Loading...
HomeMy WebLinkAboutRESPONSE - BID - 7360 AVERY HOUSE RE-ROOFSECTION 00300 BID FORM PROJECT: 7360 Avery House Re -Roof Place: Ft. Collins/Avery Hou: Date: 4/2/2012 In compliance with your Invitation to Bid dated 4/2 , 20 12 and subject to all conditions thereof, the undersigned a (Corporation, Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor) authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. Accompanying this Bid is a certified or cashier's check or standard Bid bond in thesum of four thousand twenty four & 75/100 ($ 4024.75 ) in accordance with the Invitation To Bid and Instructions to Bidders. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment Bonds is as follows: Developers security & Indemnity Company All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. through SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 10% of the contract. ITEM SUBCONTRACTOR 19 �r9vlrQ✓ as�`� Zeigler Construction PO Box 371 BeDvue, Co 80512 (970)181-4765 Slvmn=Wer lauM Our Team; Shawn Zeigler Owner/operator of Partners Roofing 1994 — 2006 Owner/ operator of Zeigler construction 2006 — present 20 years roofing experience 30 years construction/ carpentry experience Ines Ruvalcaba Master roofer. 35 + years roofing experience Jim Raasch 30 A- years roofing experience. Specializing in historical roofing. Peter Farquhar Stone mason specializing in historical restoration. Zeigler Construction PO Box 371 Bellvue, CO 80512 (970) 481-4765 Shawnzeigler@gmail.com Zeigler constructions work strategy for the Avery House. Comply with all federal, state, local, and historical rules and regulations. Comply with all OSHA rules and regulations. Perform the work as detailed in the Avery bid #7360 and the addendum page. If the bid is awarded on 4/9/12 we would like to get the fencing and the scaffold erected from 4/9/12-4/13/12. We would start shingle tear off and chimney repair on 4/16/12. We would like to finish on 5/22/12 and have the scaffolding and the fencing removed on 5/23/12. Safety 1) All entrances and sidewalks shall be properly marked and secured for public safety. 2) A 6' high chain link fence with privacy screen shall be erected around the entire perimeter of the house. 3) 3) Scaffolding shall be erected around the entire perimeter of the house. The owner may want to take -_this_opportunityto`inspectthe_facia_andaoffit._ Removal and decking 1) Remove all existing wood shingles down to the decking. 2) We would like to have the parking spots in front of the Avery house on Meldrum for the length of the — project. 3) We will park our big dump trailer on the street and shuttle debris with tarps or small trailers as to not rut" — the sod.— - — - 4) Recycle all wood shingles-at-Hagemens. Approximately 38 yards --" -- 5) Replace any rotten decking. -- 6) All decking shall be re=nailed because of age and -shrinkage. -_ 7) Install wood inserts on the gable ends of the dormers between the sheathing and crown molding for proper nailing. 8) Install plywood over spaced sheathing as needed. 9) Install cut to fit inserts over the windows for protection. 1-0) Protect the stonewalls with plywood. - — -11) All debris will be cleaned up daily: — - 12) We will start on the NE corner of the building and work in a clockwise motion. 13) All sections will be dried in with I&W and felt the same day that they are torn off so as to keep a water tight system at all times. 14) Some bat mitigation may be required during tear off. We will work with the proper authorities to make sure this happens in a safe and humane manner. 15) We will run magnets around the property upon completion to retrieve any missed nails or staples. Flashing and Underlayment 1) Install one course of Grace I&W on the eaves and valleys. 2) Install double layer 30# ASTM D 226 felt. 3) Install w valley and drip edge. 4) Install flashing and counter flashing on the chimneys. 