Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7312 ROSELAWN OFFICE BUILDING• 0MM PROJECTTF LE: Roselawn Cemetery - Office / Restrooms CONTRACTOR Classic Contractors, INC. PROJECTNUMBER OP-432320 DESCRIPTION: Office and Restrooms I� City • F6rtCollins In preparing change orders show in order as separate numbered paragraphs the following: Reason for change: Please reference Classic Contractors C.O.R. dated May 18, 2012. Description ofchange:Add IT closet, Add flow fill and extra conduit, change windows to tan, access Change in contract cost This will increase the contract cost by $5.060. 4. Change in contract time: (Attach additional sheets as required) ORIGINAL CONTRACT COST TOTALAPPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER Total C.O. % of Original Contract ADJUSTED CONTRACT COST WOMI $136,870.00 $0.00 $0.00 $5,060.00 3.70% 3.70% $141,930.00 - ;S 2%7 Karl Schmidt D to Project Manager � Ethan Cozzens 6 z Da e to�r D 2- Print Name Etha Cozzens Date oc: City Clerk Project File Contractor Purchasing Engineer Classic C011t [IC101'S, i,vr. P.O. Box 2798 Loveland, CO. 80539 970-227-2951 970-371-1604 May 18, 2012 City of Fort Collins 7312 Roselawn Office Building Revised front iblay 4, 2012 letter Attn: Ethan Cozzens Request for changes: I. Previous change for slab on grade in lieu or crawl space was a deduct of $ 4,575.00, add full underslab 2" insulation would add S 925.00, move insulation to outside of the monolithic pour and add flashing and FRP at exposed insulation would add S 760.00. The total deduct for slab on grade would be S 2,890.00. 2. Paint gutters and downspouts in lieu of standard color, REJECTED 3. Add flow -fill to electrical trench, add $ 1,219.00 4. Change exterior doors to solid at double, and half lite at entry, deduct S 340.00. 5. Change window color front white to tan, add $ 519.00. 6. HVAC changes to draw return air front close to floor, add S 544.00 7. Add rr Roont, add $ 4,014.00 8. Add access wiring, City of Fort Collins to furnish wire to be pulled by electrical contractor to blanked boxes for City of Fort Collins to furnish and install card readers, add $ 544.00. 9. Add drinking fountain per ASI-I, add $ 1,365.00. 10. Add solar shading to one skylight, add $ 85.00. Bold items are changes from previous letter of May 4, 2012. If you have any questions, please contact me at 970-371-1604. Classic Contractors, [tic Karl Schmidt