor, Engineer and Landscape Architect to determine acceptability of plant material.
During inspection, an inventory of rejected material will be made, and corrective and necessary
cleanup measures will be determined.
From the time of installation, during construction, and throughout the Correction Period, the
Contractor shall maintain all plant material, sodded and seeded areas in a healthy and vigorous
growing condition, and ensure the successful establishment of vegetation. During the
Correction Period, the Contractor shall water, cultivate, and prune the plants, and repair, replace
or readjust guy material. The Contractor shall also remove weeds from plant beds and saucers,
maintain specified depths of mulching material and fertilize via a root feeder during the spring of
each growing season.
Dead, dying or rejected material shall be removed during the Correction Period as directed.
Plant replacement shall be performed during the spring planting seasons at the beginning and
end of the Correction Period. Plant replacement stock shall be planted in accordance with the
Contract and is subject to all requirements specified for the original material. Plant replacement
shall be at the Contractor’s expense.
An inspection will be conducted by the Contractor, Engineer and Landscape Architect, 12
months after the beginning of the Correction Period in order to determine acceptability. Plant
replacements determined to be necessary at this inspection will be planted within 30 days
following the inspection. A second inspection to determine acceptability will be conducted no
later than 23 months following the beginning of the Correction Period. Plant replacements
determined to be necessary at this second inspection will be planted within 30 days following
the inspection. Following any necessary plant replacements, the Contractor, Engineer and
Landscape Architect will conduct a final inspection in order to close the Correction Period. The
Contractor shall remove all guying wires, straps and stakes from the plant material prior to this
final inspection.
The trees planted by the Contractor shall be watered twice per month at the rate of 30 gallons
per tree per watering event for the months May through October, or as needed. The trees shall
also be watered once per month at the rate of 30 gallons per tree for the months November
through April, or as needed.
The shrubs planted by the Contractor shall be watered twice per month at the rate of 10 gallons
per shrub per watering event for the months May through October, or as needed. The shrubs
shall also be watered once per month at the rate of 10 gallons per shrub for the months
November through April, or as needed.
Prior to the beginning of the Correction Period, a watering schedule listing the calendar days
chosen to complete the required watering shall be submitted to facilitate inspections by the
City/Engineer.
The Contractor shall submit the desired watering schedule for all plant material for the months
of May through October when the irrigation is on so the schedule can be programmed into the
central computer. The Engineer shall be notified in advance each month when each of the
winter watering is to be done.
Harmony Road Maintenance Project
College Avenue to Timberline Road
37
The Contractor shall keep a project journal documenting all landscape and irrigation
maintenance activities including work locations and time spent. The Contractor shall provide
copies of the journal to the Engineer upon request.
The Contractor shall shield guy wires from trees with white PVC tubing to make the wire visible
for pedestrians and bicyclists - the cost to be included in the cost of the plants. The Contractor
shall maintain staking and guying until the end of the Correction Period. The Contractor shall
remove all guying wire, straps and stakes at the end of the Correction Period.
The Contractor shall obtain inspection and approval of all plant material by owner’s
representative at the nursery or on-site prior to planting.
All plant material shall meet the ANSI Z60.1-2004 American Standards for Nursery Stock.
Plants with disease or insects are not permitted. Plants with wounded or broken branches will
be rejected. Trees with co-dominant leaders or poor form will be rejected. Trees with girdling
roots visible at the surface of the ball will be rejected.
Subsection 214.05 shall include the following:
Packaged Materials: Deliver packaged materials in original, unopened containers showing
weight, certified analysis, name and address of manufacturer, and indication of
conformance with state and federal laws if applicable.
Bulk Materials:
Do not dump or store bulk materials near structures, utilities, walkways and pavements, or on
existing turf areas or plants.
Provide erosion-control measures to prevent erosion or displacement of bulk materials,
discharge of soil-bearing water runoff, and airborne dust reaching adjacent properties,
water conveyance systems, or walkways.
Accompany each delivery of bulk fertilizers, lime, and soil amendments with appropriate
certificates.
Do not prune trees and shrubs before delivery. Protect bark, branches, and root systems
from sun scald, drying, wind burn, sweating, whipping, and other handling and tying
damage. Do not bend or bind-tie trees or shrubs in such a manner as to destroy their
natural shape. Provide protective covering of plants during shipping and delivery. Do
not drop plants during delivery and handling.
Handle planting stock by root ball.
Deliver plants after preparations for planting have been completed, and install immediately.
If planting is delayed more than six hours after delivery, set plants and trees in their
appropriate aspect (sun, filtered sun, or shade), protect from weather and mechanical
damage, and keep roots moist.
Set balled stock on ground and cover ball with soil, peat moss, sawdust, or other acceptable
material.
Do not remove container-grown stock from containers before time of planting.
Harmony Road Maintenance Project
College Avenue to Timberline Road
38
Water root systems of plants stored on-site deeply and thoroughly with a fine-mist spray. Water
as often as necessary to maintain root systems in a moist, but not overly-wet condition.
Subsection 214.06 shall include the following:
Pay Item Pay Unit
Deciduous Tree (3 Inch Caliper) Each
Evergreen Tree (6 Foot Height) Each
Evergreen Tree (20 Gallon) Each
Deciduous Tree (6 Foot Clump) Each
Deciduous Tree (8 Foot Clump) Each
Deciduous Tree (10 Foot Clump) Each
Shrub (5 Gallon Container) Each
Perennials and Ornamental Grasses (1 Gallon Container) Each
Water required for all items of work will not be measured and paid for separately,
but shall be included in the work.
Payment shall be full compensation for all work necessary to complete the item.
Landscape maintenance performed during construction will not be measured and paid for
separately, but shall be included in the work.
Harmony Road Maintenance Project
College Avenue to Timberline Road
39
REVISION OF SECTION 403
HOT MIX ASPHALT
Section 403 of the Standard Specifications is hereby revised for this project as follows:
Subsection 403.02 shall include the following:
The design mix for hot mix asphalt shall conform to the following:
Table 403-1
Value For Grading
Property Test
Method SG(100 ) S(100 ) Patching
Air Voids, percent at:
N (design) CPL 5115
3.5 – 4.5
3.5 – 4.5
3.5 – 4.5
Lab Compaction (Revolutions):
N (design) CPL 5115 100 100 100
Stability, minimum CPL 5106 30 30 30
Aggregate Retained on the 4.75
mm (No. 4) Sieve with at least 2
Mechanically Induced fractured
faces, % minimum
CP 45 90 60 60
Accelerated Moisture Sus-
ceptibility Tensile Strength Ratio
(Lottman), minimum
CPL 5109
Method B
80
80
80
Minimum Dry Split Tensile
Strength, kPa (psi)
CPL 5109
Method B 205 (30) 205 (30) 205 (30)
Grade of Asphalt Cement, Top
Layer PG 64-28 PG 58-28
Grade of Asphalt Cement,
Layers below Top PG 58-28 PG 58-28 PG 58-28
Voids in the Mineral Aggregate
(VMA) % minimum CP 48
See Table
403-2
See Table
403-2
See Table
403-2
Voids Filled with Asphalt (VFA),
% AI MS-2 65-75 65-75 65-75
Dust to Asphalt Ratio
Fine Gradation
Coarse Gradation
CP 50 0.6 – 1.2
0.8 – 1.6
0.6 – 1.2
0.8 – 1.6
0.6 – 1.2
0.8 – 1.6
Harmony Road Maintenance Project
College Avenue to Timberline Road
40
All mix designs shall be run with a gyratory compaction angle of 1.25 degrees and properties
must satisfy Table 403-1. Form 43 will establish construction targets for Asphalt Cement and all
mix properties at Air Voids up to 1.0 percent below the mix design optimum.
Table 403-2
Minimum Voids in the Mineral Aggregate (VMA)
Nominal ***Design Air Voids **
Maximum Size*,
mm (inches)
3.5% 4.0% 4.5%
37.5 (1½) 11.6 11.7 11.8
25.0 (1) 12.6 12.7 12.8
19.0 (¾) 13.6 13.7 13.8
12.5 (½) 14.6 14.7 14.8
9.5 (⅜) 15.6 15.7 15.8
* The Nominal Maximum Size is defined as one sieve larger
than the first sieve to retain more than 10%.
** Interpolate specified VMA values for design air voids between
those listed.
*** Extrapolate specified VMA values for production air voids
beyond those listed.
The Contractor shall prepare a quality control plan outlining the steps taken to minimize
segregation of HMA. This plan shall be submitted to the Engineer and approved prior to
beginning the paving operations. When the Engineer determines that segregation is
unacceptable, the paving shall stop and the cause of segregation shall be corrected before
paving operations will be allowed to resume.
Hot mix asphalt for patching shall conform to the gradation requirements for Hot Mix Asphalt
(Grading SG).
A minimum of 1 percent hydrated lime by weight of the combined aggregate shall be added to
the aggregate for all hot mix asphalt.
Acceptance samples shall be taken.
Subsection 403.03 shall include the following:
The Contractor shall use an approved anti-stripping additive. The amount of additive used shall
be a minimum of 0.5 percent by weight of the asphalt cement. The additive shall be added at
the refinery or at the hot plant. If liquid anti-stripping additive is added at the plant, an approved
in-line blender must be used. The blender shall be in the line from the storage tank to the drier
drum or pugmill. The blender shall apply sufficient mixing action to thoroughly mix the asphalt
cement and anti-stripping additive.
Delete subsection 403.05 and replace with the following:
Harmony Road Maintenance Project
College Avenue to Timberline Road
41
The accepted quantities of hot mix asphalt will be paid for in accordance with subsection
401.22, at the contract unit price per ton for the bituminous mixture.
Payment will be made under:
Pay Item Pay Unit
Hot Mix Asphalt (Grading S) (100) (PG 64-28) (Modified Binder) Ton
Hot Mix Asphalt (Grading SG) (100) (PG 58-28) Ton
Aggregate, asphalt recycling agent, additives, hydrated lime, and all other work necessary to
complete each hot mix asphalt item will not be paid for separately, but shall be included in the
unit price bid. When the pay item includes the PG binder grade, the asphalt cement will not be
measured and paid for separately, but shall be included in the work. When the pay item does
not include the PG binder grade, asphalt cement will be measured and paid for in accordance
with Section 411. Asphalt cement used in Hot Mix Asphalt (Patching) will not be measured and
paid for separately, but shall be included in the work.