5) Install new pipe jacks and heat stack jacks. 6) There are 4 applications where the roof meets a stone wall. These areas will need to be flashed and counter flashed. 7) We will have a metal break on site to fabricate our flashing as needed. 8) R&R metal ridge. Venting 1) R&R existing Rv 51 roof vents 2) Install cedar breather. 3) Install vented roll ridge on the ridges. Shingles 1) Install smooth sawn, Class B, fire treated, 18" perfection shingles with a 5 %z" expose. 2) Use proper fasteners. 3) Shingles to be purchased by the owner. — - Gutters-- 1) R&R all gutters and downspouts. 2) Gutters and downspouts may contain lead paint. We will test the gutters and if needed remove the gutters and downspouts with proper lead abetment techniques. 3) Gutters and downspouts to be recycled by the owner. Painting 1) All painting to be performed by the owner. Flat Roof 1) Install %z" cdx over the existing membrane. 2) Install fully adhered 60 mill white EPDM. ALL work to be preformed as per specs. ALL materials used as per specs. _ _ —ALL -work-to.be.documented with photographs._ _--_ Zeigler Consuviction PO Boa 371 Bdlwue, Co 80512 (970)181-4765 ShawnadgkF@gnmaiLcom Zeigler Construction Limited Warranty Zeigler Construction herby warrants that the EPDM roof and the wood shingles installed will remain watertight for a period of 5 years. BUILDING NAME & LOCATION Avery House 328 West Mountain Avenue Fort Collins, Co WARRANTY TERM FIVE YEARS FROM THE DATE OF SUBSTANTIAL COMPLETION EXCLUSIONS AND CONDITIONS The corporate surety warranty shall not exceed a term of one year. Damage resulting from use of the roofing system in a manner for which it is not normally intended or for which it has not been designed. Damage to the membrane or wood shingles caused directly or indirectly by unusual occurrences of the elements such as, but not limited to, cyclones, tornadoes, or wind speeds in excess of 90 miles per hour, lightning or hail. Damage to, or failure of, the membrane or wood shingles in any manner caused or contributed to by: Settlement or movement of building components: Solid or liquid deposits of any substance other than those for which the system was designed: Zeigler Construction BY: Title: �wh� Date: Y/z 12 I DR 0172 (12/98) COLORADO DEPARTMENT OF REVENUE DENVER CO 80261 (303)232-2416 CONTRACTOR APPLICATION FOR EXEMPTION CERTIFICATE Pursuant to Statute Section 39-26.114(1)(a)(XIX) DO NOT WRITE IN THIS SPACE The exemption certificate for which you are applying must be used only for the purpose of purchasing construction and building materials for the exempt project described below. This exemption does not include or apply to the purchase or rental of equipment, supplies, and materials which are purchased, rented, or consumed by the contractor and which do not become part of the structure, highway, road, street, or other public works owned and used by the exempt organization. Any unauthorized use of the exemption certificate will result in revocation of your exemption certificate and other penalties provided by law. A separate certificate is required for each contract. Subcontractors will not be issued Certificates of Exemption by the Department of Revenue. It is the responsibility of the prime contractor to issue certificates to each of the subcontractors. (See reverse side). FAILURE TO ACCURATELY COMPLETE ALL BOXES WILL CAUSE THE APPLICATION TO BE DENIED. istration/Account No. (to be assigned by DOR) Period 0170-750 (999) $0.00 89 89 - • R � TQ Trade name/DBA: Owner, partner, or corporate name; Zeigler Construction Shawn Zei q ler Mailing address (City, State, Zip : Contact Person PO Box 371 Zip CO 80512 Shawn Zei ler E-Mail address: Federal Employer's Identification Number: Bid amount for your contract: Shawnzei