Loading...
HomeMy WebLinkAbout500101 ZEIGLER CONSTRUCTION - CONTRACT - BID - 7360 AVERY HOUSE RE-ROOFCity of Fort CoMns Purchasing SPECIFICATIONS AND CONTRACT DOCUMENTS FOR AVERY HOUSE RE -ROOF BID NO. 7360 Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov. com/purchasing PURCHASING DIVISION 215 NORTH MASON STREET, 2ND FLOOR, FORT COLLINS 5.0 INTERPRETATIONS AND ADDENDA. 5.1. All questions about the meaning or intent of the Bidding Documents are to be submitted in writing to the Engineer and the OWNER. Interpretation or clarifications considered necessary in response to such questions will be issued only by Addenda. Questions received less than seven days prior to the date for opening of the Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 5.2. All questions concerning the scope of this project should be directed to the Engineer. Questions regarding submittal of bids should be directed to the City of Fort Collins' Purchasing Division. 5.3. Addenda may also be issued to modify the Bidding Documents as deemed advisable by OWNER or Engineer. 5.4. Addenda will be mailed or delivered to all parties recorded by the OWNER as having received the Bidding documents. 6.0 BID SECURITY 6.1. Each Bid must be accompanied by Bid Security made payable to OWNER in the amount stated in the Invitation to Bid. The required security must be in the form of a certified or bank cashier's check payable to OWNER or a Bid Bond on the form enclosed herewith. The Bid Bond must be executed by a surety meeting the requirements of the General Conditions for surety bonds. 6.2. The Bid Security of the successful Bidder will be retained until such Bidder has executed the Agreement and furnished the required contract security, whereupon Bid Security will be returned. If the successful Bidder fails to execute and deliver the Agreement and furnish the required contract security within 15 days of the Notice of Award, OWNER may annul the Notice of Award and the Bid Security of that Bidder will be forfeited. The Bid Security of other Bidders whom OWNER believes to have reasonable chance receiving the award may be retained by OWNER until the earlier of the seventh day after the effective date of the Agreement or the thirty-first day after the Bid Opening, whereupon Bid Security furnished by such Bidders will be returned. Bid Security with Bids which are not competitive will be returned within seven days after the Bid opening. 7.0 CONTRACT TIME. The number of days within which, or the date by which the Work is to be substantially complete and also completed and ready for Final Payment (the Contract Times) are set forth in the Agreement. I F darilagleS . bUL [lot be cuts of recommenicLition, ot. pigment nnd'pirewht the Appli , cation re . pw or rcphcenrwnt of work of others de.stroved' or to, OW-NMRor return1lid.A . pplictnion fir-MINTRACITOR' damaged,' by correction. renioVal or.replacement of indimtbg in writing EN-GrINEER's,re2sons for refusing to C0NTR_AGt0R's.niifedNe i%rudc ('()\,7rR.AC,T()R 4mil recommend �aymtmt'. In the latter case�;CON71Zv_­rnk .. . not be allowed'an e'xtensiLn. of the Contract, Times (or in ay make,she` necessary corrections and resubi nit the \filestoncs) because of any delay in pei*fbnmancd of -the Application. I en L 4Wys - after pieserimatim of - the work'itu-ibutable to . , �ppli6ation felr'Paymcnt to OWNM'AviLh OIGMERs. rights and remedies herelinder. rec.oniiiieridation. the anibunt reo6mmouled will (�.mbjet;t to the provisions of the last sentmcc of paragraph 14; 7) :bccurnc.duc and when.due will be paid'by !OWNER' to ARTICLE 14-PXv_,NmNTS TO CO-NTRACTOR AND CONTRACTOR 14. i. ENGIMEHIZ!s recommenchtion it . any pitmen[ reque5ted'in m 1kiphlition t ' or Payment will . doastf(Ute_ra I 'on rtpn�. ritation by h1*NGlNRhX to OWNER, based -Scjredufr of Mihiev, `s on site �ihsctvauons of the ex`ecurcd Work- asancxI>erl . er.ml and quaLi1ie'ddesnzrvprofessi6naI and on 141. The si:hcddlic of values established as provi&d FNGINFER'srevicw o frthe ' Ap'-pl='tj'dh far Paymntand gift h 2,9 will serve as the b. Pan! LSIS for progrcss'paym Lis the aqcompunyringg data and schcdulcs'Lhat'to the best of, in he incorporated into a. tams of Aplifientidn' f6r FInyment acceptable to ENGINEER Progress paynicrits,on 'number kc,ount a , f Unit Price Work vrill be,brusedon the tit1_4JA, the, Work his progressed. to the paintunitscompletud. `ridicatcd, -1pplicat itin f v t or Preigrev Pa. ni.w v I ' 4-5.2. the q641iry of the W'ork, is gencrilly; in accardance with thsContract Doeurncnt, (.9'ubject to' 14.2- fcir I in evaluition. of the Wrirl, as a functionin.6 wholecti ch.progress fitlyincrit (but not more often Lhan.on cc a prior to or upon SubsUintiii.l Ccmq;ldii)n, to the results month), CONTRACTOR shall subniitato 13�4011,TEER for of r any subsequent tests Qafle& tuC ill the revic%i an Application ficir Riyrric6t filled out and signed he 'completed (Xicurnerts, to,a Final determination of quantities an'd CONTRACTOR covenng the Work as of the classification for Unit Price. Work under date of the Application and accompanied by such parigruph 9:11,1, and tcrany 6thee quaflfic'atiiins.titatcd' supporting documentation asis re4tiuccl by the Contract in the recom mervdation.); Sltd, - 1)(lcutircm.sIt. payment is requested on the hasisor nlateriaLi and equipment not incorporated in the.Work- but. 14,5_3, the conditibnSr precedent - to delivered and. suizably,stomt at the tits or at another 'CONTRACTOks being_ jemitled to such paymenu 16cation agreed to in writing-, the Apphcation 2i Payment appear tc I ) hive Been rulfillW insular as -it' is shall 11soibe icconrpinied by a bill ofsalc; invoice or oilier ONG13NT-ER's-responsibilit-v to'ob-serv'e-the Work: d mumentati6n warranting ihat'OVVNT, k Liars received the nnueeiiils and cqdipmeiit7fh;e and d6r of all Liens. and, Flowerer- 'by recommending any Such ppynient 'will 'noi evidence that the mmeriiC%. and equipment are covered 1w ERNGNMER thereby he damed to have appropriate prcpertv insurance and other arranizements to, 'interest represented that: (ii)'exhateaWc or continuous orizsite represented. protect•0\V\FER!i therein; all, of which %Vill be tnspec have been in ade Yb check the quality or. the satisfactory to OXV'k\FFR, The amount of retainage with quantity of the Work beyond the responsibilitiies 'in respect to progress pm-ments will beisstipulated in the speciflically as:iigpad to ENGI INMM the Contract, Agreement, '&y funds that are wittthold th!L(JIY�T-R DeZurneriLs or (ii) that there may not be other matters or shall not be subject to Nub�Aittaion by the CON TRACTOR. issues: between the ponies that might entitle with securities or zmv arranrternews involvin, an escrow or CONTRACTOR to be find- additionally by CWNFCPor cLsuxhanslup. PK_esetirigg ap oil for, Pa ent _jh!�L -P leati j_ -!M— it e OWNER to withhold payancnt to ,entitle fonn theCONTRACTOR expressly waives his right. to the berefiLs of 24-9L-101. 14.& ENGENMUCs rccommendmion of any pkvment, including , final payment, shall rlotr=un that IaN'URNEER is reston5iwd for coNLTR\ c-rows means' method& CONMICTOR's rVwm", of Tide: techniques. sequences. or procedures of coiistruction. or, .14-3- CONTR\C.'-TOR.%varrantsitnd,guarantees that .title .1he sa&ty precautions,and proirmms.inmLhl thereto. or, equipment covered, by tiny to till -Work,- matcriAy and c to my ffiilurQ of CIO to, comply with Laws' r NT Application for Paymmi.'whether incorporated in the and Rcgulations, applicable to the Lurrushing or. I Projector not� willpss tooW.NERII_U.Niar tharithe'tind performanw- . i;f Work. or for arty 'failure of of paylneriE free and clear of all Licris. CONTI-LACEOR lo� pertbrin or furnish Work, in ncordance with the ContractDoGLUIrents. Rinietv (if. Ipplieatiumvfbi PrgkTgvx Prqpieijv 143. 'HINGINEER may rctuse to recommend ihe whole 14.4. ENGUNIEER will. withiri ten da}4; after receipt of or any Pul.of any pavr[lem if_irt ENGRYEERs opinion: it .ift each Applicon form Pacnt, either, indfMc, Ur Writing A Avould h,,, incorrect to 'make the represerimno I ns to covurnv19 . wl city oi, FoR r I COLLIM M 1JD[F1CAnaNs atEv,w.oiwi I I (5WNE-R reterred tout paragraph 14.5. ENGI IEER may also rerusz to reconrmt nd'any stchpaymani_ or,because. of subsequently discu"vered cvidma -or the..restills. of subsequent irrpectionsror tests, nullify any such peynient previously. rccommcnded to such extem. as may be. necescln in ENGINEEWs opinion -to protect .OWiYER. from Foss because:. 03:1., the Work is;dejecln•c•, ur,ccmpleted \York lia5 Econ dama_ed requtrirt_ correction or replacement.. I4.7.1. the C'ontract Primhasbeen reduced by Written Amendmentor Chance Order, 14.7: O\VNER, has been required to correct ck,fectnz Nark or complctr\Vork, ih.accordance with paragraph I J.14. or 143.41 E'NGINEER', has actual knowledee of the. occurrence of 'any of the" events cnuni rate.d' in 5 .paragraphs 111 through 1524 inclusive. 0WNFR.11mv,refuse to make princntof thcYull amount recommended by ENGNF.$Rbec use' 14.75 claiims have-- been. made ar„safnst :OWNER, an account orC:(3N'I"kAurbie%perrormanceor furnishing or.thc Work,. 14.7a5: Licros have,t-.en filed inkanneetion with the Work. except where CCiN'M--\CTOR hxt ddii"vered a: specific ,Bond :smisfnctgry to OWNER'fo secure the �uisfaction and dischnrge,ofsuch .Liens, 14.7].- there are,other items enotlingOW'NERlo a xt- off agiinst the .muaunt recomincoded: or ltl.:S. OWNER. has actual knowledge- ,of the. occurrence of any of the events, enumerated .in Iairagraplis 14.7.1' through 14.73 or paragrapts 1 i;2.1 t upiigh 1'5.2,4.incliuivc- but OWNER must eive CONTRAC-FOR immediate: ,%witwil notice (with a. copy to ENGRNER) stating, the reasons for such acti6nand promptly pay CONTRACTOR the amount so withheld, or-anv adiustment thereto need to. -bv OWNTER- and ` CONTP_-V:7OR when C°ONTIL\CTOR. corra:is to OWMER's. satisfaction the.: rc. s m for suck action. lubslandaL Compledatl: 1 diX When COT.°rPACTOR considers the entire Work 'ready for its untended use CONTRACTOR. shall ratify. 01:VNrER and ENGINMER in writing thaf the entire R'ori is substantially. "I complete (except for items spccificully listed by C0l:UR,,%_`OR2 * irn;omplctcl and requesi'th t: ENGIN-EP issuea certificate or Substantial Completion: Witfun a. reasonable time thcrcallcr, OWNER. CONTRAGTORand 6� iGINEER shall make an inspection of the Work to detemnim; the status of completicn. If. ENGINEER does not.con. ides the Nark iubstantiallY cuniple-te: ENGINEER will notify CONTRACTOR. in writing vitn, the reasons therefor if EJCDC n7ENMV. Cl NDMO(Ci 19 t0s,01 ')P F(ttia) :iIT WCITY OF FORT COLUNS MODLFIC'ATIONS(Pd,_V,1r20rni)' ainsiders the Work-,,ubstuntially complete, GNQ,GNEER will prepare:and deliver'lo CURER a tentative crutilicale .of Substantial Completion which shall fixthe date of SubstantiaL Completion. Thereshall ,bc attached to the certificate: a, tentative list of items- to be •completed or .corrected before,inal pay'nienL OIVigF..Rizhall hnveseven days after receipt of the tentative:eertilicaia during which to tuakewritten bbjet:ticxr to UNGINEER' ustoany provisions of the certificateor attached list, If.' after considcnng suchobkctiuns, ENULNEER-cunclufes that .Lhe.\Nark is not substantially cnmpktw ,LtiCLMEER'wi[I wlihmn fourteen days alter submissun of'the tentative certrhuhle to OW\t6R notify (_'ONTRAC;F OR.in.wn'tm9: stating the reasons therefor. If. alter ,ccmidera lion oC OWNER's ohjectiom- F2\i(i1NEER'corisiders the Wort: stiEktantially complete,.. Ei~IGINL•ER }will, within said foureen dos. execute and deliver t% OWNER aad .COWER:\QfOR a. de'tinitiJa ccrtilicate of Substantial Completion with' a revised temtative list ofitems to be completed or corrcctcd)•rcticctme.such chan_Tis from the .tentative ccrtiftciie.as ENGINEER belieJcsjustified after ainsideru[ion of any objection from OWNER. At the Completion. PNGhNEF.g will; deliver .to OWNER and CONTRA(: 'OR.n written recommcndntion as to division of r sponsihiliui pending linap pavmynt .hen@ech OWNER :mcKONrRACTOR with {spc& to Seciiiig•, operation,safety, maintenance,, hct4 utilities, �imathancc and warranties fund guarmntc s: Unless -CA NL•R and CONTRACTOR a,yce otherwise in writing and x) inform FSNGINEER in tutting prior to F:NGLNEI R% issumg the definitive. - ,c&titicate df' Substantial Completion, ENGWEER's akvsvd-reeommutdation will be binding on 0\V?dEf:, and COu!'I:F{r1CTt3R until f mat Igrymimtt 14,e7, OWNER shall Have the rielit to exclude CONTRACTOR: from the Work after the .date (if' Substaniial totmplction: but OWNER shall-.allrnu Q0N1TIGNC.T0R rrisonable-access to completc or correct items on thetcntativ'c list 'l'arti4l 'Utilization. IIJ, tf): Use by OW'N$R. at. 0WNF.R's. option of any substantially completed part of tle Work,. which: (i) has specilina Hy been identified in the Contrict:Dcx 6ments. or (u)OWINM. G.NULNE•ER and CORT(ACTOR agree constitutes a sepumtely functioning and usable: part aPihe IN*6rk that can be us_cd by OWNER' for us.'int_ended purpose without significant 'intcrfcronce with CONTRACTOR'S performance or the remainder of the AVock. ,may bn ucccmplishcd prior to Substaniial Cumpletion of all'thd Wbrk subject to the following: 14.10.LOWNER .at tmv time- may request CONTRACTOR in pTitira to, permit OMNER to use .utv such'�vt oI the Wuxi, ivhich OWTIER bcticves tci be' ready for its intended Use and substantially complete. ICCUNTR-ICI OR mp s that sudi putt of the Work'is suW- anlially'complcie, COM-Lke'rOR will certify_.to OWNL ER and ENGINEER that such part of the. Wark is substantially complete and request E14GF\EER to issue a certthcule aC Substantial Completion for that part of the Work.. CONTRACTOR.at.any time may notttv.OW; TER and L1G UEER in writing that CONTRACTOR considers any such part of the Work ready for its.intended ux: and substantially complete and regocst L.NGr\mc-R to issue"a eertiGcte>of Substantial Ctimplettbn.for that pan ofd>< Work. Within rersotial letimo after either such request. OWNL•R, CONTR ACTOk and EtNGC GERshall drake an iruspcction of that"part of thc.Work to determine its statusof completion If L,,IGINEER dtxcsnot c nsid r hn[ part'ofilie Work to Le sutsta_ntially, complete, CNG[DIEL•it will notify OWNER a nl CON I RICTOR-in writing giving the rewsons therefor_ If ENGINEER considers thin part of the Workto-be substantially complete, the provisions of pammaphs.14 S and 1-19 will apply with re_srect to ccnifie tioh of-$u1lstrmtial Completion of .that pin of the Work and flu division of responsibility" in respect thereatand acccsv thereto. 14.10 No oecupericy or separate optrmon of part of the Work evill be accomplished,prior to cgmpliarice. with the requirements of paragraph i.IS•,m respect of property insurance. Final hl.gtecdon: 14.11. Upon written noiice from C.otniv- ,roP, that the entire. Work or an agreed pattian thereof is complete, M,1312NL•ER will make it fined irspection'with'OWNER .and ' CON I RACTOR mil will nutdy C ONIRAC. MR. in writing of all particular in which this inspection revenLs that the Witrk is incomplete or deJecti •: Comm\c Ole. sftall immcdiatcly'takc such measures as arc ncccssary to complctcsuch work or rcrndy'such deficiencies. Final 7lppficationfor Rtt'ntenr,• I4,12. Allec CONTRACTOR tins completed all such corrections to tie satisfaction of ENGCNEER and deliverdf to aa;ordancc .with the Contras Decunwilts all maintenance_ and'-opemdng mttm�tioris,. �.lu'dules.. guarantees, Goads., eertifieatcs or other evidence of insurance. required 'by paragraph5.4., certificates of inspection, marked -up record documents (as.prmided in pamgraph6,19) and other dctunnents_ CnNrFACTOR may make application_for linal'payment following the. procedtlre for progress payments. The final Application for' Payment .shah be. accompanied (except as• previously drlivrreil) by: (i)ia docianentution called for in the Contract Doctanentc..including but not limited to tic. evidence of insurance required by subparagraph v 4-11. Su1 contscnt of the surely if arty;. to [-trial puyinent. and tui) complete and legally et7ective. releis s or waivers. (ati ifiactory to OWNER) of rill Liens arising out of or filed in connecton u'ith•the, Work In lieu of such releases or waiver of Liens and. as approved" by- OWNER CONTR•\CT OR may ftrmish. receipts or releases in ,lull' and aflidavii•of COtgRACTOR that:. (i)'the releases and retkipts include all labor. sen'icc§, material and equipment for which it Lien could be filial, and (ii) all. p:ayrulls. material and equipment trills, and other indebtedness' connected with the Work kir which OW; EP or CIWNMI -.s property ,m &hL in any way be responsible havc'lxen paid or otherwis satisfied ffnm••Sulxontr9cior'or'Supplier bails EJMC UhTAT it: COturno,a 191(" ti9'J(t Ediiiuii car crrc or• rORI' COLLPM MODIFICATloM (MY arzeat"ri .to furra_sh arch a relense or receipt in full, C01rLR4\CTOR may furnish a*Bond•or other collateral satisfactor_y.to OWti'M to indemnify OWNER agairist any Lien fCClCrur;: Ur 1VatVCI1.Of 11Cn1' :ifal (he".CUnSenl UC the surety to Finalize pavment -•aii" to be submitted rim forma wriformin¢ to rho format of the OWNER'S standard forms bound in the Protect manualr f <rtal Pnvmenr anelil'ccrpnine :. 14.13 !If. on thebasis of LNI GUEER's ?bserGiuion of the 14'cwk dtiring cuni ctiun,and' fmal "inspection. and ENGINEER's review of the limit Applicauon.forPtwiera and accompanying documentation as required by the Contra et ,l)oeumcnts, F�'NGINFFR_ is srtisbed that die Work, has been completed and C ONT.RACTOR's. othi:r obligations under the Contract. Documents have been . rultillctl ENGINEF.'R will. within ten days,aftor receipt of the ,fmd' Application for Paymen% mrlt;oic in writing, TNUINEER's rocpmmendanon of jn%m6r and preaent .the application to OWNER for payment. At the" same .time ENGINF.F.R,%ill also give Cvritten notice tit OWNER and CON'1-RAC:fC)R that the Work is'acccptable subject to the provisions of paragraph 14,15" Otherivise, FNG IilF.fiR will return" the Application to CO\TR•\CTOR, indi adng in writing the rersats for refusinu: to. recommend final payment. in which. terse CONTRACTOR shall maket e neccvtp' canecdons and eesuNnitthe.t\pplie;itiini. "rhlnydaysalter,presentation to t)WNFR of the Application and accompanying doutmentauan; -in .appropriate form and substance. and with FNGINEhR's recraimendation and notice of acceptability, theamount recommended by ENGEN-MR .will became due and will bepaid by QriVNEh to COS TRACTOR .uhicet etae puragraph 17.6.2 of these Genii-il�omfiti?t}s 14.14. iC' through ,no '.fault of COVTR\CTOR final" completionof die Wurk� is sichilicantiy delayed and if EVGINEER s . confirms, OW" ERshnll; upon receipt of CONTRACTM!s Efin1 ,fApppgatign t* Paymient and recommendation of ENGLNEL•R and without terminating the Vicentent: make payment of the Lalance•due for that portion of the'Work fully completed :and accepted. if the temitining.bnlance to Ix held by OWNER CorWork not fully 'completed or correct&d is less than the rctainage stipulated in the \Srccaiierit and if Bonds liave bcen famished as required in parigraph 5_1, tie written consent of the surely to the payment of, she balance due- for that portion of the Work liiliv completed and accepted shall be submitted by CONTRACTUR.to CNGINCCIZ with the :Application for .such"paymcnl Such payment -shall be made under the terms and tamditions, governing Grad payment, ekcept that it stial_I not CUnstttute-it'tvaiVer of claims. lf%airrr. ri�'CftiimS 14,15. 'I'hr Soak nL_ �� d acceptance of iota i priymrnt avill cansiitute: 1.4, 17:I,a waiver of all -lainis by OWNER against _CONTRACTOR. except cloitits arising from urisettled.[Jons, from tkk�crive Work appearing after 31 firm] inspection,,piursuant to paragraph W.11. from (hilure to comply With the Contract: Documeins or the terms of anv special. guammees specified thl ycin, or Crom CONTRACT.OR's continuing obligations umhr the Contract Documents: and 14,15.2.A waiver of all claims by CONTRACTOR against'OWl UZ'.otfier than those previously mach in uritine andstill unsettled.. ARTICLE ISUSPENSION OF WORK AND M 'EERINATIrO\ OWNER May Suopend•&bdr: 15.1. At anv time and without cause_ OWNER may suspend the Work or any portion thereof for a.D.ned of:itot more than. 'niety days by notice in writing to CONTRACTOR and FNGINEF.R which Will fm the date on which Work will h resumW. CONTRACTORshall. resume the Wer!: on the date so Fixed CONTRACTOR hall be allowad an adjustment in the Contract brill or an extension of tls Contract Times, or both, directly attrihuttblc to any such suspension if CONI IZ Coop makes an aappnived claun therefor as .ptuvided• In _\rtiules I 1 anil 11 -61 NER-May Terminate: 15:2. Upori [he occurrence of any one or more of the. follo«•ine events: 15;3;1. if CO]rrRAC'fQR ptrsistently fails to perfomI till \Voile in accordance with the. CarAnict Ducumats (including: but not lunited to. failure to supply sufficient. skilled workers or suitable maierials or equipment or failure to..adhereto die progress, sc1twMe•asmblishcd hater paragraph°9 agadjusted from .tuna to"time pursuant to paragraph 6.6): 1.52:2. if CONTRACTOR disregards Laws. or R guhtiors of any publicbody invingjuhsdiction: 15:3.3.. if CONTRACTOR disregards the. authofity of ENGDTj -LiL or 15:14, if.CONIRACTOR otherwise violates in any substantial Fray any provisions of the Contract Documents: OWNER. may. after giving-CONTR.ACTUIZ (and the suretv,. if-anv) -seven days Written notice and fo-the extent pet-mlacd.b\ Laws and Regulatibrts, terminate the services of CONTRACTOR, e\clu& C'O_NTR\Cl'OR from the site and take possession of the Workand of all COJTRACTOR's tools, appliances. construction equipment imd machines' at the site and use the same to the Cull extent thev could be used by CONTRACTOR (Without liability to CONI'RACIM ktr trespass or conversion). ncorlomtc in the• Work. all materials and equipment soredat the site or for which OWhdHl: has paid 9.1MCt,ENFP LCo;4urrim,�3 t9 iris 1144v Eeitita I, 32 act CrY OFFORT COUNS\IODIHCd:TIQNS 1MV—IC1101I CONTRACTOR but which are stored elsewhem, and. finM the Work m OR'Z 1LR may diem c"dirnt. In.such caSd CONTRACTOR shall not be entitled to receive tiny further payment until the'Woik is finished lC the unpaid balance -of the Contract Price exceeds all claims. cua& losses and dtmnge_s, suuaincd by OWNER arising out _of or resultingfrom completing the Work such excess. Will be paid to CONTRACTORC If such claims„imis, losses and damages,. exceed such unpaid balance, CONTRACTOR shall pay the differencc to,OWNER. Such claims.. costs, losses and damages incurred.by QryNER will be reviewed by ENGINEER as to, their Teitsormbleness and «•lien su approvecl.hy ENC� IN F:ER incniparated in.uClhanue Orc4ir,. provided that When exercising any rights or remedies under this. pamgmph OWNEIi shall not be required to obtain the lowest.pnce for the LVorl; perfomt tit. 15.3. Where COiTTRAC' o.w., serviceshave been so tcmtinatcd _by' OWNER. the•termirm_ticn.will notallcct anv rights' or remedies of OWNER aeahtst C6.Nt ACTOR then existing or which may thereafter accrue. Any retention or payment of moneys due CONTRAC rOK liv OWNER' will not. release. CU'rRAC-roR rrom liability, 15,4. Upon seven da\.� written notice: to, CONTRACTOR and EAR*F•E .GR,. OWNF2. may, Without cause and witfoul;prejudica to airy other right ar remcdv,of CAVNER elect to to minate the':Cgredment: In such "case, CCNTR:AC OR. shnlb he paid (i6Lhout duplication:ot' any items):: l=iA 1. for completed and acceptable. Work executed inaceorciance with the Contract Documents prior to .the eflectivc,&iCe of -termination, including fair and reasonable sums, Or overhead and profiton such Work-.. 15.4.2-. tar expenses sustainedprior to the ellectiv,e lister of tennination in perfonning.-services anti burnishing labor, m_awiak or equipmcnrns.required . by .the. Contract QouUments in connection with uncompleted Work. plus fair and reasonable sums for overhead and profit on such expenses', 134.3 for all claims, fasts;, 1&sse\ and d irmrges it urnd in settlement or terminated conuacts�wah Subcontractors, Suppliersand.others, and -15.4:4. for reasonable azpenses.directly attributable to termination. CON'TRzC rORsh:ill not be paid on account of lose of anticipated profits. or revenue of other ec6n6rnic losi- arisine out of or resulting from such taminruion C'OrV (IZ•ICTOR dlaY Stop if•ork'orTerminate: I i.5. IL through no actor fault of COL 1TF,\C.TOR. the Work is suspended for a period of,more than ninety days by OIVMER or under an order of c\xrrt or -other public authonry or. ENGINF:E:R, fails',to act an any Application for Payment within thirty days alter it is submitted or C;%Vi,fER fails for thirty days to paac. CONF'I*R.A. r0R any, 11 FJ I 1 P I I� 1 sum finally determined to bedue, tier: CONTR:\CTOR may, upon seven days' written notice to 01\NLR am[ E Gi 7FEIL and providedO\VNIR Or ENGLNEER Jo not romecly such cusp. gn or failure within that .time;. terminate'the .freemen and n.cmer liom OWNER payment on the same -terms as provided vt pnmgmph 15.4. 'In lieu or terminating theAgreementand without prejudice to any otherrittid or remedy, ifENGNa—Rthas 16dedto act on an Application for Paymentwithin thirty days afler''it is submitted. or OWNER has luiled lyr.thirty days to pay Ct1N71ZaCTOR any sum. finally determined to be due; CON CRr\CTOR may upon seven days wriuen notice to OWNER and ENGINEERstop the Work until Ixtymentof all such amounts flue CONTRACTOR. including interest thereon: The provisi6nis of this paragraph 13 - are not intended to p*ludc CQNTRACTOR' from making claim under Articles I I and 12 for an increase in Contrnul' price or Contract Times of ochenvisc for csp:nscs'or:d.nnge- directly attributable to CO\TTR.NC• OEes stopping'Work as permitted by this pnragmph. AwrlCL6.16-015PUI'.E RFSOUTHON If and to the extent that MVL1 i and Y,CWfRAC•I.OR.. have agreed on the method and procedure lor-resolving Jisprlrs Lxttvccn titrethat may .arise under this Agreement, such dispute resolution method.and procedure,. if any, shall. he as set forth in I•shibkC7C-\, .Dispute Resolution Agreenxnt', to h: Httachcd hereto andmade a purr hereof. Jf no sucha`nemem on. the mcihod and proccdrire for msglvina such disputes has tarn reached. and subject to,ihe provisions or phragraphs 910 9.11 and 9 1'_, OWNER, and CONTRACTOR may exen:ise such rights or. remedies ,is either may utterwlsa have under the Contract Doeumenme'r by Laves. or Regulations Hi respect of uny dispute, ARTICLE 0-\MSCELLANEOGS. Giivrb hVritice: 17.1- Whenever any provision iff� the Contract- Documn its'requires the �-vrna of written nuice,, it will be deemed tohave ,been validly given if delivered in person:to the individual ni to a member of the him: or to an oflica of the,curpuration-for when it' is intentler,L or if delivcred tit or .sent by registered or certified mni4 postage -prepaid' to the last businessaddress knpwn to the Inver of the notice, �17.Zf Cbniputatiurt u%Tiine:: 17 =.1. When.anv period,of time •ia referredto in the: C.Ontract Documents by days. -irwill Lie computed to exclude•Ihc'first and include the last day OF such period. If the last (lay Of any such period lots an a. Saturday or Sunday or on a day made a Icgal holiday by the lave of the applicable jurisdiction. such day will' Fe omitted from the. computation.: L'VUCGEN'beAb.CONDMON'S'.191ihS (I7J4 E66ail, 'a4 Q'IY OIL FOR I' COLLI aS \1001MCATI ONS IRE ' d! 00A 17:Z.? A rnlendnr davof hventy-four hours measured from,aiidriight to the nest rnidnight will corulitute a day, :\'an a raj 'fnurri .17.3:, .Jhould OFVtiLR�r COvTR 1C:LOIt ti ller.injury -or damage to person • or.property bx:cauw of any. error, omission err .i61 of the Other party or of any. of the other puny employees or :gene; or others for whose acts the other party is legally liable. claim will bee mnde'rn writing in the other piny within' a reasonable time of the first ui s vane at.such injury or damage.. The provisions -of this paraemph. 