Excavation, preparation, and tack coat of areas to be patched will not be measured and paid for
separately, but shall be included in the work.
Harmony Road Maintenance Project
College Avenue to Timberline Road
42
REVISION OF SECTION 403
HOT MIX ASPHALT (HAND PATCHING)
Section 403 of the Standard Specifications is hereby revised for this project as follows:
Subsection 403.01 is revised to include the following:
This work shall consist of excavating pavement areas to the specified depth, preparing the
subgrade, and placing Hot Mix Asphalt (HMA) in accordance with these specifications, and in
reasonably close conformity with the lines, grades, thickness and typical cross sectioning shown
on the plans or established.
Subsection 403.02 is revised to include the following:
The materials shall conform to the requirements of Revision of Section 403 – Hot Mix Asphalt
found herein;
Subsection 403.03 is revised to include the following:
Patching will be accomplished in the following manner:
A straight vertical cut shall be made through the pavement to provide a square rectangular
opening, such that each edge of the finished patch will be parallel or at right angles to the
direction of traffic. Wheel cutting shall not be allowed. All patches placed in pavement not to
be overlayed shall be saw cut.
If, in the opinion of the City, the subgrade material for the patch is unsuitable, it shall be
removed to the limits and depths designated. If asphalt is to be placed in the extra depth,
the Contract Unit Price for Patching shall be used for measurement and payment. If the
deepened section is to be filled with subbase material, the excavation will be measured and
paid for under Unclassified Excavation (Complete in Place).
The Contractor shall be responsible for the protection of the subgrade / base course until
subsequent courses have been placed.
After the excavation has been completed, the Contractor shall prepare the subgrade by
utilizing a vibratory plate, roller, or other compaction device approved by the City.
After the area to be patched is prepared, the Contractor shall place emulsified asphalt tack
coat on all pavement cut surfaces and on the lip of exposed gutter and crosspan faces that
abut these paving areas.
Emulsified Asphalt for tack coat shall be grade CSS-1H. The tack coat shall consist of a 1:1
dilution (one part emulsified asphalt to one part water). The application rate for tack coat
shall be approximately 0.1 gallons per square yard.
Grading SG shall be used in all locations except in locations where patching takes place and
no overlay is scheduled.
Grading SG shall be placed in the bottom of the patches and shall be left one and one-half (1
½) Inches to two (2) Inches below the existing street surface to allow the patch to be
Harmony Road Maintenance Project
College Avenue to Timberline Road
43
“topped” with a surface course material. The “topping” material shall be HMA Grading S.
HMA used for “topping” material will be measured and paid for at the Contract Unit Price for
Patching.
In locations where concrete repairs take place in an area of a large patch or in grind areas
and the grind operation does not immediately follow the concrete repair within three (3) days,
the Contractor shall remove no more than six (6) Inches of pavement. The pavement areas
shall be temporarily patched with a minimum of two (2) Inches of asphalt. These locations
shall be paid under the Contract Unit Price for Patching.
Regardless of the delivery temperature, the mixture shall not be placed for use on the
roadway at a temperature lower than two hundred twenty-five degrees Fahrenheit (225 ° F).
Pavement areas to be replaced adjacent to concrete repairs shall be as soon as schedule
permits.
Areas requiring reduction in the quantity for Patching shall be deducted from the pay quantity
using the following formula: Deduct 0.054 Tons per Square Yard Inch.
Subsection 403.04 is revised to include the following:
Patching will be measured and paid for at the Contract Unit Price per Ton. Pavement cutting,
excavation, subgrade preparation, haul, disposal and bituminous materials will not be measured
or paid for separately, but shall be included in the Contract Unit Price for Patching.
Subsection 403.05 is revised to include the following:
Work performed and materials furnished as prescribed by this item and measured as provided
under “Measurement” will be paid for as follows:
Pay Item Pay Unit
Hot Mix Asphalt (Hand Patching) Ton
The above prices and payments shall include full compensation for furnishing all labor,
materials, tools, equipment and incidentals and for doing all the work involved in Patching;
including pavement cutting, excavation, haul, disposal, surface preparation, traffic control
devices, personnel and related traffic control incidentals and bituminous materials, complete-in-
place, as shown on these plans, as specified in these specifications and as directed by the City.
Harmony Road Maintenance Project
College Avenue to Timberline Road
44
REVISION OF SECTION 420
GEOTEXTILE PAVING FABRIC
Section 420 of the Standard Specifications is hereby revised for this project as follows:
Subsection 420.01 is revised to include the following:
This work shall consist of placing Geotextile Paving Fabric as manufactured by Phillips Fibers
Corporation, Hoechst Fiber Industries, Amoco Fabrics Company, or an approved equal in
designated areas in substantial compliance with the plans, specifications and as directed by the
City.
Subsection 420.02 is revised to include the following:
Geotextile Paving Fabric shall be a non-woven, needle-punched pavement reinforcing fabric
which conforms to the following properties:
Grab Strength, either direction, minimum (ASTM D-4632) 90 pounds
Elongation, either direction, minimum (ASTM D-4632) 50 percent
Burst Strength (ASTM D-3786) 185 pounds / square inch
Weight, minimum 3.6 ounces / square yard
Asphalt Retention, minimum (TF25 #8) 0.2 gallons / square yard
Melting Point, minimum (ASTM D-276) 300 degrees Fahrenheit
The tack coat to be applied to the roadway surface and / or to the Geotextile Paving Fabric shall
meet the following requirements:
Asphalt Cement AC-20
Emulsified and /or Cutback Asphalt shall not be used as tack coat for Geotextile Paving
Fabric
Subsection 420.03 is revised to include the following:
Surface Preparation:
The pavement to be repaired shall be cleaned and free of dirt, dust, water and vegetation.
Cracks shall be cleaned and filled in accordance with Section 403 of these specifications. If the
crack filling materials contain volatiles, adequate curing time must be allowed prior to placement
of the fabric. The pavement must be cleared of all sharp or angular protrusions.
Application of Tack Coat:
The tack coat shall be applied at a rate in accordance with the manufacturer’s specifications
(approximately 0.25 gallons per square yard). Application must be by a distributor.
Temperature of the tack coat must be sufficiently high to permit a uniform spray pattern. The
maximum asphalt temperature shall be three hundred degrees Fahrenheit (300 ° F).
Subsection 420.04 is revised to include the following:
Geotextile Paving Fabric Placement:
The Geotextile Paving Fabric shall be placed into the tack coat with a minimum of wrinkles.
If Geotextile Paving Fabric folds greater than one (1) Inch occur, the Geotextile Paving Fabric
shall be slit and allowed to lie flat. Additional tack coat shall be placed as required to insure
Harmony Road Maintenance Project
College Avenue to Timberline Road
45
fabric bonding.
If Geotextile Paving Fabric is placed adjacent to patched sections of roadway, the fabric shall
overlap said patched section a minimum of twelve (12) Inches.
All joints shall overlap adjacent fabric approximately six to twelve (6 to 12) Inches.
Transverse joints of the Geotextile Paving Fabric shall be shingled in the direction of the paving
to prevent edge pickup by the paver.
Additional tack coat shall be uniformly applied to the joints and overlaps to insure bonding.
It shall be the Contractor’s responsibility to maintain the Geotextile Paving Fabric until the
overlay is complete. If the Geotextile Paving Fabric begins to be picked up, the Contractor shall
immediately broadcast sand or hot mix asphalt over the area or “skin” the Geotextile Paving
Fabric with Hot Mix Asphalt SC Type 1 or 2. Excess sand or hot mix shall be removed before
paving. Sand and / or Hot Mix Asphalt SC Type 1 or 2 used for this purpose will not be
measured and paid for separately under the terms of this contract.
Geotextile Paving Fabric shall be clean, dry and sufficiently bonded to the tack coat prior to
commencing the paving operations. Paving operations shall be completed the same day as the
Geotextile Paving Fabric placement.
Subsection 420.09 is revised to include the following:
Geotextile Paving Fabric will be measured by the Square Yard of surface area covered,
complete in place, including surface preparation and AC-20 tack coat.
Subsection 420.10 is revised to include the following:
The accepted quantities of Geotextile Paving Fabric will be paid for at the Contract Unit Price
per Square Yard complete in place, including surface preparation and AC-20 tack coat.
Payment will be made under:
Pay Item Pay Unit
Geotextile Paving Fabric Square Yard
Harmony Road Maintenance Project
College Avenue to Timberline Road
46
REVISION OF SECTION 601
MISCELLANEOUS CONCRETE
Section 601 of the Standard Specifications is hereby revised for this project as follows:
Subsection 601.02 shall include the following:
Concrete Class D shall be used for curb, gutter, sidewalk, curb ramps, median cover material
and miscellaneous paving.
Harmony Road Maintenance Project
College Avenue to Timberline Road
47
REVISION OF SECTION 605
SUBSURFACE DRAINS
Section 605 of the Standard Specifications is hereby revised for this project as follows:
Subsection 605.01 shall include the following:
This work consists of furnishing all materials and workmanship necessary to construct the
underdrain cleanouts, wrapping the underdrain with weed barrier, CDOT Class A filter material,
10 mil plastic visquine and connection to the existing 15-Inch RCP storm sewer line. The
underdrain cleanouts (on 50’ center to center spacing) consist of a 4-Inch riser pipe, tee and
screw-on cap as specified with the lines and grades shown on the plans. The underdrain will
daylight to the existing center median on Harmony Road.
Pay Item Pay Unit
4 Inch Perforated Pipe Underdrain Linear Foot
Harmony Road Maintenance Project
College Avenue to Timberline Road
48
REVISION OF SECTION 608
DETECTABLE WARNINGS
Section 608 of the Standard Specifications is hereby revised for this project as follows:
Subsection 608.01 shall include the following:
This work includes the installation of detectable warnings on concrete curb ramps at the
locations shown on the plans and in accordance with the plans.