ler@ail.com 26-2146038 $ 80,495.00 Fax Number: Business telephone number: Colorado withholding tax account number: ( ) 970 481-4765 o Ie o c ac a s a t, a t c n artles pAQ • a I all o D a etta Name of exempt organization (as shown on contract): Exempt organization's number: City of Fort Collins 98- Address of exempt organization (City, State, Zip): 215 North Mason Street, Fort Collins CO 80524 Principal contact at exempt organization: John Ste hen Principal contact's telephone number: 970-221-6P/77 Physical location of project site (give actual address when applicable and Cities and/or County (ies) where project is located) 328 West Mountain Fort collins CO 80524 Scheduled Month Day Year construction start date: 4 15 2012 Estimated Month Day Year completion date: 5 25 2012 I declare under penalty of perjury in the second degree that the statements made in this application are true and complete to the best of my knowledge. Signature of owner, partner or corporate officer: Title of corporate officer: Date: Owner 4 2 2012 DO NOT WRITE BELOW THIS LINE 7 ADDENDUM No.1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 7360: Avery House Re -Roof OPENING DATE: 3:00 PM (Our Clock) April 2, 2012 To all prospective bidders under the specifications and contract documents described above, the following changestadditions are hereby made and detailed as follows: • In order to expedite the project the City of Fort Collins will purchase the cedar shingles. Do not include shingles in your bid. • Shingle width is limited to 4" minimum to 10" maximum. • Contractor to provide a 5 year minimum 'Water tightness" warrantee. • Sheet flashing materials can be 26 gauge ASTM Berridge Galvalume or equal, instead of 24 gauge. • The existing copper flashing material on the turret can be replaced with either galvanized metal or copper. • Extend eave/ ice dam protection membrane 36" around the perimeter of the building and one continuous 36" width sheet 18" each side of the valleys. Addendum to item number 3.02 D. • The existing wood cedar shingles shall be recycled at a site approved by the City. Existing metal flashing shall be collected by contractor and the City will haul off to City recycle bins. ' • Single ply membrane allowed on the flat roof section will be either white EPDM or TPO roofing. Please contact John Stephen, CPPO, LEED AP, Senior Buyer, at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Z (-ece'%v e-L +k,6 s Aad et,. du vw% Addendum 1 — 7360 Avery House Re -Roof A4�_ ?,Q(II�,� Page 1 of 1 `'" CERTIFICATE OF LIABILITY INSURANCE DATE(MMIDDYriY) a/vzo12 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY ATE THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURE R(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER Daniel B Richmond (970) 484-2881 923 C Prospect 8 Fort Collins, CO 0525-1110 (005/316) CONTACT NAME: Dan Richmond PH NE 970 484.2881 FAX N,: 970 484.2945 n oaess: drichmon@amfam.com INSURER S AFFORDING COVERAGEMN�C FamilylnsuranceNSUREDZeigler Construction Llc P O Box 371 UINSURERA:erican Bellvue, CO 80512-0371 _ __ ....._... _ .-_..._�... NGVIJIUIN NUMBEN: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR Amw SUBR ICY EXIS LTR TYPE OF INSURANCE POLICY NUMBER MMIDIDY EFF LIMITS GENERAL LIABILITY COMMERCIAL GENERAL LIABILITY CLAIMS -MADE ❑OCCUR URRENCE S RENTED Ea occurrence S Anyone person) w S S ADV INJURY $ AGGREGATE $GEN'L AGGREGATE LIMIT APPLIES PERS-COMPIOP POLICY PRO LOC AGG $ $ A AUTOMOBILE LIABILITY ANY AUTO ALOW AUTOS NEO f( SCHEDCH ULED HIRED AUTOS NON -OWNED AUTOS N N 05-XJ2856-07 7/22/2011 7/22/2012 —COMBINED SINGLE LIMIT Ea accident BODILY INJURY (Per person) $ 1,000,000 BODILY INJURY Per amidenl I ) $ 1,000,000 PROPERTY DAMAGE Per edam $ 1,OOD,DDD 5 UMBRELLA LIAB EXCESS LIAB OCCUR CLAIMS -MADE N / A RENCE S 5 DED RETENTIONS WORKERS COMPENSATION