HomeMy WebLinkAboutCHANGE ORDER - RFP - 7033 DISCOVERY MUSEUM FACILITY (5)SECTION 00950
CHANGE ORDER NO. 7
PROJECT TITLE: Discovery Museum
CONTRACTOR: Hensel Phelps Construction Company
BID NUMBER: 7033
DESCRIPTION: The construction of a 46,928 square feet Discovery Museum facility complete with related site
work, curb & gutter, paving, sidewalks, utilities and landscaping.
1. Reason for change: Incorporation of Various Change Estimates (CE) into the Contract.
2. Description of changes: WCD #015 Rev. 1 Construct three framed drywall exhibit enclosures in the
Main Exhibit Gallery - $214,384.00; CE367 Credit for unspent Bond and General Liability Insurance for the
base building construction — ($7,873.00); CE367 Credit for unspent Bond and General Liability Insurance for
the exhibit enclosures — ($1,042.00).
3. Change in Contract Cost: $205,469.00
i
4. Change in Contract Time: 0 Days
ORIGINAL CONTRACT COST $11,400,000.00
TOTAL APPROVED CHANGE ORDERS 875,077.00
TOTAL PENDING CHANGE ORDERS 0.00
TOTAL THIS CHANGE ORDER 205,469.00
ADJUSTED CONTRACT COST $12,480,546.00
ACCEPTED BY:
Contractor's Representative
ACCEPTED BY:
Facilities
ACCEPTED BY:
ACCEPTED BY:
APPROVED BY:
Museum Director (City of Fort Collins)
Director
of Purchasing and Risk
cc: Purchasing Architect Contractor
-5b
Az-
Datb
Date —
,5 `I /z
Date
JAzxj/�
Datd
Date
Project File
SECTION 00950
CHANGE ORDER NO. 7
PROJECT TITLE: Discovery Museum
CONTRACTOR: Hensel Phelps Construction Company
BID NUMBER: 7033
DESCRIPTION: The construction of a 46,928 square feet Discovery Museum facility complete with related site
work, curb & gutter, paving, sidewalks, utilities and landscaping.
1. Reason for change: Incorporation of Various Change Estimates (CE) into the Contract.
2. Description of changes: WCD #015 Rev. 1 Construct three framed drywall exhibit enclosures in the
Main Exhibit Gallery - $214,384.00; CE367 Credit for unspent Bond and General Liability Insurance for the
base building construction — ($7,873.00); CE367 Credit for unspent Bond and General Liability Insurance for
the exhibit enclosures — ($1,042.00).
3. Change in Contract Cost: $205,469.00
i
4. Change in Contract Time: 0 Days
ORIGINAL CONTRACT COST $11,400,000.00
TOTAL APPROVED CHANGE ORDERS 875,077.00
TOTAL PENDING CHANGE ORDERS 0.00
TOTAL THIS CHANGE ORDER 205,469.00
ADJUSTED CONTRACT COST $12,480,546.00
ACCEPTED BY:
Contractor's Representative Date
ACCEPTED
ACCEPTED BY: 'ffu if �l C
Disco ery Museum Director (City,of Fort Collins)
ACCEPTED BY:
Director
APPROVED BY: �_
Dir cto of Purchasing and Risk Management
cc: Purchasing Architect Contractor
Date
1
Date
Date
Project File
SECTION 00950
CHANGE ORDER NO. 7
PROJECT TITLE: Discovery Museum
CONTRACTOR: Hensel Phelps Construction Company
BID NUMBER: 7033
DESCRIPTION: The construction of a 46,928 square feet Discovery Museum facility complete with related site
work, curb & gutter, paving, sidewalks, utilities and landscaping.
1. Reason for change: Incorporation of Various Change Estimates (CE) into the Contract.
2. Description of changes: WCD #015 Rev. 1 Construct three framed drywall exhibit enclosures in the
Main Exhibit Gallery - $214,384.00; CE367 Credit for unspent Bond and General Liability Insurance for the
base building construction — ($7,873.00); CE367 Credit for unspent Bond and General Liability Insurance for
the exhibit enclosures — ($1,042.00).