Subsection 608.02 shall include the following:
Detectable warnings on curb ramps shall be truncated domes of the dimensions shown on the
standard plans. Domes shall be prefabricated by the manufacturer as a pattern on concrete or
masonry pavers.
Pavers shall meet all Americans with Disabilities Act (ADA) requirements for truncated domes,
and when installed, shall be capable of producing the pattern of domes as shown on the
standard plans.
Pavers shall meet the requirements of ASTM C 902 or ASTM C 936.
Alternate materials may be used, if pre-approved by the Engineer. The Contractor shall submit a
sample of the product, the name of the selected supplier, and documentation that the product
meets all contrast requirements and will be fully compatible with the curb ramp surface to the
Engineer for approval prior to start of work. Known vendors of alternate products include but
are not limited to the following:
VENDOR NAME PRODUCT PHONE NUMBERS
TMA Construction Supply CAST in TACT Warning
Panels
303-295-6050
East Jordan Iron Works, Inc. Truncated Dome Plates 800-626-4653
Neenah Foundry Company R-4984 Detectable
Warning Plate
800-558-5075
The domes and the underlying surface shall have a minimum of 70% contrast with the light
reflectivity of the adjoining surface. The contrast shall be verified using the following equation:
100
1
1 2
B
Contrast B B
Where B1 = Light Reflectance Value (LRV) of the lighter area
B2 = LRV of the darker area
Absolute black and white will not be permitted.
Harmony Road Maintenance Project
College Avenue to Timberline Road
49
The contrast shall be achieved by adding pigment during the fabrication of the paver. Prior to
start of work, the Contractor shall submit appropriate documentation from the manufacturer
verifying that the contrast has been met, along with a sample paver, to the Engineer for
approval.
Bedding and joint sand shall be free of deleterious or foreign matter. The sand shall be natural
or manufactured from crushed rock. Limestone screenings or stone dust shall not be used.
Sand for bedding material shall conform to ASTM C 33. Sand that is to be placed between
joints shall conform to ASTM C 144.
Subsection 608.03 shall include the following:
(g) Detectable Warnings. Pre-fabricated pavers for detectable warnings shall be brought to the
site in steel banded, plastic banded or plastic wrapped cubes capable of being transported
by a fork lift or clamp lift. Pavers shall be carefully removed and stacked in a manner which
results in the least amount of damage. All pavers that are damaged during transport or
delivery will be rejected and shall be replaced at the Contractor’s expense. Minor cracks or
chipping due to transport and handling that do not interfere with the structural integrity of the
paver or the overall pattern of truncated domes will not be deemed as grounds for rejection.
The Contractor shall spread the bedding sand evenly in the area defined and shall screed
the sand to an appropriate embedment depth as shown on the plans or as directed by the
Engineer. Sufficient sand should be placed to stay ahead of laid pavers
Pavers shall be placed in a running bond pattern. Domes shall be aligned to create a
square grid in the predominant direction of travel as shown in the plans. Pavers shall be
installed such that the base of the truncated dome is at the same elevation as the adjoining
surface, allowing for a smooth transition between the curb ramp and the detectable warning.
When cut pavers are required to fill gaps between the pavers and the edge of concrete, the
Contractor shall bevel portions of the truncated domes at a 45-degree angle to create a
smooth transition between the partial dome and the curb ramp surface. Unless otherwise
directed by the Engineer, pavers shall be cut and installed in such a manner that the domes
on the cut sections will not significantly impact the overall pattern of the truncated domes.
The Contractor shall use a plate vibrator to embed the pavers into the sand. The size and
type of plate vibrator shall be in accordance with manufacturer’s recommendations, or as
directed by the Engineer. All pavers that are damaged during embedment shall be replaced
at the Contractor’s expense.
Joint spacing between paver units shall be in accordance with the manufacturer’s
recommendations, or as approved by the Engineer. Joints shall be filled completely with
joint sand. Excess sand shall be removed by sweeping.
(h) Alternate products. Alternate materials shall be installed in accordance with manufacturer’s
recommendations.
The concrete surface to which alternate materials are to be applied shall be prepared in
accordance with manufacturer’s recommendations. Material requirements, color and
application shall be in accordance with manufacturer’s recommendations and as approved
by the Engineer.
Harmony Road Maintenance Project
College Avenue to Timberline Road
50
Subsection 608.05 shall include the following:
Detectable warnings on curb ramps, including sand, pavers, alternate materials, and all other
work and materials necessary for fabrication, transport, and installation will not be measured
and paid for separately, but shall be included in work for concrete curb ramp.
Harmony Road Maintenance Project
College Avenue to Timberline Road
51
REVISION OF SECTION 623
IRRIGATION SYSTEM
Section 623 of the Standard Specifications is hereby revised for this project as follows:
Subsection 623.07 is hereby revised to include the following:
In locations where a sprinkler system is being relayed, the sprinkler heads shall be new and
of the type and manufacturer equal to those being replaced, or as approved by the
Engineer.
Subsection 623.10 (b) is hereby revised to include the following:
Lateral pipe shall be Class 200 PVC.
A warranty period of two years from final acceptance or two full growing seasons (growing
season defined as May through October), whichever is greater, will be apparent for all the
components associated with the irrigation system installed as part of the construction
project. All improvements which do not meet the project’s contract specifications be it
through substandard materials or workmanship, shall be removed and replaced at the
Contractor’s expense.
The project will be inspected by City representatives on a monthly basis while the system is
in operation throughout the duration of the warranty period. The City will develop a list of
components which will need to be addressed and deliver this to the Contractor. The City
and Contractor will meet to finalize the list of items to be addressed along with determining
the timing of the work to be completed. The following will result in removal and replacement
of failed irrigation equipment or parts with new components which meet the project’s
contract specifications:
Any failure due to product substitution not previously approved by the City
Any failure due to improper installation, not including failures due to acts of nature
Any failures of the irrigation controller and attached sensors due to defective electronics
Any failures due to broken valve wires, wires nicked during construction, improper
connections, improper wire gauge, improper grounding, and any other failures due to
improper wiring installation
Any failures of the zone valves and decoders due to defective equipment
Any failures of the mainline and lateral pipes due to factory defects, poor workmanship,
improper pipe welds or weld material, or poor backfilling techniques
Any defective valve boxes, or any failures of valve boxes due to improper installation
(must fall with -1/8” to -5/8” of adjacent improvements)
It is the responsibility of the Contractor to correct the irrigation system immediately unless
directed by the City. All warranty repairs will remove the improperly installed or failed
irrigation equipment and replace with the new components to meet the intent of the contract
specifications and plans. The installation shall be performed in accordance with the
specifications for irrigation improvements as is defined in the contract and the plans.
The Contractor will be responsible for scheduling all traffic control necessary for addressing
Harmony Road Maintenance Project
College Avenue to Timberline Road
52
the items to be repaired. All traffic control plans shall be submitted to the City’s Traffic
Operations Department for approval prior to commencing the warranty work. The
Contractor will also be responsible for notifying the City’s project manager at least 48 hours
prior to the beginning of any work.
Subsection 623.16 is hereby revised to include the following:
The Contractor will be responsible for the proposed irrigation connection to the City’s existing ¾
-Inch waterline in the existing median east of the Union Pacific tracks. The Contractor will use
the 2-Inch conduit to feed the proposed median west of the Union pacific tracks. Payment for
these items will be under “Irrigation System (Median)”.
Pay Item Pay Unit
Irrigation System (Relay Turfed Areas) Lump Sum
Irrigation System (Median) Lump Sum
Harmony Road Maintenance Project
College Avenue to Timberline Road
53
REVISION OF SECTION 625
CONSTRUCTION SURVEYING
Section 625 of the standard Specifications is hereby revised for this project as follows:
Subsection 625.01 is hereby revised to include the following:
All existing survey monuments and property corner located outside of the project grading limits
as defined on the plans that are damaged or destroyed by the Contractor will be replaced at the
Contractor’s expense.
All existing survey monuments and property corners located within the project grading limits
which are intended to remain in place and intact as defined on the plans shall be protected by
the Contractor. Where necessary monuments, property corners, and section corners will be
adjusted or replaced by the City for this project.
City of Fort Collins will provide the surveying and staking anticipated to include the following:
1. Control
Location of horizontal and vertical control points will be provided at approximately 1000-
foot intervals. Monuments will be set outside the limits of construction.
2. Easements and Right of Way
Temporary construction easements (TCE) and those portions of right of way between
TCE’s will be staked at 100 foot intervals on tangents, PCs, 50 foot intervals on curves,
angle points and corner points.
3. Excavation and Embankment
a. One set of slope stakes at 25-foot intervals (stations) on each side of the proposed
road including intersections. Staking information to include cut/fill for
“limit of cut” or “limit of fill” location
decision point (ditch flowline or grade break)
edge of pavement
roadway centerline
b. One set of shoulder and/or curb stakes at 25-foot stations on each side of the
road including intersections.
c. One set of slope or shoulder stakes for the grading of each driveway and field
access.
d. Ditch grades shall be defined by the slope staking described above.
4. Storm Drainage
One set of offset stakes for each storm drain pipe and inlets.
5. Utility Crossing
One set of offset stakes for the utility conduit crossings.
Harmony Road Maintenance Project
College Avenue to Timberline Road
54
6. Subgrade and Paving
a. One set of blue top subgrade stakes at 25-foot stations on tangents, PCs and PT’s
after completion of the subgrade preparation. Stakes to be set at 25-foot stations for
horizontal curves with a radius less than 1,000 feet and at all vertical curves. Blue
tops will be set on centerline and the edge of pavement on both sides of the
roadway. These blue tops will remain in place to be used for the aggregate base
course or paving operations.
7. Signs
One set of stakes to locate each sign.
8. Delineators
No survey will be provided. The Contractor shall install delineators as specified in the
plans.
9. Striping
City of Fort Collins will provide layout of all temporary pavement striping for the
Contractor.
10. Mailboxes, Newspaper Boxes and Address Posts
No survey will be provided. The Contractor shall reset all mailboxes, newspaper boxes
and address posts per agreement with the property owner and approval by the Engineer.
