HomeMy WebLinkAboutRESPONSE - BID - 7319 FURNITURE PART II FOR POUDRE RIVER PUBLIC MAIN LIBRARY7319 Poudre River Library Acrylic End Panel Pricing Page 1 of 1
7319 Poudre River Library Acrylic End Panel Pricing
Glen Sonnenfeld [gsonnenfeld@arapahoesignarts.com]
Sent: Wednesday, February 01, 2012 2:44 PM
To: David Carey
Attachments: 7319- PRLD End Panel Prici—l.pdf (66 KB) ; PRLD End Panel Bid Form.PDF (50 KB)
Good Day David,
Please find our pricing attached to provide and install the acrylic end panels for City of Ft. Collins
97319. These panels are very similar to the ones we fabricated and installed at the Green Valley Ranch
Library last year here in the Green Valley Ranch area of NE Denver.
I have provided pricing based on the use of 1/2" clear acrylic with a back print (2nd surface print) to
meet the Oz Specs, with an ADD of approximately $8,800 to use the frosted acrylic referenced in the
drawings.
We have excluded EP-14, as the canopy tops are not really in our area of expertise.
Please let me know if you have any questions or need any clarifications, as we look forward to this
project with the City of Ft. Collins.
Thanks,
Glen Sonnenfeld
Project Manager
Rs�nefeld@ampahoesmnam com
ArapahoeSignArts
1135 West Mississippi Ave,
Denver, Colorado 80223
303-937-1915 phone
303-579-6900 cell
303-937-7711 fax
https:Hwebmail.fcgov.com/owa/?ae=Item&t=IPM.Note&id=RgAAAAB99V%2fJ9%2bgsTr... 2/1 /2012
BID FORM — BID# 7319
FURNITURE PART II— MAIN LIBRARY
POUDRE RIVER PUBLIC LIBRARY DISTRICT
Page 5 of 5
Groups Bid (please check all that apply):
❑Bid Group 1
❑Bid Group 2
❑Bid Group 3
In Words:
Company:
Signature:
Print Name:
Title:
Address:
Phone:
Email:
❑Bid Group 4
❑Bid Group 5
�Bid Group 6C-) ���-���
Total Amount Bid: '$ ( 7.
01 �03-937-/�/_S; C 303-57�-G90�
✓ak)ahae si,)lNai'TS. cow)
_� 2✓LcX Davt�� (� r d f i S ('e G �I C ed � "^
�Lj 3�y~ J-9 2-3aL
bf,060 o� 1)
4 V007 �0, q ed✓�
awlouvN
Addendum 2
7319 Furniture Part II -Main Library-Poudre River Public Library District Page 8 of 9
Poudre River
Acrylic End
DATE: 211112
Library
District
Panels
Sign Type
Type Name
Qty
I Unit cost
I Ext. Unit
Install Unit Cost I Ext. Install
TOTAL
FABRICATION
EP-1
42" H Graphic Panel
4
294,541
1178.15
17.00,
68.001
1246.15
EP-2
42" H Display End Panel
4
273.72
1094.89
17.00
68.00
1162.89
EP-3
42" H Plain End Panel
4
227.72
910.89
17.00
68.00
978.89
EP-4
66" H Graphic End Panel
27
431.05
11638.37
17.00
459.00
12097.37
EP-5
66" H Display End Panel
34
335.32
11400.92
17.00
578.00
11978.92
EP-6
66" H Plain End Panel
34
288.40
9805.64
17.00
578.00
10383,64
EP-7
78" H Graphic End Panel
9
488.26
4394.33
17.00
153.00
4547.33
EP-8
78" H Display End Panel
10
377.71
3777.06
17.00
170.00
3947.06
EP-9
78" H Plain End Panel
6
347.27
2083.62.
17.00
102.00
2185.62
EP-10
90" H Graphic End Panel
7
591.45
4140.18
17.00
119.00
4259.18
EP-11
90" H Display End Panel
23
431.80
9931.49
17.00
391.00
10322.49
EP-12
1 90" H Plain End Panel
20
374.28
7485.58
17.00
340.00
7825.58
EP-13
End Panel Si na a
236
20.06
4734.97
6.80
1604.80
6339.77
EP-14
-BY OTHERS'*
All fabrications above to be 112" thick clear
acrylic with polished edges,
UV cured print on back 2nd surface of acrylic panel
.no holes or fasteners included
Frosted acrylic will be an ADD of approximately 8 800
Addenda #1 and #2 are acknowledged
Fabrication time is approximately 6-7 weeks
following approval of all shop drawings and submittals
TOTALS
418
$ 72,576
$77,275
SERVICES FOR
INSTALLATION
Install
Installation of all sign types
1
4,699
1
0
S 4,699
.-F,Wiatioi $ 4,699
Fab total $ 72,576
Assumed Tax Exempt $
"PROPOSED TOTAL $ 77.275
0.00%
Installation services inclutles all necessary travel to and from Job site, estimated install to be completed within five (5) days.