3. Change in Contract Cost: $205,469.00
4. Change in Contract Time: 0 Days
ORIGINAL CONTRACT COST $11,400,000.00
TOTAL APPROVED CHANGE ORDERS 875,077.00
TOTAL PENDING CHANGE ORDERS 0.00
TOTAL THIS CHANGE ORDER 205,469.00
ADJUSTED CONTRACT COST $12,480,546.00
ACCEPTED BY: /
ACCEPTED BY
ACCEPTED BY:
ACCEPTEDI
APPROVED
Discdvery Museum Director (City of Fort Collins)
cc: Purchasing Architect Contractor
—7/!
Az-
Datb
Date
'1 nl /Z
Date
Dat
1 '
r
Date
Project File
SECTION 00950
CHANGE ORDER NO. 7
PROJECT TITLE: Discovery Museum
CONTRACTOR: Hensel Phelps Construction Company
BID NUMBER: 7033
DESCRIPTION: The construction of a 46,928 square feet Discovery Museum facility complete with related site
work, curb & gutter, paving, sidewalks, utilities and landscaping.
1. Reason for change: Incorporation of Various Change Estimates (CE) into the Contract.
2. Description of changes: WCD #015 Rev. 1 Construct three framed drywall exhibit enclosures in the
Main Exhibit Gallery - $214,384.00; CE367 Credit for unspent Bond and General Liability Insurance for the
base building construction — ($7,873.00); CE367 Credit for unspent Bond and General Liability Insurance for
the exhibit enclosures — ($1,042.00).
3. Change in Contract Cost: $205,469.00
4. Change in Contract Time: 0 Days
ORIGINAL CONTRACT COST $11,400,000.00
TOTAL APPROVED CHANGE ORDERS 875,077.00
TOTAL PENDING CHANGE ORDERS 0.00
TOTAL THIS CHANGE ORDER 205,469.00
ADJUSTED CONTRACT COST $12,480,546.00
ACCEPTED BY
i
ACCEPTED
ACCEPTED BY:
Discovery Museun
ACCEPTED BY:
Discovery,u'seun
APPROVED BY:
hector of Purcha
cc: Purchasing Architect
Contractors Representative
Iz
Datb
5 iZ
J Date
,{City of Fort Collins) Date
1
�2�, 4C//I/V
(NPC) Date
and Risk Management
Contractor
Date '
Project File
SECTION 00950
CHANGE ORDER NO. 7
PROJECT TITLE: Discovery Museum
CONTRACTOR: Hensel Phelps Construction Company
BID NUMBER: 7033
DESCRIPTION: The construction of a 46,928 square feet Discovery Museum facility complete with related site
work, curb & gutter, paving, sidewalks, utilities and landscaping.
1. Reason for change: Incorporation of Various Change Estimates (CE) into the Contract.
2. Description of changes: WCD #015 Rev. 1 Construct three framed drywall exhibit enclosures in the
Main Exhibit Gallery - $214,384.00; CE367 Credit for unspent Bond and General Liability Insurance for the
base building construction — ($7,873.00); CE367 Credit for unspent Bond and General Liability Insurance for
the exhibit enclosures — ($1,042.00).
3. Change in Contract Cost: $205,469.00
4. Change in Contract Time: 0 Days
ORIGINAL CONTRACT COST $11,400,000.00
TOTAL APPROVED CHANGE ORDERS 875,077.00
TOTAL PENDING CHANGE ORDERS 0.00
TOTAL THIS CHANGE ORDER 205,469.00
ADJUSTED CONTRACT COST $12,480,546.00
ACCEPTED BY
ACCEPTED BY:
ACCEPTED BY:
ACCEPTED BY:
APPROVED BY
Contractors Representative
Facilities
(City of Fort Collins)
Director (NPC)
Date
Da e
ire for of Purchasing and Risk Management Drale
cc: Purchasing Architect
Contractor
Project File