11. Property Corners and Section Corners
Reset property corners located along the right of way and section corners within the
project grading limits.
Harmony Road Maintenance Project
College Avenue to Timberline Road
55
REVISION OF SECTION 627
TEMPORARY PAVEMENT MARKING
Section 627 of the standard Specifications is hereby revised for this project as follows:
Subsection 627.01 is hereby revised to include the following:
This work shall consist of furnishing, installing and removing, if necessary, temporary pavement
marking in accordance with the latest revision of the Fort Collins Traffic Operations Manual, City
of Fort Collins Work Area Traffic Control Handbook, Larimer County Urban Area Street
Standards (LCUASS) and Manual on Uniform Traffic Control Devices for Streets and Highways
(MUTCD) and in conformity to the lines, dimensions, patterns, locations and details shown on
the plans or established by the City.
Subsection 627.10 is hereby revised to include the following:
Pavement marking tape shall be suitable for use on asphalt cement or portland cement concrete
pavements and shall be installed as follows if this method is selected for use by the Contractor:
1. The surface to which the tape is applied shall be clean, dry and free of dirt, oils and
grease. The tape / tab shall be pressed down immediately after application, until it
adheres properly and conforms to the surface.
2. All roads shall have temporary pavement markings before they are opened to traffic
unless the City stripping crews have been scheduled to install permanent markings prior
to opening the road to traffic.
3. Markings applied to a final surface shall not leave a scar that conflicts with permanent
markings. In general, temporary markings on the final surface shall be avoided and will
require approval from the Engineer prior to placement.
4. Temporary markings shall be installed in such a manner that the markings adequately
follow the desired alignment.
5. Lane lines shall be “taped” intermittently with a two (2) Foot long by four (4) Inch wide
reflective temporary stripe at fifty (50) Foot intervals.
6. It is the Contractor’s responsibility to maintain the temporary markings, at the
Contractor’s expense, until the permanent pavement marking is installed by the City.
7. Removable pavement markings shall be installed in accordance with the manufacturer’s
recommendations and maintained by the Contractor until permanent markings are
installed by the City.
8. Temporary edge lines are not typically required unless specified by the City.
9. All tape shall be removed by the Contractor after permanent markings have been
completed by the City.
Harmony Road Maintenance Project
College Avenue to Timberline Road
56
Subsection 627.12 is hereby deleted and replaced with the following:
The types of temporary pavement markings and associated maintenance of temporary
pavement markings will not be measured and paid for separately, but will be paid at the
Contract Unit Price Lump Sum.
Subsection 627.13 is hereby revised to include the following:
The costs of installing, maintaining and removing temporary stripping shall be included in the
Work. No measurement or payment shall be made separately for required traffic control
devices, personnel and related traffic control incidentals.
Pay Item Pay Unit
Temporary Pavement Marking Lump Sum
Harmony Road Maintenance Project
College Avenue to Timberline Road
57
REVISION OF SECTION 630
CONSTRUCTION ZONE TRAFFIC CONTROL
Section 630 of the standard Specifications is hereby revised for this project as follows:
Subsection 630.01 is hereby revised to include the following:
This work shall consist of furnishing, installing, maintaining and removing temporary
construction traffic control devices including, but not limited to: signs, advance warning arrow
panels, variable message boards, barricades, channeling devices and delineators as required
by the latest version of the City of Fort Collins Work Area Traffic Control Handbook, Manual on
Uniform Traffic Control Devices for Streets and Highways (MUTCD) and the Larimer County
Urban Area Street Standards (LCUASS).
In the event of a conflict between the MUTCD and the City’s criteria, the City of Fort Collins
specifications shall govern.
Subsection 630.02 is hereby revised to include the following:
All traffic control devices placed for the project must meet or exceed the minimum standards set
forth in the City of Fort Collins Work Area Traffic Control Handbook and the MUTCD. All traffic
control devices shall be clean and in good operating condition when delivered and shall be
maintained in that manner on a daily basis. All traffic control devices shall be clearly marked
and free of crossed out information or any other form of defacement that detracts from the
purpose for which they are intended (ex. Crossed our information, information written in long-
hand style, etc.).
Additionally, any sign blank with sign faces on both sides must have the back sign face covered
when in use to avoid confusion to motorists traveling in the opposite direction and other
potentially affected parties.
Subsection 630.09 is hereby revised to include the following:
Traffic control through the construction area is the responsibility of the Contractor.
When a device is not in use, the Contractor shall remove it from the project for the period it is
not needed. Devices temporarily not in use shall, as a minimum, shall be removed from the
area. Moving will include devices removed from the project and later returned to use.
Traffic control devices shall be placed and / or stored in the City right-of-way in such a manner
that minimizes the hazards to pedestrians, bicyclists and vehicles.
Traffic control devices shall be removed from the site immediately upon completion of the work
for any street(s).
In the event there is a violation or safety issue, the City will order a “Stop Work Order” until the
issue(s) is corrected. The Contractor shall not be entitled to any additional compensation for
delays associates with the “Stop Work Order”.
The Contractor shall be responsible for ensuring safe passage through the work zone for
vehicle, pedestrians and bicyclists.
Harmony Road Maintenance Project
College Avenue to Timberline Road
58
The Contractor shall use variable message boards to advice road users about upcoming work
on Arterial and Collector Streets. The City will issue direction for the number of boards, general
locations for placement and message verbiage. Fully automated variable message boards shall
be installed and operate continuously for all work on Arterial and Collector Streets.
1. Two-way traffic shall be maintained at all times unless approved by the City. Lane width
shall be maintained at a minimum of ten (10) Feet.
2. The Contractor will provide twenty-four (24) hour minimum notice to the City of Fort
Collins Traffic Department when the project operation is near a signalized intersection.
3. The Contractor shall provide and coordinate uniformed police officers for traffic control
when necessary for the safety of the workers and traveling public.
Traffic control plans shall be submitted for all work locations prior to commencement of any
work. Plans shall be submitted on approved forms supplied by the City. A traffic control plan
shall be prepared by a Traffic Control Supervisor certified by the American Traffic Safety
Services Association (ATSSA) or a Worksite Traffic Control Supervisor certified by the Colorado
Contractor’s Association (CCA).
The typical traffic Control plans shall be submitted for approval to the City by 8:00 am, two (2)
working days prior to the commencement of work. All plans shall be delivered to the City at 625
Ninth Street, Fort Collins. Facsimiles of plans shall not be allowed.
No phase of the construction shall start until the Traffic Control Plan has been approved.
Failure to have an approved Traffic Control Plan shall constitute cause for the City to stop work
and Owner shall deduct from compensation $1,000.00 per day for said compensation, as well
as the Contractor’s forfeiture of payment for all work and materials at that location with no
adjustment in the Contract time.
The Traffic Control Plan shall include, as a minimum, the following:
1. A detailed diagram which shows the location of all sign placements, including advance
construction signs (if not previously approved) and speed limit signs; methods, length
and time duration for lane closures and location of flag persons.
2. A tabulation of all traffic control devices on the detailed diagram including, but not limited
to: construction signs, vertical panel, vertical panel with light, Type I / II / III barricades,
cones, drum channelizing devices and advance warning flashing or sequencing arrow
panel. Certain traffic control devices may be used for more than one operation or phase.
However, all devices required for any particular phase must be detailed and tabulated for
each phase.
3. Number of flaggers to be used.
4. Parking restrictions to be in effect.
Approval of the proposed method of handling traffic does not relieve the Contractor of liability
specifically assigned to him / him under this Contract.
Subsection 630.10 is hereby revised to include the following:
Harmony Road Maintenance Project
College Avenue to Timberline Road
59
The Contractor shall designate an individual, other than the superintendent, to be the Traffic
Control Supervisor. Traffic Control management shall be performed by a Traffic Control
Supervisor (TCS). The TCS(s) shall possess a current American Traffic Safety Services
Association (ATSSA) certification as a Worksite Traffic Control Supervisor or Colorado
Contractor’s Association (CCA) certification as a Traffic Control Supervisor. Proof of
certification shall be presented to the City Traffic Control Manager, and when requested by the
City, for each TCS utilized on this project.
One TCS shall be designated as the Head TCS. The Head TCS shall have a minimum of one
year experience as a certified TCS. Qualifications shall be submitted to the City for approval a
minimum of one week prior to commencement of the work. The Head TCS shall be on site at all
times during the construction.
It is the intent of the specifications that the Head TCS be the same throughout the project and
remains on site at all times during the construction.
If, in the opinion of the City, any traffic control individual does not perform their duties at or to the
minimum industry standard, the Contractor will be required to replace that individual.
The TCS shall be equipped with a cellular phone.
The TCS duties shall include, but not be limited to the following:
1. Prepare, revise and submit Traffic Control Plans as required.
2. Supervise and direct project flaggers.
3. Coordinate all traffic control related operations, including those of the Subcontractor and
supplier.
4. Coordinate project activities with appropriate police and fire control agencies, Transfort,
school districts and other affected agencies and parties prior to construction.
5. Inspect traffic control devices on a calendar day basis for the duration of the project to
ensure devices are functioning properly.
6. Oversee all requirements covered by the plans and specifications which contribute to the
convenience, safety and orderly movement of traffic.
7. Flagging in emergency or relief for short periods of no more than fifteen (15) minutes
over a sixty (60) minute period.
8. Traffic control device set up and removal.
9. Maintain a project traffic control diary which shall become part of the City’s records. This
diary / log shall be submitted to the City daily and shall include the following information
as a minimum:
a) Date
b) For Traffic Control Inspection, the time of the inspection
c) Project description and location
d) Traffic Control Supervisor’s name
e) Types and quantities of traffic control devices used per approved MHT
Harmony Road Maintenance Project
College Avenue to Timberline Road
60
f) List of flaggers used, including start time, stop time and number of flagging hour
breaks
g) Traffic control problems (traffic accidents, damaged or missing devices and
corrective actions taken)
Traffic control management shall be maintained on a twenty-four (24) hour per day basis. The
Contractor shall make arrangements so that the Traffic Control Supervisor or their approved
representative will be available on every working day, “on-call” at all times and available upon
request of the City during non-working hours. A twenty-four (24) hour telephone number shall
be provided to the City prior to commencement of work.