173 - shall not be construed as a substitute 'for Or a waiver of the.proyisronc of any appheible st utc of limitations of repose.Camtdanh a Reinedies PA. 'flu duties and obligations -imposed ,by these. General Conditioris and the rights and rcxnediy' aynilahl,e herewuler to the purties hereto. and, in particular but without. limitntion, the w'nrmmec guarantees and obligations imposed upon C ON'I-R,IC•LOR by -paragraphs6.12, 6.16, 6.3h, o I o_ '; 13 1 13712; 13114, 14,_i and 1 and all of tic rig and rcmcdles available to OWNIR and F-CNGINF,ER thereunder, are to addition' t6. and -ire norto be.construed many way wi.a limitation rif,•any I ights,and remedies ava ilnble.to any or all of them which.are otienvisE Hup'osed or aVailnble: by Laws ,Or Kcgulations.by special warranty or guarantee or'hy-other pnvisions.(if the Connnct.Documents; and the provisions - of this paragraph will- he as effective as if repented specifically in the- Contract Documents in connection.with each"particular duty; ohiiaatiom right anti remedy tp which they apply, .F}%ssianal. F eav and Court Ci;sLv 1He1u11ed.. 17.5. IVhenever reteiernx. is made to "claims_- costs,. losses and 6niages'; it shall include in.each Lase, but not tz limited to, all fee:: and charges of engineers, architects. attorneys and other ,profs ionals and till court or artiirrdtion or. other dispute resolution casts. 17.6. 'The laws of the State of„CZ[ontdo apply to: this _\greemen[_Reference to t> wo.periinem Cotbndo stntuteti are as follows •17.6.'. If s claim is -bled OWNER is required by law (C.•RS.3S'_6-167) to withhold from all.caymcntc,to CONTRACTOR sufficient funds to H=re the paymicnt of'all claims fcr labor, materials, team hire_ sustenance, provisions, provender or other .supplies .used or consumed by COId'f•RACTOR or his 33 EJC'DC GENEH.V. CONLN'IIOi•J 1910s (19W Ediiic I 34 10 CTFC06 FORT COLLIMMODI1•lC'A'1lON51 RLV•IiZU11A I I I I I 11 I J (This paoc Idthlardk intentionally.) I I I I I I [LK*uc(jENE:TXL olo-i Wig" E�Itiwj 35 WICITY OFFOR r,COLLINSMOLAHCAMNS (REV,10000) I I I F7C'UC GE�ti:.u. COiJQI'IIOIdY Ll IQ� {1'i'IV Ldiiipi! 36 WCTIYOF PORT COLLINSMODIFA'.TIlONS lILHI'd20001 I I 1 I EXHIBIT GC-tA 'torGeneral Conditions of the; -Construction Contract ,Behvccn OWNER and CONTRACTOR blspuTL• RESOLUHONAGREEMENT OAVNER and 'CONTRACTOR: hereby :agree that. .article 16 61 the Gencurd Conditiores of the'Coastnfction Coolriacr between OWNPR sand v 0N'fRACTOR is. amended to v ctude>the follpiving aureemen[ (if 'hc. parties; 16.1. All claims, disputes and othermatters. in . question leuween OWNER and CON''TELaCI UR .arising, ourof"or relating _to the Contract I ocunicots or. die breach thereof («wept for cfamis.which have hem waived by t6c: making or acceptance 'of,final payment as provided ,by paragraph 14,1?)•w•fll. be decided by •arbitration in "accordance weer thew Constructitin :Industry Arfiitnation Rules of' the American Arbitration :Association then u¢ut tr?iret, subject to. the ltmtatighs of the Article to this agreement so to .a0itratc and any other •agreement or consent in arbitmic catered`into in nccord:incrhzrewith.as. provided in this.Article: :lo wilhlic,spa:itieglly enfem illl_c under, die prevailing law: of any`court leaving jtuisdictioii, I6,'. NoLlcmand for arbittationofanydai.m;,dispute or other matter flkat 'is- required, to. bc� referred to GYGIIKUR initially for decision in .accordance with l imgmph 9.1 i{sill he made until the earlier of (a) the date on which ENGINEER hisrendered a written decision or (h) the that} -first d:t after tic panics have presi,ntcd'dicir evidence to"L'IGMMR if a. wrlmen decision has for been rend.red'by .1, NOINEF.Rbefore that date_ two demand for arbitration of any -arch claim, dispute, or utlier matter will: be made later titan thirty days after the klate, on which ENGINEER his• rendered i writtri decision in respect thereof in accordance. with paragraph 9. H—, and the tailure: to demand arbitration within. said thirty dayti" period %Q11 result in ENTCjLVTER's decision being final• and bindine upon OLVNER. and,(ONTRA(�TOR. -If'CVGINEER renders a decwon after urbatrtuon proceedings imve been initiated such decision may be:entered as evidence but will not suprscdc the arbirratlQn pnay, rococdt.exccpt whefe the decision is acceptable to the pattira conccrned,, No demand for arbitration of ariwritim .decision. of rONGLNEER rendered in acccvctancn, with paragraph n, 0) will be iitadc later thartten days after the party makingsuch demand has. dclivered' written notice of intention to appeal its provided in paraUTaph 9: 111, 163. Notice of the demand Inr arbivatiori will be. tiled in writine with the other party to the Aurcement and kith the American ArbilrationAasex ia(ior.ar d a copy -well be sent to CNG LIMIER for information The demand for arbitration will be made within the drirtyeday or tcn-day -period ;ipcc,ificd in paragraph 16.'2 as applicable, and in all cahermiSes within a reasonable Bore alter the claim. dispute or other matter in question has arisen,-tind'in no event shill: env such dcmand be made after the date when 'inslitutian of epl'or equitable proceedings based on such claimdispute or other matter in question .would. to barred' by the applicableslatutc of linuLa0.ois.. 93CUC GENERAL CO::Ufr1D2d5191 o Y WPM EiGiiad vv[ CITP pF FQR F CCd.t Ii:S bfOUIF[GPriGtC5 tKGV `y,j97 1614. Grrxpt as prowulcd in paragraph he)_5'below•; no.arbitiation arising ,•out of "or relatima it; Ilia Conirnet Documcnts shall iitclud'e by coroalidatiin, joirsler or in any other manner any other person or.. entity- (im:luding ENEN- GEEK'E, tG TNEER's Consultant and the officers, directors igams empliivee_s.or consul Lnnts of vt'v, of than} who is nct it party,lo this contrect'unles: I tiA L lhc'inclusion ut 1uch,other perion or critily is necessary i1 c,omplete rcliel is to. be afforded'among tho6c wholirc already parties fir the arbtlraribm anal 164.2. 4'. such other person or entity is substantially involved in a question of law or fact which is common to those who are already parties to 'thc arhitration.and whtchivill pose in such procceding.0 and. 104. the written consent of the: other person or entity .witght ,to be included and of LAMER ,'and CONTRACTOR liar been obtained for well inclusion; which. consent shall male specific reference tothis parngraplc but no such consent,shatl continue c6lisent to.ailhifmtiun or any dispute not speeitically..ddscribed in such consent or arbitration with any party not speciticmly identified in such consent. ' 16. is Notwithstanding paragraph teal. if a claim.. dispute or.odier inattr in question henvech MNER.:and CON'TR:ICTOR involves the Work of •a SuNohtr'ackir, either OIVNKR or 'CONrl RAUl-OR, may _join each Subcontra toms aparty to the arhitrad<in berween'CRA'NER. and CON I R'AC I OR. hereunder. CON'I,RA( I -OR =hall' include in A subcontracts required by paragraph 6.11 :r specific provision whcrchi- the Subcontractor cairsentstto tieing _joined .in an arbitration between OAVNER: and CUNCR4CTOR involvitig the 1,Vork of such Subwnftactor. Nothing in this paragraph- 16.5 nor in the provision of such subcontract consmung td.joinder .shall' create Inv claim; right or cause of action in tavor of Sub contractor and `a6m3 CJl4NER_ ENGLNEER� or GNGi�i TEGR's:ContiItants tNit does'noi othenviu east. 16,6. The award rendered by the.arbitratcrs will be. final, judgment may lie cn'tered upon it,inany court having yuriaiiction tharcOC and it will not fit:. Sul?leer to mifli Wcatitm pr'.appe:iL 16.7, OSVNGR;mil CONTRACTORa`ree that they shall first 'submit .any and .all urucidcd claims;, wiaitarcltiims, 'disputes :uid otwr matters 'm question between them airist�out of or relating to the C.ontnia Uccumenta orthe brra,cfi lhaeof l'drsputes 1, to mediation by the Aaiuriam ..Arbitration Assoc:iaocin under the Constriction. industry-14lcdiation Rules of the. American Arbitration :A_%kciation prior to titter of them initiating against the- other a demand for arbitration .pursuant. •to ,paragraphs 16, 1 through 166 unless' delay in initiating arbitrauon would urcxaa cvbly prejudice one of the; partics' `Clio resNdivc thirty arld ten day time limits within which to file a demand for arbitration as provided in paragraphs, 162 and 16:3 above shall be suspended with respect to i. dispute submitted to mediation within those same apphcabic brae limits and shall remain suspended until ten days after the term inntion of the mediation. 'rhe mediator of:inydispute submitted to mcdiation.undcr this Agrecincrit ;hall noLxrve as arbitrator -of suchdispute unless otherwise awed, i� I EXDCGENERA L 19 1 M WOO b.Um6 .0 CJT"-QF (Pr.- v 9,9A) mm I I I I I I I I I I J I I I I I I 8.0 LIQUIDATED DAMAGES. Provisions for liquidated damages are set forth in the Agreement. ' 9.0 SUBSTITUTE ("OR EQUAL") MATERIAL AND EQUIPMENT The Contract, if awarded, will be on the basis of material and equipment ' described on the Drawings or specified in the Specifications without consideration of possible substitute or "or equal" items. Whenever it is indicated on the Drawings or specified in the Specifications that a substitute or "or equal' ' item of material or equipment may be furnished or used by CONTRACTOR if acceptable to Engineer, application for such acceptance will not be considered by Engineer until after the "effective date of the Agreement". The procedure for ' submittal of any such application by CONTRACTOR and consideration by Engineer is set forth in the General Conditions which may be supplemented in the General Requirements. ' 10.0 SUBCONTRACTORS, SUPPLIERS AND OTHERS ' 10.1. Each Bidder shall submit at the Bid opening to OWNER a list of principal subcontractors he proposes to use in the Work. Refer to Section 00430 contained within these Documents. ' 10.2. If OWNER or Engineer after due investigation has reasonable objection to any proposed Subcontractor, either may, before the Notice of Award is given, request the apparent successful Bidder to submit an acceptable substitute without an increase in Bid price. If the apparent successful Bidder declines to make any substitution, OWNER may award the contract to the next lowest responsive and responsible Bidder that proposes to use acceptable subcontractors. Subcontractors, suppliers, other persons or organization listed and to whom OWNER or Engineer does not make written objection prior to the giving of the Notice of Award will be deemed acceptable to OWNER and ENGINEER subject to revocation of such acceptance after the effective date of the Agreement as provided in the General Conditions. ' 10.3. CONTRACTOR shall not be required to employ any subcontractor, supplier or other persons or organizations against whom he has reasonable objection. The use of subcontractors listed by the Bidder and accepted by OWNER prior to ' the Notice of Award will be required in the performance of the Work. 11.0 BID FORM. ' 11.1. A copy of the Bid Form is bound in the Contract Documents which may be retained by the Bidder. A separate unbound copy is enclosed.Jor submission with the Bid. I SECTION 00800 SUPPLEMENTARY CONDITIONS I7 1 1 1 11 1 1 SECTION 00800 SUPPLEMENTARY CONDITIONS Conditions of the Contract These Supplementary Conditions amend or supplement the General Conditions of the Construction Contract (EJCDC General Conditions 1910-8, 1990 edition with City of Fort Collins modifications) and other provisions of the Contract Documents as indicated below. SC-5.4.8 Limits of Liability A. Add the following language at the end of paragraph 5.4.8. The limits of liability for the insurance required by the paragraph numbers of the General Conditions listed below are as follows: 5.4.1 and 5.4.2 Coverage A - Statutory Limits Coverage B - $100,000/$100,000/$500,000 5.4.3 and 5.4.5 Commercial General Liability policy will have limits of $1,000,000 combined single limits (CSL). This policy will include coverage for Explosion, Collapse, and Underground coverage unless waived by the Owner. 5.4.6 The Comprehensive Automobile Liability Insurance policy will have limits of $1,000,000 combined single limits (CSL). 5.4.9 This policy will include completed operations coverage/product liability coverage with limits of $1,000,000 combined single limits (CSL). SC-12.3 Add the following language to the end of paragraph 12.3. Contractor will include in the project schedule zero days lost due to abnormal weather conditions. II ' SECTION 00900 ADDENDA, MODIFICATIONS AND PAYMENT 00950 Contract Change Order 00960 Application for Payment [1 L I SECTION 00950 CHANGE ORDER NO. PROJECT TITLE: Avery House Re -Roof CONTRACTOR: Zeigler Construction PROJECT NUMBER: 7360 DESCRIPTION: 1. Reason for change: 2. Description of Change: 3. Change in Contract Cost: 4. Change in Contract Time: ORIGINAL CONTRACT COST $ .00 TOTAL APPROVED CHANGE ORDER 0.00 TOTAL PENDING CHANGE ORDER 0.00 TOTAL THIS CHANGE ORDER 0.00 TOTAL % OF THIS CHANGE ORDER TOTAL C.O.% OF ORIGNINAL CONTRACT ADJUSTED CONTRACT COST $ 0.00 (Assuming all change orders approved) ACCEPTED BY: DATE: Contractor's Representative ACCEPTED BY: Project Manager REVIEWED BY: Title: APPROVED BY: Title: DATE: DATE: DATE: APPROVED BY: DATE: cc: City Clerk Contractor Project File Architect Engineer Purchasing � � � q \ \ \ I � � � � � � a a & \ \ 7 \§\k§ 20 2 ZOO z zgw§e_ 25/Q2w \/2�§j � CL § W ) \ ) } j a§ \z \ c \ / & S ) _ ()_ $ ) \/) ) \\ \\ \ { < < E ) ` \\ o) s z 3 _ \ ) /( }, ) \� m o= z\ \)( / )£/ ® j )< 2 } /) / //< o F-<< \ CL §\ ? 0 co_ CL co z _ _ _ -0 M\ e = - - - / <m CL\ \ L / - - < < < LL \ z - 76 / / / LU j a) ]y \ \ <-0\ \ » a ) < < < LU a) \\z\ z ± 0 a) ^ 0 0 / < < .ƒ /:t a) %-mr k k } ))k§ a 6 a{ a\ / ƒ / / / / z ) u 6 ± 3 7 11 C p � U � LLO a co N w al Q m� �0000000000000000000000000000000000 a FW ��6q&I����eos���v)6q6qsos6q�6qsov�������������6q� a oN N @ a m o °ro m d c00000000oo00000000000000o000o00oo0 30000000000000000000000000000000000 a o0000000000000000000000000000000000 i � Gq 641,Ul » vi vi vj vi vi vl vi 613 v? 6c3 69 vi &H Ui A vi vz V) 0c) A vi v>E» vi va vi vi ER vi vi E o ll U p � ❑ O a� C50000000000000000000000000000000000 000000000000000000000000 O Y 00000000000 O O O O O O O O O CD O CD O O O CDO O O CD CD CDO O O CDO O O O o O E L.L a) p p of of vT VJ VJ eR eA v3 613 69 vi e9 vi 64 U., eA eA vi 69 v> vi eR eH vi vi v) fA v> eA fA v) v> EA Zz�Ea)Q) Ow o0a U UQ O J d a c0000000000000000000000000000000000 (L a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 Q o _Ile E0000000000000000000000000000000000 Qv>v>e»e»v><»f»v>t»v>v>v>evv>v>e»ev6yugeuo vv3v>e»v>v>e»e»vfv>v>e»f»vf o n ON t UL C > H5 O �0000000000000000000000000000000000 000oo000000o00000000000000000000000 . . E0000000000000000000000000000000000 Q eAeae»v>vie»Eve»vsv>6vvsefleaeve»er-�e»e»e»vs6vvsva6ve46464644..,>e464e464 � U tea` w at- v) C H D Z D T O - � c Q 1- O U o cn � — J z p Q F O Q a) Q m = 7 Z LI L7 I 1 1 I U a LL.V 0 a m _O M W (D Q N p C p 0— 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 H@ 0 0 0 0 0 0 0 06 06 0 0 06 0 0 0 0 0 0 0 06 06 0 06 0 0 06 0 0 F LJJ 0 69 EA 64 64 613,61) fA 69 EH vi 69 61f 64 fA vi 6`i 64 69 69 69 vi 64 69 64 64 EA 64 EA 69 fA EA EA 69 ER 64 a N O N @ fn C N a O �00000000000000000000000000000000000 000000000000o00000o000000000000000o YN 0o6o66000000000000000000000000000000 E69E1).6969fA6464VR64646969ER64fAEAVi69i61i61)64EA69 69696461!6469EA636469viVs Z O a 2 } O N U @ p Cl a 0 � o �00000000000OOO000000000000000000000 �000000000000oo0O00000000000o00000OO Z O N N N 0p p 0000000 C) C) CD000 C16 o00000 C100000000000 69 64 EA 69 69 ER 61> fA 69 69 64 64 69 64 69 69 64 69 69 69 69 64 Vf Y< U) esi 64 64 64 69 ER GA V) 6 (A O 69 O_ Q 5 .2 Q >p > E a) m c¢> (jaa J O a a Q m co000oo0ooOoo00o00oo0000000a0000000o Z300000000000OOOO0000000000000000000o °) 00066600000000000o000000000o00000000 Q EA 6-1 69 EA 6A 64 b4 eA eA 64 69 EA EA 64 64 64 64 69 fA (A 6-i fA fA 6-169 69 61T 64 64 69 fA U1 64 69 eA 0 O U r Y N IF 3 ~ 2 C 0 0 0 Cl 0 0 0 0 0 0 0 0 0 0 0 O O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O O 0 O 0 O E E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 EA 69 64 69 EA 64 69 EA fR 64 61i EA EA 64 64 64 64 64 (A (A uc� Efi vi Ni 69 69 64 EPr 64 EA EA 64 69 0 (Al 0 69 N C � d N (n C � w W CO O W CD Q O C7 Z Q ~ O F O o U J W Z L Q� U O a a) a m E Z It 0-0O O ,qt@ N I O O O O CD O O O O O O O O O CD O O O O CD CD O O Co O O CD O O O O O O L1J m .0 U O O O O O O O O O CD CD CD CD CD CD O CD O O CD O CD CD CD O O O O O O CD O p (D �— o00000006666666666666666666666666 64 Q c e»e»e»v369v6<3 e»e»e»6- cuc e»e»ene»uc vVre»e»e»e»esucre)u>6sse»<»f»e»u3e» a0 C 0 0 6-1 a o c o o n O o U L N a)Ha o CO J -O O O Q c 7 O m O 6 O wi'S >." o F of c 2 EA <CL 2 < o� w� 0 U) c 0 U VI N L y/ U J O E CZ O N E� o E O Z I Qualifications The contractor must demonstrate successful experience in working on historic architectural buildings, and in the completion of forms and reports required by the Colorado Historical Society. Please provide 3 projects that are similar in scope with the bid. A resume shall be submitted for each general contractor key personnel and each sub contractor key personnel working on the project, and all key personnel must ' be identified. All key personnel, including sub -contractors shall meet the Secretary of the ' Interior's professional qualifications for Historians or Architectural Historians, as identified in the Historic Preservation Fund Grants Manual, available online. The Project Manager shall assume ultimate responsibility for project deliverables and ' will be the primary contact for the project. SCOPE OF THE WORK: Work includes, but is not limited to, documentation of and subsequent removal of all existing roofing materials down to the structural roof deck and replacement of same with a new roofing assembly that is in compliance with the Secretary of the Interior's Standards for the Treatment of Historic Properties and in accordance with local building codes. Roofing system includes, but is not limited to, the installation of sawn, cedar shingles, appropriate underlayment(s), venting as ' necessary, a small section of flat roof single ply membrane, galvanized drain goods and repair of related roofing and architectural components required to provide a watertight, historically accurate and esthetically pleasing installation that replicates the roof originally installed on this structure. Masonry: 1) All brick chimneys shall be re -pointed and a mortar analysis performed. Roof flashings shall be inspected and replaced as necessary. Match existing brick if any replacement is needed. ' 2) All sandstone block shall have mortar analysis performed. 3) The cracked mortar on the east turret sandstone block shall be repaired ' as necessary. Match existing sandstone if any replacement is needed. Gutters: 1) Replace all existing gutters and downspouts to match existing. Match ' existing size with galvanized metal and same gauge as existing gutters. Contractor to provide: 1. All permits. 2. Documentation by photos of the complete project and subsequent removal of all existing roofing materials down to the structural roof deck and replacement of same with a new roofing assembly that is in compliance with the Secretary of the Interior's Standards for the Treatment of Historic Properties and in accordance with local building codes. 3. Delivery of two (2) complete sets of photographs, processed and labeled according to the Colorado Cultural Resource Survey Manual, in archival sleeves. Additionally, two (2) sets of CDs or DVDs containing all the photos taken, with the photo files in either a jpeg or of format, shall be provided to the City 4. Install a temporary 6' high chain link construction fence with fence screen in the yard around the perimeter of the building. Install gates for access where appropriate. The fence needs to be in place and maintained throughout the duration of the project. 5. Roofing system includes, but is not limited to, the installation of sawn, cedar shingles, appropriate underlayment(s), venting as necessary, a small section of flat roof single ply membrane, galvanized drain goods and repair of related roofing and architectural components required to provide a watertight, historically accurate and esthetically pleasing installation that replicates the roof originally installed on this structure. Substantial completion means: removal of all existing roof materials including wood shingles, Duralast membrane on the flat roof section, galvanized gutters and down spouts. Replacement of the wood shingles, flat roof membrane, gutters and downspouts, also completion of the repairs to the cracked mortar joints on the stone turret, plus tuck pointing of the brick chimneys. All fencing, tool and equipment needs to be removed from the property, and completion of any needed repairs to the landscaping such as sprinkler, sod, trees or shrubs and clean up of construction debris. SECTION - 07313 WOOD SHINGLES PART 1 - GENERAL 1.01 WORK INCLUDED A. New roofing as noted in the documents including cedar shingle roofing, underlayments, eave, and ridge protection; associated metal flashings 11.2. Bid Forms must be complete in ink or typed. All lump sum prices on the form must be stated in words and numerals; in case of conflict, words will take precedence. Unit prices shall govern over extensions of sums. 11.3. Bids by corporations must be executed in the corporate name by the president or a vice-president (or other appropriate officer accompanied by evidence of authority to sign) and the corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the corporate name. 11.4. Bids by partnerships must be executed in the partnership name and signed by a partner, his title must appear under his signature and the official address of the partnership must be shown below the signature. 11.5. Bids by joint venture shall be signed by each participant in the joint venture or by an authorized agent of each participant. The full name of each person or company interested in the Bid shall be listed on the Bid Form. 11.6. The Bid shall contain an acknowledgement of receipt of all Addenda (the numbers of which must be filled in on the Bid Form). 11.7. No alterations in Bids, or in the printed forms therefore, by erasures, interpolations, or otherwise will be acceptable unless each such alteration is signed or initialed by the Bidder; if initialed, OWNER may require the Bidder to identify any alteration so initialed. 11.8. The address and telephone number for communications regarding the Bid shall be shown. 12.0 BID PRICING. Bids must be priced as set forth in the Bid Schedule or Schedules. 13.0 SUBMISSION OF BIDS. 13.1. Bids shall be submitted at the time and place indicated in the Invitation to Bid and shall be enclosed in an opaque sealed envelope marked with the Project title, Bid No., and name and address of the Bidder and accompanied by the Bid Security, Bid Form, Bid Bond, Statement of Bidders Qualifications, and Schedule of Subcontractors as required in Section 00430. If the Bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation "BID ENCLOSED" on the face of it. 13.2. Bids shall be deposited at the designated location prior to the time and date for receipt of Bids indicated in the Invitation to Bid, or any extension thereof made by addendum. Bids received after the time and date for receipt of Bids will be I ' 1.02 SUBMITTALS A. Shop Drawings: Indicate specially configured metal valley and drip edge flashings, trim, fastening methods and locations, and installation details B. Product Data: Provide data indicating material characteristics and provide representatives samples of each for approval, prior to installation C. Manufacturer's installation instructions: Indicate preparation required, installation procedures and scaffolding layout with provisions for pedestrian protection 1.03 QUALITY ASSURANCE A. Perform work in accordance with RCSHSB (Red Cedar Shingle & Handsplit Shake Bureau) instructions B. Roofing contractor to be bonded, licensed, fully insured and in ' compliance with all other requirements of the City of Ft. Collins, CO C. Demonstrate experience with re -roofing wood shingled historic structures by provision of at least 3 project references on the attached reference form ' D. Shingles shall be installed in general accordance with NPS Preservation Brief # 19: The Repair and Replacement of Historic Wooden Shingle Roofs 1.04 ENVIRONMENTAL REQUIREMENTS ' A. Do not install eave edge ice dam protections when ambient temperature is below 50 degrees F PART 2-PRODUCTS 2.01 SHINGLES A. Shingles: Uniform thickness (3/8" nominal butt thickness, 5/2") RCSHSB sized and graded Western Red Cedar #1 Grade (Perfection), clear, straight, 100% edge grain (including under ' coursing); eighteen (18) inches long, taper -sawn, square butt, shingle style, traditional overlap pattern, 5 1/2" exposure B. Shingle width limited to a minimum of four (4) inches and a maximum of eight (8) inches (unless removal of existing roofing overlay reveals a different shingle width variation and/or pattern) C. Treatment: Provide documentation of factory preservative ' treatment to improve fire retardancy yielding a U.L. Class "B: fire rating 2.02 SHEET MATERIALS A. Eave Ice Dam Protection: Sheet barrier of self-adhesive, rubberized asphalt bonded to sheet polyethylene, 40 mil thickness, ' with strippable treated release paper; manufactured by the Grace Co., or equivalent 11 1 B. Underlayment: U.L./A.S.T.M. D226 No. 30 asphalt saturated felts, un-perforated; weight to be confirmed by manufacturer's product data sheet C. Continuous Ventilation Air Space Underlayment: Three dimensional nylon matrix "Cedar Breather" (or equivalent) manufactured by Benjamin Obdyke, Inc. 2.03 ACCESSORIES A. Nails: Type 304 or 316 stainless steel, or hot -dipped zinc coated galvanized conforming to minimum standard ASTM 153 Class D (1.0 oz/ft) OR (only after approval by the Owner and Engineer of procedures and a sample pattern panel and assurances from the Contractor/Roofer that resultant fastening is adequate for this project's environmental exposure) Staples: Type 304 or 316 stainless steel, minimum 16 gauge with crowns 7/16" minimum horizontal, maximum '/" horizontal B. Location/Penetration: Fasteners, two (2) per shingle, shall be applied approximately'/4" from the edge and approximately 1 '/2" above exposure line, and shall be long enough to penetrate into the original layer of solid wood sheathing at least 3/" or all the way through C. Plastic Cement: Asphalt type with mineral fiber components, non - asbestos D. Lap Cement: Fibrated cutback asphalt type, non -asbestos 2.04 METAL FLASHING MATERIALS AND RIDGE CAP SHINGLES A. Sheet Flashings and Ridge Cap Shingles: ASTM Berridge Galvalume (or equal), 24 gauge, pre -weathered Galvalume finish, (or Satin Finish Galvalume), refer to existing for profiles B. Bituminous Paint: Acid and alkali resistant type, black color C. Nails: Standard round wire roofing type, stainless or hot dipped zinc coated steel, of sufficient length to penetrate through shingles and into wood substrate 2.05 FLASHING FABRICATION A. Form flashing to match existing profiles and to protect materials from physical damage and shed water B. Form sections square and accurate to profile, in maximum possible lengths and spliced widths, free from distortion or defects detrimental to appearance or performance C. Hem exposed edges of flashing a minimum of 1/4 inch on underside; unless noted otherwise, metal hip and ridge cap shingles shall not be hemmed I ' D. Apply bituminous paint on concealed surfaces of flashings if flashing has no factory pre -finish on "back" side/concealed 1 surface(s) PART 3 - EXECUTION 3.01 EXAMINATION AND PREPARATION A. Verify that any chimney and roof penetrations are flashed to deck t surface B. Verify deck surfaces are dry, free of ridges, warps, or voids C. Broom clean surfaces ' D. Fill known holes and surface cracks with an approved filler at areas of bonded eave protection E. Confirm configuration of existing roof decking and in those cases t where spaced sheathing is present, install 1/2 CDX plywood sheathing over entire area of spaced sheathing F. Existing wood shingles, metal roofing and miscellaneous flashings to be completely removed ' G. Document original wood shingle patterns, sizes, detail, and weather exposure and retain representative samples ' 3.02 INSTALLATION - EAVE/ICE DAM PROTECTION A. Place eave and gable edge metal flashings tight with fascia boards; weather lap joints and seal with plastic cement; secure flange with t nails B. Apply rubberized asphalt/polyethylene sheet eave protection (ice and water shield) in accordance with manufacturer's instructions and as shown on the Drawings C. Apply lap cement over underlayment starter strip ' D. Extend eave/ice dam protection membrane minimum four (4) feet upslope beyond interior face of exterior wall, unless otherwise directed by the Owner t 3.03 INSTALLATION - PROTECTIVE UNDERLAYMENT A. Place two plies of D226 No. 30 felt underlayment over entire area, with ends and edges weather lapped and nailed; stagger end laps of each consecutive layer B. Install perpendicular to slope of roof C. Weather lap and seal watertight with plastic cement, items projecting through or mounted on roof 3.04 INSTALLATION - VALLEY PROTECTION A. Place one layer of tapered sheet metal flashing, minimum 22 inches wide, centered over valleys and "W" crimped to guide water B. Weather lap joints ' 3.05 INSTALLATION - METAL FLASHINGS 1 1 u A. Install flashings in accordance with RCSHSB requirements and as ' approved by the Owner/Engineer B. Weather lap joints and seal weather tight with plastic cement; secure in place with concealed fastenings ' C. Flash and seal work projecting through or mounted on roof with plastic cement, weather tight 3.06 INSTALLATION - CONTINUOUS VENTILATION/AIR SPACE UNDERLAYMENT A. Place over felt underlayment one layer of three dimensional nylon ' matrix over entire area except at open non -shingled valleys B. Install per Manufacturer's recommendations for a wood shingle installation ' C. Installation includes appropriate detailing at hip and ridge cap locations and roofing transition interfaces at "widow's walk" upper roof platform flashing/counter flashing t 3.07 INSTALLATION - SHINGLES A. Place shingles in accordance with RCSHSB requirements to produce straight coursing pattern with five and one-half (5 1/2) inch ' weather exposure to produce triple thickness over entire roof area (unless demolition of existing wood shingle roofing indicates otherwise) , B. Provide double starter course at eaves C. Project first course beyond face of fascia boards and drip flashing approximately 1/2 inch t D. Use minimum two (2) inch edge overlap E. Coordinate installation of weather tight placement of counter flashings F. Complete installation to provide weather tight service G. Roofer is responsible for daily weather protection of the interior of the building, re -roofing debris removal, and site clean-up including ' protective storage of materials off -site and/or on -site as coordinated with the Owner ' END OF SECTION I 1 I I returned unopened. Bidder shall assume full responsibility for timely delivery at ' the location designated for receipt of Bids. 13.3. Oral, telephonic, telegraphic, or facsimile Bids are invalid and will not ' receive consideration. 