Loading...
HomeMy WebLinkAboutRESPONSE - BID - 7319 FURNITURE PART II FOR POUDRE RIVER PUBLIC MAIN LIBRARY7319 Poudre River Library Acrylic End Panel Pricing Page 1 of 1 7319 Poudre River Library Acrylic End Panel Pricing Glen Sonnenfeld [gsonnenfeld@arapahoesignarts.com] Sent: Wednesday, February 01, 2012 2:44 PM To: David Carey Attachments: 7319- PRLD End Panel Prici—l.pdf (66 KB) ; PRLD End Panel Bid Form.PDF (50 KB) Good Day David, Please find our pricing attached to provide and install the acrylic end panels for City of Ft. Collins 97319. These panels are very similar to the ones we fabricated and installed at the Green Valley Ranch Library last year here in the Green Valley Ranch area of NE Denver. I have provided pricing based on the use of 1/2" clear acrylic with a back print (2nd surface print) to meet the Oz Specs, with an ADD of approximately $8,800 to use the frosted acrylic referenced in the drawings. We have excluded EP-14, as the canopy tops are not really in our area of expertise. Please let me know if you have any questions or need any clarifications, as we look forward to this project with the City of Ft. Collins. Thanks, Glen Sonnenfeld Project Manager Rs�nefeld@ampahoesmnam com ArapahoeSignArts 1135 West Mississippi Ave, Denver, Colorado 80223 303-937-1915 phone 303-579-6900 cell 303-937-7711 fax https:Hwebmail.fcgov.com/owa/?ae=Item&t=IPM.Note&id=RgAAAAB99V%2fJ9%2bgsTr... 2/1 /2012 BID FORM — BID# 7319 FURNITURE PART II— MAIN LIBRARY POUDRE RIVER PUBLIC LIBRARY DISTRICT Page 5 of 5 Groups Bid (please check all that apply): ❑Bid Group 1 ❑Bid Group 2 ❑Bid Group 3 In Words: Company: Signature: Print Name: Title: Address: Phone: Email: ❑Bid Group 4 ❑Bid Group 5 �Bid Group 6C-) ���-��� Total Amount Bid: '$ ( 7. 01 �03-937-/�/_S; C 303-57�-G90� ✓ak)ahae si,)lNai'TS. cow) _� 2✓LcX Davt�� (� r d f i S ('e G �I C ed � "^ �Lj 3�y~ J-9 2-3aL bf,060 o� 1) 4 V007 �0, q ed✓� awlouvN Addendum 2 7319 Furniture Part II -Main Library-Poudre River Public Library District Page 8 of 9 Poudre River Acrylic End DATE: 211112 Library District Panels Sign Type Type Name Qty I Unit cost I Ext. Unit Install Unit Cost I Ext. Install TOTAL FABRICATION EP-1 42" H Graphic Panel 4 294,541 1178.15 17.00, 68.001 1246.15 EP-2 42" H Display End Panel 4 273.72 1094.89 17.00 68.00 1162.89 EP-3 42" H Plain End Panel 4 227.72 910.89 17.00 68.00 978.89 EP-4 66" H Graphic End Panel 27 431.05 11638.37 17.00 459.00 12097.37 EP-5 66" H Display End Panel 34 335.32 11400.92 17.00 578.00 11978.92 EP-6 66" H Plain End Panel 34 288.40 9805.64 17.00 578.00 10383,64 EP-7 78" H Graphic End Panel 9 488.26 4394.33 17.00 153.00 4547.33 EP-8 78" H Display End Panel 10 377.71 3777.06 17.00 170.00 3947.06 EP-9 78" H Plain End Panel 6 347.27 2083.62. 17.00 102.00 2185.62 EP-10 90" H Graphic End Panel 7 591.45 4140.18 17.00 119.00 4259.18 EP-11 90" H Display End Panel 23 431.80 9931.49 17.00 391.00 10322.49 EP-12 1 90" H Plain End Panel 20 374.28 7485.58 17.00 340.00 7825.58 EP-13 End Panel Si na a 236 20.06 4734.97 6.80 1604.80 6339.77 EP-14 -BY OTHERS'* All fabrications above to be 112" thick clear acrylic with polished edges, UV cured print on back 2nd surface of acrylic panel .no holes or fasteners included Frosted acrylic will be an ADD of approximately 8 800 Addenda #1 and #2 are acknowledged Fabrication time is approximately 6-7 weeks following approval of all shop drawings and submittals TOTALS 418 $ 72,576 $77,275 SERVICES FOR INSTALLATION Install Installation of all sign types 1 4,699 1 0 S 4,699 .-F,Wiatioi $ 4,699 Fab total $ 72,576 Assumed Tax Exempt $ "PROPOSED TOTAL $ 77.275 0.00% Installation services inclutles all necessary travel to and from Job site, estimated install to be completed within five (5) days.