All traffic control devices and traffic control management shall be placed under the supervision
of a Traffic Control Supervisor.
The Traffic Control Supervisor shall have up to date copies of the City of Fort Collins “Work
Area Traffic Control Handbook” and Part VI of the MUTCD, pertaining to traffic control for street
and highway construction, available at all times.
The following list reflects devices that may be used on the project or as authorized by the City:
“NO PARKING” sign with stand Size A Specialty Sign
Vertical panel without light Size B Specialty Sign
Channelizing drum without light Safety Fence
Type I/II barricade without light Light
Type III barricade without light Advance warning flashing or sequencing arrow panel
Cone with reflective strip Variable message board
Size A sign with stand Size B sign with stand
All costs associated with Traffic Control Plan review will not be measured or paid for separately,
but shall be considered incidental to the Work. Review fees will not be measured or paid for
separately, but shall be considered incidental to the Work.
The Contractor shall provide the services of the Colorado State Patrol or City of Fort Collins
Police when necessary during the course of the work as instructed by the City. Associated
costs shall be incidental to the Work.
The City shall deduct from compensation due the Contractor $10.00 per day for each traffic
control device not removed from the site immediately upon completion of the work or as directed
by the City.
Flagger hand signs and devices, such as Stop / Slow paddles, will not be measured and paid for
seperately, but shall be included in the Work.
The flaggers(s) shall be provided with electronic communication devices when required. These
devices will not be measured and paid for separately, but shall be included in the Work.
The cost of batteries, electricity and / or fuel for all lighting or warning devices will not be
measured and paid for separately but will be considered subsidiary to the traffic control.
Sand bags and caution tape will not be measured and paid for separately, but shall be included
in the Work.
Harmony Road Maintenance Project
College Avenue to Timberline Road
61
The Contractor may provide larger construction traffic signs than those typically used in
accordance with the City of Fort Collins Work Area Traffic Control Handbook and the MUTCD, if
approved by the City. However, no payment will be made for additional panel size.
The City shall not be responsible for any losses or damage due to theft of vandalism. The City
of Fort Collins will not be responsible for any damage caused by the Contractor’s construction
activities to the public. Private or public property which is damaged by the Contractor’s
equipment or employees will be the sole responsibility of the Contractor.
Subsection 630.15 is hereby revised to include the following:
All traffic control costs including, but not limited to, furnishing equipment, equipment set up /
removal / modifications, TCS and flagging personnel, vehicles, phones, hand signs,
communication devices, sandbags and all related incidentals required for traffic control under
this Contract shall be considered a subsidiary obligation of the Contractor in connection with the
various items of the Work. No measurement or payment shall be made separately for traffic
control related items as specified in these specifications or as directed by the City.
SPECIAL CONDITIONS FOR WORK ON ARTERIAL AND COLLECTOR STREETS
1. Cross street traffic shall be maintained at all times unless authorized by the City in
writing.
2. Full closures on Arterials and Collectors will be allowed under extreme circumstances
and only upon approval from the City. Plans shall be approved a minimum of two (2)
weeks prior to commencement of work and / or the time required to adequately notify the
public through the media.
3. Construction or repair work will not be permitted at or in the vicinity of an Arterial /
Arterial intersection that has major traffic volumes between the hours of 7:00am to
8:30am or 3:30pm to 6:00pm (except in the case of an emergency). Work may be done
on weekends or extended hours (outside of the 7:00am to 6:00pm window) at Arterial /
Arterial intersections with approval from the City.
4. Construction or repair work on Arterial streets, outside of the influence of an Arterial /
Arterial intersection, is allowed during the hours of 7:00am to 6:00pm; Monday through
Friday excluding holidays. The City will specify the minimum required distance needed
from the Arterial / Arterial intersection. Work may be done on weekends or extended
hours (outside of the 7:00am to 6:00pm window) with approval from the City.
5. Time restrictions on State Highway 287 (College Avenue) will normally be restricted from
9:00am to 3:00pm.
6. Construction hours, except for emergencies, shall be limited to 7:00am to 6:00pm
Monday through Friday excluding holidays, unless authorized by the City in writing.
Pay Item Pay Unit
Construction Zone Traffic Control Lump Sum
Traffic Control Management Day
Flagging Hour
Harmony Road Maintenance Project
College Avenue to Timberline Road
62
UTILITIES
The following Utilities are known to be within the project limits:
Utility/Agency Contact Phone
Traffic – City of Fort Collins Syl Mireles
(970) 221-6815
Fiber Optic – Comcast Dennis Greenwalt (970) 484-7166
Electric – City of Fort Collins Doug Martine
(970) 224-6153
Telephone – Century Link Bob Rulli
(970) 988-2120
The work described in these plans and specifications will require coordination between the
Contractor and the utility companies in accordance with subsection 105.10 in conducting their
respective operations, so the utility work can be completed with minimum delay to all parties
concerned.
The Contractor will be required to provide traffic control for any utility work expected to be
coordinated with construction, as directed by the Engineer.
The Contractor shall coordinate expected relocation completion schedules with each utility after
notice to proceed. The Contractor shall complete a project schedule and updates to that
schedule so that the project will be completed in the time frame allowed in this contract
considering utility relocations and utility coordination at the time of construction.
The work listed below shall be performed by the Contractor in accordance with the plans
and specifications, and as directed by the Engineer. The Contractor shall keep the utility
companies advised of any work being done to their facilities, so that the utility companies can
coordinate their inspections for final acceptance of the work with the Engineer. Provide written
notice to each utility company, with a copy to the Engineer, prior to any work by a utility
company that is to be coordinated with project construction. A minimum of three (3) calendar
weeks of prior notice is required.
General – The Contractor shall comply with Article 1.5 of Title 9, CRS (“Excavation
Requirements”), when excavation or grading is planned in the area of underground utility
facilities. The Contractor shall notify all affected utilities at least three (3) business days prior to
commencing such operations. Contact the Utility Notification Center of Colorado (UNCC) to
have locations of UNCC-registered lines marked by member companies. Call 811 for locates
requests. All other underground facilities shall be located by contacting the respective
company. Utility service laterals shall also be located prior to beginning excavation or grading.
All costs incidental to the foregoing requirements will not be paid for separately, but shall be
included in the work.
63
STANDARD SPECIAL PROVISIONS
64
February 3, 2011
REVISION OF SECTION 103
COLORADO RESIDENT BID PREFERENCE
Section 103 of the Standard Specifications is hereby revised for this project as follows:
Subsection 103.01 shall include the following:
(a) Colorado Resident Bid Preference. A resident bidder shall be allowed a preference against a
nonresident bidder from a state or foreign country equal to the preference given or required by the
state or foreign country in which the nonresident bidder is a resident.
Resident bidder means:
(1) A person, partnership, corporation, or joint venture which is authorized to transact business in
Colorado and which maintains its principal place of business in Colorado: or,
(2) A person, partnership, corporation, or joint venture which is authorized to transact business in
Colorado, which maintains a place of business in Colorado, and which has paid Colorado
unemployment compensation taxes in at least seventy-five percent of the eight quarters
immediately prior to bidding on a construction contract for a public project.
To determine the resident bid preference status of a bidder, the bidder shall submit a completed
Form 604 with the proposal. Failure to submit the residency Form with the proposal will be
justification for and may result in the rejection of the proposal and forfeiture of the proposal
guaranty.
The proposals will be treated as follows:
(1) All proposals will be checked for accuracy by the Department.
(2) The dollar amount of the checked proposal from nonresident bidders will be adjusted by a
percentage equal to the percentage preference given or required by the state or foreign country
of the bidder’s residency. If the state or foreign country does not give or require a residency
preference, no adjustment in the proposal dollar amount will be made.
(3) Adjusted proposals from nonresident bidders will then be compared to proposals from resident
bidders, and the bidder with the lowest total will be considered the apparent low bidder.
(4) Should a nonresident bidder be the apparent low bidder, in accordance with paragraph (3)
above, an award will be made on the basis of the original proposal, not the adjusted proposal.
(5) The Department will proceed with its normal award procedure.
65
July 29, 2011
REVISION OF SECTION 105
CONSTRUCTION DRAWINGS
Section 105 of the Standard Specifications is hereby revised for this project as follows:
Delete subsection 105.02(f)
66
February 3, 2011
REVISION OF SECTION 106
CERTIFICATES OF COMPLIANCE AND
CERTIFIED TEST REPORTS
Section 106 of the Standard Specifications is hereby revised for this project as follows:
In subsection 106.12, delete the second paragraph and replace it with the following:
The original Certificate of Compliance shall include the Contractor’s original signature as directed
above. The original signature (including corporate title) on the Certificate of Compliance, under penalty
of perjury, shall be of a person having legal authority to act for the manufacturer. It shall state that the
product or assembly to be incorporated into the project has been sampled and passed all specified
tests in conformity to the plans and specifications for this project. One legible copy of the fully signed
Certificate of Compliance shall be furnished to the Engineer prior to installation of material. The original
shall be provided to the Engineer before payment for the represented item will be made.
In subsection 106.13, delete the second paragraph and replace it with the following:
The Certified Test Report shall be a legible copy or an original document and shall include the
Contractor’s original signature as directed above. The signature (including corporate title) on the
Certified Test Report, under penalty of perjury, shall be of a person having legal authority to act for the
manufacturer or the independent testing laboratory. It shall state that the test results show that the
product or assembly to be incorporated into the project has been sampled and passed all specified
tests in conformity to the plans and specifications for this project. One legible copy or original document
of the fully signed Certified Test Report shall be furnished to the Engineer prior to installation of
material. Failure to comply may result in delays to the project or rejection of the materials.
67
July 29, 2011
REVISION OF SECTION 106
HOT MIX ASPHALT – VERIFICATION TESTING
Section 106 of the Standard Specifications is hereby revised for this project as follows:
Delete subsection 106.05 (e) and replace with the following:
(e) Mix Verification Testing. After the mix design has been approved and production commences, the
Department will perform a minimum of three volumetric verification tests for each of the following
elements to verify that the field produced Hot Mix Asphalt (HMA) conforms to the approved mix
design:
(1) Air Voids
(2) Voids in Mineral Aggregate (VMA).