AND EMPLOYERS' LIABILITY ANY PROPRIETORIPARTNER/EXECUTIVE Y/N OFFICER/MEMBER EXCLUDED' (Mandatory In NH) If yes, describe under OF OPERATIONS below U- OTH- RDISEASE $ IDENT S - EA EMPLOYE $DESCRIPTION - POLICY LIMIT 5 DESCRIPTION OF OPERATIONS / LOCATIONS/ VEHICLES (Attach ACORD 111. Add3ional Remarks Schedule, if more space is required) CERTIFICATF Hnl noo City of Fort Collins 215 N Mason St Fort Collins, CO 80524 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCr^WITH THE POI„LCY PROVISIONS. A u 1 ACORD CORPORATION. All rights t-- •-•��/ I ne AL,UHU name and logo are registered marks of ACORD CERTIFICATE OF LIABILITY INSURANCE 033//23/2�012 TB CEMWMJATE B ISSIED AS A MRTR3t OF M01i 71101111 ONLY A® C011i'66 WD MISKIIS UPOW TE C6C EMME IBOI.OBL 7105 C6[IfiG7E DOES NOT AFFMR YBY OR IMM A7IVELY ANIBO, EtR911D OR ALT3( THE COYBtASE AFFOMIED BY TE POLICES BHDW 7M CIEWFlI :A7E OF OMMAUM 00FS NOT C0MMINTFE A COWMACT 8ETO TM �MISILNERM AUUWRM) Rl3IRESENTATVE OR PROMK33k AND7RE CERTINW ATE fret MPORTANT_ OOhe OeoHlr,�' holder is mo AOOf110NAL INSIIA®. the PoOmPm) oast be atlosed. 0 SIBM)r.RTON IS "*JVM so4Fct to The I and ®oodiR vtthe. M . oes. - pared-®lI As1S0eme4dm this I Amce¢tameja efiglftloffm comes ame holder in sm of such adossemod(s). mom® Jmw C_ BBCSN!w i BSSOCIBN!E4, 1WC_ 220. ith Street Ft. Collims CO 80524- MOM: ma (Il70) 464-2005 Doc 'f'070 mm� tioP •+t+:••-•••�••••�.aam m®® m9e_9fl— Construction. LLC �t M s ® Fimiglor Construction, LLC Po Buz 371 Ballveee CO 00512-0371 mms A h14aN>ZC CILZOALMT 332503UUMCZ CO mmsam3 s ® C_ mma e lm®E _ = F. IMOIICRIM. NDTRGM45TAW DM ANY WIMMENE W1f,, TOM OR a>MMMDw OF AW cmNTRI)I D CR OTWBR D OMMIE WT WWH D4S.Y TO MDR TM CMIHFiCATE MAY BE I®I® OR WAY IERDADA THE INSAMOM ArfUMM BY TIE POUGESs QDOMe® DIEM IS SAUGMr TD ALL RE MR =, F7C UMMS ADO D]DUO=M OF MICH POUD ES. LANDS SHOM MAY HAW ®R BaHMMM BY PAO C AVIVS em TOW Mf Eat ®, iID evaw ® gm®eeeel ee>�meeel emrm A Centel.e 1 f"* Ofrs ?7041r II 031DeOa� Its 1000000 Z 11 GBOW / / / s 100000 Fp � z®aoowR M®®wDArymmmme®gyp s5000 / r / / wD�DOMLs.saar�iMiwiRr a 1000000 s 2000000 ®eLLA.➢EHIIOMaWBII@SW®i: / / / / AW®LLCIIS-OAM9.®wAa'E� I2000000 Z o�uuorw "� uax / / / A nmos0® s Im�E om®ar ao®� / / / / Q:uv9BMM9�arm3tB;wlmmr a AMrmourto / / / / ®LLYinewMrpMmmw®ou s .mwlown®.oMuoam �IIIf "D '�AllA1016 / / / / ®LLtl INLl16[lF��tlltlp s Mtm@A�a➢DO: / / / / $ 1s �w D0 ODOJUR lOo� / / / / EdpDIX s ea0 ClAME4 ADE NEMITI M $ / / / / s •M•® m■®e / r r / �soAnwF eomaON ® mwaesr mr amsars�v Emam®. maw TL®ems-®+ s / / / / m�RiwmomaDFaoq�aT:aosDs® eELL.®ems-D®IlOr1rNMD0 s ®®6 OMIT R uSi I ®B IPA I® Ll YOfW rW brib. i s 40< Med1 I.oclmrw.wlc mwlsam 4maNi:rLA11aAM Atm. Todd Ben[gfoLd SNWADANYtF71EA0O11E F09Ai EG01�IIDBHOIE TE EXPIRA7W UNTIE 718EOF. OOIICE M L E O91F6® w ACC01m0N[Eo IIEPOLWFFRDFOMMW Jillie of Colorado, TLC. 720 s_ Colorado Blvd_ Ste GOOK samma® o Deaver CO 80246- All rights moo®fig Im w...wos ®e mu ow me Icg®ea Boa mnuzar 8. BID SCHEDULE (Base Bid) Includes all work per specifications Lump Sum $ 80, 4 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. (Seal - if Bid is by corporation) RESPECTFULLY SUBMITTED: Printed Date Title R-1947 License Number (If Applicable) Address—] 3 C/ g b-t— �Uf�i6�J Ca 80521 I " q 3 6q� {-Earwe— Telephone, q20- q9z- 0997 t,Ijovk- SECTION 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned Zeigler Construction as Principal, and as Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado, as OWNER, in the sum of $*Ior the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, . 7360 Avery House Re -Roof NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all. persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. *Developers Surety and Indemnity Company ** Five Percent of Amount Bid------- (5%------) IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this day of April 2 12012, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. 