13.4. No Bidder may submit more than one Bid. Multiple Bids under different ' names will not be accepted from one firm or association. 14.0 MODIFICATION AND WITHDRAWAL OF BIDS. 14.1. Bids may be modified or withdrawn by an appropriate document duly executed (in a manner that a Bid must be executed) and delivered to the place ' where Bids are to be submitted at any time prior to the opening of Bids. 14.2. Bids may also be modified or withdrawn in person by the Bidder or an authorized representative provided he can prove his identity and authority at any ' time prior to the opening of Bids. ' 14.3. Withdrawn Bids may be resubmitted up to the time designated for the receipt of Bids provided that they are then fully in conformance with these Instructions to Bidders. ' 15.0 OPENINGS OF BIDS. ' Bids will be opened and (unless obviously non -responsive) read aloud publicly as indicated in the Invitation to Bid. An abstract of the amounts of the Base Bids and major alternates (if any) will be made available after the opening of Bids. ' 16.0 BIDS TO REMAIN OPEN SUBJECT TO ACCEPTANCE. / ' All Bids shall remain open for forty-five (45) days after the day of the Bid Opening, but OWNER may, in his sole discretion, release any Bid and return the Bid Security prior to that date. 17.0 AWARD OF CONTRACT. 17.1. OWNER reserves the right to reject any and all Bids, to waive any and all ' informalities not involving price, time or changes in the Work, to negotiate contract terms with the Successful Bidder, and the right to disregard all nonconforming, nonresponsive, unbalanced or conditional Bids. Also, OWNER reserves the right to reject the Bid of any Bidder if OWNER believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful ' financial ability or fails to meet any other pertinent standard or criteria established IJ I by OWNER. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. 17.2. In evaluating Bids, OWNER will consider the qualifications of the Bidders, whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award. 17.3. OWNER may consider the qualification and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work as to which the identity of Subcontractors, Suppliers, and other persons and organizations is submitted as requested by OWNER. OWNER also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award. 17.4. OWNER may conduct such investigations as OWNER deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial ability of the Bidder's proposed Subcontractors, Suppliers and other persons and organizations to do the Work in accordance with the Contract Documents to OWNER's satisfaction within the prescribed time. 17.5. If the Contract is to be awarded, it will be awarded to the lowest responsive and responsible Bidder whose evaluation by OWNER indicates to OWNER that the award will be in the best interest of the OWNER. Award shall be made on the evaluated lowest base bid excluding alternates. The basis for award shall be the lowest Bid total for the Schedule or, in the case of more than one schedule, for sum of all schedules. Only one contract will be awarded. 17.6. If the Contract is to be awarded, OWNER will give the Successful Bidder a Notice of Award within forty-five (45) days after the date of the Bid opening. 18.0 CONTRACT SECURITY. The General Conditions and the Supplementary Conditions set forth OWNER's requirements as to performance and other Bonds. When the Successful Bidder delivers the executed Agreement to the OWNER, it shall be accompanied by the required Contract Security. 19.0 SIGNING OF AGREEMENT. When OWNER gives a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Agreement with all other written Contract Documents attached. Within fifteen (15) days thereafter, CONTRACTOR shall sign and deliver the required number of counterparts of the Agreement and attached documents to OWNER with the ' required Bonds. Within ten (10) days thereafter, OWNER hall deliver one fully signed counterpart to CONTRACTOR. Each counterpart is to be accompanied by a complete set of the Drawings with appropriate identification. ' 20.0 TAXES. OWNER is exempt from Colorado State Sales and Use Taxes on materials and equipment to be incorporated in the Work. Said taxes shall not be included in the Contract Price. Reference is made to the General and Supplementary ' Conditions. 21.0 RETAINAGE. Provisions concerning retainage are set forth in the Agreement. 22.0 PURCHASING RESTRICTIONS. Purchasing restrictions: The Bidder's authorized signature of this Bid assures the ' Bidder's compliance with the City's purchasing restrictions. A copy of the resolutions is available for review in the Purchasing and Risk Management Division or the City Clerk's office. ' A. Cement Restrictions: City of Fort Collins Resolution 91-121 requires that suppliers and producers of cement or products containing cement to certify that the cement was not made in cement kilns that burn hazardous waste as a fuel. 23.0 COLLUSIVE OR SHAM BIDS. Any Bid deemed by the City in its sole discretion to be a collusive or sham Bid will be rejected and reported to authorities as such. Your authorized signature of this Bid assures that such Bid is genuine and is not a collusive or sham Bid. 24.0 BID RESULTS. For information regarding results for individual Bids send a self-addressed, self - stamped envelope and a Bid tally will be mailed to you. Bid results will be posted ' in the Purchasing office seven (7) days after the Bid Opening. END OF SECTION 1 J SECTION 00300 BID FORM ' 11 1 I 1 n 11 11 I I 1 SECTION 00300 BID FORM PROJECT: 7360 Avery House Re -Roof Place: Ft. Collins/Avery Hou: Date: 4/2/2012 In compliance with your Invitation to Bid dated 4/2 , 20 12 and subject to all conditions thereof, the undersigned a (Corporation, Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor) authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in thesum of four thousand twenty four & 75/100 ($ 4024.75 ) in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment Bonds is as follows: Developers security & Indemnity Com1Dany 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. through 1 8. BID SCHEDULE (Base Bid) Includes all work per specifications Lump Sum $ 80, 495. 00 In words Eighty thousand four hundred ninety five and 0/100 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. RESPECTFULLY SUBMITTED: Zeigler Construction CONTRAQITOR A J 4/2/2012 Printed Date Owner Title ttt-17Y / License Number (If Applicable) (Seal - if Bid is by corporation) Attest: Address i 39 Telephone q-W- I [] 1 i I i SECTION 00400 SUPPLEMENTS TO BID FORMS 00410 Bid Bond 00420 Statement of Bidder's Qualifications 00430 Schedule of Subcontractors 11 11 I 1 City of Fort Coffins Purchasing ADDENDUM No. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 7360: Avery House Re -Roof OPENING DATE: 3:00 PM (Our Clock) April 2, 2012 Financial Services Purchasing Division 215 N. Mason St. 2n° Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov. corn/purchasing To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed as follows: • In order to expedite the project the City of Fort Collins will purchase the cedar shingles. Do not include shingles in your bid. • Shingle width is limited to 4" minimum to 10" maximum. • Contractor to provide a 5 year minimum "water tightness" warrantee. • Sheet flashing materials can be 26 gauge ASTM Berridge Galvalume or equal, instead of 24 gauge. • The existing copper flashing material on the turret can be replaced with either galvanized metal or copper. • Extend eave/ ice dam protection membrane 36" around the perimeter of the building and one continuous 36" width sheet 18" each side of the valleys. Addendum to item number 3.02 D. • The existing wood cedar shingles shall be recycled at a site approved by the City. Existing metal flashing shall be collected by contractor and the City will haul off to City recycle bins. • Single ply membrane allowed on the flat roof section will be either white EPDM or TPO roofing. Please contact John Stephen, CPPO, LEED AP, Senior Buyer, at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST STATEMENT ENCLOSED WITH THE ADDENDUM HAS BEEN RECEIVED. BE ACKNOWLEDGED BY A WRITTEN BID/QUOTE STATING THAT THIS Addendum 1 — 7360 Avery House Re -Roof Page 1 of 1 SECTION 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned 2eiRler Construction as Principal, and as Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado, as OWNER, in the sum of for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, . 7360 Avery House Re -Roof NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. *Developers Surety and Indemnity Company ** Five Percent of Amount Bid------- (5 ---) I I POWER OF ATTORNEY FOR DEVELOPERS SURETY AND INDEMNITY COMPANY INDEMNITY COMPANY OF CALIFORNIA PO Box 19725. IRVINE, CA 92623 (949) 263-3300 KNOWALL BY THESE PRESENTS that except as expressly limited, DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA, do each hereby make, constitute and appoint: ***Mark Sweigart, Susan J. Lattarulo, Donald E. Appleby, J.R. Richards, Tiffany McGonagle, Gloria C. Blackburn, DiLynn Guern, Florietta Acosta, Kevin W. McMahon, Sarah Brown, jointly or severally"' as their true and lawful Allom ey(s)-in-Fact, to make, execute. deliver and acknowledge, for and on behalf of said corporations, as sureties. bonds, undertakings and contracts of surety ship giving and granting unto said Altarney(s)-in-Fact full power and authority to do and to perform every act necessary, requisite or proper to be done in connection therewith as each of said corporations could do, but reserving to each of said corporations full power of substitution and revocation, and all of the acts of said Atlorney(s)-in-Fact, pursuant to these presents, are hereby ratified and confirmed. This Power of Attorney is granted and is signed by facsimile under and by authority of the following resolutions adopted by the respective Boards of Directors of DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA. effective as of January 1st, 2008. RESOLVED, (hat a combination of any two of the Chairman of the Board, the President, Executive Vice -President, Senior Vice -President or any Vice President of the corporations be, and that each of them hereby is, authorized to execute this Power of Attorney, qualifying the attorneys) named in the Power of Attorney to execute, on behalf of the corporations, bands, undertakings and contracts of suretyship: and that the Secretary or any Assistant Secretary of either of the corporations be, and each of them herebyis, authorized to attest the execution of any such Power of Attorney: RESOLVED, FURTHER. that the signatures of such officers may be affixed to any such Power of Attorney or to any certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signatures shall be valid and binding upon the corporations when so affixed and in the future with respect to any band, undertaking or contract of suretyship to which it is attached. IN WITNESS WHEREOF, DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA have severally caused these presents to be signed by their respective officers and attested by their respective Secretary or Assistant Secretary this January 1 sl, 2008. By.--Qo6nqViceDanielresident By:�—� Slepnen T. Pale. Senior Vice -President Slate of California County of Orange AND w: 0 �z' 193E o On,--__ Jammq- 31 2011 _ before me. _----- _. .. Antonio Alvarado, Notary Public_ Date Here Insert Name and Title of the Officer personally appeared - __- _ _Paw al Yo my and Stelhen J PaleI._____., _ Name(s) of Signer(s) -------- _,.._...__..-.. ....._.__... . _.__...— �� ANTONIO ALVARADO j ca r COMM. N 1660643 s NOTAR`! PUBLIC CALIFORNIA U ORANGE COUNTY ^' IL My COMM. S Ires Aug. 9. 2.013 Place Notary Seal Above 1 who proved tome on the basis of satisfactory evidence to be the person(sj whose name(s) islare subscribed to the within instrument and acknowledged tome that helshellhey executed the same in hislhedtheir authorized capacity(ies), and that by hismerltheir signature(s) on the instrument the person(s), or the entity upon behalf of which the persons) acted. executed the instrument. I certify under PENALTY OF PERJURY under the laws of the Stale of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature Antonio Alvarado, Notary Public CERTIFICATE The undersigned, as Secretary or Assistant Secretary of DEVELOPERS SURETY AND INDEMNITY COMPANY or INDEMNITY COMPANY OF CALIFORNIA, does hereby certify that the foregoing Power of Attorney remains in full force and has not been revoked and, furthermore, that the provisions of the resolutions of the respective Boards of Directors of said corporations set forth in the Power of Attorney are in force as of the date of this Certificate. This Certificate is executed in the City of Irvine, California, this 2nd day of April, 2012 reggOkur, istantSecretary I0-1380(Rev01i 11) SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: Zeigler Construction 2. Permanent main office address: PO Box 371 Bellvue, CO 80512 3. When organized: 2006 4. If a corporation, where incorporated: 5. How many years have you been engaged in the contracting business under your present firm or trade name? 6 years 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) We have approximately 20 signed roof contracts. All of these contracts are NOT time sensitive and will be put on hold to complete this project. 7. General character of Work performed by your company: I4igh end custom and sp ciality rnofind. 8. Have you ever failed to complete any Work awarded to you? No If so, where and why? 9. Have you ever defaulted on a contract?. If so, where and why? 10. Are you debarred by any government agency? No If yes list agency name. 11. List the more important projects recently completed by your company, stating the ' approximate cost of each, and the month and year completed, location and type of construction. tSee Attached. 12. List your major equipment available for this contract. ' All required roofing equipment. Ladders, safety equipment and metal break. 13. Experience in construction Work similar in importance to this project: 1 Jobs listed on line #11. ' 14. Background and experience of the principal members of your organization, ' including officers: Shawn Zeigler - 20 vears of roofing experience Ines Ruvalcaba - 30 years+ of roofing experience ' Jim Raasch - 30 years+ of roofing experience ' 15. Credit available: $ 45, 000. 00 16. Bank Reference: ' 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? Yes ' 18. Are you licensed as a General Contractor? Yes If in yes, what city, county and state? Fort Collins, Larimer County, CO What class, license and numbers? Roofing - R1947 19. Do you anticipate subcontracting Work under this Contract? Yes If yes, what percent of total contract? 10 ' And to whom? Farquhar Masonry I 11 I 20. Are any lawsuits pending against you or your firm at this time? No IF yes, DETAIL ' 21. What are the limits of your public liability? DETAIL 1, 000, 000.00/2 , 000 , 000.00 ' What company? Atlantic Casualty Insurance 22. What are your company's bonding limitations? $too , 000 . oo ' 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital ' comprising this Statement of Bidder's Qualifications. Dated at this 2 day of April 20_L2. ' Name of Bidder ' By: Shawn Zeigler ' Title: own/1erlI State of Co o ra& , County of LG rl Yyl e;✓ ■ JhCOu) e f q �� being duly sworn deposes and says that he is 0W N Gt2 V of ZecNe'y 0-C4 -UCJI on and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this Notary Public My commission expires: (0-241I2- day of rf l 120 12.- (Seal) tit. ����"s';'•,C'�. U WO MY ComnVsslon UYVIrew �Iz14,1l Z 11 Bigler Co nns ictIon WbX 3�7! Be8Yvue, Co 90512 �9ii6MLFn'.91f B4.�i� _ 4:4,°4➢E I 1 & 13 Projects completed 832 W Oak st. Steve Davidson 970 818 381 1 3/2012 $32,000 Installed 1&W on the eaves, cedar breather, copper flashing and wood shingles. 318 Loomis Kim Morten 970 482 8267 9/201 1 $22,000 Install I&W on the eaves and wood shingles. 629 W Mountain David ffaimson 970 295 5408 5/2011 $12,000 Install I&W on the eaves and wood shingles. 730 Olive Craftsmen Builders, Steve Josephs 970 218 6905 4/2008 $34,000 histalled IJLW on the eaves, cedar breather, copper flashing and wood shingles. 1 100 McLain Fiats Aspen, Co Carl Cherry, 307 747 4369 8/201 1 $42 5,000 Installed I&W, copper facia, bylin cave melt, hand soldered copper gutters and copper shingles. Zeigler Construction R E Ivue Co 80512 (970) 111765 �k�0.4SVAF�84=,$:ff �Y9T�A�_S,iY%BA Our Team; Shawn /Cigler Owner/operator of Partners Roofing 1994 — 2006 Owner/ operator of Zeigler construction 2006 — present. 20 years rooCing experience 30 years construction/ carpentry experience Ines Ruvalcaba Master roofer. 35 + years rooting experience Jim Raasch 30 1 years rooting experience. Specializing in historical roofing. Putor Farquhar Stone mason specializing in historical restoration. Zeigler Construction PO Box 371 'Bellvue, CO 80512 (970) 481-4765 Shawnzeigler@gmail.com Zeigler constructions work strategy for the Avery House. ' Comply with all federal, state, local, and historical rules and regulations. Comply with all OSHA rules and regulations. Perform the work as detailed in the Avery bid #7360 and the addendum page. If the bid is awarded on 4/9/12 we would like to get the fencing and the scaffold erected from 4/9/12-4/13/12. We would start shingle tear off and chimney repair on 4/16/12. We would like to finish on 5/22/12 and have the scaffolding and the fencing removed on 5/23/12. Safety ' 1) All entrances and sidewalks sliall be properly marked and secured for public safety. 2) A G' lii(,h chain link fence with privacy screen shall be erected around the entire perimeter of the house. 3) 3) Scaffolding sliall be erected around the entire perimeter of the house. The owner may want to take ' this opportunity to inspect the facia and soffit. Removal and decking ' l ) Remove all existing wood shingles down to the decking. 2) We would like to have the parking spots in front of the Avery house on Meldrum for the length of the project. 3) We will park our big dump trailer on the street and shuttle debris with tarps or small trailers as to not rut the sod. 4) Recycle all wood shingles at Hagemens. Approximately 38 yards 5) Replace any rotten decking. ' G) All decking shall be re -nailed because of age and shrinkage. 7) Install wood inserts on the gable ends of the dormers between the sleathing and crown molding for proper nailing. ' 8) Install plywood over spaced sheathing as needed. 9) Install cut to fit inserts over the windows for protection. 10) Protect the stone walls with plywood. 1 1) All debris will be cleaned up daily. 12) We will start on the NE corner of the building and work in a clockwise motion. 13) All sections will be dried in with I&W and felt the same day that they are torn off so as to keep a water tight system at all times. 14) Some bat mitigation may be required during tear off. We will work with the proper authorities to make sure this happens in a safe and humane manner. ' 15) We will run magnets around the property upon completion to retrieve any missed nails or staples. Flashing and Underlayment I ) Install one course of Grace I&W on the eaves and valleys. 2) Install double layer 30N ASTM D 226 felt. 3) Install w valley and drip edge. 4) Install flashing and counter flashing on the chimneys. 5) Install new pipe jacks and heat stack jacks. G) There are 4 applications where the roof meets a stone wall. These areas will need to be dashed and counter flashed. 7) We will have a metal break on site to fabricate our (lashing as needed. 8) R&.R metal ridge. Venting 1) R&R existing Rv 51 roof vents 2) Install cedar breather. 3) Install vented roll ridge on the ridges. Shingles 1) Install smooth sawn, Class B, fire treated, 18" perfection shingles with a 5 ''/z" expose. 2) Use proper fasteners. 3) Shingles to be purchased by the owner. Gutters I ) R&R all gutters and downspouts. 2) Gutters and downspouts may contain lead paint. We will test the gutters and if needed remove the gutters and downspouts with proper lead abetment techniques. 3) Gutters and downspouts to be recycled by the owner. Painting 1) All painting to be performed by the owner. Flat Roof 1) histall %Z" edx over the existing membrane. 2) Install fully adhered 60 mill white EPDM. ALL work to be preformed as per specs. ALL materials used as per specs. ALL work to be documented with photographs. ' Zeigler Construefion PO Box 171 S1cra a she as �0 om Zeigler Constrlic;tion Limited Warranty Zeigler Construction herby warrants that the 1 t'DM roof and the wood shingles installed will remain watertight ' for a period of 5 years. 0 BIJILDING NAME & LOCATION Avery House ' 328 West Mountain Avenue Fort Collins, Co WARRANTY TERM ' FIVE YEARS FROM T14F DATE OF SUBSTANTIAL COMPLETION EXCLUSIONS AND CONDITIONS The corporate surety warranty shall not exceed a term of one year. Damage resulting from use of the roofing system in a manner for which it is not normally intended or for which it has not been designed. Damage to the membrane or wood shingles caused directly or indirectly by unusual occurrences of the elements t such as, but not limited to, cyclones, tornadoes, or wind speeds in excess of 90 miles per hour, lightning or hail. Damage to, or failure of, the membrane or wood shingles in any manner caused or contributed to by: Settlement or movement of building components: ' Solid or liquid deposits of any substance other than those for which the system was designed: ' Zeigler Construction BY: rifle: Date: / s ' date: �Z r2 I CONTRACT DOCUMENTS TABLE OF CONTENTS Section Pages BID INFORMATION 00020 Notice Inviting Bids 00020-1 - 00020-2 00100 Instruction to Bidders 00100-1 - 00100-9 00300 Bid Form 00300-1 - 00300-3 ' 00400 Supplements to Bid Forms 00400-1 00410 Bid Bond 00410-1 - 00410-2 00420 Statements of Bidders Qualifications 00420-1 - 00420-3 t00430 Schedule of Major Subcontractors 00430-1 CONTRACT DOCUMENTS 00500 Agreement Forms 00500-1 00510 Notice of Award 00510-0 00520 Agreement 00520-1 - 00520-6 ' 00530 Notice to Proceed 00530-1 00600 Bonds and Certificates 00600-1 00610 Performance Bond 00610-1 - 00610-2 00615 Payment Bond 00615-1 - 00615-2 00630 Certificate of Insurance 00630-1 00635 Certificate of Substantial Completion 00635-1 ' 00640 Certificate of Final Acceptance 00640-1 00650 Lien Waiver Release (Contractor) 00650-1 - 00650-2 00660 Consent of Surety 00660-1 ' 00670 Application for Exemption Certificate 00670-1 - 00670-2 CONDITIONS OF THE CONTRACT ' 00700 General Conditions 00700-1 - 00700-34 Exhibit GC -A GC -Al - GC-A2 00800 Supplementary Conditions 00800-1 - 00800-2 ' 00900 Addenda, Modifications, and Payment 00900-1 00950 Contract Change Order 00950-1 - 00950-2 ' 00960 Application for Payment 00960-1 - 00960-4 SPECIFICATIONS 1 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 10% of the contract. ITEM SUBCONTRACTOR t I 1 I I I I I I I I I I I I I I I 1 I 1 [J 1 SECTION 00500 AGREEMENTFORMS 00510 Notice of Award 00520 Agreement 00530 Notice to Proceed I 1 SECTION 00510 ' NOTICE OF AWARD DATE: April 4, 2012 ' TO: Zeigler Construction PROJECT: 7360 Avery House Re -Roof OWNER: CITY OF FORT COLLINS (hereinafter referred to as "the OWNER") You are hereby notified that your Bid dated April 2, 2012 for the above project has been ' considered. You are the apparent successful Bidder and have been awarded an Agreement for 7360 Avery House Re -Roof. ' The Price of your Agreement is Eighty Thousand Four Hundred Ninety -Five Dollars 80 490 . ' Three (3) copies of each of the proposed Contract Documents (except Drawings) accompany this Notice of Award. Three (3) sets of the Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is by April 19, 2012. 1. You must deliver to the OWNER three (3) fully executed counterparts of the Agreement including all the Contract Documents. Each of the Contract Documents must tbear your signature on the cover of the page. 2. You must deliver with the executed Agreement the Contract Security (Bonds) as ' specified in the Instructions to Bidders, General Conditions (Article 5.1) and Supplementary Conditions. Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned, to annul this Notice of Award and to declare your Bid Security forfeited. ' Within ten (10) days after you comply with those conditions, OWNER will return to you one (1) fully -signed counterpart of the Agreement with the Contract Documents attached. City of Fort Collins BM,IVZXA Jgm$s B. O'Neill, II, CPPO, FNIC�' Di for of Purchasing & Risk Management I SECTION 00520 AGREEMENT THIS AGREEMENT is dated as of the 4`h day of April in the year of 2012 and shall be effective on the date this AGREEMENT is signed by the City. The City of Fort Collins (hereinafter called OWNER) and Zeigler Construction (hereinafter called CONTRACTOR) OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1. WORK CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Project for which the Work under the Contract Documents may be the whole or only a part is defined as the construction of the 7360 Avery House Re -Roof. ARTICLE 2. ENGINEER The Project has been designed by City of Fort Collins Operation Services, who is hereinafter called ENGINEER and who will assume all duties and responsibilities and will have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. ARTICLE 3. CONTRACT TIMES ' 3.1 The Work shall be Substantially Complete by May 25, 2012 when the Contract Times commence to run as provided in the General Conditions and completed and ready for Final Payment and Acceptance in accordance with the ' General Conditions within five (5) calendar days after the date when the Contract Times commence to run. 3.2. Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1. above, plus ' any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal preceding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as Liquidated damages for delay (but not as penalty) CONTRACTOR shall pay OWNER the amounts set forth hereafter. I I 1) Substantial Completion: Three Hundred Dollars ($300) for each calendar day or fraction thereof that expires after the May 25, 2012 period for Substantial ' Completion of the Work until the Work is Substantially Complete. 2) Final Acceptance: After Substantial Completion, 0 Dollars ($0) for each calendar day ' or fraction thereof that expires after the five (5) calendar day period for Final Payment and Acceptance until the Work is ready for Final Payment and Acceptance. ' ARTICLE 4. CONTRACT PRICE ' 4.1. OWNER shall pay CONTRACTOR for performance of the Work in accordance with the Contract Documents in current funds as follows: Eighty Thousand Four Hundred Ninety -Five Dollars ($80,495), in accordance with ' Section 00300, attached and incorporated herein by this reference. ARTICLE 5. PAYMENT PROCEDURES ' CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. ' 5.1. PROGRESS PAYMENTS. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Application for ' Payment as recommended by ENGINEER, once each month during construction as provided below. All progress payments will be on the basis of the progress of the Work measured by the schedule of values established in paragraph 2.6 of the ' General Conditions and in the case of Unit Price Work based on the number of units completed, and in accordance with the General Requirements concerning Unit Price Work. ' 5.1.1. Prior to Substantial Completion, Owner will be entitled to withhold as contract retainage five percent (5%) of each progress payment, but, in each case, less the aggregate of payments previously made and less such amounts ' as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. If , in the sole discretion of Owner, on recommendation of Engineer, Owner determines that the character and progress ' of the Work have been satisfactory to OWNER and ENGINEER, OWNER may determine that as long as the character and progress of the Work remain ' satisfactory to them, there will be no additional retainage on account of Work completed in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100% of the Work completed. 95% of ' materials and equipment not incorporated in the Work (but delivered, suitably stored and accompanied by documentation satisfactory to OWNER as provided �I in paragraph 14.2 of the General Conditions) may be included in the application Section 00520 Page 3 for payment. 5.1.2. Upon Substantial Completion payment will be made in an amount ' sufficient, if necessary, to increase total payments to CONTRACTOR to 95% of the Contract Price, less such amounts as ENGINEER shall determine or OWNER may withhold in accordance with paragraph 14.7 of the General ' Conditions or as provided by law. 5.2. FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.13. ' ARTICLE 6. CONTRACTOR'S REPRESENTATION In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations: 6.1. CONTRACTOR has familiarized himself with the nature and extent of the ' Contract Documents, Work, site, locality, and with all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work. ' 6.2. CONTRACTOR has studied carefully all reports of explorations and tests of subsurface conditions and drawings of physical conditions which are identified in ' the Supplementary Conditions as provided in paragraph 4.2 of the General Conditions. 6.3. CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests, reports, and studies (in addition to or to ' supplement those referred to in paragraph 6.2 above) which pertain to the subsurface or physical condition at or contiguous to the site or otherwise may affect the cost, progress, performance or furnishing of the Work as ' CONTRACTOR considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of paragraph 4.2 of the General Conditions; and no additional examinations, investigations, explorations, tests, reports, studies or similar information or data are or will be required by CONTRACTOR for such purposes. 6A. CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, 1 I 1 investigations, explorations, tests, reports, studies or similar information or data in respect of said Underground Facilities are or will be required by CONTRACTOR in order to perform and furnish the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provision of paragraph 4.3. of the General Conditions. 6.5. CONTRACTOR has correlated the results of all such observations, examinations, investigations, tests, reports and data with the terms and conditions of the Contract Documents. 6.6. CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. ARTICLE 7. CONTRACT DOCUMENTS 7.1 The Contract Documents which comprise the entire Agreement between OWNER and CONTRACTOR concerning the Work consist of the General Conditions, Supplementary Conditions, those items included in the definition of "Contract Documents" in Article 1.10 of the General Conditions, and such other items as are referenced in this Article 7, all of which are incorporated herein by this reference. 7.2 Forms for use by CONTRACTOR in performing the Work and related actions in carrying out the terms of this Agreement are deemed Contract Documents and incorporated herein by this reference, and include, but are not limited to, the following: ' 7.2.1 Certificate of Substantial Completion 7.2.2 Certificate of Final Acceptance 7.2.3 Lien Waiver Releases ' 7.2.4 Consent of Surety 7.2.5 Application for Exemption Certificate 7.2.6 Application for Payment LI Cli 7.3 Drawings, consisting of a cover sheet and sheets numbered as follows: na The Contract Drawings shall be stamped "Final for Construction" and dated. Any revisions made shall be clearly identified and dated. 7.4. Addenda Numbers 1 to 1, inclusive. i 1 7.5. The Contract Documents also include all written amendments and other 1 documents amending, modifying, or supplementing the Contract Documents pursuant to paragraphs 3.5 and 3.6 of the General Conditions. 1 7.6. There are no Contract Documents other than those listed or incorporated by reference in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of the General 1 Conditions. ARTICLE 8. MISCELLANEOUS 1 8.1. Terms used in this Agreement which are defined in Article I of the General Conditions shall have the meanings indicated in the General Conditions. 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written 1 consent of the party sought to be bound; and specifically but not without limitations, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this 1 restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge that assignor from any duty or responsibility under the Contract Document. 1 8.3. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, ' Agreement and obligations contained in the Contract Document. 1 1 1 1 1 1 I 1 1 OWNER: CITY OF FORT COLLINS ER CONSTRUCTION 50AS M S B. O-NEILL II, CPPO, FNIGP-- PRINTED IR CTOR OF PURCHASING RISK MANAGEMENT ' Date: q/V9 I Title: Ow yl 'e r Date: `1 id 1i � (CORPORATE SEAL) Attest: �� G� / y L k, 46, V0 Address for giving notices: Pas 3Zl PSetl d LLe- Co ?6;5 z License No.: I SECTION 00530 NOTICE TO PROCEED Description of Work: 7360 Avery House Re -Roof To: Zeigler Construction This notice is to advise you: That the contract covering the above described Work has been fully executed by the ' CONTRACTOR and the OWNER. That the required CONTRACTOR's Performance Bond and Payment Bond have been received by the OWNER. That the OWNER has approved the said Contract Documents. ' Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and directed to proceed within () calendar days from receipt of this notice as ' required by the Agreement. Dated this day of 20 ' The dates for Substantial Completion and Final Acceptance shall be 20_ and , 20_, respectively. ' City of Fort Collins OWNER By. Title: ' ACKNOWLEDGMENT OF NOTICE ' Receipt of the above Notice to Proceed is hereby acknowledged this _day of 20 ' CONTRACTOR: Zeigler Construction By: ' Title: SECTION 00020 INVITATION TO BID ' 7 SECTION 00600 ' BONDS AND CERTIFICATES ' 00610 Performance Bond 00615 Payment Bond ' 00630 Certificate of Insurance ' 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance ' 00650 Lien Waiver Release (CONTRACTOR) 00660 Consent of Surety 00670 Application for Exemption Certificate 1 1 1 1 1 !i: LD r r P SECTION 00610 PERFORMANCE BOND KNOW ALL MEN BY THESE PRESENTS: that Zeigler Construction P.O. Box 371, 1361vue. CO 80512 This bond does not 8PP1Y to that part of any warranty or maintenance guarantee that extends beyond one year from the completion of the contract. Bond No. 537237P (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and a( LLC) (Firm) Developers Surety and Indemnity Company (Address) P.O. BOX 19725, IRVINE, CA 92623 - 9725 hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins. 300 Laporte Ave Fort Collins Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of Eighty Thousand Four Hundred Ninety -Five Dollars 80 495 in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, finely by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the 4th day of April, 2012, a copy of which is hereto attached and made a part hereof for the performance of The City of Fort Collins Project, 7360 Avery House Re -Roof. NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions and agreements of said Agreement during the original term thereof, and any extensions thereof which may be granted by the OWNER, with or without Notice to the Surety and during the life of the guaranty period, and if the Principal shall satisfy all claims and demands incurred under such Agreement, and shall fully indemnify and save harmless the OWNER from all cost and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER may incur in making good any default then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. This bond does not apply to that part of any warranty or maintenance guarantee that extends beyond one year from the completion of the contract. IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this lath day of April .20 12 IN PRESENCE OF: Principal Zeigler Construction (Title) (Corporate Seal) IN PRESENCE OF: IN F} RES/ENC/E OF: g,/%r rown, Surety Witness M(Surety Seal) (Title) P.O. Box 371. I3cllvue. CO 80512 (Address) Other Partners By: NA By: Surety elopers urety and 1 demnity Company By: Tiffan o e, Attorne Fact �n X 9 5 R VTNF A Q7A7; - Q775 (Address) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. w L:" IN P P r on SECTION 00615 PAYMENT BOND KNOW ALL MEN BY THESE PRESENTS: that Zeigler Construction P.O. Box 371. Bellvue. CO 8Oi 12 This bond does not apply to that part of any warranty or maintenance guarantee that extends beyond one year from the completion of the contract. Bond No. 537237P (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and a( 1.1-C) (Firm) Developers Surety and Indemnity Company (Address) P.O. BOX 19725. IRVINE, CA 92623 - 9725 hereinafter referred to as "the Surety", are held and firmly bound unto the City of Fort Coffins, 300 Laporte Ave.. Fort Collins Colorado 80522 a (Municipal Corporation) hereinafter referred to as "the OWNER", in the penal sum Eighty Thousand Four Hundred Ninety -Five Dollars 80 495 of in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the 4th day of April, 2012, a copy of which is hereto attached and made a part hereof for the performance of The City of Fort Collins project, 7360 Avery House Re -Roof. NOW, THEREFORE, if the Principal shail make payment to all persons, firms, subcontractors, and corporations fumishing materials for or performing labor in the prosecution of the Work provided for in such Agreement and any authorized extension or modification thereof, includinc all amounts due for materials, lubricants, repairs on machinery, equipment and tools, v consumed, rented or used in connection with the construction of such Work, and all insurance premiums on said Work, and for all labor, performed in such Work whether by subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. This bond does not apply to that part of any warranty or maintenance guarantee that extends beyond one year from the completion of the contract. IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this 1 nth day of April 20 12 IN PRESENCE OF: Principal Zeigler Construction (Title) (Corporate Sea]) IN PRESENCE OF: IN NESENCE OFv �ar h Brown, Suretv Witness (Surety Seal) (Title) P.O. Box 371, Bellvue. CO 80512 (Address) Other Partners By. NA By: Surety rpgelopersrSurety-and Indemnity Company By: Tif any JVT o ttorney- n Fact 9 5 I VINE. C 2623 - 9725 (Address) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. I 1 1 1 1 POWER OF ATTORNEY FOR DEVELOPERS SURETY AND INDEMNITY COMPANY INDEMNITY COMPANY OF CALIFORNIA PO Box 19725, IRVINE, CA 92623 (949) 263.3300 This bond does not apply to that part of any warranty or maintenance guarantee that extends beyond one year from the completion of the contrart. KNOW ALL BY THESE PRESENTS that except as expressly limited, DEVELOPERS SURETYAND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA, oo each heroby make, constitute and appoint'. "Mark Sweigart, Susan J. Lattarulo, Donald E. Appleby, J.R. Richards, Tiffany McGonigle, Gloria C. Blackburn, ❑iLynn Guern, Flonetta Acosta, Kevin W. McMahon, Sarah Brown, jointly or severally""" as their true and lawful AVomey(s)an-FaA to make, execute, deliver and acknowledge, for and on behat of said corporations, as sureties, bonds, undertakings acid contracts of surety- ship giving and granting unit said Adumey(s)an-Fad fu6 power and authority to do and to perform every ad necessary, requisite or proper to be done in connection therewith as each of said corporations could do, but reserving to each of said corporations hill power of subsbtu9on and revocation, and all of the acts of said Atterney(s)-in-Fad, pursuanito these presents, are hereby ratified and confirmed. This Power of Attorney is grained and is signed by facsimile under and by authority of the following resolutions adopted by the respective Boards of Directors of DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA, effective as of January 1st, 2008. RESOLVED, that a combination of any two of the Chairman of the Board, the President, Executive Vice -President, Senior VIoe-Presidenl or any Am President of the corporations be, and that each of them hereby is, authorized to execute this Power of Atiomey qualifying the allorney(s) named in the Power of Attorney to execute, on behalf of the corporations, hands, unit ertakings and contracts of suretyship; and that the Secretary or any Assistant Secretary of either of the corporations be, and each of them hereby Is, authorized to ahest the execution of any such Power of Attorney; RESOLVED, FURTHER, lrat the signatures of such officers; may be affixed to any such Power of Attorney or to any certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signatures shall be valid and binding upon the corporations when so affixed and in the future with respect to any bond, undertaking. or contract of suretyship to which it is attadted. IN WITNESS WHEREOF, DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA have severally caused these presents to be signed by their respective officers and attested by their respective Secretary or Assistant Secretary this January 1st, 2008. By •. / „�jR ANBajh'a,, Q- ^"""' '•+. O�PANY Daniel Young, Vice -President �':,, h,:'`ORP (7Rgv�;y�.. p -i pCiPOR OCT. 5 By: Stephen T Pate. Senior Vice -President A >�,•;• a 1867 O �, ; State of California ��, *°• County of Orange "" ,«•�•', ' On January 31. 2011 before me, Antonin Nvarsdo, Notary Public Date Here Insert Name and Title of the Officer personally appeared Daniel Yours and Stephen T Pate__ ' Name(s) of Signar(s) 1 who proved to me on the basis of satisfactory evidence to be theperson(s) whose name(s) islare subscribed to p the within instrument and acknowledged to me that heishellhey executed the same In hisherAher authorized ANTONIO ALVARADO � cepaclty{es), and that by hisTerltheir signatore(s) on the Instrument the person(s), urine entRyupon behalf of comm. $ t8806a.9 Whichso the pern(s) acted, executed the instrument. N :� M NOS' PUBLIC CALIFORNIA q 1 certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is 0ORANi COUNTY ti true and correct. My nornm. nes; Aug. 9.2Dt2 i WITNESS my hand and official seal. _ Place Notary Seal Abcde Signature' Antonio Alvarado, Notary Public CERTIFICATE The undersigned, as Secretary or Assistant Secretary of DEVELOPERS SU RETYAND INDEMNITY COMPANY or INDEMNITY COMPANY OF CALIFORNIA, does he r certify that the foregoing Power of Attorney remains in full force and has not been revoked and, furthermore, that the provisions of the resolutions of the respective Bards of Dirad rs or, said corporations set forth in the Power of Attorney are in force as of the date of this Certificate. lilil This Certificate Is executed In the City of Irvine, California, this 13th day of April 2012 . 1 regg Okur sand Secretary _ -�, FA 10-1380(Ray.01(tt) .....":••.n�i� 1 SECTION 00630 CERTIFICATE OF INSURANCE CONTRACTOR shall insert his own standard form for Certificate of Insurance. I [I 1] 1 ACORO® CERTIFICATE OF LIABILITY INSURANCE DATE (M 2 12 04/17/2012 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED :l REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: JOHN C. BECKETT & ASSOCIATES, INC. 220 Smith Street ARC, ONENo, Est: (970) 484-2805 FAX p); (970) 984-2885 E-MAIL tim@beckettinsurance.com ADDRESS: PRODUCER Ze3. ler Construction, LLC CUSTOMER ID R, g Ft. Collins CO 80524— INSURERS AFFORDING COVERAGE NAIC0 INSURED INSURER A ATLANTIC CASUALTY INSURANCE CO Zeigler Construction, LLC INSURER B Po Box 371 INSURER C INSURER D INSURER E Be11Vl1e CO 80512-0371 INSURER F ' COVERAGES 1 CCDTICICATC FUIIM QCD• QC\YICInIU u1111AQCD• THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR .LTR TYPE OF INSURANCE INSR WVD POLICY NUMBER POUCY EFf (MM/OD/YYY1') POLICY EXP (MMMDNYYY) LIMITS A GENERAL LIABILITY 11•I093000225 07/14/2011 07/14/2012 EACH OCCURRENCE S 1000000 X COMMERCIAL GENERAL LIABILITY / / / / PREMISES Ea occurrence) $ 100000 CLAIMS -MADE 1XI OCCUR / / / / MED EXP (Any one person) $ 5000 PERSONAL B ADV INJURY $ 1000000 GENERAL AGGREGATE $ 2000000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ 2000000 / / / / X POLICY PRO LOC / / / / NO VYND $ AUTOMOBILE LIABILITY ANY AUTO O COVERAGB / / / / / / / / COMBINED SINGLE LIMIT (Ea accident) $ BODILY INJURY (Per person) $ ALL OWNED AUTOS / / / / BODILY INJURY (Per accident) S SCHEDULED AUTOS HIRED AUTOS / / / / / / / / PROPERTY DAMAGE (Per accident) $ NON -OWNED AUTOS / / / / $ UMBRELLA LAB OCCUR U COVERAGE / / / / EACH OCCURRENCE $ AGGREGATE $ EXCESS LIAR CLAIMS -MADE / / / / DEDUCTIBLE $ / / / / g RETENTION S 7- W ORKERS COMPENSATION AND EMPLOYERS' LIABILITY ANY PROPRIETOR/PARTNERIEXECUTIVE YIN OFFICERIMEMBER EXCLUDED? ❑ (Mandatory In NH) N I A l" O COVERAGE N / / / / / / / / / / / / WC STATULIM - I OTH- E.L. EACH ACCIDENT $ E.L. DISEASE - EA EMPLOYE S I1 yes, describe under DESCRIPTION OF OPERATIONS below / / / / E.L. DISEASE - POLICY LIMIT S ENO COVERAGE DESCRIPTION OF OPERATIONS I LOCATIONS / VEHICLES (AKach ACORD 101, Additional Remarks Schedule, if more space is required) �. cERnHICAIE HOLDER CANCELLATION (970) 221-6760 (970) 224-6134 BUILDING & ZONING DEPARTMENT SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE ' THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. CITY OF FORT COLLINS 281 NORTH COLLEGE AVENUE AUTHORIZED REPRESENTATIVE t PO BOX 580 Z_ FORT COLLINSLI CO 80522- � "ACORD 25 (21 ' INS025 (200909) © 1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD SECTION 00635 ' CERTIFICATE OF SUBSTANTIAL COMPLETION TO: CITY OF FORT COLLINS (OWNER) DATE OF SUBSTANTIAL COMPLETION: PROJECT TITLE: 7360 Avery House Re -Roof ' PROJECT OR SPECIFIED PART SHALL LOCATION: Fort Collins, Colorado INCLUDE: ' OWNER: City of Fort Collins CONTRACTOR: Zeigler Construction CONTRACT DATE: April 4, 2012 The Work performed under this contract has been inspected by authorized ' representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project or specified part of the project, as indicated above) is hereby declared to be substantially completed on the above date. ' A tentative list of items to be completed or corrected is appended hereto. This list may not be exhaustive, and the failure to include an item on it does not alter the ' responsibility of the CONTRACTOR to complete all the Work in accordance with the Contract Documents. ENGINEER AUTHORIZED REPRESENTATIVE DATE ' The CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to complete and correct the items on the tentative list within the time indicated. CONTRACTOR AUTHORIZED REPRESENTATIVE DATE The OWNER accepts the project or specified area of the project as substantially complete and will assume full possession of the project or specified area of the project at 12:01 a.m., on . The responsibility for heat, utilities, security, and insurance under the Contract Documents shall be as set forth under "Remarks" below. CITY OF FORT COLLINS, COLORADO By: OWNER AUTHORIZED REPRESENTATIVE DATE REMARKS: SECTION 00640 CERTIFICATE OF FINAL ACCEPTANCE 20 TO: Zeigler Construction Gentlemen: You are hereby notified that on the day of , 20_, the City of Fort Collins, Colorado, has accepted the Work completed by Zeigler Construction for the City of Fort Collins project, 7360 Avery House Re -Roof. A check is attached hereto in the amount of $ as Final Payment for all Work done, subject to the terms of the Contract Documents which are dated April 4, 2012. In conformance with the Contract Documents for this project, your obligations and guarantees will continue for the specified time from the following date: _, 20_ Sincerely, OWNER: City of Fort Collins By: Title: ATTEST: Title: I 1 I SECTION 00020 INVITATION TO BID Date: March 15, 2012 The City of Ft Collins is requesting bids for roof replacement, gutter replacement and brick chimney re -pointing at the historic Avery House located at 238 West Mountain Avenue per the attached specifications. The contractor must demonstrate successful experience in working on historic architectural buildings, and in the completion of forms and reports required by the Colorado Historical Society. Sealed Bids will be received by the City of Fort Collins (hereinafter referred to as OWNER), at the office of the Purchasing Division, 3:00 P.M., our clock, on April 2, 2012, for the Avery House Re -Roof; BID NO. 7360. If delivered, they are to be delivered to 215 North Mason Street, 2nd Floor, Fort Collins, Colorado, 80524. If mailed, the mailing address is P. O. Box 580, Fort Collins, CO 80522-0580. At said place and time, and promptly thereafter, all Bids that have been duly received will be publicly opened and read aloud. All Bids must be in accordance with the Contract Documents on file with the City of Fort Collins, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80524. A prebid conference and job walk with representatives of prospective Bidders will be held at 10:00 AM, on March 21, 2012, at the Avery House, 328 W. Mountain Ave., Fort Collins. Prospective Bidders are invited to present their questions relative to this Bid proposal at this meeting. The Contract Documents and Construction Drawings may be examined online at: ' • City of Fort Collins BuySpeed: https://www.fcaov.com/eprocurement Bids will be received as set forth in the Bidding Documents. The Work is expected to be commenced within the time as required by Section 2.3 of General Conditions. Substantial Completion of the Work is required as specified in the ' Agreement. The successful Bidder will be required to furnish a Performance Bond and a Payment ' Bond guaranteeing faithful performance and the payment of all bills and obligations arising from the performance of the Contract. ' No Bid may be withdrawn within a period of forty-five (45) days after the date fixed for opening Bids. H LI 1 SECTION 00650 LIEN WAIVER RELEASE (CONTRACTOR) TO: City of Fort Collins, Colorado (OWNER) FROM: Zeigler Construction (CONTRACTOR) PROJECT:7360 Avery House Re -Roof 1. The CONTRACTOR acknowledges having received payment, except retainage from the OWNER for all work, labor, skill and material furnished, delivered and performed by the CONTRACTOR for the OWNER or for anyone in the construction, design, improvement, alteration, addition or repair of the above described project. 2. In consideration of such payment and other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the CONTRACTOR voluntarily waives all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights which the CONTRACTOR may now or may afterward have, claim or assert for all and any work, labor, skill or materials furnished, delivered or performed for the construction, design, improvement, alteration, addition or repair of the above described project, against the OWNER or its officers, agents, employees or assigns, against any fund of or in the possession or control of the OWNER, against the project or against all land and the buildings on and appurtenances to the land improved by the project. 3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or performed to or for the construction, design, improvement, alteration, addition or repair of the project were furnished, delivered or performed by the CONTRACTOR or its agents, employees, and servants, or by and through the CONTRACTOR by various Subcontractors or materialmen or their agents, employees and servants and further affirms the same have been paid in full and have released in full any and all existing or possible future mechanic's liens or rights or claims against the project or any funds in the OWNER'S possession or control concerning the project or against the OWNER or its officers, agents, employees or assigns arising out of the project. 