(3) Asphalt Content (AC).
The test frequency shall be one per day unless altered by the Engineer.
The test results will be evaluated and the Contractor shall make adjustments if required in
accordance with the following:
1. Target Values. The target value for VMA will be the average of the first three volumetric field
test results on project produced hot mix asphalt or the target value specified in Table 403-1 and
Table 403-2 of the specifications, whichever is higher. The target value for VMA will be set no
lower than 0.5 percent below the VMA target on Form 43 prior to production. The target values
for the test element of air voids and AC shall be the mix design air voids and mix design AC as
shown on Form 43.
2. Tolerance Limits. The tolerance limits for each test element shall be:
AC ± 0.3 percent
Air Voids ± 1.2 percent
VMA ± 1.2 percent
3. Quality Levels. Calculate an individual QL for each of the elements using the volumetric field
verification test results. If the QL for VMA or AC is less than 65 or if the QL for air voids is less
than 70, the production shall be halted and the Contractor shall submit a written proposal for a
mix design revision to the Engineer. Production shall only commence upon receipt of written
approval from the Engineer of the proposed mix design revision.
After a new or revised mix design is approved, three additional volumetric field verification tests will
be performed on asphalt produced with the new or revised mix design. The test frequency shall be
one per day unless altered by the Engineer.
If the QL for VMA or AC is less than 65 or the QL for the test element of air voids is less than
70, then production shall be halted until a new mix design has been completed in accordance
with CP 52 or CP 54, a new Form 43 issued, and the Contractor demonstrates that he is
capable of producing a mixture meeting the verification requirements in accordance with A or B
below:
A. The Contractor shall produce test material at a site other than a CDOT project. The
Contractor shall notify the Engineer a minimum of 48 hours notice prior to the requested
68
test. The location and time of the test are subject to the approval of the Engineer, prior to
placement. Three samples will be tested for volumetric properties. If the QL for VMA or AC
is equal or greater than 65 and the QL for the element of air voids is equal or greater than
70, full production may resume or;
B. The Contractor may construct a 500 ton test strip on the project. Three samples in the last
200 tons will be tested for volumetric properties. After construction of the test section,
production shall be halted until the testing is complete and element QLs are calculated. If
the QL for VMA or AC is equal or greater than 65 or the QL for the element of air voids is
equal or greater than 70, full production may resume. If the QL for VMA or AC is less than
65 or the QL for the element of air voids is less than 70, the material shall be removed and
replaced at no cost to the Department. The time count will continue, and any delay to the
project will be considered to have been caused by the Contractor and will not be
compensable.
The costs associated with mix designs shall be solely at the Contractor’s expense.
If the Contractor fails to verify the new mix design in accordance with A or B, then production
shall be halted until a new mix design has been completed in accordance with CP 52 or CP 54,
a new Form 43 issued, and the Contractor demonstrates they are capable of producing a
mixture meeting the verification requirements in accordance with A or B.
4. New or Revised Mix Design. Whenever a new or revised mix design is used and production
resumes, three additional volumetric field verification tests shall be performed and the test
results evaluated in accordance with the above requirements. The test frequency shall be one
per day unless altered by the Engineer.
5. Field Verification Process Complete. When the field verification process described above is
complete and production continues, the sample frequency will revert back to a minimum of
1/10,000 tons. The Engineer has the discretion to conduct additional verification tests at any
time.
69
February 3, 2011
REVISION OF SECTION 107
RESPONSIBILITY FOR DAMAGE CLAIMS,
INSURANCE TYPES AND COVERAGE LIMITS
Section 107 of the Standard Specifications is hereby revised for this project as follows:
Delete subsection 107.15(c) and replace it with the following:
(c) Each insurance policy shall include provisions preventing cancellation or non-renewal without at
least 30 days prior notice to Contractor. The Contractor shall forward to the Engineer any such
notice received within seven days of the Contractor’s receipt of such notice.
70
August 19, 2011
REVISION OF SECTION 108
CRITICAL PATH METHOD
Section 108 of the Standard Specifications is hereby revised for this project as follows:
Subsection 108.03 shall include the following:
The Bar Chart or Initial Schedule shall be submitted at least 10 working days prior to the start of the
work. The Engineer’s review of the Schedule will not exceed two working days. Work shall not begin
until the Schedule is accepted in writing, unless otherwise approved by the Engineer
In subsection 108.03 (c), delete the third paragraph.
71
May 5, 2011
REVISION OF SECTION 109
COMPENSATION FOR COMPENSABLE DELAYS
In subsection 109.10, delete the first two paragraphs and replace with the following:
109.10 Compensation for Compensable Delays. If the Engineer determines that a delay is
compensable in accordance with either subsection 105.22, 105.23, 105.24, or 108.08, monetary
compensation will be determined in accordance with this subsection.
(a) These categories represent the only costs that are recoverable by the Contractor. All other costs or
categories of costs are not recoverable:
(1) Actual wages and benefits, including FICA, paid for additional labor not otherwise included in (5)
below;
(2) Costs for additional bond, insurance and tax;
(3) Increased costs for materials;
(4) Equipment costs calculated in accordance with subsection 109.04(c) for Contractor owned
equipment and based on invoice costs for rented equipment;
(5) Costs of extended job site overhead;
(6) Costs of salaried employees not otherwise included in (1) or (5) above incurred as a direct result
of the delay;
(7) Claims from subcontractors and suppliers at any level (the same level of detail as specified
herein is required for all such claims);
(8) An additional 16 percent will be added to the total of items (1) through (7) as compensation for
items for which no specific allowance is provided, including profit and home office overhead.
72
February 3, 2011
REVISION OF SECTION 109
MEASUREMENT OF QUANTITIES
Section 109 of the Standard Specifications is hereby revised for this project as follows:
In subsection 109.01, delete the 17th paragraph and replace it with the following:
Vehicles used to haul material being paid for by weight shall bear a plainly legible identification mark.
Each of these vehicles shall be weighed empty daily at times directed by the Engineer. The Contractor
shall furnish to the Engineer, in writing, a vehicle identification sheet that lists the following for each
delivery vehicle to be used on the project:
(1) identification mark
(2) vehicle length
(3) tare weight
(4) number of axles
(5) the distance between extreme axles
(6) information related to legal weight, including the Permit No. and permitted weight of each vehicle for
which the State has issued an overweight permit.
This information shall be furnished prior to time of delivery of the material and at any subsequent time
the Contractor changes vehicles, combination vehicles, axle length relationships, or overweight
permitting of vehicles.
73
February 3, 2011
REVISION OF SECTION 401
COMPACTION OF HOT MIX ASPHALT
Section 401 of the Standard Specifications is hereby revised for this project as follows:
In subsection 401.17, delete the third paragraph and replace with the following:
SMA shall be compacted to a density of 93 to 97 percent of the daily theoretical maximum specific
gravity, determined according to CP 51. All other HMA shall be compacted to a density of 92 to 96
percent of the daily theoretical maximum specific gravity, determined according to CP 51. If more than
one theoretical maximum specific gravity test is taken in a day, the average of the theoretical maximum
specific gravity results will be used to determine the percent compaction. Field density determinations
will be made in accordance with CP 44 or 81.
74
February 3, 2011
REVISION OF SECTION 401
COMPOSITION OF MIXTURES – VOIDS ACCEPTANCE
Section 401 of the Standard Specifications is hereby revised for this project as follows:
Subsection 401.02(a) shall include the following:
On projects with voids acceptance of hot mix asphalt, mix designs based on a theoretical rejection
of baghouse fines may be used when necessary to meet CDOT mix design requirements if the
following additional requirements are met. Written approval for use of theoretical rejection of
baghouse fines mixture design shall be obtained before production of project material.
(1) Price adjustment for the hot mix asphalt shall be made based on voids acceptance criteria as
prescribed in the latest version of the Standard Special Provision, Revision of Sections 105 and
106, Conformity to the Contract of Hot Mix Asphalt (Voids Acceptance). All costs associated
with theoretical rejection of baghouse fines mix design, production, and acceptance shall be at
the Contractor’s expense.
(2) The Contractor shall submit a separate Quality Control (QC) plan for handling the rejection of
baghouse fines. The plan shall identify the plan, equipment, and procedures that will be used
for the rejection of baghouse fines. The plan shall include detailed information on baghouse
control systems and actual data demonstrating consistent system functionality. The QC plan
shall be approved in writing prior to production.
(3) The Contractor shall demonstrate that the material can be produced in accordance with one of
the two procedures listed below. The Contractor shall supply project aggregate material for
use in establishing acceptance testing equipment correction factors. Aggregate samples that
have been produced according to CP-L 5117 to represent plant-produced material shall be
provided by the mix design lab.
(i) The Contractor shall produce a minimum of 3000 tons of material. This material shall be
placed on non thru lanes or offsite in locations approved by the Engineer. A minimum of 3
samples will be tested for AC content, air voids and VMA. QL’s for each element will be
determined in accordance with the contract documents. If the QL is equal to or greater than
65 for VMA and Asphalt Cement Content and the QL for the element of air voids is equal to
or greater than 70, full production may commence. This material may be considered a
separate process and price adjustment will be in accordance with subsection 105.05 or;
(ii) The Contractor shall construct a 500-ton test strip on the main line on the project. Tonnage
other than 500 tons may be produced only if approved. Three samples in the last 200 tons
will be tested for volumetric properties. After construction of the test section, production
shall be halted until the testing is complete and element QL’s are calculated. If the QL is
equal to or greater than 65 for VMA and Asphalt Cement Content and the QL for the
element of air voids is equal to or greater than 70, full production may commence. If the
TQL is less than 65 or the QL for the element of air voids is less than 70, the material shall
be removed and replaced at the Contractor's expense.