11:1L` Eel 1:711 Name: Zeigler Construction Address: P-o. Box 371 Bellvue 0 80512 By: OW ►7 e-V - ATTEST: By. (SEAL) SURETY Developers Surety and Indemnity Company I Trvine CA 92623 By. Florietta Acosta Title: Attorney -In -Fact (SEAL) POWER OF ATTORNEY FOR DEVELOPERS SURETY AND INDEMNITY COMPANY INDEMNITY COMPANY OF CALIFORNIA PO Box 19725, IRVINE, CA 92623 (949) 263-3300 KNOW ALL BY THESE PRESENTS that except as expressly limited, DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA, do each hereby make, constitute and appoint: "'Mark Sweigart, Susan J. Lattarulo, Donald E. Appleby, J.R. Richards, Tiffany McGonigle, Gloria C. Blackbum, DiLynn Guern, Florietta Acosta, Kevin W. McMahon, Sarah Brown, jointly or severally"' as their true and lawful Attomey(s)-in-Fact, to make, execute, deliver and acknowledge, for and on behalf of said corporations, as sureties, bonds, undertakings and contracts of surety- ship giving and granting unto said Attomey(s)-in-Fad full power and authority to do and to perform every ad necessary, requisite or proper to be done in connection therewith as each of said corporations could do, but reserving to each of said corporations full power of substitution and revocation, and all of the acts of said Attomey(s)-in-Fact, pursuant to these presents, are hereby ratified and confirmed. This Power of Attorney is granted and is signed by facsimile under and by authority of the following resolutions adopted by the respective Boards of Directors of DEVELOPERS SURETY AND INDEMNITY COMPANY and INOEMNITY COMPANY OF CALIFORNIA, effective as of January 1st, 2008. RESOLVED, that a combination of any two of the Chairman of the Board, the President, Executive Moe -President, Senior Vice -President or any Vice President of the corporations be, and that each of them hereby is, authorized to execute this Power of Attorney, qualifying the attomey(s) named in the Power of Attorney to execute, on behalf of the corporations, bonds, undertakings and contracts of suretyship; and that the Secretary or any Assistant Secretary of either of the corporations be, and each of them hereby is, authorized to attest the execution of any such Power of Attomey; RESOLVED, FURTHER, that the signatures of such officers maybe affixed to any such Power of Attorney or to any certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signatures shall be valid and binding upon the corporations when so affixed and in the future with respect to any bond, undertaking or contract of suretyship to which it is attached. IN WITNESS WHEREOF, DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA have severally caused these presents to be signed by their respective officers and attested by their respective Secretary or Assistant Secretary this January 1 st, 2008. By: \ f Daniel Young, Vice -President By: Stephen T. Pale, Senior Vice -President State of California County of Orange gPOkq)i^ yy, OCT. ; < 1936 raw P..� `�aD••` OCT, 5 1967 On January 31, 2011 before me. Antonio Alvarado, Notary Public Date Here Insert Name and Title of the Officer personally appeared Daniel Young and Stephen T Pate Name(s) of Signer(s) who proved to me on the basis of salisfadory evidence to be the persons) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized ANTONIO ALVARADU 1[ capacity(ies), and that by hisMerttheir signature(s) on the instrument the person(s), or the entity upon behalf of t which the person(s) acted, executed the instrument. N COMM. it 1860643 NOTARY PUBLIC CALW< MM S I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is 3 ORAWIE COUNTY true and coned. 