4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if ' any, and the Surety on the project against and from any claim hereinafter made by the CONTRACTOR'S Subcontractors, materialmen, employees, servants, agents or assigns against the project or against the OWNER or its officers, employees, agents or assigns arising out of the project for all loss, damage and costs, including reasonable attorneys fees, incurred as a result of such claims. ' 5. The parties acknowledge that the description of the project set forth above constitutes and adequate description of the property and improvements to which this Lien Waiver Release pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and may be relied upon by the OWNER, the lender, if any, and Surety on any labor and material bonds for the project. Signed this day of 20_ CONTRACTOR: Zeigler Construction By: Title: ATTEST: Secretary STATE OFCOLORADO ) )ss. COUNTY OF LARIMER ) Subscribed and sworn to before me this day of Witness my hand and official seal. My Commission Expires: Notary Public 20_, by _ I SECTION 00660 CONSENT OF SURETY TO: City of Fort Collins Colorado (hereinafter referred to as the "OWNER") CONTRACTOR: Zeigler Construction PROJECT: 7360 Avery House Re -Roof CONTRACT DATE: April 4, 2012 In accordance with the provisions of the Contract between the OWNER and the CONTRACTOR as indicated above, for (Surety) on bond of ' hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final Payment to the CONTRACTOR shall not relieve the Surety Company of any of its obligations to the OWNER, as set forth in the said Surety Company's Bond. ' IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this day of 20 ' (Surety Company) By: ' ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-Fact. DR 0172 (12/98) COLORADO DEPARTMENT OF REVENUE DENVER CO 80261 (303)232-2416 CONTRACTOR APPLICATION FOR EXEMPTION CERTIFICATE Pursuant to Statute Section 39-26.114(1)(a)(XIX) ON DO NOT WRITE IN THIS SPACE The exemption certificate for which you are applying must be used only for the purpose of purchasing construction and building materials for the exempt project described below. This exemption does not include or apply to the purchase or rental of equipment, supplies, and materials which are purchased, rented, or consumed by the contractor and which do not become part of the structure, highway, road, street, or other public works owned and used by the exempt organization. Any unauthorized use of the exemption certificate will result in revocation of your exemption certificate and other penalties provided by law. A separate certificate is required for each contract. Subcontractors will not be issued Certificates of Exemption by the Department of Revenue. It is the responsibility of the prime contractor to issue certificates to each of the subcontractors. (See reverse side). FAILURE TO ACCURATELY COMPLETE ALL BOXES WILL CAUSE THE APPLICATION TO BE DENIED. Registration/Account No. (to be assigned by DOR) Period 0170-750 (999) $0.00 89 - `CONTRACTOR'INFORMATLON Trade name/DBA: Owner, partner, or corporate name: Mailing address (City, State, Zip): Contact Person E-Mail address: Federal Employers Identification Number: Bid amount for your contract: $ Fax Number. Business telephone number: Colorado withholding tax account number: Copies of contract or agreement,pages;(1) identifying the.conparties _11tracting EXEMPTION �INFOR_MATION,-arid(2)contammgsignaturesiofcontracttngpacfiesmust ieattached Name of exempt organization (as shown on contract): Exempt organization's number: 98 - Address of exempt organization (City, State, Zip): Principal contact at exempt organization: Principal contact's telephone number: Physical location of project site (give actual address when applicable and Cities and/or County (ies) where project is located) Scheduled Month Day Year Estimated Month Day Year construction start date: completion date: 5 I declare under penalty of perjury in the second degree that the statements made in this application are true and complete to the best of my knowledge. Signature of owner, partner or corporate officer: Title of corporate officer: Date: DO NOT WRITE BELOW THIS LINE ' Special Notice ' Contractors who have completed this application in the past, please note the following changes in procedure: ' The Department will no longer issue individual Certificates of exemption to subcontractors. Only prime contractors will receive a Contractor's Exemption Certificate on exempt projects. ' Upon receipt of the Certificate, the prime contractor should make a copy for each subcontractor involved in the project and complete it by filling in the subcontractor's name and address and signing it. The original Certificate should always be retained by the prime contractor. Copies of all ' Certificates that the prime contractor issued to subcontractors should be kept at the prime contractor's place of business for a minimum of three years and be available for inspection in the event of an audit. ' Once an 89# has been assigned to you, please use the next five numbers following it for any applications submitted for future projects. This should be your permanent number. For instance, if you were assigned 89-12345-0001, every application ' submitted thereafter should contain 89-12345 on the application. The succeeding numbers will be issued by the Department of Revenue. DO NOT enter what you believe to be the next in sequence as this may delay processing of your application. IJ SECTION 00700 GENERAL CONDITIONS ' 1 1 1 1 1 I I I I GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT These GENERAL- CONDITIONS have bem..&veloped by, using -the STA-VDARD,GENE-TUM, CONNTIONS OF THE CONSTRI jCTION CONTRA(77 pvcpared by the that ducurncnt are shave by widcrlining text that hm,ken added and striking tlirvuuh text -that has bmn dchtcd, I I I I I I F:JCDC- GENERAL CONDITIONS- lt)l 08 (t,996'rDfT[ON) WITH CITY OF FOt;ff COLLINS MOMFLCA VIONS (REV 9/99) IU I Article or Paragraph Num6cr S, Title DCFUqTIONS TABLE OF CONM-- frs.or-* i3FNERj\L CONT)FRONS Page Article or -Paragraph Mumber Number &'I'i Ile 1.1 Addenda I J.-I Agreement...........................................1 1.3 Application for Payment......,__......,.. 1.4 Asbesto's 1.5 Bid 1;6 Bidding Documents...._._....._.............. I 1-7 Bidding Requirements;:.,,,.-.... . ..... 1.3 Boruls......................................I..........1 1.9 Changc,Ordcr...................................... I L10 Contract Documents ........... I ...... 1.11 Contract Price : ..... j_.I 1. 12 Contract Tinies .... 4 ................_....__'.I ..... I : 13 CONFI`RACTOR� ................. I ..... I .......... 1 1.14 11"fective .............................................. V I.. Drawings..,--,-.... ......... .................... 1 16 Effcctivc Data of the Agreement,'_...,_,.,. I 1. 0 EING MER 1. ]AIN ENTGENEERs Consultant ...................... 1 1.19 Field Order..:....:...::.:.:.:.::..:__:...:.:.......I General Requirements....;_ ................... I 1.7 1 Hazardous Waste, ................................ 2; 1.22.a Laws and Regulations; Laws or Regulations� .2 1 "'b ........ .. Legal Holidays .......... ............. L.23 Liens............o. .............. '1. 24 Nwdstonc 1.25 Notice of Award 17-6 '\rmicc to Proceed 1.27 OWNIER .................. ............. I_'_)S Partial Utilization ............... ................ 2 1.29 PCBs IJ() Petroleutt;__:1 z - I - - - IProject ...................... .................. 1;3-'.a Radioqctivc, Material._ .......... 1.311) Regular Working Hours,,.,,. ...... :..., 1.33.Resident-Projeci Representative -2 1.34 Samples ............... .............................. L35 Shop Drawings...._...._.._ ............ . ... 2 1.36 specifications ....................... .............. 2 1:37 Subcontractor ........ .......... ................... 1.33 Substantial Completion:„.,,,,,.,,,,.„ 1.39 Supplementary Conditi 6n a 1.40 supplier..,:.: ........ 1 41 Underground Facilities, ........... : ........ 2-1 1.42 Unit Price Work .........................I........3. ........................I........3 1.43 WA .............................. 1.44 Work Change. Directive-- 1.45 Written Amendment Pace Num her PREL11%,11NARY MATTERS 3 I Del ivory of Bonds ............................ j Copies of Document% ... .................. .. 3' 3'3 t Coin m encem ent.of Contract Times; Notice to Procced "' ­ .. ­­3 2.4 Starting the Work.....,.. ........... I ... 3 2.5-2.7 Before Starting Ccnstrucfiont CONTRAC­7ORs Responsibility to Report; Preliminary r3chcWies: Delivery of Certificates of Insurance 3-4 2.3 Precumtryclion Confcrencci ............. 4 2.9 Initially Acceptable'Scheduleq, ......... 4 CONTRACT DOCUNIE-N-TS: IINTEi IT. -\MENDING. REMSF _ ................... ............ 4 3.1-12 Intent 13 Reference to Standards and Speci- fications of Technical Societies. Reporting and Resolving Dis- crepneies, ..................... :t_5 3-4. Intent ofCcrtain Terms or Adjectives . ................................... _ 5 3.5 Amending Contract Docunents ..... 16 supplementing Contract Documents, .................................. 5 3.7 Reuse of Documents .......................... i 4. AVAILABILITY- OF LANTDS;, SUBSURFACE AND PHYSICAL CONDITiois: REFERENCr POINTS ..................... 4.1 Availability of Lands...., 5-6 4_1 Subsurface and Physical Condilions........... _................._ 4:2. 1 Reports and Diawin&i ....... ___ ...... _ o 4'. 2 Limited Reliqncd by CONTRAC- TOR AUthorizcd; Technical Data 4. 2.3. Notice of Differing Subsurface or Physical Conditions .................. j6 4 2.4 F.NCTr3NFFRs Reviciv .......................ci 4:13 Possible Contract Documents Chan; e 6. 4.2.6 Possible P�ice­a­�'T"�tn­i'e's Adjustments ., ..... ......... ;. -7 43 1 "hysiLni Conditions --Underground Facilities . ............... .................... _ 1 4:3. f Shown or Indicated ...................... 7 4 -XTot Sho%vn or 4A Reference Points...............................7 UXIM: GENLIUV_ CONDITIONS 1910-3 (19.110 EDITIOEM wiOTYCT I L I I I I I I I I I I I I I I I Article or Paragraph Number 'Cl'itle P28C Article.or Paragraph N." u an Iv r Num,tmr 9-Title 45 Asbestas, PCBs, Ntroleurn. Hazardous Waste or Radioactive Material .....................1-8 3. 14ONDS A.u1) I LNISURANCH ...........1......I............ Performance, Payment and Other' Bonds................................. ........... 33 Licensed Sureties and lntnirers; Certificates of insurance__.- -------- .5.4 -,(�ONITRAC.70Ws Liability Insurance .....................'....I ............... 9 5.5 OWNERs Liability [nsuranc,:__.,_,. ­ ___9 56 Property [wittr2nce.,, ... .......... .5.7 I:oiler and N,lachincry or -Addi- tional Propaty.Insurance, ................ W 5.8 Notice of Canccilation Prmision W 3,9 CONTRACTOFs Responsibility for Deductible Amcamns . ....... Hh 5.16. Other Special Insurance .......... 5.II Waiver of Rights: ...... -5 - 12 - 13 Receipt and Appi icatibit of Insurance Proceeds 5.14 Acceptance 6fBb.nds; and Cifsu'- ance; Option to Replace_:., ...... ,l I 1 5 Partial Utilization --Property Insurance .......... H CONTRACTOR'S RFsPomsrBlLlTIFS_ ...... 6. 1 -6,2 'Supervision and Superintendence 6.3-6.3 Libori Nlatedils and Equipment. 6.6 . Pro,;ress Schedule z.............................. 12 6.7 'Substitutes and "Or -Equal" Items, CONTRACTOR`.% 113(peinsr , Substitute Construction klethcJs or Proccdurcst FNGINEER's Evaluation,.._.._,.._, 12,13, &M. I I Concerning,'Subconuractorp, Suppliersand Others, Waiver of Rights: 13-14 6.12 Patent Fees and Royalties...................J4 C. 1 -11, Permits...--_--.:.... 14 6.14 Ln%vs and Rcgulmtions,_, 6.15 r3.xe3 J 4-15 6.16 Use of Premises 15 6.17 Site Cleattliness-__., i5 6.IS Safe Structural Loading .................... _1 5 6'. 19 Record DoCualents­­,­i 15 6,20 Safety and Protection,., :1 =16 6.21 Safety RCprmmta1ivC .... ­ ...... 6.22 Hazard Communication Programs,,_„ 16 6,23 Emergencies ........................ _ 16 634 Shop Drawings and Sam ples_ � ........... I G Nge Nunibcr 6_225 Submittal Proceeclurei;; CONL TFLACTOR!s review Pribr lo,shop Drawing or Samp!c 6.26- Shop Drawing X, Sample Submit- tals Review by UNGLINUE&...._ 16-17 (527 Responsibility for Variations Front Contract Dccmpenta_,._,j7 6.128 Related Work Performed Prior to HKOUNMR's Revio'and Approval of Required Submittals: ............ .......... 17 6.29: Continuing the Wort:,,,,,,,,,,,,,,,,, ,1­17 6J0. CONTRACTORs General - Warranty and Cjuarantoq ..... ;_1 7 6.3 t - 6.33 Indemnification 7-18 6.34 Survival of Obligations ............. .... J S TCITITERVV�ORK_ ........... ........................ J � 7. V=7.3 Related Work at Site IS T4 IS OWNER '3 RESPONSIBILITIES .......... )S SA Communications to CON- Trl_aCTOR ............ is 8.2 Replacement of ENG NZFEEK ........... IS 8.3 Furnish Data andPiy Promptly When Due IS 9.4 Lands at Easement.%, Reports and Tests 18-19 8.5 Insurance 19 '3.6 Change Orders._,_- ...... ­J9 8 7 Inspections, Tests and Approvals....., ............... ­.­­.... 1,9 S.3 Stop or Suspend Work: 'rcrminate CoNd RACI'OR's Services, ............. ........... 19 ,S.9 Limitations on OWNER'S Resportsibilities ............................ 19 S. 10 Asbestos, PCBs, Petroleum,. Fliiardbtu; Waste or Radioactive Miitcnal.......... ......... J9 8.11 Evidence of Finwaiul Arrangements. ................ ........... 19 9. ENGINEERS STATUS DURMIG CO'NSTRUCTION 19 9.1 C)%VNF.R;s Rcprtseritatiic,, 19 9.12 Visits to 19 Represdntmil`d . ............... 19_�l 9.4 Clarifications and [merl5re- tatl . ontk ........................................ il 5 Authorfzed Variations in Wrlz 21 EICUC C3LNUU[, CONUMUNS 191 tl;S 11990 1701 110M wrow or Fowr I I I Article or Paragraph Page- Article or Paragraph Page 1 Num&-r &Title Number LNumhcr &-ritte Number ,9_6 R eCL n- Defective WWL.. -1 13S-13.9 Uncovering Work'at E.,NCI- 93A9 Shop Drawings, Change Orders NEERs Requcsc......................7.28 and Payments ................. ......... I I3.11) OW-114TER. `by Step the Work: ... ...... 2.3 9.10, Determ;natims for Unit Prict:4,_;-21 -22 13a1 Conrcction or -Removal of 9: 11-9.12 Decisions On Disputes EN01- Dfective Work ............................ %�'S VEER as Initial Interpreter,,,,, .... i� ...... . 13.1-1 Correction Period.... ........................ ? s 9.13, Limitations on LINGINCER's, 11.13 Acceptance ofDefeclive Work ........ ,28 Authority anti Responsibi lit ies;,z ,-22-123 13.14 OWNER May Correct Defective CILANG17S IN TILE WORK 23 39 IV.1 0 %VNER's Ordered Change ........... - 3 14- mym.,%rrs TO coirnt-%uro R Am.) W.2 Claim for Adjustment.... COMPLLION ,.... ........... t .................. . 29 -3 W Work Not Required by ContraCL 14 1 Schedule of Values..... Documents ..................................... 14.--4 Application for Progress lt).J Change Orders .... ...................... ..... . D Payment,,,,,,,,,, ....... � -iq 10.5 Notific-ation of Suretv ............ ........ 143 CONLMRAcrowsua' rranty of Title ................................ 29 CH.�NJGE-01: CONTRAUl- PRICE ........ 14'-1-114.7 Review of Applicatitincflir Contract Pride; Claim for Progress Payments ..................!)40 . AdjusLment, Value of 14.514.9 Substanti Completion. . 39 .. the Work, ...... �:23t�4 14.10 Partial Utilization ----- 11,4 Cost of the Work ......................... _ �4-�i 14.11 Final Inspection, ...... ...................... 31 11'.5 Exclusions to Cost bhhe Work ...........i 14.12 Final Applidition.for Payment ........ 31 11.6 CO?TeRAC'1'01's '3 14:13-14.14 Final Paym ent and Acceptance 31 11.7 Cost Records -6 .25, 14.1 Waiver of Claims..............:....31-321 11.3 Cash Allowances (5 11.9 Unit Price Work ............................ - 26 li SUSPUNION OF WORK ,V-\fD TERMIN.,mom 32 CHANGE OF CONTRACT TIMES ............................ )d li A OXVNT-R"vl,,iv Suspend Work .......... 3 111 Claim for Adjustm ent ............ ....... 26 . 15,2- 15A (.)\VJPR 'May'renninate .......... Time of the Essence ........... 26 ....... 15.5 CONMACTOMMay Stop 11.3 Delays. Beyond CO3.N7RACTORs Work or Terminate.,, :�.32-33* Control ...... ............... �26-2 7 12.4 Delays Beyond OWNITR's.and 16. DISPUTE RESOLUTION T ..................................33 CONTRACTM,s Control P 17. MISCELLANFOUS ..... ..................................... 33 TESTSAND INSPECTION& CORRECTION. 17.1 Giving Notice., ....... - 33 RENIOVAL OR ACCEPTANCE OF 17.2 Computation of Times___ .......... 33' DE17-EC77VE WORK, ............................. ............... '7 IT L\.Iotice Of Claim ................................ 13 13.1 \16tice of Detects, .............................. '7 17.4 Cumulativa Remcdies� .... : ............. 1_33 13.-' Access to the Work ........... _27 17.5 Professional Fees and'Court 133 Teitcand jnsbqctlons� Costs [ncldd&d ........................ 11 CONMACTORs Cooperation .......... 27 17.6 Applicable State Laws ................ 33-34 13.4. OWNEW's Responsibilities; Intentionally left blank,,,-.--,.., _ ...... ...... 35 Independent Testing Laboraton ......... 2 7 13<5 COT"W R.,\(--T6R!.s F-XF1IBIT GC -A: (Optional) Resppnsibiliaes: ................ ...... Dispute Resolution Agreement,.,.,.,..,-...... GC-AI13.6-13.7 Covering Work Prior to llispcc- 16, V- 16,16 Arbitration: ................ ...... ... .. GC.Al tion-Testinggr Approval ------ __;--.-27 16.7 Mediation..,..... I_ ........ ...... CC -Al t;JCL)C GESERAL CONVI I IONS 1910-8 (19111 M RONI %Y) crry OF FORT coi.i.ms moraFic,CnoNstru-'w9fig) I I The OWNER reserves the right to reject any and all Bids, and to waive any informalities ' and irregularities therein. Bid security in the amount of not less than 5% of the total Bid must accompany each Bid , in the form specified in the Instructions to Bidders. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, ' shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision -making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do ' business with the City of Fort Collins is prohibited. City of Fort Collins James B. O'Neill, II, CPPO, FNIGP ' Purchasing & Risk Management Director FNDEX T0:cjr.,.NT--7,RAL CONDMONS 6rcf-Foh Collins 6%6ciificition's to,Lhb General Condi.066s of the Construction Contract are not shown in this inciex Article or Paragraph Number Acceptance of - Bonds and [nsurnkq: .................... _ ......... : ...... 1) 14 defecrive kVork. ............ ........ __10.4J. 13.4K 13.13 final Payment.... ............... ............... ...... 9.1-1 14.15 insurance .................................... : .................... 5:14 Work. ork. by COMBUACTOR.- ..................... -7-3 Substitutes and "Or -Equal" Items M ... ......... 7.,:Tl Work by OWNER ................. 1.5, 6.30, 6:34 Access to the -- Lands. OWNER andCCWlRAGT0R .responsibilities,..: ......... --- ...... site. related Work ... ........ ....... W'ork . .......................................... 13 2, 1314, 14.9 Acts or Omissions-, Acts and Cat issions- CONTRAGrOR 6.9:1. 9.13.3 ENG1 NTFR ... ................................ ...... 6- -301 9,13.3 . .................................................... Addenda -definition of (also set: definition Of SIeCiftlflioru;) ...... (I A 1. 11.), 619), 1:1 Additional Property Insurinces,,..... .... ...... d..: .... 5.7 Adjustments" Contract price or Contract -r imcs,,, 1. 5; 3.5. 4-1. 4.3 : 2. 4. 5. 1, ------ ...... : .......... A.53, 9-4; 9-5, 10.2-10.4, .......................-I I. 12, 14.18, 15: 1 progress schedule., ................ ............. 15.6 .Agrdem,nr-- definiti6n of "All -Risk" Insurance. policy form., ......................_.,5 6.2 Allowances, Cash xmendint! Contract Documen-t5. Amendment. Written-- ingeneral.........J.1(1, 1,4i:, -13, 5:10, 5,12, 6.6.2 ..... ...:......I ...... 1 ........ ().8 , 2, 6.19. 10.1, 10.4, 11.2 -.:- 112.1. 1.3.12.2, 14.7.2 Appeal, OWNER or CONTRACTOR. intent to 210, 9.11, 10.4, 16. 16.5 Application for Payment- -definition of., ........... a ........ .......... Responsibility ...................... ........ 9,9 Final paNrinent .................. 9-13.4.,9.13 14': 12-14.15, in -encral ........................... 2;8, 2-9. 5.6.4. 9.10, 15.5 prouress payment..':.-- 1-14.7 review of----'...._._...._ .... ! ............... .14.4-14,7 Arbitration ........................... ......................... 16.1-16.6 Asbestos - claims pursuant thereto....... ..... 4 5. 2- 4.5,3 CON ACTOR withorized'to stop Work,...... _ 4. 5:2' definition of., .... - ............. I ............. I ...... ....... (.4 Axticle or, Paragraph ragriph Number 'OWNER responsibility 1br .............. ............... 4.5- 1, 3.10. *sible price,and times change ....................... - . �. 5-. 2 Authorized Variations in Work .......... 3.6, 6.25. 6.27. 9.5 Availability of Lands_:-_- ......................... 4.1. 8.4 Award, Notice -of -defined ....... ........ L7-5 : Plefore Starting Construction. ................... ......... �'- i-"� Bid-definifibn or.,,,,,,;,,,,,,,,,,,,,„- ............L5 .. (L 1, 1.10. 13, 3.3. . I . --- 4.9-6.4. 6.13, 11.4.3; [1,9.1) Bidding Documents -.definition of Bidding Requirements --definition Of 1.7 (1.1, 4,162) Bonds - .acceptance of'., ........................ ......................... 5,14 additional bonds ................ ............... Cost of the Worlti 11.5.4 ........... delivery of ... I ... .... I I .......... 511 final Application for flaynictit ................. 14:1 -i-1'41 � gencril ............... : ........... ...... 1. 10, 5.1-5.3. Ji. 13; 11.1 9.13.1 10.5. 14.7.6 performance. Payment 2 Bonds andInsurance-in gereral i .Builder's risk "all-riskk" policy [6 rat ............ 5,6. 2 Cincellation Provisions, Insurance ... z..J.4.1 1, 5:8, S. 15 Cash -Allo%knnces H-.8 Certificate 6.30.2.3: ..........................................I.......14.9, 14.10 Certificates of Inspection....: 13.5, 14.12 Certificates of 5.4;11. 5.4,13, 5.&5: 5.8, 5.14. 9.1 "A 14A 2 Change in ContrnIct Price Cqsh Allowances E3 chiiin fu . r price ' adjustment..:... 4:1, 4.2.6, 4.5. 5.15; 6.8.1, tX4 ............ 9. %9, 11, 10. 2, 10. 5; 11. 2; 13.9, ...................... *13,13,,13.14, 14.7, 15.1, 15,5 CONTRACTOR'% fee ................... 1 L6 Cost of the Work general 11.4-11.7 Exclusiohs to--n; :1 z-w- 1.1. IL': ........ 1.5 Cost Records ............... -- .... :. ... 17 in,gencral .............. 1,19z 1.44, 9.11, 1�1.4_ 1Q.4-3, 11 Lump Som Pricing .......... ........................... _,l 1-3:2 Notiricition of.surety_ --: ...... -- . 1............ 10.5 Scope or_.,...,...._._..._.;-„ Testing and frfspcctiom Uncovering tlid.Wcrk: ................................. 13.9 L:J(,I)C GENERAL CONDITIONS 1910-3 i I 9A CD1 r[ON1 %WEITY OF FOKr Unit Price Work .Article or Paragraph i timber Value of Work ........... .............. Change in Contrict'rimes.- Claim for times adjustmcnt, ...... :4. 1; 4.2.6, 4. 5,1 5, 15 6.3:1 9.4. 9.5. 9.11. 10. 2i 10.5: 12.1. ...............13.9, 13.13, 13.14, 14.7, 15J, 15.5 Contractual time limits,,, .......... __­_! i­! __­_ I -Y.3 Deliv-, beyond CONTRACTOR'S control .................... 113 Dclays beyond OWINER's and CON'rmdrbiz's control,;.,,,,,"...... Notification of ...... ;! ...... 10, i Scope of changc: ........ ..................... ....... ;I0.3A().4 Change Orders— Acceptance of De%cnivo Work..._------ ------ 1:11.13 Amending Contract Documents .. .... I ........... Cash Allowances Change of Con iTact Price..... -` ......................... I I Change of Contract, T inics. 12 Changes in.the Work ...... ------------ :-­10 CQl,FFPLACTOR!s fee ........................................ 1, 1 . G Cost or the Work ..... ....... .................... J 1'.4-11.) Cost ........... - 111-.7 dermition bf ........ ........... --_----­------------ 1.9 emergencies ......................... 6 ..................... 0.23 ENGINEERs responsibility ....... 9.'?, 10.4. 11.2, 12.1 cxccuLion or.....:_ .......... 6 ........... .......... .......... 10.4 I_ Indemnifiction ........... ............. (. 12, 6,1.61 6.31-633 Insurance, Bonds and ................... 5. 1 13, 1(),5. OlV.\ TE may terminate * ...................... A-5.2- 15.4 OWNERs Respunsibility-_ ............. ____34 10.4 Physical Conditions_ Subsurthco and .............. ................. 4. .1 Underground Facilities- ......... .................. Record Documents ........ ..6.19 Scope of 6ange . . ................................ 10.3-10.4 Substitutes .............................................7.3, �6.7.3. 6.8.2. Unit Price Work 6 ............................... 11.9 value or "lark, covered by, ................................ 11.3 Changes in the Work ..... z ...... .................... "...) 0 1\rotifi6ation of suietv OkWER, and CON'Tk.�&F&k's' responsibilities........-_.........._._----_------ ..... _10.4 Right to an adjwtment...............:--°,:,:.:_.:--,---10.2 Scope of change ._.: .................................. 103-10.4 Claims -- ,against coPrrIZA&oR .......... ------------ ,_6.16 against OWNER_....... ...... 157-32 Change of Contract Price ............... ............9.4, t 1,2' Change of Coitract Times ........................ _9,41 111 COINTR.ACTORs -------- 4..7,1. 9.4, 9. 5, 9.11. 10.2. 11.9, 12.1, 13.9. 14.N.. 15. 1. 15. S. 17.3 CONMTRA(71:()Ws Fee 11'.6 .-Vticle or Paragraph Number CONTRACTOR!s Hibillty_ ......... 5.4, 6,12, 6,16, 6.31 Cost or the Work..................... 1.4, 11,3' Decisions -on Disputes ..... .......... ........ 9.11, 9.12 Dispute Resolution,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ................ Dispute Resolution Agrecment._, ......... I ...... 16: 1 - 16.6 ENGINEER as initial interpreter";,;,,,;,,,;;,;;;,:::,I I Lump Stan Pricing_.::-:._..: 1.3.2 Noticc of ................... ­.. ........................ ITJ OWNT.*R's .................... 9.4, 9.5, 9.11. 10.7, 11.2, 11.9 .......12.1. 13.9. 13.13. 13:14. 17.3 OWNTE.Rmuv refuse to make piiyment ................. 14.7 .Professional Fees andCourt Costs lncludLd,-.... ............. .... ; ------------ ___ ........ 17.3 request for formal decision of) .... ; ...................... 9.11 Substitute Items .............................................. 6-7-1-7- - . I ..... . ............... ............ ............. I 'rim, requirements .............. ­ ................ _9 It. 111 Unit, Prim Work... ...... ...1L93 Value of .......... 11. , 3 Wilivcro[­:un Final ViLymc% ....... ...... 14.14, 14,15� Work Changc'Directivd ........... ......... ­10.2 v(ritten notice ...... 9.11. 11.2', 111 Clarifications and Interpretations,,,,.,,,,,,, 3.6.3. 9,4: 9.11 Clean Site __ ........................ ..................... .17 codes 6r,rechnical Society, Organization orAssociation .................................................. 3.3 Commencement of Contract Times---- 13 Cdramunications-- general , �w_ .; . ........ ... 6.2, 6.9.2, 8:1 in unicition Ifazard Coin ❑ Completion - Final Application for Payment„ ...... ................. [4.12' Final inspection, .......... I ........ ...........14.11 Final Payment and Acceptance,,..__.--;" .Partial Utilization ............................................14.10 Substantial Completion_.................... I.X 14.8-14.9 Waiver of C"Iiims_ ..... ; ......................... j 4. 15, Coniputation of Times. _ .. ....... 17:2. 1,. 1 T.2.2 Concerning Subcontractors, Supplier.% and Others ................................................. .............................*...... ¢. 3-6.11 Conferences - table initially acceptable schedules;_ ...... 1 p .... ....... :17!:­­..2.9 ' preconstructioni..................... ......... ................... 1.8 Conflict, Error. Ambiguity, Discrepin4__ c6,N-rRACTOR to Report......._,..--,:....-_. 2:5, 3.3.2 Construction. before,starting by cowfz.Acrop . ........................................... �,.s-2.7 Construction Machinery, Equipment, ew .. ....... ..... . 6.4 Continuing the Work ............. ....... ............... 6.29, 10.4 Contract Documents— Aniendinu, .... I ......................... ...................... 1. i Bonds......................................................... .... 5.1 LJCLX: GENERAL CONDMONS 19 10 -3 (199U ED1110N1 w/ 0 TY OF FORT COLUNS MODIFICATIONS ( RF V 91991 I I I I I I I I I I I I I I I I I I Cash Allowances -...... ........ ... ............................ 11-8- Art icle or Paragraph. Nurn Fer Chin& of Contract Price ........................ ............ I I Change of ContractTimes ! - �--- 1.7_- -Chinges in the Work ... ....................... _10.4-10.3 check and Verify ........ C I arifica tions-an d Interpretations.,...... 16, 9.4. T 11 definition of, .10 MNIGILNIEFR as initial intc'rpretcr or ..... ....... ).'I I ENGrL,TEFR is OW[,FER!s representative,,, I fnsurancc� ...... Intent ................... 11-3,4 in inor variations in the Work., _ ........ ... 3.6 oMqF�ws responsibility to furnish 'data.,., ----------- N.3; OWWER's responsibility to make prompt payment...._ ................... s13, 14'4, 14:13 precedence,...... 3:1,3.3.3 Record Docurn ents Reference to Standards Ind.Specifications of Technical Societics, Rclatcd-Work., .............. : ............... ............ Reporting and Resolving Discrefm ricies ...... ,;_2.5, 33 Reuse 3.7 Supplementin .. ................................... 1. ............ ­316 TerminatiOn ofENTGRNEERs Employment .......... 9.2, Urlit Price Work .......................... ................ 1.9 variations ..... .................................... 3.6, 6�23, 6.,27 Visiis.to Site, HNIGINU7,R's .............................. �.2* Contract Price -- adjustment of,., ....... 4.1. 9.41 10.3, 1 l.'Y- 113 Change. of..:..:----------,. ........ I Decision on Disputes,,,,,,,,; 9. . I I definition of ... _ ............................................... 1,11 Contract Times - adjustment of 3S, 4.1, 9.4, 103. 1.2 Change of.,.: ..... 111-1 1-4 Commencement o(, ........ ............................. ..... 23, : definition of,, ... ............... . ..... 7 CONITR�ACTOR= Accepffinca of insurance ........... ........................ . 5; 14 Communications .......................................6.2. .......... *­­ ............. .... . *I 6.2. 6:9,2 Continue Work ....................................... 6, M 104. coordination and scheduling, .......... ....... 6.9.2 definition of 1. 13' Limited Reliance on Technical Data Authorized. . ................ ...... ­­ ... 4.2.2 X-fay Stop Work or Terminate,,,., ... :­­ ...... _q. 15.5 provide site access to others ......................... 7_2. 112 Safetyand Protection,,,,,,,,,,,,,,,,,,, 4.3.1.1- 6A 6, 6. 1 N, 6:2 1 -6. 23' 7.2, 1; ......................................12 Shop Ormvingand SampleRevicw Prior to Submittal ..........................I...... 3j M Stop Work requirements. ..................... ............ 432 .0\1TRACTOR's rGtick:gc Paragraph NumFxr Compensation- ......... :­­11. V 1.1-1 Continuing Obligation .................................... 1415 Dqfevlive Work Di[Ly*iLiLoff.eeLdefettive-%Vork .... I ..................... IXII Duty to Rcport-, Changes:iri the Work caused by EmergenCYL ............. ­ ......... .......... ------ _6.23 IN fects in W&k of Other% ):3 Differing conditions ............ ............ !­--4123 Discrepancy in Documents;,,,,, 2.3, 3.3.2. 6,14.21 Underarotind Facilities not indicated ........... 4.3,12 Emergencies ................... ­ ....... :­ ......... 1 .......... H.quipmentand &,lachincry Rental. Cost of the Work ..... .......... ;: .......... ­ ...... 11,4J_3 Fee--C.ost PILL%— ... A tASA I 1:5_ 1, 11,6 General Warranty and (),Liarant& ............ ...... 630 fliazard Communication Programs,,,,,,,,,,,,,;,,,, ,,0;22 Indemnification ­-7-5.1 6.16; 6.31-6.33 Inspection or ale ork .............................. T3, 13:4 Labor, Nralciials and Hquipmeni. ................ ;.J.3-6.5 Laws said Regulations, -Cornpliince'by ..... I.;_ 6,14.1. Liability Irisurimce ..................... 1.11-11 ........ :.___5__4 Notice of Intenuo Appeal,,,,,,, t)A, L6.4 obligation to perform and complete the Wot k ....... ................................. §30 Patent Fees anti Ro Ili' ,ya es, paid for by ........ ....... 612 Performance and Other Bonds .......... ­1 ........... 51 Perm its• obiwined.und paid for by,,,,,,,,,,,,,,,,,,,,,, 6.13 Progress Schedule.___. ... 2.6. 2.8. 19. 6.6, .................. ... ).29, 10.4. 15,11 Request ffir f6rin2l decisionon diiputes... ..... _ __9, 11 Responsibitio's-- Change-% in the Woel ------------ ......... ------- Concc'rrting,Subconaactors. Suppliers and Others ... .................................. 6.S-6. IJ Continuinia the Work ............................ 6.29, 10.4 CONTRACTORs expense.....,.:....:....,:.:....: .63.1 CONTIZA.CTORs Generil Warranty and Guarantee 1 - '................ ..................... 6,36 - CONITRACTORs review prior to Shop Drawing or Sample submittal, ...... ........ b.,25 Coordination of Work ........... - 6,9:-- Emergencies ................ I ...... I ......... ­ ............ 6.23 CINGINT,ER's evaluation. Substitutes or "Or -Equal" Items ............ 6:7.3 For Acts and Omissions of Others J.9:1-60r 2, cii i I ti)r deductible iimounts,insurance, i.9 go , nerill ................................. ....... 63 7. 2, 7.3, 3.9, flizardous Conitaunicition Program&,,. ___6,22 Indenin ; it'ication ................................... 6.31-6,33 EJCnCGLNLTLALC0N0l110,'qS 1910-34170EUITIONI I Labor,. Materials and Equipmcnt .............. 6-3- - 61. i. Laws and Regulations..-,,.-,- 111-2- .11 16.14 Liabilitv Insurance.,---.- ........... Article or ParaurapH Number Notice of variation from Contract Documents ...... . ........................ :0.27 Patent Fees and Royalties : ........................... §. 12 ...... ....... j6,6 Record Decuments 6.19 iclited Work performed liricir to ENG[NEERs approval of required SUbrnittalS; ---------- I ' ' 117 1 ;71- 1-" ' 6--28 safe structural, loading .................................. 6. fs Safety and Protection -­ �,.220, 7:2: 13:2' ....... .: ....... Safety Representative-_- ----- ................. fi.21 the Work, ...... ; ............. - W6 .... 6.9.1- .Scheduling 'Shop Drawings and Samples ........... - ...... 6.24, Shop Drawings anti SRm0c3 Roviaw by ENGLNEER. ............ 6.1& Site Cleanliness ------ ;­ ............. ....... jG. 17 Submittal Procedures ................................. .....­ 6.2: Substitute Construction McLhods and Pr=dures- ...... ....... �6.7.2 Substitutes and 'Cir-EciuHl' ltcm3 ..... .... ......6.7.1 Sitperintcn6ricr........................................... G12 Supervision.............. .................................... 6.1 survival ofobiigtions, ......... 6-34 Taxes6. ........................................................... Tcsis and Inspections ................................... ........**.......*............. :. To Report .................. ............................. 2.5. Use of Premises, 16-6,18: 6.30.2.4 Review Prior to Shop Drawing or Sample Submittal ........ I ....... V ..... ............ - ... 16-25 Right to adjustment for chang6 in the Work.....10.2 riiht to claim ------------- 4, 7.1, 9.4, 9.5, 9.11, 10. 2,11 E9. 11.1. 13.9, 14. S, 15.1. 15.5, 17.3 Safety and protection .................. b20-622. 7.2; 13.2 Safety Representative ... ........................... : ... ..6211 Shop Drawings and Samples Submittals .... 6.24-6:29 Special Consultants, ........... 11.4:4 Substitute Construction Nietlacycls and Procedures 7 Substitutts and 'OrwEqual' Items. Expense ........................................... 6.7,1. 6.7-2, Subcontractors, Suppliers and Others..._-. ,.6.8-6.11 Supervisi6n and Suporintendence .......... 6.1, 6.2; 6,21 y - ...................... Taxes. payment by-........_ jc.li Use ol'Premises, 6.16-6.1.8 Warranties and guarantees,__,_-..._.......--:-: 6.5. 6.30 Warranty ofTitle ......................... 14-3 Written Notice Required-- CONTRACTOR stop Work or wrininitc ........ 1.5.5 Reports of Differing Subsurface and Physical Conditions .............. 4.2.3 Substantial Completion .................................. 14.3 aii CONTRACTORS -other ..............................................7 Contractual Liability Insurance ....... .................... �A 11) Contractual Time Limits ....... .Article or Paragraph Number Coordination-- 00?,iTICACTOR's rebiponsibility ........................ 6.9.2 Copies of Documents.,,,..-,,,,,,,,,,,,,,, Correction Peiiod.­., ...... ...... Correction, Removal or Acceptance of Defective Work-- in general ................ ............. I(J:4.1, 13.10-13.14 Auccptartice of Defective Work, ....... ......... ........ 13.13 Correction or Removal of befective Work .... ............... : ............ 6.30, 13,11 Correction Period 1 j -J 3.12 OWNI; R May Correct De/ectnv Work ............. , 13.14 OWNER ?vlay Stop Wqrk ­ ..... 13: 10 Cost- o1TcsLs and Inspections....._:-_ . ..................... Records 11.7 Cost of the work - Bonds and insurance, additional ..... . .............. 11:4.5.9 Cash Di.wounuj .... ................... :� ..................... CO.NTRAGEOR's Fee ...... 11.6 Employee Expenses ......::............................_I 1.4:5.1 Exclusions.tc. .................................................... 1115 G encralli.4-11:5 Ham,: ofrice,aml iiv&hcad expcn.scs .................... 11,5 Losses, ind'darnag,3 .....................................I 1:A:.6 Matcrials.and equipment ......... ­ ............ ....... ;.11 4.1 ,Minor. expenses .................................. ; ......... 11.4.5;S .Payroll costs on changes, ....... 1�...... ........ I L4.1 performed by Subcontractors., j L 4:3 Records 11,7 Rentals of construction equipment ,and machinery:.......___ ........ I IA. 5.3 , Rcyiihy payments; perm its and liccnsc roes ............................................ Site off -ice, and temporary facilitfe*, ............... 11.4.5-1 Special Consultants, CONTRAC TOR.'s ........... ­11.4.4 Supplcmental...,;,;-,- ------- : ..... I .......... - .... ... A 1.415 Taxes rented to the Work 11,45.4 Tests and Inspection........- ' ................................ lij Trade Discounts .................... 11.4.2 Utilities; fuel and sanitary facilitic.,,­ .... ::.z-. 11. 4- i 7 Work after regular hours, ................... ............ 11.4.1 Covering Work,. ........... :. ................................ 13.6-13; 7 Cumulative Remedies,... ................ 1--.11A-1 7.3 Cueing: fitting and patching - 7.2 .. ......... Data, to Le ftirnisfied bv ()Vy'-.qFR ....................... ... X-3 .......... I ...... - ... ...... - ............. j 7. -'. 2 Dccislons on Disputer . ..... .............................. 9.11, 9-12 dtjevrive--definition of 1, 14 defective tVork--- Acceptance of ................ ­ .................. ­10.4.1. 13.13 E.'JCDC GENUtAl- CONDHIONS 1910-8 t 19911 LDITION) wl CITY OF coat COLUNSMODIFICATTONS (REVW9,A I I I I I I I I I I I I F-1 L-1 I I I I I I I I I I I I I I I I I I I I I C&r=irm�or Removal of ............. _:J()AI, 13,11 Correction Period..:.,....... ingeneral. 14:7. 14.11 Article or Paragraph Number ............... OWNER Ntay Stop Work-,,......, 13AU Prompt Notice of_Defects. ................................... 13; 1 Rejecting ..,,,_,, ..... :.: ... .: ... ::_ ;,_ ii 9.6 Uncowring the %Vork� .......... 3:s. Definitions ...... . ...................................................... I Delays ........ ................. 6. 29, 12.3-',I�14� Delivery of Bonds. �_­ ...... ......... ...... Delivcryiol7certificaies 'or in'surame.1 Determinations for Unit Piiecs., ;9. 110 Differing Subsurface or Physical Conditions Notice of-_ 4_.2.3 FNNGRNEER's Review ....... ............. ...... 4,2.4 Possible Contract Documents; Cham, V.. .............. 4.15 Possible PriceLand Times Adjustments ............... 4.16 Discrepancies-Repurting and Resolving,_,, .... 3.3.2: 6.14.2 Dispute Resolu6on- Agreement ................. _ 16� 1 - 16. 6 Arbitration .......... .. .... 16:1-16.5 ,.;entral 16 Mediation......................................... ............. Dispute Resolution Avreeraent ..... ....... ___ ...... (6. 1 - 16.6, Disputes, Decisions by HNGINHR ............... _.Q. 11-9:12 Documents -- Copiesof ........................... 12 ....... .............. Record 6.19 Reuse of ...... _�::.17 Drawin . gs -definition.oc, ..... 4: .... ... ...... Easements ; Effective date or Agreement - definition of. _.......... J', 16 Era ergencics ENGINEER - as initial interpreter an disPutxs................. 9. 11-.9:12 definition of 1.17 Limitations�an authority and responsi6iliti�s;,,,;.13'. Replacement of .................. -- --- ----- Rasidoit Project Representative ............... ........... 9f3 ENGINEERs Consultant -- definitim a.( ..................1.13. ENG LNE E R!s, authority and responsibility, limitations on ......... 9; 13 Authorized Variations in the Work_ 9, Change Orders, responsibility for ...... :9.7, 10, 11, 12 Clarification -sand Intcrpretation!k, . ............. .6.3.9.4 Decisions on Disputes... ....... 1-51.12 de/eefive Work, notice of, , , ................. 13.1 Evaluation of Substitute Items ..... ... I ...... ­ ..... A73 Liabilimr .... , '­ ... .............. ........... 6.3 2; 9,12 ,Notice Work is 14.13 Observations ............................................i.31).2, 9.2 ()WNf7R!i Representative, ........... I ............. I ...... Payments to the C0t\q'RAc*roR_ ResponsibilityCur.,:.::.:,::.--:._..... .9.9m'14 MommendaL.i)n 0fPhVMent..,,j.: ......... ­14-4, 1413 ,,Vticle or ­Paragraph Niiaibtr Rcsponsibditics--Limitations on ............... :P.J.T-9.13 Review of Reports on Differing Subsurface and Phvsiud Conditions_ 4 Shop Drawings and Saffiples. review responsibility............................................... . M Status During Cmstruction-- authorized variations in the Woric- 9.5 Clarifications and liucrprctations,,_ Decisions on Disputes,,,,,;,,,,. ,V. 11�9..12 Detenninations on Unit Price ............ ; .......... 9.1 0 F--MGIN1hHRas Initial Interpreter,-"-",-" 1.9.11-9.11- FNIGINMER' - s Rcs ponsibilities ............ ; ... 9: 14, 12 * Limitations on ENG MjFRs Audioriry and Respamilbilifies... -.9:13 OW"NERs 9: I Project Rcprcsent.ative, ....... 93 Rejecting DefeciAv Work„ ............................ 9.6 Shop Drawings, Ghiin& OrdeM .and Payments... ­.­_..90-9.9 Visits to Site 91 Unit Price determinations...." ........................... 9xi Visits to Site_ ...... .................................... _9.1 Written consent required ........................... 9.1 Equipment, Labor. Materials and .........................(1.3.6. 5 Equipmcnt rental., Cost of the Work . ....... __ .I _;l 1,4.- -.3, Equivalent Materials -and Equipment ......................... 6.7 error or omission.[ ....... ....... 633 Evidence of Financial Arrangements., Explorations of physical conditions,., .......... ;..4_2:1 Fee, CONTRACTORs--Costs Plus ............................ 11.6 Field Order-- deCmition of ,.1.19 issued by ENGINEER .................. ........... :. 16.1. 9.51 Final Application for .Payment ............................... 14,12 Final fnrpectiorl .... : .............. 1;_.. .................. 4.11 Cirit Piyment-- ard,'Acceprinca ........... ..................... 14 . .13-14,14 Prior to, for cash alloviinces .........• .....................I 1:3 General, Provisions .......................................... 17.3-174 General Requirements - definition of, .3; 20 principal references to..............].6. 6.4.:6.6-67, 6_24 Giving Notice ._ ------ .... I ............. . ..... ­_ - - .17.1 Guaxantce of Work --by CONTRACTOR ........ §. 30, 14. 12 Hazard Communication Proarims.. ............................. 6_212 Hazardous Waste— definition of general .................. --------- ()W,'MZ's responsihilitv for ... ............. I ...... ... SAO EJCL'C GESERALCONDIF101,13 I M-N.4199GLUM ON) WOW OF FORT COLUNS MODIRCXTKM� (REV I 9M) F, Indemnificatilin ...................... ....... 6.. 1 2 6.16'. 6,3 1 --6-.33 Initially Acceptable Schedules ... 19 .............. Inspection— Certificlites o(, ...... ;...... :_.:�9:13_4, 11.5, 1412 Final ............ I ......................... Article or Paragraph Numhxr Special, required byEN-GINUER ..........................9.6 Tests and 113-13.4 Insurance -- Acceptance of, by OWNER* ............................... i. Additional, required bychinges in the Wo rk.................... - ............ __,l 1.4.5.9 Before ,starting the Work Bonds and --in Lcricrat ........................................... S. Cancellation Provisions ......... ........... ­.­ ......... Certificates of ------- ...... 2-7, 5, 5:3, 3-4.11. 5.4.13; ........... :.; ......... 5.6.5. 5.S, 5,14, 9.13A 14,12 completed operations,-_ ........ ­ ........ * ... * ...... D-4.13 .CONTRACTOR!s Liability_ .................. . ......... ­ S..4 CONTRACTORs UlLjedicri to ccVcra­e 5.14 Contractual Liability-, ...... deductible amounts, C.0NrP_4(;*rOR!s responsibility ................................................ 7:9 Final Application for Payment,,,,,,,,,;,,,; Licensed Insurers i___ ................... 5.3 Notice requitements. material changes ........ M, 10.5 Option to Replace ............................................. 5.14 other special insurances,;,,,,, ................. J-10 OWNER as fiduciary for insureds ............. _5.12-i. 13 OWNFR*9 Liability ................. ........................... 5-5. OWNERs Responsibility ..................................... &i. Partial Utilization, Property Insurance.. �5-15 Propcity,,,. ........ Receipt and Application-orInsurance Procccds............................................. .I'_ -5.13 Special Insurance, .. . .................................... --- 5.10 Waiver ofRights . � 7 . . . . m . . . . . ­ - - : 5-11 Intent of Contract Documents ..................... ........ 11 -3.4 Interpretations and -Clarificat ionti.....................3.6.3, 9.41 Investigations of physical, condition.!k ........ 1 ........ ..... 4.2- Labor, Materialsand Equipment.,,...,. ...... -6.5 Lands -- and Easements.. ......................................... ........ 5.4 Availability. of_ .. ................................ ...... L 8.4 Reports and Tests : ........... z ....... % ........ _. Laws and Regulations. -Laws or Regulations-- Bonds5 ............ ................................. .1 -5.2 Changes in the Work...a.­ ......... ­:­:'. I ----------- 10.4 Contract DccumentS­_.,,,.­­,­ .... --,.I CONTRAuron Responsibilities .................... fi- 14, Correction Period, defxtire Work .................... 13J2 Cost of the Work, taxes .................... ........... 11A.5.4 definition of-, ................ ... ..... ------ 1.22 gener.A6_14 Indemnification .................................... -...6.31-6.33 Insurance.......................................... ................ 3_5 Prcccdcricc,._ - Reference 16 Safety and Protection ........ ...... 6.20. 13. 2 Subcontractors, Suppliers and Others, .......... 6.,4-6.11 Article or Piragr aph Number Tests.and Inspections .................................... 13. i Use of Prem ises ...... .............. 4. 16 visits to Site Site........,--,,, ..... ...... ........ 9�2 Liability Insurance-;............._...,.., CON'fRAC:,roR',;� ...................... ................... 5.4 Licensed'Sureties and Insurers...._ ... ... .................. 6.53. Liens -- Application for Progress Payment....,; ................. 14.2' coNrp,xurows Warranty ofTitlL ....................14..3 Firint,Application for Payment;.....: ..: .... ; ........ :w.14.12 definition ............................... .......•........... 1.23 .of.., Waiver Pf Claims:_ .............................. ........... is Limitations on ENGINEER!s authority and 9.1 Limited Reliance byCONTRACTOR .Authorized,,, ......... ........... 4.2.2 Maintenance and Operating Minulils_ Final Applictiticri for Payment.._,_ ... 4. IT Manuals (of others)-- Precedence., .... ....... ­ .. ........ .­'� ........ Reference to ill Contract Documetius.................. 3.3.1 Materials and equipment -- furnished by Qo\rrR_-\(-.roR .............................. 6:3 not incorporated in Work...................................14.2 Materials or eqUipan CIA --equivalent .... ....... 63 ,Mediation (OptionaI):_.,,;.q,,, ....... ..... 16.7 Milestones --definition of ............... _: .......... ........... J.24' Miscellaneous— Conil5uta ic rri R n ome,..... 11 ........ ....... 17:2 Cumulative Remedies.,,, ....... 17.4 G: ivin- Notice .... z ...................... ........................ Notice or Claim........._ 17.3 Professional Fees and Court Cosrs'Inclu'ded.1 ....... 17.5 MI ulti-prime contracts .... �; ......... �_ -------- ,J trot Shon7i or Indicated a3:2 Notice or - Acceptability of Project .................................... 14:lj Award, definition of ............. ..... ........ Claim............................................................ 17.3 Defects.13.1 Differing Subsurffice or Physical Condi tions, ... .. 4. 2.3 Tests and [nspections........................................ 113, Variat;ori, Shop Drawing and Sample, ................6.27 Notice to Proceed - definition of ...... .. ­­"­'­ ... ..... .......... I ... l:26 iv ai'� of _ ...... I ............. .......... ...................... 13 EJM; GENERAL COSUMONS I q 10-3 (1991) FDIIIO\l w/0TY OF FORT IRE V9/'r11) I I Notification to Surety .......................................... resting, indcperidcnt: . . .... ................... 13.4 Observations; by LNGINEM ........ usc,or occupancy OccupancV of the Work-.,. I 5-6.30.2.414�10 of tho Work... .... ...... �5. IS, 6.30.2�4. 14'. 10 Omissions or acts by CONTRACTOR., ... 9,13 written consent orapproval Open Peril policy form, Insurance ........................... �6.2 required ...................... .................. 9.1z03. 11.4 Opti6n to Repliye..; ......... a ....... ........... ...... i: 14 Article or Paragraph lqum i�lr I `:Or. Equal"Itums ............................ ; ......................... 6.7 Other work 7 overtime kilork—prohibition .................. 63 Acceptance at'djectivo Work ........................... 131.13 appoint an ENGINEER.. ...... A2. as Fiduciary ......... 1;-1 .... 1*1111, ........ ......... 11—:5-12-5,13 Availability of Lands; responsibiliLy .... ............... 4. 1. definition of ... ........................................ _11.27 data, furnish ... ........ ........................8.3 ,%.Lay Correct DrfMive Work: .... ; .......... ; ........... t3; 1 4o N-lay refuse to make payment. I .................... 1.4.7` May Stop the Work ............. ................... ........ 13:10 May Suspend Work. Terminate.,,-,., ........... Ij;IU. 150-15.4 . Payment, make prompt .................... ��3, 14�4. 14:13 performance ofuther-work..; ................. ; ........ .... 7.1 permits and licenses, requirements,_,,__,;_.,- &U purchased insurance requirements,;,,,;,,,;,,,; 10 ORWEWs- - Acceptance of the -Work ....... ...................... (�. 3 0. 2. 5 Changebrder-s, Obligation to cxectag., ........ 18.6. f0A Communications ............ ......... : ....... : ...... I Coordination of thc-Work, ................................... 7.4 pisputes; request (br decision ........... ................ Inspectionstests and 13:4. Liability Insurance ...,.., ....... Notice Or Defects ... ............... ............. ......... J3. I Represcntative--Dtirifig Construclion; FNGINFhWs iStanel 9. 1 Responsibilities - Asbestos; PCBs, P.etrolearn:Hazardous. Wmste or-Radianctive Material ................... M Change Orders, ...... ............... 8,6 Chanaes in the*.Wbrk ...... ...... .......... ; ...... 10.1 communications:_... ..... 1—.11-1 .... A I ........... CONTP--\CrOWs responsibilities ....... ............ �,9 evidence of Imanciul urrangements.. .... inspections, testsand ........... 1;7 insurance lands. and edsement5: ............. 8:4 prompt payment by ............................. 9.3 . *....S.2 ' 6f. . replacenientof�LN NEER, ............ .......... reports and tests...... ................................. 8:4, rt stop or suspend Work, ................. terminate CONTIR-ACTORs services — X 15 . 2 � rA - —-- - - sefyarate representative at Site ... ...... —­11 ......... 9,3 ti EJCDC (ZNERAL CONDITIONS MO-S (1990 E01 110N) wl-01-Y. OF PORT COLLINS M0r)1r1G,kT1CJN.i (Rr.V T-IM I I I Article or f-'arigraph Numhcr �lritteh fiotiu 9_4; 911, ......... * ......................... [1:--, 11.9. 14.7: 15A PcEts-_ detinition of 9 general "p'o"n*'S'i'*bi*['i'C'�*"('"or ....................... ........ 4.5 okvm��'s­r�*' ................. Partial Utilization -- definition of general &30,2.4. I-uo Property Insurance- .............. 511 i Patcn(Fccs and RoyalLics ........................................ 6.12 Payment Bonds Payments. Recommendation of._ . ..... 1 4.4' 14:7. 14.13 Payments to CONTRACTOR and Completion -- Application for ProgessPayllwins ............... ... 14.2 coN'TRACrOR°s Warranty of'ritic .................... 1.1.3 Final Application for Nyment,,.., ......... 4 r 12 Final Inspection ...................................... ........ 14-11 Final Payment and Acceptance ............. _14.13-14.14 . ........ 7.$.3. 14 Partial Utilization 14-10 Retainfige....................... .................................. 14.2 Review of App"IiMtions fur Progress Paym�!nts..._,-, --- ...... ;'...:.14.4-14,7 prompt payment ._, ........ w. 1: ....... ...... ............. z.._$3 Schedule of Values., ..... I ...... I .................. I ....... ...1,4.1 Substantial Completion .............................. I­I.S-14.9, Waiver ofClaifils 14.15 when payments due ... ............................ 14,4,14.13 withholding payfficni ................ 1-13 Performance Bonds ............................................. Permits 13 Petroleum— definition of., ................ ............. ................... j.3Q general........................... ................................. . 4.5 OWNTIR's responsibility far_,­­4­ 10 Physical Conditions— - Drawings ct, in -or relating to ......................... 4. 2. 1. 2 ENGNEFR's review : .... : W ....... 4.2.4 existing structures,..:_...-- .: ...... _I.: ------- 4.2.2 general4.2,1.2 ......................................................... Nroticc of Differing Subsurfice or 4.2.3 Possible Contract Docurn cnts Change Possible Price and Times Adjustments, �_. -4.16, Reports and Drawing.1 ............ _.: ..... I .... I .......... 14.11 Subsurface and ; ................................ .............. 4 3 .Subsurfacc Condition.s ...................... 1. 1 Technical Data, Limited Reliance by (_(5NTP,A,GTCiR Authorized 4.'-2 Underground Facilities -- general......................................................... :4.3 Not Shown or Indicaed ........ ........ 4. -1, 2 Protection of--., .............. .................. 43.,62(1 M Article or Paragraph Number Shown or fndi6atqd,,...,, --- ...... ...... . ......... 4,3t I Tcchnical Data... PreconsEructibR:Con fereneq,.... .................................. 2.3 Prcliminary Ntatters Prelim iiinry Schedules ......... ..................................... 2:6 Pilemiscs. Use of 1.6. 1 ".. 18 Price, Change of - Contract - ; .................. ..... ............... :11 Price, Contr�ict­dcfihitioil q( �_,, n ......... 111 Progress Payment. Application,; for,:.:,_ .... Progress Payment,retainage.., --- I .......... ------------- 14.2 Progress schcdl4lc, CONTRACTOWs ........... 7.6; S' 2.9. .......I ....... ....... 6.6. 6.,29;, 10. 4. 15;2. 1 Project -definition of.,...... .......... 1:31 Project Represenlztivc­ ENG1N=-Rs Status During Construct ion, ........... .9.3 Project Representative, Resident --definition of --------- 1.33' prompt payment by CAVWFR_.; .... ....... _.: .......... S:3 Property Insurance -- Additional ......... ........ .............. ................ %7 general5.6-5. 10 Partial 14.10.2 receipt and application of proceeds-,.., .... _.-5; 12-5; 13. Protection, SiWayand; ..................... : ....... t!i;40-6.21, 13:12 Porch list ; :;"'JAII Radioactive Nffncrial­ defintibn o� gencraW.5 OWNER's responsibility fac ............................. :,& 10 Recommendation of Nyme I nt ....... :..: ....... 14.4, 14:5,,14.13 R4:9rd Documerim .............................. .......... &19, 14.12.' Records, procedures for maintaining ............... 2..8 Reference Points._.--,,, Reference, to Standards find,Specificatioris. of Technical Societies,,,,,,,,,,,;; I ............. ......... R:gulfitions. Laws find (' of.) .... ........ ........................ 6; 14' ! RejectingpelLctive Work ...... ..9.6 li,_Ihted Work— atSite ........................................... 7.1-7.3 Performed prior to Shop Drawings ,and Samples submittals review, ... ........ ;.: .... 6.28 Remedies, Cumulative ...................... 4 17.4;. 17;5 Removal or Corrcctioh of0e ��thv Mirk . Y --- ............ J,';I I rental itgrecin cnts. O%VNER approval required ..... 11.4.5.3 replacement of ENGWEER, by OWNER ............ ....... 3. 1 Report.ingfind Resolving Discrepancies'........ ................ 2.5. 3.3;2: 6,14'.2 Reports -- .and Drawing' ........................ ;­ ...... .............. 4.2:1 and Tests, LAVINT--R's responsibility ,...,, Resident and Project Representative-. ve-. definition of ...................................................... 1.33 provisionfor,, ............... ........... ............................... 9.3 FXW (35NERAL CONI Ill IONS I11I0-S*([94O.EDI1lON.1 w) (-.1TY OF FORT COLLINS MODIFICAn ONS i REV 911P)) I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Article or. Paragraph ATum Fier Resident Superintendent, ClOiNTTRACTOWs ...... ._ :_6_2 Rcsponsibilit i,s, CONTR_,\C_TOTs-in-gcncral ............. ........... ENIGNEERs-in general ... I ................ 11 .......... Limitations on 9! 13 OWNT -:Rs-in,genera ....... Retainage , ---------- .................. . Rcus;c of I)ocumcnM _31, . .7 Review by CONTPAcrOR: Shopl)rawings and Samples Prior to Submittal,...,....,--, .. Review of Applications to - r PrUlgess Payments., .... I ............. ......... Right to an adjustment . . ................ ............. 1 Q.W2 .Rights of Wa) ----- -------- .......... ............ ..... 4.1 Royalties, Patent Fees and...,,,.., .................. ... 6.12 Safe SuuctuiallLoading................... 6.18 and Protection,_-, ..... 6-20-6.21. 7,'_� 112 general .......... -6-23. Representative, CONTPL\CTOR!s,, ......... ;: ........ J-21 Samples - definition ..... 1.34 general 24-6.2S Review bv CWM,\CTOR 6. 25 Rcview by FNGINEFR .............................. (�.26, 6.1-7 related Work .................................................. submittal of submittal procedures„ ...................•.. : ...... Schedule of prqgress .6. �.S-Z9. 6.6. Scheduli of Shop Drawi ' ng,and Sample Submittals .1.6. 2: 9 .9, 6,24 -6� .-8 Schedule of Valu"---. _'8-2.0, 14.1 Schedules— Adherence to I Adjustim...........................................................f1.6 Change of Contract Time%.: ........ ; ... 1� .................. 10.4 Initially,.,\cceptable,_'.. .... .................... :8, 2.9 Prc6ilinary .................................... I ............... ,...176 Scope of Changcti.. ..................................... 10.3-10.4 Subsurface Conditions 4.2.1:1 Shop Drawings— and Samples, general ................................. 6.24-6:28 Change Orders & Applications for Payments, and---._ .... ... ;,9,7-9_9 definition of ENGITNIRFR*.% Rppr6,v.ql of 3.6,2 : FNrGF_\TCER!s responsibility for review ............. ....... .............. _9,7, 6.14 i. 2S related Work 6:28 review procedures .......................... !.N, 6:N-6,28 M ArtiClerof Paragraph. Number - submittal required ............... ........ ............... _6:2:4_t Submittal Procedures 6.2 5 Use to approve substituti0l"..i ... :_ ...... ............ _01 7.3 Shown or Indicated ............................ I ................... 431T Site Access ................... 7.2. 13.2 Site Cleanliness .. ............... ­.11 .... 6.17 Site, Visits to- by ONGIN7CM .... ...... ........... by others ........ ............ .................. .......... ....... 13,,2 :'special causes of loss",policy form, insurance --- -------- .............. ....... _J-6.2 definition oC:..:::.::.:.:...:::•:,::.:,:.....-:,,•;.,._.::,,::,1136 Specifications - definition 1. of -technical Socictim reference to-__ ------ ---- *3;3. . I precedence,..-....... ...... Standards an ' d'Specifications of.Technical Societies ....... I ........................ -3 ­.­­ -3 Starting Construction. Before ....... 2.5-2.8 S6rting- the w6rk ....... 2:4 Stop or Suspend Work. - by CONFrRAc-rOR ....................... : ................. 1. 15.5 by QIV',,tEk,:-; ...... .... ........... _3. 8, 1.3. 10, 1 ;. I Storage of materials and equipment : ......... ......... 41, 7.2 Structural Loading. Safety ...................................... 16. 18: Subcontmutor- 'Cohcerning; ....................................... I definition of delays, _ ............................................................. 12.3 waiver ofrights........................................I. , SubconLracturs.-in a neral-....... Subconrracts--required provisions & 11, 11.43 Submittals-_ Applications for payment ................................ _1 4. 'Ahintenance: - and Olieration M5nuals_.,,...:,., --- 14:12 Procedures...,., ................ ............. ............ ..... r,6. ?j 6. 19 Samples........,.•................. M ............... 6�24A�29- 'Scheduld oWilues ........ ....... ..6 14,1 Schedule of Shop Draw ingqand Snmples. Submissions.,-_ 26, 2a;-2.9 Shop .......... I .............. 18 Substantial Completion- certification aC., .. . ..... 30_2.3, 14:8-14 9 definition of ...................................................... 1, Substitute Coristniction klethcds or Procedures._,__13.7. 2 Suhs6tute% and "Or Equal" Items ..... -------- „­___6.7 CONTR_-VCT0R!s Expense- ENIGINEER's Evaluation...., ..... ..... ............... 1 .& 7 3 "Or -:Equal......, ............................. ........ 6.7. 1; 1 .3tibsthuteCorstruction NvIctliodi. L,xm)c crNMkL CONOi rioss igio.s -11990 LDM ON) %V1 CITY OF FORT COLLINSMODIRCATIONS t.REV 9091 I I .Article,or Parauuph ,\lumber or Procedurcs._.. ....................................... substitute Items- .-� ..... ............ ........... 7 ....... Sulx�urfficc'and Physical Conditions -- Drawings of. in or rclainig to ......................... 4;-1. 1.2 ENGWEER!s Review 4,2;4 Limited Reliance by CONTRACTOR Authorized 42-.3 Nonce of Differing Subsurhcc or Physical Conditions, ...... ... Physical Conditions ...... ...... 7 7:-,4. 2. 1 - 2. Possible Contract Docuinenui Change ................ 4.2.5 Possible Price and Times AdJustracnis; �.2.6, Reports and Drawings_:-„--,....,_....._ ... - ......... 4.21.1 Subsurface and ............................ : ....................... 4.2 Subsurface Conditions at. the'Site 4-11- I. Technical Data ... .................................4.-Y., . . 'Supervision- CONTICACTQRs responsibUity ....... 6. 1 OWNER shall not supervise ................................. Y.9' ENGINEFIZ shall not sup ervLge ................ 9,*2. 9.13.22 Superintendence ntendence ....... 1- .... ......... ...... �6.6 2 Superintendent; CONTP-ACTOR!s resident ... ; ........... §.2 Supplemental costs ...............................................1 1.4.5 Supplementary Conditions-- defibition of .............. .................................. 1.39 principal rell!rences to ...... ... .......� 1, 11), 1. 1 S' 7,; 2,7; .......... .......... 44.3. i 1. -5.3, 5:4, 5-6-5 9 ........... A 1*. 6.8, 6.13; 7.4. 3.11. 9.3-9. 10 Supplementing Contract Ducumerits, ..... Supplier -- definition of .......................................... - ......... 1.40 principal references Eq ........... a.7, 6.5. 6.3-6.11. (j.20; 6.�4-9'13. 14.11 Waiver of Rights...... ......... .................... Stueiy- consent to final payment,,,,,,,,,,,,,,,,,,,,,,,, 14A2. 1.4.14 FNZGrN7FF.R has no duty to , .......... I ............ ...... 9- 13 -Notification o( 1,025.15:2 qualification of ........................... I ....... ......... ill -i.3. : SurvSurvivalof Oblwtuiuns.... 6.34 Suspend %Vurk-- OWNER Slay.-_ ........ ........... j3. W., 15 1 - Suspension of Work and CONTRACTOR'Miy StopLkVork or Tenn inate ............................. 15.5 OWNER May Suspend Work_ .... 5.1 OVY N31- R N fay Term inate 5.2-15.4 Taxes --Payment by CONFI-R-ACMR ............... 6.15 . Technical Data - Limited Reliance by CONTTP--\CTOR ................. 1.2. Possible Price and Times Adjustments ri, Reports of Differing Subsurface and Physical Conditions ....................................4.3.3 siv Temporary construction facilities .... ...................... 4,1 .-Vticle or Paragraph Number Term ination -- by co,\rricAcrOR ........ ... ..... -------- --- _1 5.5. by OWNER ................................ I ........ N:N: 15; 1-15.4 of ENGLNEERs C'mplcymerit ............................... $.2 Suspension of Work-in,generit ............................. 15 Terms and Tests and Irti;pections-r .Access; to the Work, by others_.___.,--, 13-2 CONTR.Acrows reslignsibilities 133 cost of 13.4 covering Work prior to .... ...... J136-137 Laws and Regulations (or) .................... 13.5 Totice.of De fcq� ... ...... ........ ;_ ....................... ' 3. OWNER Klay Stop ......... __ _13,P) e O�VL\TF.R's-indcpendnt,tes.ting .... I - . ;., .... .... ; ........ :33-4 special, required by ENGINEER ...... -.1 ............ ...9.6 tuncly notice rquired ..... I ........ - ................. Uncovering lhl:%Vork- at ENGINEER , Times- A�Jjusting: .............. ........................ ........... : ...... 6: 6 Change of Contract,. , ....... ........ 2 Computatiun 6� ---------------- 11 ....... z ...... : ".; ... --. 172 Contract 'rim us-,dernition uC, ............... .......... 1. 12 day........ ....................... _ ................ .......17.2.2 Xjil6tonusl_ ...... ............ .......... I ...... ...... Requirements-- Ippeals................................................. . 9-10, 16 clarifications, claims and (.1isputes IL-2, 13 Commencement of Contract Tirue�__,j :--;,2.3' Pretionstruction Craircrence., I ...... . 13; ... I ... I .............. schedulcs .......................................... 2.6, 2.9, 6.6 Startine,the Work--,., ..................................... 1.4 Title. Warranty cf,_ .................... Uncovering Work,,,,,,,,,,,,,,,,, Underground Facilities, Physical Conditions- * ... ......... ............. d,lifinition or ........:.....:....................................JAI ............. ....... JAI Not Shown cr fridiemed., :- - 4.3-1 protection of .................. ........... .4111, 6.-2.0 Shown or [ndicatcck 4.3.1 Unit Mee Work - claims ...... ... 11-9A definition of : JAZ' general 11.9, 14.1, 14.5 Unit 11ricc%-- general 11.3. 1 Determination for ......... ....... . ....... 9 1 iT Use of premises,,,........ .................... .6 16. 6.18, 6.30,24 Utility owners., ..................... G.!Y, 6.20, 7.1-7.3, 13:2 Utilization. Partial_....... ... LIS i 15. 6.30.2.4. 14. 10 Value of the Work- ...... 11-3 Values. Schedule of ................ ; ............. 2A 2.82.9. 14.1 EJCDC Q:NffltCONDITIONS 1910-3 (1990 ED111ON1 w/ CITY -OF FQR,rc,)i.i.rNS,\(Or)[FICATTO\'S (RFVWTn I I I I I I I I I I I I I I I I I I �1 11 I 1 H 1 1 SECTION 00100 INSTRUCTIONS TO BIDDERS 1 I I IVariations in Work--LMinor Authorized, ..... .. 6.27d.5. Aiticle or Paragraph ufaber Visits to Site —by ENNGLNTEER.' ........ ..............N! ..... 9:2' Waiver of Clainis--on Final Payment ......... __7_14:15 Waiver of Rights.by insured parties ....... I .......... 5: 11'.6.11 Warranty arid- Guarantm General --by CONITRAC.TOR .................... ................... 9U0 Warranty of fitli�. 6vork_ ,Access to 13.2 byothers,, ............... ...... ............... I ............... 7 Changes in the_ Contindim, the COMER —ACTOR Nfay Stop Work or Terra inate; ................................ 5. i Coordination of. .... ..................... 7.4 ---------- - - Cost of the,_:.:..:.:::....: : J:1.4- 11.5 definition of.--... ........... ­1 .......... .................... 1-43 neglected by QONT'rRACT OP ............. ...... ... 13.14. OWN M- May 'itop WorL*_, ..... t:............. : ------ IT 10 OWNFRIMay SuTend Work ................... Related, Work at Site ........... I ....................... 13.10, 15 1 - T 1-7.3 Starting the,. J.4 Stopping by CONTRACTOR ...... ; ............ Stopping by OkVl\TR ................................. lfi, 1-15.4 -Variation and deviation- authorized. vainor ..... __3.6 Work.Chan& Directive— chi]rus pursuant to., ......... .:' ...... ........................ 0.1 definition of ­.JL44 principal references to .... ...............35,3,E 10.1-10.2 Written Aniendment- definition of..--, :­.: principal references to.., ........... 1.0), 3-D- 510'1512� 6.S.2, 6.19, 10a, 10.4; .................... 12-1, 13.11-:1 14.7.2 Written Clarifications and interpretaLions .............................. .... 3.63. 9.4. 9.1.1. Written Notice Required — by CONTRACTOR ..................... ....... 7..1, by OWNER .................... 9: 10-9,11, 1014, IT11 113-14 I I I Xv I I UCCC GENERAL CONDI'T IONS 1910-S it M EDI IION`1 WC.71TY. OF FORT COLLINS MODJFICATIONi (REV 91991 I ('rb.is pas-c left blank intentionally). t:JCL)C GEN'fflIALCOMA HONS 1910-S 11991, EDIIIOVI Nv, kM OF FORT i-OIJANS'MODIRCATTONIS (REV 917A I I I I [1 1 u GENERAL COND-MONS .UITICLE I--DEFLr-ITIONS Wherever used in thesc:General Coriditions or in the other Coritmct Ducuments. the- f916ving: 'ferms.'ha'vc-'the [meanings, indicated 'which- are, applicable to .both the Singular anil.plural thereof- LL Adtieirda-Written or gmghic instruments issued pre to the opening of Bids which clarifj.,.corrcet or the Bidding Requirements or the Contract Documents. 12 :4grerntent-The wnrtcn contract h rivecri'OWNER. nndCONCRACTOR'ouvnring tfii Wurk to Ii pcTformcd other Contract 'Documenis are attached to. the Ag cement and made is part thereof as provided there in. 1.3. Application fi)r Pumient-The form acceptedby Fti'i7l�rF.liR which into be nscii by cowrRACI"OR in requesing preigr c¢ or final payments and which is in be accompanied by su6h supporting documentation as is required by the Contract Docuni m ,% 14. asbestos —Any material That contains niore than.ono pereenrasbesaosand is frlabte or is rieleisingasbcstos'fibers ta into the r nftiye current action Icvas esthllshed by'the Uniied Scntes Occurmi6nnL 'Sarety and, Health Administration I:�, Rid —The offer or. prufx)stl of the Hidder submitted on the prey ribed renn setting fonit the fieicas. for the Work to.bcperformed. " 1,6. Bidding. Doeimren&--The advertisemern or invitatton to Bid, instructions.to biddcM the Bid fonu,-and the proposed Contract Document; (ira:tuding all '\ddernla. issued prior to receipt of Dick). 1:7. Ridding Requiratnents--Thc, adyertiscment ex invitationao,Did.'i structionsao bidders, and the Bid roan. U.. Bonds-Perfomiiinee acid P(iyuentliondi and other instruments ofsecurity.. 1.9. Charge 'Onkr—A document reconunended by D- TO E,R- which is signed. by CONTRACTOR and OWi'.VER'and'authorizes an addition: deletion or revision in the Work, .or.an adjustmentin the Cuninact Priec cw the Contract Tunes, issued on or after the Ettictivc Date of the Agreement 1,11). Contract Ddcianents—The Agreemenl, Addenda: (which pertain to the 'Contract Dkvmenw).. coi\trRLACTCOR's Bid (including ., documentation nccompanying the Bid and any, puma Bid documentation submitted.prior to the Notice of Award) when attached as an exhibit to the Agreement, the Notice to,Procccd the Bonds. thew Genera[ Canditiorm the Supplementary Conditions, the Speeificaticros.ind. the Dnnvings. as the t.�CUCGENtiL�V, �O\UI'O tiD[i I9111J (I `Yla EeAtiuii n'/ GI'IY OFFOft�T Cl7LLl �.S AIOUIGIQ\TIO\:S IR[il' di�Ggiil same are niore specifically identified in the .\grcenicnr. together with ail' Written'Amendment£ Change Orders, Work Change Directive:, Field O. rdom and &NIGNEER's written interpretations and clarifications issued pursuant to ;paragraphs3.5:. 3 o i and•3.6.3 on.or after the Effective Date of 'the :\ereement, Sliop brawing siaii6ittis approved pursuantto purigaphs'-6.36and 6,27 .and the repcyts and.drawings refened to ire piraadph"s 4,2:1 and '41.1.are.not Contract Documents. CI I, Continct Price-Tlic' moncvs payable by OWN -ER O Rto CONTRACTOR forwmpleiion of the Wcirk in accordance with the, ContractDocuutentsas sorted in the Agrccmctt (subject. to the piocisions. of fxmmgmphl 1.9.1'in the case of Unit Price Worl). 1':2. Conhuct Tltms=The numbers uC days or the .daics.stated inthe-Agreement. (i) to.adiieve qubstantial Completion and (n),to complete the. Work' so that it is ready fir fiml prvment as evidenced by hNGINBFR'.s wntten recomrnendatioh. of [inal payment m accordance with paragraph 14,13: 11.13. CON'IM40OR—The person, Emt it corporation with whom OWNF;h. has enteredinto the Agmemcnt. 1.14, tLfrctma An adjective whichwhen oicdifying the wo(d'Wirk reters to Work that is unsatisfactory, faulty 6r deficient in that it dtcs not confomm to the Contract Documents, or does nor meet the rcquiremcats.af any inspection; reference standard, test or approval refcmred to in the Contract Documents.,ir has. been damaigcd prior to ENGIINEER's rominawndotion of final .payment (unless' responsibility. for the protection thereof has been assumed h} OWi IF.R it Substantial -Corn pieiion in a"ccoFdan5owith parnsmph 1 ass or 14.1 o), 1-16. Drawings-Thc drawings which show the scope, extentandcharacter or the WorL to be .furnished:und fxiforrned by CONTRACTOR and which have been prepared oi' approved by L•NIGIINEER.nnd are referred ti in the Contract Documents, Shop- drawings are not Drawings,, s so defined. L16 Cfecrive Core of Pie dgtvenrant-The date Indic ited In the', reeirienton which it becomes a[fective, but if no suclr date s indicateddit nieansiht date on which the s\greemeni. is signed :end dclivcred by the Last of the two parties to sign and 1.17_ CA'GINEE•R—The person; Linn or corporation named us such in the Agrecincnl: 1.13. ENGl..-12ER's Cotimiltant--A person firm or corporation having a. contract. with ENGINCER io furnish' seriaces as ENG fNTER's independent pio(essiunal assii.atte or consultant with respect to the 'Proleerand who is identified as such in the. Supplementary Conditions.. 119. rind niter —A written order issued by ENGINEER which orders minor changes in the Work is accordance with barograph 9,5 but which does not involve u change in the Contract Price or the Conimct Times: d:20. Genera/ Regdirenmtits—Sections of Division I of the Specifications, 1.21. Haaurtluus li•arte-T he term Ilar_irdous Waste ;hall' have the navaning.prbvidcd in Section 1004 of the Sotid Waste Disposal Act (42 USC-Secaign 690.3) as amended from time to'time: " 1 22.a. Lafrd unJRegidationu Luni%orRe{pilahons-;Any. and all applicable laws. rules, mgulalioits, ordmances_ codes and, orders. of tiny' and all governmen-Lid baes.. ngcncim uuihoritieramlcourtshavirigjuris eion 1.22.b. Lezal Holidmsw shall be those holidays observed by the.City of FortCollins I.23: Liernc-Lints. chargs. security interests or encumbrances upon real property or persoml property. U4. Wilegro(e- A principal event specified in the Contract Documems relining to an intermediate completion date or time-prior'to Substantial Gnmpletion of :ill the: Work. 1,25, Mae,! ofduVmnl—A written notice by n1,0113.k to. the apparent successful bidder stating [fiat uprm compliance by the apparent suoccssful bidder with the conditions precedent enumerated ilicrein, within the title. specificdl 011'ND• R wi Il sigh and deliva the,\Crcement. 1.26. Varier to Pri ;eec-A written notice giJen by OSVD!1 R to CCJYrRA&TOk (with a copy to F.'NGENF.F.R) Fixing. the date on which. the. Contract Times wilt commenec to rvnand on which CONTRACTOR shall start to p:rtnrm, CONTRA&OR'S � obligations under the Contract Docufficm. . 1.27, OIINER—The public body .or authority, .corporation, association firm or person with lvhotn CONTRACTOR has entered into the Agrcenient and for 'whom, the Work is to be provided: 1.23. Patiial Utilcuriot-Use. by OWNIER of I substantially completed par of'thc Work .for the purlx> for wh• ich It is intended (ora related purpose) prior to Subismntial Completion of all the Nark 1 =9. PCBs —Polychlorinated bipheryk, 1,30. Petroleum --Petroleum; including mrde oil or any 1}acuan thereof which -is ttipiid at. standard conditions of temperature and pressure ((;t) dcurees Fahrenheit and 14.7 pounds per square inch absolute), such . as oil, petroleum, fuel oil. oil sludge, oil refuse, utsoiine: kerosene and oil mi::ed with other non -Hazardous Wastes -and crude Ull:r. 1.31. Prafeci-The total construction of which the Work to be provided under the Contract D6ctanents may be the whole, or ti part as. indi.cated elsewhere in the Contract Documents. 1.32:a. Rurliouctive Jluteniul—Scarce: specia[.nuclear. or byproduct material as defined by the Atomic' Energy- Act of FJC'D''tiE?1F1i.V. CONUt'110Iv O t9-8 099V 2Aitipti. car CITY OF FORT (.)OLLI\S \IOOn•7C'.4BONS I RLVI iNnmi 19i4 (42USC'Section.20II ct stq:).n:; amepded from time to time. 1.32.b. RwVdur FForkinz Howe-ReIuilkr working hours arc defined as :7:00am'ta o:00tmt unless otherwise stxeifi ed in the Gineral-Requirements: 1:33. ResidentProjget. Raprasentati%v=The authorized representutiv _ of CNO MMFR who may be ass' d'to the site or any part thercolc 1:34. Sample;=Physical ecamples of mateiials, equipment..-or.workmanship that are representative of some portion of the %V6rk and which establish the standards by which such portion of the Work will be iridgccl 1.35. Shdp Orundngs All drawings. diagrams., ilhfsuuticrs. schulules and other data or mf6mmfion -which are specifically-prepare-d or'.aicmblcd hv'or fee CU�ITRACTVR and submitted by COYTRACTOR to illustrnte some,portion ofthe Work.. 1,36- Specificatioic—Thoseportions of the Contract Doeutncnts consisting of-uritten technical descriptions of materials, equipment, construction systems; stendards'and workmanship as applied. to the Work and. certain administrative .d tailsaliphctblcthereto: 1.37, Subcontractor---Ari individual. firm or corporation hnv,ing a direct cnntrrict with CONT R:\C' OR or with any other Subcontractor for the,perfodnance of -a lzat-of-the Work at die silo: 1,38. .Substandal Completion --The Work (or a specified'part the,reot)•has progressed to the pintwhere, in the opinion (if 'FNGIYF.FR as evidenced by ENGGVEER:s definitive certificate of Substamial Completion. it is sutiiciemly complete, in accordance With dtc Comae Documents, so that. the Work (or specified part) cart be utilized for 'for which it is imcndcd: or if.no:such certificate is issued, when the Work is complete and ready for final ,Hymen as cvideaced by FNGnrF.'FR's written remmmendmion of fimd payment in accordance, with pnragrmph 14.13' The terms "substantially ctimplete' and "! ubstimfially coniplctcd" as appliad'toarail or pail of thne[Work refer to' Substantial .Cbm pletion.thereof 1.39. Suppiementaty Conditions-'rhe prim of the Contract Documents whiieh amends or supplements these General Cundition!. 1.40. Supplier —A manufacturer, fabricdtor.. supplier. ctisirihulor_ materialmanor vendor having a direct contract with CONTR,-ICTOR or with any Subcontractor to furnish materials or equipment to be incogioiated in the Work -'by C ONTRkTOR or any'Subcunhactat 1.41. Ciirdergrprvtdb Fucililies—Al pipelines. conduits. ducts..cablcs. wires, manholes. vaults, tanks, tunnels or other such facilities or attachments. and any ,encasements containing such fudiiies. which have hcn installed undprgrotrnd.to furnish any of the Billowing services or I 1 1 1 1 LI 1 11 1 i 1 i 1 1 i i 1 materiiLs- electricity. ;ass steam, liquid petroteiin prixlucLs„ telephurie, or other comnuwctuiortti cable televisicn.sew•agc and drainage. riano' Hl. traffic'or other. control systemsor water. 1.42, fhpr price Work --Work to be paid for on die'bnsm of unit prices. 1:43. ftiofk;-The cntre completfd construction or tic various separately ideotifiablc p its thereof required to be Curnished tender they ontra(t Documents. Work incltides - and'is the result of perform-mir err furnishing labor and 'burnishing and incorporating matcYials arid equipment into the construction, and performing or furnishing scn-iccs arid furnishing doqumzksc rill as. required by the •(:ontmcr Dricthncrnts. 1.44: MaP,c Change ihncriee- \. w uen directive to CWNTkACfOR, sued on or atter,thc Effective Date :of the. Agecment and signed by OWNER and recommended by ENGINEER.,ordcnrg to addition. deletion or revision in the :Work, or- responding to differing -or untoresean physical conditions- under which the .}Vork ii. to be pertormed .as providei in paragraph 4.2or 4,; or zo emergencies under, paragraph 6 3. A Work Change Directive will not change the Contract Price or the contract Times. but •is .,evidence that. the;parties expect that the change directed or doconented by a. Work Glcmge. Directive will be incorporated in a -su.iequently issued Charge Urder following negotiations hy'the Partiesas to its eRecL A am•.. on.the Contract Price or Contract Tinies as provided in paragraph 10.2. 1.45 Wrizien,4nrrnhn.,nt-:A written amendntcnt.of the Comet Documents, signed by OW'NFR and. CONTRACTOR on or after the Effective Date of the :(greemznt and&nornnallg- dealing with the-nonengmcering or nontechnical rather- thanstrictly consu'uction-related aspects of the Contract Documents, ARTICLE ?-PRELL%RN:4RY':44ATTERS 'Delivery pfl3nriitvi- 11.. When: CO.NTMCTOR. delivers. .the esccuied Ao&nwnts to OWNER. CONTRACTOR shall also deliver to OWNER such Bonds as -CONTRACTOR- may be required to furnish' in acrorebince with paragraph is C. .Copies of Docun.1M1s.-. 23 OWNER shall rumish to CON -TRACTOR up to'(en topics (unless otherwise specified in the Supplementary Conditions) or the. Contract Documentsas are. reasonably neezasaty for.the execution of the Work Additional copies will be lurnislied. upoh rcques6 at die cost of reproductitm. Commencement a%Cpntrrrct Tinier Notice to Proceed 2:3. 'rhe Contract'rintes will commence to run on the thirtieth day' after the Etfectidc Date.oC'thi Agreement, or, tt('UC'tit'Nt7i:AL CONUI'TfON3't91o5 (I7111 EiGtiuii u7 QYY OF FOP, r COLU NS ]toolFlcA nONS a(Ev iron(s) if a Notice to FYoceed is given on the day indicated ut the `oticc�to proceed. A'Natice.to Proceed maybe given at any tine within thirty days aderdie Eff&di" Date of.the rlgrecm a n(.—Fa-rri�eveteF-we4l=tiro-t:ortttret=Fitnrs cemmar».e-tFrriurlater-than-tiro-s+htktttda}-aftra•-thr-�lu} .of=Bid openipg•ar-tha;thiriiath dev eljer the Ftfectivt-f�atz ef•the:4ereemrnl>whichzver-datris�esrliar: Starring th a Nark: 2A CONTRAC7OR shall start to perform. th'e, Work o'rr the Site when the Contract 7imesm comence to riot,. lira no'Work shall be done at thesite prior to the date on which the Corivact'Times commence to nun •llejprz Srarruig Conirruction: 25 Before undertaking each part of the Work- •CUisr[:AC'rOk shall camfully study and compare the Contract Documcnts and check' and verify pertinent .figures -shown therein and all applicable field mensurcoicnts: CONTRACI'OR shall promptly rep6r in w'riungao H'NOINF.HR any conflict, error, ambiguity or discreliancy- which COMTRA(;TORt may discover and shall nbtltn a -'written imcrprctanon dr�clarthaation.from. ENCUNFGR hefnre proceeding with',ain Work affected therchy. however, CON'fRA(:I'OR shall not be liablc,w OWNER or ENGINEER for failure to,iepon,an}'contlict, error: ambiguiiy .or dcrepancy in .the Contract 'Documents, unless CON'fRAUl'OR, knew or reasonably should have known. thereof. '' (. Within ten days after lire Effective, Date, of the dareement (unkn ot6nv isc specified :in the (iciter±l Riquircrnents), C:ONTRAC•.OR. shall submit to LNG(NEL•R for review; 2.6.1. a preliminary- progress schedule indicating rho times ,(numbers of days or dates) for starting and completing the various stages of die Work; utcluding any Milestones specified in the Contract Docuttiznus, 2:6.1 a preliminary scheduleofShopC1mwing end Sample submittalswhich will list each required subm itta l and the times Cor subm ittmg, rev iewing anti proussing such submittalt •i:6.2.1. In no else will a 'schedule, •be eeceptable, which allows less than _^_ 1 calendar days for each review by Fn^_ineer. i6..3. A preliminary schedule of, values for all of - Work,. which will include quantities and prigs of items 20-egating the Contract. Price and trill subdivide the Work into cpniponentparisin sulLcien i detail to serve as the -basis for pnxaress.ptyments' iltring construction Stich prices will include an appropriate`amountofoverhead and proGrapplicablr to rrch'item of Work. .7. Before :any CVork at the site, is startcd: CONTRACTOR arxl-CW4' , 8 shall each deliver to the a heF OWNER with copies to insured i:kntiGzd-ire-t4ie-St}pplamenmrCaaditaons ENG(NEFR 1 certificates of nsumnce (and other et�iderice of insurance. sh-sit;•Kr—ai-a';e;n—eFany-iidcliiional-insuizt{—mtrF F< requested by OIWi ERI- which CONTRACTOR -twJ F? 6lrrw iwtivc4y are is required to :purchase and maintain. in ace:ordanee with plartgmph^ 4446•and37. Preconstruction Conference:- '_`,3: Within twenty dac s after the Contract Times start to run: but before any Work at the'site is started, a codererrCr. attended by CO\Z'R.4CTOR. EI;GNFER and others as appropriate will be held to establish a working understanding among the parties as to the Work and to discuss the schedules referred to m. paragraph 3.6, procaiures for handling Shop Drawings and other submittals processing Applications for 'Payment and maintaining required records_ lniriallpAcceptable Sciedulev. 