75
February 3, 2011
REVISION OF SECTION 401
COMPACTION PAVEMENT TEST SECTION (CTS)
Section 401 of the Standard Specifications is hereby revised for this project as follows:
In subsection 401.17, delete the fifteenth paragraph and replace with the following:
Two sets of random cores shall be taken within the last 200 tons of the CTS. Each set shall consist of
a minimum of seven random cores. The Engineer will determine the coring locations using a stratified
random sampling process. The locations of these cores will be such that one set can serve as a
duplicate of the other. One set of these cores shall be immediately submitted to the Engineer. This set
will be used for determining acceptance of the CTS and determining density correction factors for
nuclear density equipment. Densities of the random samples will be determined by cores according to
CP 44. Density correction factors for nuclear density equipment will be determined according to CP 81.
Coring shall be performed under CDOT observation. Coring will not be measured and paid for
separately but shall be included in the work. For SMA, a CTS is not used. The Contractor shall follow
the requirements for the demonstration control strip in accordance with the Revision of Section 403,
Stone Matrix Asphalt Pavement.
76
February 3, 2011
REVISION OF SECTION 401
TEMPERATURE SEGREGATION
Section 401 of the Standard Specifications is hereby revised for this project as follows:
In subsection 401.16 delete the twelfth (last) paragraph and replace it with the following:
The Engineer may evaluate the HMA for low density due to temperature segregation any time industry
best practices, as detailed on Form 1346, are not being followed or the Engineer suspects temperature
segregation is occurring. The Engineer will first meet with the Contractor to discuss the paving
practices that are triggering the temperature investigation. Areas across the mat, excluding the outside
1 foot of both edges of the mat, that are more than 25 °F cooler than other material across the width
may be marked for density testing. Material for temperature comparison will be evaluated in 3-foot
intervals behind the paver across the width of the mat. The material shall be marked and tested in
accordance with CP 58. If four or more areas within a lot of 500 tons have densities of less than 93
percent of the material’s maximum specific gravity for SMA mixes or less than 92 percent of the
material’s maximum specific gravity for all other HMA mixes, a 5 percent price disincentive will be
applied to the 500 ton lot. The 500 ton count begins when the Engineer starts looking for cold areas,
not when the first cold area is detected. This price disincentive will be in addition to those described in
Sections 105 and 106. Only one area per delivered truck will be counted toward the number of low
density areas. Temperature segregation checks will be performed only in areas where continuous
paving is possible.
77
May 5, 2011
REVISION OF SECTIONS 412, 601 AND 711
LIQUID MEMBRANE-FORMING COMPOUNDS
FOR CURING CONCRETE
Sections 412, 601 and 711 of the Standard Specifications are hereby revised for this project as follows:
In subsection 412.14, first paragraph, delete the second sentence and replace with the following:
The impervious membrane curing compound shall meet the requirements of ASTM C 309, Type 2 and
shall be volatile organic content (VOC) compliant.
In subsection 601.13 (b), first paragraph, delete the second sentence and replace with the following:
A volatile organic content (VOC) compliant curing compound conforming to ASTM C 309, Type 2 shall
be used on surfaces where curing compound is allowed, except that Type 1 curing compound shall be
used on exposed aggregate or colored concrete, or when directed by the Engineer.
In subsection 601.16 (a) 1., delete the first sentence and replace with the following:
1. Membrane Forming Curing Compound Method. A volatile organic content (VOC) compliant curing
compound conforming to ASTM C 309, Type 2 shall be uniformly applied to the surface of the deck,
curbs and sidewalks at the rate of 1 gallon per 100 square feet.
Delete subsection 711.01 and replace with the following:
711.01 Curing Materials. Curing materials shall conform to the following requirements:
Burlap Cloth made from Jute or Kenaf AASHTO M
182
Liquid Membrane-Forming Compounds for
Curing Concrete
ASTM C 309
Sheet Materials for Curing Concrete AASHTO M
171*
*Only the performance requirements of AASHTO M171 shall
apply.
Straw used for curing shall consist of threshed straw of oats, barley, wheat, or rye. Clean field or marsh
hay may be substituted for straw when approved by the Engineer. Old dry straw or hay which breaks
readily in the spreading process will not be accepted.
78
February 3, 2011
REVISION OF SECTION 412
PORTLAND CEMENT CONCRETE PAVEMENT FINISHING
Section 412 of the Standard Specifications is hereby revised for this project as follows:
Delete subsection 412.12(a) and replace it with the following:
(a) Hand Finishing. Hand finishing should be minimized wherever possible. The Engineer shall be
notified prior to hand finishing work and the proposed hand finished work shall be addressed in the
Quality Control Plan for concrete finishing. Unless otherwise specified, hand finishing methods will
be permitted only under the following conditions. Hand finished concrete shall be struck off and
screeded with a portable screed that is at least 2 feet longer than the maximum width of the slab to
be struck off. It shall be sufficiently rigid to retain its shape. Concrete shall be thoroughly
consolidated by hand vibrators. Hand finishing shall not be allowed after concrete has been in-
place for more than 30 minutes or when initial set has begun unless otherwise approved by the
Engineer. Finishing tools made of aluminum shall not be used.
The Contractor shall provide a Quality Control Plan (QCP) to ensure that proper hand finishing is
accomplished in accordance with current Industry standards in the concrete pavement placement. It
shall also identify the Contractor’s method for ensuring that the provisions of the QCP are met. The
QCP shall be submitted to the Engineer at the Preconstruction Conference. Paving operations shall
not begin until the Engineer has approved the QCP. The QCP shall identify and address issues
affecting the quality of finished concrete pavement including but not limited to:
(1) Timing of hand finishing operations
(2) Methodology to place and transport concrete
(3) Equipment and tools to be utilized
(4) Qualifications and training of finishers and supervisors
When the Engineer determines that any element of the approved QCP is not being implemented or
that hand finished concrete is unacceptable, work shall be suspended. The Contractor shall supply
a written plan to address improperly placed material and how to remedy future hand finishing
failures and bring the work into compliance with the QCP. The Engineer will review the plan for
acceptability prior to authorizing the resumption of operations.
79
February 3, 2011
REVISION OF SECTION 601
CONCRETE BATCHING
Section 601 of the Standard Specifications is hereby revised for this project as follows:
In subsection 601.06, delete (13) and (17) and replace with the following:
(13) Gallons of water added by truck operator, the time the water was added and the quantity of
concrete in the truck each time water is added.
(17) Water to cementitious material ratio.
80
February 3, 2011
REVISION OF SECTION 601
CONCRETE FINISHING
Section 601of the Standard Specifications are hereby revised for this project as follows:
In subsection 601.12 (a) delete the fifth paragraph and replace it with the following:
Water shall not be added to the surface of the concrete to assist in finishing operations.
Hand finishing should be minimized wherever possible. The hand finishing methods shall be addressed
in the Quality Control Plan for concrete finishing. Hand finished concrete shall be struck off and
screeded with a portable screed that is at least 2 feet longer than the maximum width of the surface to
be struck off. It shall be sufficiently rigid to retain its shape. Concrete shall be thoroughly consolidated
by hand vibrators. Hand finishing shall not be allowed after concrete has been in-place for more than
30 minutes or when initial set has begun. Finishing tools made of aluminum shall not be used.
The Contractor shall provide a Quality Control Plan (QCP) to ensure that proper hand finishing is
accomplished in accordance with current Industry standards. It shall identify the Contractor’s method
for ensuring that the provisions of the QCP are met. The QCP shall be submitted to the Engineer at the
Preconstruction Conference. Concrete placement shall not begin until the Engineer has approved the
QCP. The QCP shall identify and address issues affecting the quality finished concrete including but
not limited to:
(5) Timing of hand finishing operations
(6) Methodology to place and transport concrete
(7) Equipment and tools to be utilized
(8) Qualifications and training of finishers and supervisors
When the Engineer determines that any element of the approved QCP is not being implemented or that
hand finished concrete is unacceptable, work shall be suspended. The Contractor shall supply a written
plan to address improperly placed material and how to remedy future hand finishing failures and bring
the work into compliance with the QCP. The Engineer will review the plan for acceptability prior to
authorizing the resumption of operations.
In subsection 601.14(a) delete the fourth paragraph.
81
February 3, 2011
REVISION OF SECTIONS 627 AND 708
PAVEMENT MARKING WITH WATERBORNE PAINT
AND LOW VOC SOLVENT BASE PAINT
Sections 627 and 708 of the Standard Specifications are hereby revised for this project as follows:
In subsection 627.04 delete the table and replace it with the following
DESCRIPTION Paint
Water-Based Low VOC High Build
Alignment Lateral Deviation 2.0 inch per 200 foot Max
Coverage Rate Sq. Ft. per Gallon 100-110 100-110 70-85
Thickness Mil 15-17 15-17 20-25
Width Inches Per Plans +/- 0.25
Dry Time Minutes 5-10 5-10 5-10
Beads Application Rate, lbs/gal 6-8 8-10
Subsection 708.05 shall include the following:
High Build Acrylic Waterborne Paint. High build acrylic waterborne paint binder (nonvolatile portion of
vehicle) shall be 100 percent acrylic cross linking polymer, by weight, as determined by infrared
analysis or other chemical analysis available to the Department.
82
February 17, 2012
REVISION OF SECTION 630
CONSTRUCTION ZONE TRAFFIC CONTROL
Section 630 of the Standard Specifications is hereby revised for this project as follows:
In subsection 630.16 delete the fifth paragraph.
83
February 3, 2011
REVISION OF SECTION 630
RETROREFLECTIVE SHEETING
Section 630 of the Standard Specifications is hereby revised for this project as follows:
In subsection 630.02, delete Table 630-1, and replace it with the following:
Table 630-1
RETROREFLECTIVE SHEETING TYPES
Sheeting Type IV♦ Type Fluorescent1
Application Work Zone Work Zone
All Orange Construction
Signs X
Barricades (Temporary) X
Vertical Panels X
Flaggers Stop/Slow Paddle X X
Drums2 X
Non-orange Fixed Support
signs with prefix “W” X
Special Warning Signs X
STOP sign (R1-1)
YIELD sign (R1-2)
WRONG WAY sign (R5-1a)
DO NOT ENTER sign (R5-1)
EXIT sign (E5-1a)
X
DETOUR sign (M4-9) or
(M4-10) X
All other fixed support signs3 X X
All other signs used only
during working hours X X
1 Fluorescent Sheeting shall be of a brand that is on the CDOT Approved Products List.
2 Drum Sheeting shall be manufactured for flexible devices.
3 Fixed support signs are defined as all signs that must remain in use outside of working
hours. They shall be mounted in accordance with Standard Plan S-630-1.