3 My comm exp nes Aug 9, 2013 WITNESS my hand and official seal. Place Notary Seal Above Signature Antonio Alvarado, Notary Public CERTIFICATE The undersigned, as Secretary or Assistant Secretary of DEVELOPERS SURETY AND INDEMNITY COMPANY or INDEMNITY COMPANY OF CALIFORNIA, does hereby certify that the foregoing Power of Attorney remains in full force and has not been revoked and, furthermore, that the provisions of the resolutions of the respective Boards of Directors of said corporations set forth in the Power of Attorney are in tome as of the date of this Certificate. This Certificate isexecutedin the City of Irvine. California, this 2nd day of April , 2012 By: Zxi4el— regg Okur istant Secretary ID-1380(Rev.01/11) - SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: Zeigler Construction 2. Permanent main office address: PO sox 371 sellvue, CO 80512 3. When organized: 4. If a corporation, where incorporated: 5. How many years have you been engaged in the contracting business under your present firm or trade name? 6 years 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) We have approximately 20 signed roof contracts. All of these contracts are NOT.time sensitive and will be put on hold to complete this project. 7. General character of Work performed by your company: 8. Have you ever failed to complete any Work awarded to you? No If so, where and why? 9. Have you ever defaulted on a contract? No If so, where and why? 10. Are you debarred by any government agency? No If yes list agency name. 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. See Attached. 12. List your major equipment available for this contract. All required roofing equipment Ladders safety equipment and metal break 13. Experience in construction Work similar in importance to this project: Jobs listed on line #11. 14. Background and experience of the principal members of your organization, including officers: Shawn Zeigler - 20 years of roofing experience Ines Ruvalcaba - 30 years+ of roofing experience Jim Raasch - 30 years+ of roofing experience 15. Credit available: $ 45, 000. 00 16. Bank Reference: 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? Yes 18. Are you licensed as a General Contractor? Yes If yes, in what city, county and state? Fort Collins . Larimer County, CO What class, license and numbers? Roofing - R1947 19. Do you anticipate subcontracting Work under this Contract? Yes If yes, what percent of total contract? 1% Andto whom? Farquhar Masonry 20. 21. 22. 23. Are any lawsuits pending against you or your firm at this time? No IF yes, DETAIL What are the limits of your public liability? DETAIL 1, 000, 000.00/2, 000, 000. 00 What company? Atlantic Casualty Insurance What are your company's bonding limitations? Sioo, 000. o0 The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at Name of Bidder By: Shawn Zeigler Title: owner this 2 day of April 20_U. Stateof Nomzlo County of Uk n M C-'(- that -j tf being duly sworn deposes and says that he is (�uJNF--P— of ZeigJpX Om-c{ruc�{1�on and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this Z Notary Public My commission expires: 10)2-41I2_ day of (i l 20 12. (Seal) V%OTARy -.mo4 PUBLtO p; rmm Don Eyarm 417-41f z Zeigler Construction PO Box 371 Begvuc, Co 80512 (970)181-4765 SWMnnYkC®8TMTC0M #11& 13 Projects completed. 832 W Oak st. Steve Davidson 970 818 3811 3/2012 $32,000 Installed I&W on the eaves, cedar breather, copper flashing and wood shingles. 318 Loomis Kim Morten 970 482 8267 9/2011 $22,000 Install I&W on the eaves and wood shingles. 629 W Mountain David Haimson 970 295 5408 5/201 I $12,000 Install I&W on the eaves and wood shingles. 730 Olive Craftsmen Builders, Steve Josephs 970 218 6905 4/2008 $34,000 Installed I&W on the eaves, cedar breather, copper flashing and wood shingles. 1100 McLain Flats Aspen, Co Earl Cherry, 307 747 4369 8/2011 $425,000 Installed I&W, copper facia, bylin cave melt, hand soldered copper gutters and copper shingles.