♦ New signs and devices shall be manufactured with Type IV sheeting. Existing signs and
devices manufactured with Type III sheeting may be used on projects advertised prior to
January 1, 2014. Signs and devices used on projects advertised on or after January 1, 2014
shall be manufactured with Type IV sheeting.
84
February 3, 2011
REVISION OF SECTION 630
RETROREFLECTIVE SIGN SHEETING
Section 630 of the Standard Specifications is hereby revised for this project as follows:
In subsection 630.06, first paragraph, delete the fifth sentence and replace with the following:
Retroreflective sheeting on new devices shall be Type IV. Existing devices manufactured with Type III
sheeting may be used on projects advertised prior to January 1, 2014. Devices used on projects
advertised on or after January 1, 2014 shall be manufactured with Type IV sheeting.
85
June 16, 2011
REVISION OF SECTION 703
AGGREGATE FOR HOT MIX ASPHALT
Section 703 of the Standard Specifications is hereby revised for this project as follows:
Subsection 703.04 shall include the following:
The aggregate for Hot Mix Asphalt (HMA) shall meet the requirements of Table 703-4A when tested in
accordance with CP-L 4211 Resistance of Coarse Aggregate to Degradation by Abrasion in the Micro-
Deval Apparatus. The Contractor shall be assessed a price reduction of $1000 for each production
sample of the combined aggregate with a value greater than 20 according to CP-L 4211.
Table 703-4A
AGGREGATE DEGRADATION BY ABRASION
IN THE MICRO-DEVAL CP-L 4211
Not to exceed
Combined Aggregate (Mix Design) 18
Combined Aggregate (1/10,000 tons, or fraction thereof
during production) 20
86
July 28, 2011
REVISION OF SECTION 703
CONCRETE AGGREGATES
Section 703 of the Standard Specifications is hereby revised for this project as follows:
Delete the second paragraph of subsection 703.00 and Table 703-1.
Delete subsections 703.01 and 703.02 and replace with the following:
703.01 Fine Aggregate for Concrete. Fine aggregate for concrete shall conform to the requirements
of AASHTO M 6, Class A. The minimum sand equivalent, as tested in accordance with Colorado
Procedure 37 shall be 80 unless otherwise specified. The fineness modulus, as determined by
AASHTO T 27, shall not be less than 2.50 or greater than 3.50 unless otherwise approved.
703.02 Coarse Aggregate for Concrete. Coarse aggregate for concrete shall conform to the
requirements of AASHTO M 80, Class A aggregates, except that the percentage of wear shall not
exceed 45 when tested in accordance with AASHTO T 96.
87
January 20, 2012
REVISION OF SECTION 712
GEOTEXTILES
Section 712 of the Standard Specifications is hereby revised for this project as follows:
In subsection 712.08, third paragraph, delete the last sentence and replace with the following:
The current list of products that meet these requirements is located at: https://www.dot.ny.gov.
In subsection 712.08, delete Table 712-2 and replace with the following
Table 712-2
TYPICAL VALUES OF PERMEABILITY COEFFICIENTS1
Particle
Size Range
Millimeters (inches)
Effectiv
e
Turbulent Flow Size
D max D min
D 20
mm
(inches)
Permeability
Coefficient k
cm/s
Derrick STONE 3000 (120) 900 (36) 1200
(48) 100
One-man STONE 300 (12) 100 (4) 150 (6) 30
Clean, fine to
coarse GRAVEL 80 (3) 10 (¼) 13 (½) 10
Fine, uniform
GRAVEL 8 (⅜) 1.5 (1/16) 3 (⅛) 5
Very coarse, clean,
uniform SAND 3 (⅛) 0.8 (1/32) 1.5 (1/16) 3
Laminar Flow
Uniform, coarse
SAND 2 (⅛) 0.5 (1/64) 0.6 0.4
Uniform, medium
SAND 0.5 0.25 0.3 0.1
Clean, well-graded
SAND & GRAVEL 10 0.05 0.1 0.01
Uniform, fine SAND 0.25 0.05 0.06 40 x 10-4
Well-graded, silty
SAND & GRAVEL 5 0.01 0.02 4 x 10-4
Silty SAND 2 0.005 0.01 1.0 x 10-4
Uniform SILT 0.05 0.005 0.006 0.5 x 10-4
Sandy CLAY 1.0 0.001 0.002 0.05 x 10-4
Silty CLAY 0.05 0.001 0.0015 0.01 x 10-4
CLAY (30% to 50%
clay sizes) 0.05 0.0005 0.0008 0.001 x 10-4
Colloidal CLAY (-2
μm 50%) 0.01 10 40 10-9
1 Basic Soils Engineering, R.K. Hough, 2nd Edition, Ronald Pess Co.;
1969, Page 76.
Note: Since the permeability coefficient of the soil will be unknown in most
non-critical, non-severe applications for erosion control and
drainage, the soil-permeability coefficients listed in Table 712-2 may
be used as a guide for comparing the permeability coefficient of the
fabric with that of the in-place soil
88
February 3, 2011
REVISION OF SECTION 712
WATER FOR MIXING OR CURING CONCRETE
Section 712 of the Standard Specifications is hereby revised for this project as follows:
Delete subsection 712.01 and replace it with the following:
712.01 Water. Water used in mixing or curing concrete shall be reasonably clean and free of oil, salt,
acid, alkali, sugar, vegetation, or other substance injurious to the finished product. Concrete mixing
water shall meet the requirements of ASTM C1602. The Contractor shall perform and submit tests to
the Engineer at the frequencies listed in ASTM C1602. Potable water may be used without testing.
Where the source of water is relatively shallow, the intake shall be so enclosed as to exclude silt, mud,
grass, and other foreign materials.
89
February 3, 2011
RAILROAD INSURANCE
The Contractor shall carry insurance of the following kinds and amounts:
A. CONTRACTOR'S PUBLIC LIABILITY AND PROPERTY DAMAGE LIABILITY INSURANCE.
The Contractor shall furnish evidence to the Department that with respect to the operations the
Contractor performs, the Contractor carries Contractor's Public Liability Insurance providing for a limit
of not less than One Million Dollars ($1,000,000.00) for all damages arising out of bodily injuries to or
death of one person and subject to that limit for each person, a total limit of Two Million Dollars
($2,000,000.00) for all damages arising out of bodily injuries to or death of two or more persons in any
one occurrence; and Contractor's Property Damage Liability Insurance providing for a limit of not less
than One Million Dollars ($1,000,000.00) for all damages arising out of injury to or destruction of
property in any one occurrence and subject to that limit per occurrence, a total (or aggregate) limit of
Two Million Dollars ($2,000,000.00) for all damages arising out of injury to or destruction of property
during the policy period.
If any part of the work affecting railroad property or facilities is sublet, similar insurance shall be
provided by or in behalf of the subcontractor(s) involved.
B. CONTRACTOR'S PROTECTIVE PUBLIC LIABILITY AND PROPERTY DAMAGE LIABILITY
INSURANCE.
The Contractor shall furnish evidence to the Department that with respect to the operations performed
for the Contractor by subcontractors, the Contractor carries in its own behalf Contractor's Protective
Public Liability Insurance providing for a limit of not less than One Million Dollars ($1,000,000.00) for all
damages arising out of bodily injuries to or death of one person and subject to that limit for each person
a total limit of Two Million Dollars ($2,000,000.00) for all damages arising out of bodily injuries to or
death of two or more persons in any one occurrence; and Contractor's Protective Property Damage
Liability Insurance providing for a limit of not less than One Million Dollars ($1,000,000.00) for all
damages arising out of injury to or destruction of property in any one occurrence, and subject to that
limit per occurrence, a total (or aggregate) limit of Two Million Dollars ($2,000,000.00) for all damages
arising out of injury to or destruction of property during the policy period.
C. RAILROAD'S PROTECTIVE LIABILITY AND PROPERTY DAMAGE INSURANCE.
In addition to the above, the Contractor shall furnish evidence to the Department that with respect to the
operations the Contractor or any of its subcontractors perform, the Contractor has provided for and in
behalf of the Railroad Company, and each Railroad Company when more than one is involved,
Railroad Protective Public Liability and Property Damage Insurance providing for a combined single
limit of Two Million Dollars ($2,000,000.00) per occurrence with an aggregate limit of six Million Dollars
($6,000,000.00) applying separately for each annual period for:
1. All damages arising out of bodily injuries to or death of one or more persons.
2. All damages arising out of injury to or destruction of property.
D. GENERAL.
Said policy or policies of insurance shall be deemed to comply with the requirements of this Special
Provision if each of said policies contains a properly completed and executed "Railroad Protective
90
Liability Form", reference copies of which are available from the Agreements Engineer of the Colorado
Department of Transportation, 4201 East Arkansas Avenue, Denver, Colorado 80222.
Certificates of insurance required under A. and B. above, and policy or policies of Insurance required
under C. above shall be furnished to the Department's Agreements Engineer for transmittal to the
Railroad Company's Insurance Department.
The insurance hereinbefore specified shall be carried until all work required to be performed under the
terms of the Contract is satisfactorily completed as evidenced by the formal acceptance of the
Department. The Railroad Company shall be furnished with the original of each policy carried in its
behalf.
Note: AI MS-2 = Asphalt Institute Manual Series 2
Note: The current version of CPL 5115 is available from the Region Materials Engineer.
Note: Mixes with gradations having less than 40% passing the 4.75 mm (No. 4) sieve shall be
approached with caution because of constructability problems.
Note: Gradations for mixes with a nominal maximum aggregate size of one-inch or larger are
considered a coarse gradation if they pass below the maximum density line at the #4 screen.
Gradations for mixes with a nominal maximum aggregate size of ¾ inch or smaller are
considered a coarse gradation if they pass below the maximum density line at the #8 screen.