291. Unless otherwise provided. in the Coraracb Documents, at-least-ten-dsys-hef<xrsutmli::siart-a€thz-Fist _-\pp4isntion 16r-l§t}T+)ent before my workitthe sits Ixeins,. a, conferenei. attended by Y ONT RACTOR, PNCINFF.R. and other as apprepr ate designated bin- OWNER will be held to rev icev for aeaptabahty`.to I'NGINFER as provided below the schectuhs. sub noted in accordance with paragraph 2.5, and Division I grieral Regtbirements;, CONTRACTOR shall have an additional ten days to make corrections and adjustments and to complete and resubmit the schedules. No progress paymcnt- shall be made- to CONTRACTOR until the schLxlu'lcs are submitted to and acceptable to ENG1i1FM as provided. helow. The progress schedule will be acceptable. to F.NGI, TF.F.R as providing • an orderly progression of the Work. .to compitarin within imy speciticd Milcshines and the Contract Times, but such acceptance will neither impose on C-NGlY— a-R' responsibility for the s<quencing scheduling or Irogress of the Work riot interfere with nr'relieve CONTRACTOR trorn CONTR CTOR's full' responsibility therefor. CONTR\CTOR's schedule of Shop.Drawing and Sample submissions will be acceptable.- to F,NGI\T.FR ins providing a workable arrangement•for• reviewing mid, processing the rcquMal sttbntinals CONTRACTOR's schedule urstilies ivill be acceptable to CgGDMERnsto.form andsubsrance. .ARTICLE'3—COiv TRACr.00CU.NTENTS: I\TENT; ,4,%MN'DLNG, REUSE' Intent 3,1. The Contract Documents ceinprise the entire: acu•eemenr between (DWNER' and CONTRACTOR Wince run_ the W6rk. The Conlydct Documents are: cr)mplemcmap'; what is txllZXl for by one is its binding as_if ealled_for by all. The Contract Docianents� will be construed in accordance with the law of the place of the - Project. 3,2. Ir is the intent .of the Contract Document- to FJCDC GENEILw, CONUrr10N3 17 Uhs (l!A)V Edition wICT1T OF FORT COLIA S M00MCA FION51REV d r2a(xl) describe a functionally eompltae Pfojequ(or part. thereof) .to be constructed -in accordance with the Contract Documents. Any'WoilL material's or equipment thatmay m reasonably be inferred froIfie Contract Dgt•trmerrta or from prcvualinu C'Mtbm oiirade usage as being required to produce the intended' result will be nmished and performed whether or not specifically.called for.. When words or,plusses-which-have. a well known technic l or construction industry or trade meaning. are used to dcsvnbe Work: mat"or equipment such words or phr s!, s. shall be interpreted to accordance. with that meaning. Clari(ctuons und'interpretntiors of the Contract Documents shall be issued by DIGINEER as provided in . paragraph 9.3., 3.3:; Reference; to Standards and Specyzendon.c, of Technical Societies, Reporting. and Resolving. !hs'crepan ties: . 3.11: Reference to standard;. specifications, manuals -.or -codes of aiytechnical socigty'. onninumtion or.assnointi n; or to the Laws or Regulations,of'tiny govemmenual. auihoriry; whether .such rercrence be sliLcificc or by. implicnoon, -shall mean the latest standard- spcci R.-ition, manual;, code or .bows or Regulat ion it>'et (scone the. Nina eif opening o6Bids.(or; on the M&tive Date of the iNgreemem if therewere no Bids), except as may be otherwise spcei, ically stated in the Contma Documents, 33 If during the performance of the Work, CONTRACTOR: discovers any conflict emir, ambiguity or discrepancy within the Contract Documents or between the, Contract Documents and any provision of any such Law or Regulation applicable to the perfomtnttee of thq.Work or of any such standamL specification• manual"or-code or of iu)y .instruction of any. Supplier'iefeded to-m paragraph 6.?. CONTR\CCOR shall report it to ENG rRIL•ER "art writing at once; and, CONTRACTOR shall not proceed with du tVork nt7gcted therehy (except. in an emer ency asauthoriixd by IrtmtR•aphb 23 �) until an amendment or.supplement to the Contmct'Dccuments has b vn issued'hy one of the methods instigated in paragraph 15 oir3.6; provided, however. that CONTRACTOR shall not be ;liable to OWNER dr ENGINETR for tailurn to report any such contlict. error, ambiguity or discrepancy fades CO fTR0.CTOR 'knew or reasonably isfiuuld have known thareof. 3.3:3. Except as otherwise spe_cilically slated in the c'6mmut Documents or as may be provided by amendment or suppldmentthcreto isstied by one of the: methaLs indicated in parnmaph'3S or 3.6, the provtsions. of' the Contract Dccuments shall'_ Lake prcciitence in resnh'ing :any conblicl..erur, ambiguity or discrepancy between the provisions of the Contract voctm taa:at d: 3.3.3.1. the provisions of any such s6mdarl, speaticanon m• fivaL code -or innruction (whether or nouspccifthlly'incorpormed by reference in the. �conrract Documentts); or 11 1 1 7 !I I 1 t .the provisions of any such taws -oF Regrilations tipplicable. to the: performance 'of'the Wort: (unless' such an 'interpretation of the provisions.of the Contnict Documents would S:SaIL in violation of such Law or Regulation). No provision of any, such standard- specification; manual„ code or instrutaibn shill be. crfcchi c to change theduties and responsihibuLs or Ow'NfiA, CON412.a toe or ENGINEER ,or any of "their subciouactors, consultants .agents or employees from those set forth in the Contmci bkeumenta; nor shall it Ix effective to assign to til\'N .R, WWGINNTER or am of F1CiP IEERs Cdniultlnts, agents or cmployccs.any duty or authority to suFerviu or direut the tumishing", or Ixrfonnunce of the Work or -uiy duty, or sulhonty to undertake responsibility inconsistent with: the provisionis.of paragraph 9.13 or any other provision or the Contract Documents. 3.4_ Whenever intho Contract Documents the terms "as oidercd%.'as .directed", "ns required% "as'allmvcd "as' approved or terms of like effeee or impart are used,or the adjectives reasonable' suitehla" acceptahlr proper" or "satisfactory" or adga uvcs of ilke-cffca or imjurt are used to, &sdibe" a regturcmcnt, direotior, .review or judi7nent of�GLV't.:,GR as to the }Mork- it is intendlcil that such regtnrement..direetion, review cr judgment will' be solely to ewduate; in geii ral• the completed \4ork for compliance with the requirements of and.infurmatoon'in the Contract Documents and conformance witty the .design concept of the completed project as a functioningwhole'as shown or indicated in.the Contract DocumertS(Unless there is'a spt!Ufic statement-indimtht ,othent isc). The use of any suchaemr Or adjective shill nofhe effective tti ttsslgnio L•i`!GLNUER an-v fluty or authority to supervise or. directthe; fumuhirr; of p<rfotmmnce of the Work or any duty or authority to micertake respohsipilitr conirnry tdi'. the provisions of paragraph 911 or any other prpvisiim of the Contract Documents. 4111enrdjnq and 5'upplernenti ig,Cmrtrncr Dmumenli 3.5. The Contract Doctunents may be amended to provide nor Yddotiums; delctoon .and revisions in the Work: Or to modify the terms and conditionis thereof in One or mire of the Utowing ways 3.5. L. a for al Written Amrntlment 3.5:1 a Change Order (pursuant to paragraph I01:4);. or EAMCUENkItAL19HS(100 Eillicru MCI rY or FOR C0LL1lvs aiouaaC.a-nnus asLv.irouu 3.5.3: a Work. Chnnic Directive (pursuant to 3.6_ In .adldition the rota foments of the CuntrUt Documents: may bt supplemtaitecL and minor variatio-m anal deviations.in the lVork,mny be authortnd, In oue or more of lhe.l'ollowmiz ways: 3:6. h. A -Field Order i;purwant to paragraph 9.Sj: 3:6,2. LNGRNEER'sapprgval,ofaShop* Drawing, or 'Sample (punuant to parat�aphs 6,26 and o:371. or 3,6:3: GNG1iVEER's written utterpretafion. or clarification (pursuant to pariv,,rtph 9-4) Reitse;of Uxxrrrents:- 17. CONCR:\C1'OR, and any Subcontractor or Supplicr'or other person.pr organization .perforating or furrtihing, any of .the Work. under a, direct. or indirect" contractwithOWNER O shall not have or acquire tiny I itle to .or ownership rights in any of. the Drawings, . veificatictis. 6r other documents for copies of any .thereof) prc fnred by or bearing the scal•ot l`N[ INEERdir E1vCrINFEl2's Consultant and (ii) shall not r u t driyaf such IJnwings. Spccoticntiorts, other documenm or copies on cttmsiaris of the Project or Amy other project without writtm-conwrit of OWNER and ENG IINI "ER arid.specilic written verification oradaptationhy HIA NE;t:R. ARTICLE J--AVAILABfLITI.OF-L.%-NDS; StASURFACE :wvYD -PHYSICAL' CONDI;CiONS; ,REFERENCF. PORTS .: tvailabili(v n%Lahiifr 4, L OWNER shall. htraiish, ns indicated in the Contract Documtnts. the land% upon which the Work is to: be. performed. ri ht"t--way an(] easements for accYcs dicicto, and such other lamfs which:predesignated for the .use ofCQNTC,,\CTO2-6`portreasinstbla-ti'ritttet-request: OWNER shad idtti fy an), encumbrances or rcitrictiens not of general aptibcatton buts pccificnllyrClaIed to, 611e'bf lands so ftunished u%itli ivha CONTRACTOR bill have to comply. -in performing the -Work. Ettsemensfor permanent structures or permanent shim ts'in existing facilities will be ubl final and paid tie tiv t RVDNER unless otherwise provided .ih the ConlrcC Documents. If cowRAC-rok. and OtVIKElk aretunable to ugec on entitlement. to or the amount. or extent of any adjustments in the Contract Price or the Contract Times as a result of any delay in QWDiER's fannishing theselands, rights -of - way or eascmems. C-ONTF,\CTOR may make a claim therefor as provided in Articlos Ip and I ' CONUR, C'TOR.slnll provid_ e fur all ndditiorml Lands ariJ indicated'in the Contract pc,;imiriK or access thereto that may be required for lempomry, construction facilities •oi storage of -materials and 4:'.3.4. is of an untea ul nature, and differs equipment materislly from conditions urdirwily encoumered and generally.rccognized as inherent in work of 1 J. ': Subsur ce anti 'Irji¢cal Conifition_..' the cliamcter provided for in( the Coraiµct -Documents:. then 4.2.1. Reports iind Druwitigs: -Reference is nmde to the Supplementary Conditions for identification of, CONTRACTOR shall, prwnptl} immediately atler -,and becoming aware )liar cif befar further disturbing ' ;}? l 1. SubaTiof ce• Cnrrcbnurrs. Those reports of conclatons affecret{ thereby' or performing any Work' m explorations rind tests of su6surface.eonditions at or connection therewith (except in an emergency as contiducius.to the site that have been, utilized by. permitted by paragalth,6:13), notify OWNER ..and 'such, EVl'+L�-EER. in preparing the Contract Documents., EIGIMm EER to ttmg about condition. and CONTRACTOR,shall nor further disturb such conditions ' ar,pertorm any Work. in connection therewith (eeccpt'as 43.1 ': M( :iacul' C'undi!ions.. Those drawings of aforesaid) until receipt of written order tti do so. physical candiuons in or rchtinit to existing surface oT subsurface �stntciures at or contiguous to the site 4 2.q EVGINEER'S Rervfe�v;L UIINE?ER will (c.sccpt Underground Facilities) .that hays been promptly review the pertinent aronditi'ons, determine the , utilized b EIGNEER in preparing the Contract necessity of OWNER's obtaining additional esplamtioncr Doctimenis, tests with respectthereto and advise (1WNFR in wramg - (with a copy to CONTRACTOR) of ENULNEF.l2's 4.22 Limited Reliance by C0Ar1TNC77.Jlt: dndturn ett findingsand conclusions. nlclimcai .tiara: coNrkA(,T6R m y rely upon the generaPaecuracy ,of the technical data' contained in suchi 43.E Patsible Contract Docigttei.mv, -Clionge: ,If ' reports and drawings. but such rejmrtsand drawings are not HNG1NHER concludes that a change in the .Contract Contract Ncuments. Such "technical daw" is identified in Documents is roquired as a.resultofa condition that.aieets tho Stipplemenn, Caniitions. Except forstich reliance on one or note of the categories in paragraph 4. S3. a Work ,such "technical data"; (,'0WRACTOR may not rely upon 'Change Directive or a Cangc Order will he issued as or make any claimagninst OWNER, HNGINF F'R or any of provided in Article iti to reflect and document the ' ENGINF..ER's Lonsuliants with.rL.*ct to: consequences of such change, 42 , i. .the completeness or such reports and 4.16: Po.t4?e Pace and I+nt s A, urtnrenrs An drawings for CON7R\CTOW'a purposes, equmihle adjustment in the Contract, price or ins die including, but not Waited_ to -env aspects of the, Co&i ntract Tunes, or th will be allowed to the extent that ' means, methods, techniques. -scquuaccs and the existerice, of such uriEovetcd or revealed .condiu6n. proczchires of construction to die cinplowd :by causes an increase or decrease -in CONTIL\CTOR's cost COt'TIL%CTOR and safety pricduti and of or Lima required fur performance ohthe.'.kvork; subject, programs incidentthereto_or Iwwctcr to the tollowing: 4.2:2.2. other data. interpretations opinions 4 16. t. such condition must meet any one or and information contoinedinsuch reports orshown more. Of thc.. categories 'described in 6r.indicated in such drawings or pamgmphs4':?.3;1 through'4,'_:3,4, inclusive.- 4 '3_ .any CONTRACTOR interpretation of 4.2.6.2. a change in the Contract Documents , or conclusion drawn tiom any ...lchnical data" or pursuant to paragraph 42.5 will nut be an any such data. interpretations, opinions or .automatic authorization of nor a '66nduioin. inforiation. precedent !o entideinent o ;iny such atdjustiiicn[t 3:33 Nbace rf D1%erinng Subvgfzce or Physical srR 4 `,6.3. with respect to )Vick that is paid for Unit Price Basis. m Contract' ' Conditionsb: :, if CO\CE`bR believes dial• any subsurface or physical ennditibn at or contiguous io the site onp. my adjustriera .Price will be subject to the. provisions of that is uncovered or revealed citha; pamLjaphs 9,10 grid 119: and +2.3.I. is of suc_h'it nature as to establish that 4.2.6.4. CONTRACTOR'shaldnot be entitled ' env trcluur:wl eati" on which CONTR\CTCA is to any adlusunent in the Contract Price or Titvrs- entitled to -rely as provided in.jiaraiTapfe d!_'..r and if. 4 2_ is materially inacctiidte or 4 6 4.1. COV TR4C.Tt3R knew of 4.2.3.2. is of such a nature as to require a. the existence of such conditioins at the ' change in the C.ontmct Wcuments. or lime COhil RACfOR made a final commitmcnt to OWNER in respect of 4.133, differs ma;erialiv from that shown or Contract Price and Contmet Tinies by lac 1 FJC`UC c;ENFRAL CONUf710N5 U W Y (1!ivV EcGiimi 0 uv Cl'[Y 06 FOft'f COLLI:S�IODIf[C'.i ff0\:S tl2L•v •ipnnU)' LI submission of ri bid' or becomutg •bound under a nrteotinted contrai:i; era= ' 4:16.Q?. the cxisaence of such condition could nnasonably have itxn discovered or revealed as a result of any, C•.`Gminstion, Investa_L•auon, " ex'plorat19ni. test or study _of ate site and `contyurnts arias rcquiied by the. EitdcLng. hcquacmcnts or Cantrabt Doeumems to be conducted bv'or.for CONTRACTOR prior to 'COAT \CTURs making such Emir commitment; or ' J 2'6-# 3: CON rR ACTOR failed -to givethewritten nonce within the time and ,us required bypumgmph 4.=.3. If. OWNER -and COYMAC717OR am unable to a tea on entitlement to or insto iheamount or lersth .ot an} such equitable adjustment in -the Contract 'Price or Contract rimes, a claim may be, made therefor,ns. provided in Articles I t and- V2. However,.0W1?H)R, ENGUNEER' and ' E•atfilNEFfss Consultants. shall not be liable to CONTRACTOR R thr any claims, -costs, losses or damagts sustained by COv7RAI TOR on or in connection with�an}' otherprotcet or. anticipated'prolect. ' 4:3. Phviica('Conr6han5--Utrrle oroun(l.Fnc+hrtec: 4.3. I. Shokm or h+dicated: The, information and data shrAvn or .indicated in the: Contract, 0o' cements with respect to existing Underground ,Facilities at or contiguous to dic slue Is bascd on information and dam NmQiied t9 OWNFP or FNt:iwFFR by the owners or ' such I Indergrouml Facilities or by others. Curless �it is otherwise expressly provided at the Supplementary Conditions: ' 4.3 1.1. 0t4tiER aid ENGINEER ,hall not be responsible. for the accuRicv or completeness of ally' suchnfumtation or data; and • ..3.1.Z, The. cost arks II of the totlowmg wiII he -include) in the ContractPrice 'an&CONTRACT0R ' shall have full responsibility .for: (i) reviewing, kind checking all such intontiaiion and data. (ii) locating all Underground Facilities showmor indicated 'in.the. Contract Documents,(ii) coordination of the Work with the .owners of wets Underground Facilities ' during .:orururuction; and liv)the `af tv and protection of all such underground Facilities ;as provided' in panigmph6:2rl 3md repairing any damage thereto resulting Goni lhe,Work, ' 4.3.2. .tot 5lrrlitn-ur'liriricatdd.' Ilan ' Undergrotnd Facility' is uncovered or roTerled,at or contiguous to the site -which - Was not shoK•n or indicated in the Coittmct Da:umcnts. C:O\TRACTOR shall. promptly immediately after becoming iiware thereof kind before 'or, further disturbing conditions afficted thereby -in rx-rfonn ng any, Work connection therewith (swept in.,an emergency as required by para,,mph r._3)., identify the. owner of such Underground hiaciliryy and EIcUCOE\hiGiL CONUriI O:u l91 VS (17)rl Ectiliuo •.el CITY OF FORTCOLL1:,S MOUINCa nONS (RM1 •IconOJ 1 give written notice to that owrer.and to OWVCR and. I :GNMR_ LTFGMTTEER will promptly review the Underground 'Facility and determine tlae extefi • if any, to which a. chance is required in the ConLract Documents io.reflect and decumcnt.the con quences of the existence of .the Cnderground Eacilin:_ if LNGLNCCP concludes that a•chtnuc in the Contract' .Documents.is reyuiml. a Work Change Directive -or a Change Order will be issued as provided in Ariicle-'lit to rcaect and document such consequcnccs During such time. CONTRAC_''rOR stuill be n.sponsible'for' the saCeiy end prottection of such Uruleatgound Facility as. provided. in, pamgribil 6.20. CbNi TRACTOR shnN may be atowed an increase in the Contract Flice or an ex-ieasion of the. Contract Times, or both, to the �Ntcnt that they are'attributahlc to the existence of any Underground Facility that was not shownor indicated .ih the Contract Doduments and that CONTRACTOR did not knob• of and -could not reasainably .save been expected to he aavare of Cr to have anticipated..If OWNER and CONTP ACTOR ore unahle to'agree on entitlementto or theamount or length of any such adjustment in Contract Price or C ommet Times f.ONTR \C l OR•ma} make a claim, therefor is Provided in Amcics 11. and 12. 1-lowever, OWNTR, FNGf\TF.FR kind 6NGINI F,F.R's Consultantsshall not tie liable to C(jNTRA(3rOR for any claims, costs, losses. ordamages incurred or sustained by CONITRACTOR•on or in•coftmcuQn %�i th . nq tither project'.oi anticipa4d project Referwice Pointy.. 4.4. QWNFFR shall provide cnainecnny surveys to .esahhsh, reference points. tot construction which in L.VGL ER!s judgment are necessary to enable CONTRACTOR l6 , proceed %&h ilhc Work. COtdTIL\CTOR shill' be responsible, for. laying out the. Work:,shall prusect and,preserve the established reference -poulL9 kind shall make nochangesor relocations without thc:.pnor ivritten.approvail of QWV ER. CONTRACTOR shalt report to L�IG -ER whenever any reference puint is lost or destroyed or requires relocation because of nl cassary •clamgesin graded or loistiorm and shall' be responsible for the aCCufate replacement oroilocation of such reference 'points by professionally gtiiblied Personnel. 4.5. .46-bevosr, PCBY. Ntroleuna Hazardik" Waste or Rarioactive hfatennl • 4.5.1. •OWNER: shall be responsible .for any A3bestciv PCP-S.. Petroleum„ .Hazardous. Wavle or Radioactive Mitterfat uncovered or revealed at tie site which wits not shown or indicated n Dnnvings.6c Spculicatioas or identified is the' Contract DdwumenLs to be within the scope of, the Work and which may parent a substantial dancer to eP property exposed thereto in cunncction ivith'the .Yolk et the site. OWNER shalPnot. be responsible for:ny such outdo dt brou=hc to the site -by CONTRACTOR, Subcontractors Suppliery or anyone else. Cor whom CONTPLACTUR is. reslxinsihle. - F-F�Elt�i a sY F peel------ -- 6dV ati t RegulatiorL�-n',4'iv F,R-,ha II-uiEkm ru fy-Ball-txrld ImrEmless---69N-TRACGOR; Sultonimcter s;. otTiuers—d'ueetoea-em plover,—ugcau—other cvroultaflts .u;d-suL>ix<rarastors-�f.-each-and-any-of them- Crom-aixl-s_aihsE-al I - chi ims-cvstx-lvxsrs-_wtcl dElllln�y25---aE'LCIEi?-ONf-Jt-tH-reSEllElny GonE-sash ha aEE.IvusaeniSHter�pr<�-tdrd-thnl�(r}any-�ujvelutnr yE-lvss-br-Jemn^rts-eEUibutybttty-tttldv-mjuEv;, ciaknese^• ,r.: • ` e�-detsr-iwrijttEr-urrrF-dstrrt�Etien of'-tarty-,t'lda-pE�eEEi-t;�Fhre-EiEeri-:ho-L<<+As-iiseltl, includ irt�-the-l�=qF-trsii result ing-the re Gurre-and (ii}ttvtf»ru-inrthts setbpartzyraph ��: 1-slwl}-ebligala Cl\tiVGR to•tndammfy.arty-pe-surroi`erttitwfitltn•nrid a_y9trei-Eh.�eFlszyue; st�R-tltet-peEwrrs-eE enttty=5 OlYR•(Mgll`.tMO: �. L• r{,�„'dFk512(i5-c'>�pfEr'i.�iaf�'-.... _'�r�--�.v�'t '.J-aFC neHfl �i"G!tided-ic�4p�:'-it+�SlYSFd9-P�,=Ri>-R�etiE)I2ttF1F iRaraFduas-�4ash� E>F-REddiettc-EtH�[trkriitl-w>tcveFei! .oF-rxvtvtkdAr if ,Aire- •� icvc i;euexu. co;:urn ols t � fos tl r�o e�;eai l sJr Ca'rY OR FORT WS1t:S \IOUa•lCA'f10;15 tRGY agfinnl AKELCLE 5=L)ONDS'AiNE),L\S(i.RrVNCE. Performance. Parntent and Other Bonds: 5.1. CO\ rR:\CTOR.shalI furnish' Performance and R)yment [36tds. eadr in tin mnuunt.at,leau equal- to the Conti act Price as security for the faithful'Worm rmca and payment of all MVL' Vf F(Xs obligations' under the Contrua Documents: These Dbndi shall reriAinirtef ect at legit until, one year, after the dale when final payment becomes clue, axcept as provided otherwise by Laws or Regulations or by the ContractDa:tim Brits. CONPFACI'OR shalf:also'funish such. other Hords as are required by the Supplenientvyfinnditicine, AH Ponds shall be to the Corm prescribed by the Contract Documents .rccpt as pmvided otherwise by Laws or Regulations, and, shall be executed by such surcttes.us are, named ;in the; current list .uf Companicc Hnldino Ccrttiica[es of Authonn as Acceptable Sureties oft Federal Bonds•arld.as- Acceptable Retrsunne. Companies" as published in Circular 371, (amended by dic ,.Aud;i.'Stdif. Bureau ,of Government Financial Operauoaq US'Tressury Depaamncnt All Bands :qig cd by an agent must he nccvml7,.viied by'n. ccriitied wpy of such agems authority to aeL ff the surety on any Bond Curtshed by CONFPRACTOR is declared abankrupt- or .becomes insolvent or its right to do busirieim is terminated in any state where any pan of the Project is located or it cranes to m.at•tlu requiremcnts.of paragraph ?.1. COMB;\CRQR: shall.,ivith, tat davi thercallcr substitutes another Bond ;md surLy,.both cif which mu4 heacceptable µ) OW_NTR. 4;3.. Licensed Suretid'an f Insurer; (.Lrfifwres of In,vurrtiree:. - 5.�.1. All Bonds and' insurance required -by' the Contract LhxtiliienB to lx,purchtised and maintained by OWNER or CO\F MACTOR shall be otitam"'ed from surety or insurance comparues'th.•It are duly I,iucnscdornuthorized in the!jurisdiction.in which die Project is located to issue Bonds or insurance policies for the limits and wn eiakes .�o required. Sueh surety and irtsurtnee -companies shall. alw meet such udditiomtll requiremems and qualiticaliomas may be provided in the Supplementary Conditi6n& 53' CONTRACTOR shall dcli4u to OWNS waft copies toe ichadditional'insured idenuticd in the Supplemcniary.ConcGtinms, certificates of insurame land other evidchce of insurance requested. by OWNER or any, otha' additional. insured) whitli CONTR4CTOP is.required to purchase'und mminutiri in aCLordanct tclth tar daph 5.4. UWNGR shall 11 t 11 1 [I SECTION 00100 INSTRUCTIONS TO BIDDERS 1.0 DEFINED TERMS Terms used in these Instructions to Bidders which are defined in the Standard General Conditions of the Construction Contract (No. 1910-8, 1990 ed.) have the meanings assigned to them in the General Conditions. The term "Bidder" means one who submits a Bid to OWNER, as distinct from a sub -bidder, who submits a Bid to Bidder. The terms "Successful Bidder" means the lowest, qualified, responsible and responsive Bidder to whom OWNER (on basis of OWNER's evaluation as hereinafter provided) makes an award. The term "Bidding Documents" includes the Advertisement or Invitation to Bid, Instructions to Bidders, the Bid Form, and the proposed Contract Documents (including all Addenda issued prior to receipt of Bids). 2.0 COPIES OF BIDDING DOCUMENTS 2.1. Complete sets of Bidding Documents may be obtained as stated in the Invitation to Bid. No partial sets will be issued. The Bidding Documents may be examined at the locations identified in the Invitation to Bid. 2.2. Complete sets of Bidding Documents shall be used in preparing Bids; neither OWNER nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. 2.3. The submitted Bid proposal shall include Sections 00300, 00410, 00420, and 00430 fully executed. 2.4. OWNER and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids on the Work and do not confer a license or grant for any other use. 3.0 QUALIFICATION OF BIDDERS 3.1 To demonstrate qualifications to perform the Work, each Bidder must submit at the time of the Bid opening, a written statement of qualifications including financial data, a summary of previous experience, previous commitments and evidence of authority to conduct business in the jurisdiction where the Project is located. Each Bid must contain evidence of Bidder's qualification to do business in the state where the Project is located or covenant to obtain such qualification prior to award of the contract. The Statement of Qualifications shall be prepared on the form provided in Section 00420. Ll d:OA°PRICTOR'.c.Liahlliry Insurmne,e: �.�:. COi:rI'R-�CTUR shall ptirc,h isa'anil mntnlain'sucH liability and other hsurance,as is appropriate forthe Rork. being pertormed and furnished and as wall provide protection Crum claims set.funft belowv w' hich may;ariso out of bra rssult franc CONTR.•1GCOR's, performance and turnishir of • the 'Work and CONCRACTOTs other obligation under the Contract Dbcuments,.whether it,is to be performed or furnished by CONTRACTOR, any., Subcontrnctor or Supplier.. or. by ,anyone directly or. indirectly employed h%*;my.of' them .to perform -,or Curnish the any, of Work'. -or by anyone Cbrtvfiosc arts anv okhem mriv lie'lialile: 54:1. claims under workers' cpnipensuticin. disability, Ixnefits and other similar criiplpya behetit: acts; *-4.= damages be fir damabe ci.. ot`'hcdrly injury. occupationalsickness' or disease: cr deathqC CON (' RAQT,(jR s employees; 5f4-1 claima for damaees.because of 6edily.inucy, sicknces or dis2ase nr death ofany personothedthan C.ONCRA(iTnR s cnployccs, _i; 4; •t:-city rat s=for-dam nets-- iitsurad-hy-custant-it'ry. :per— _.,�6EYliab iijir�t� f rch-NtC�3tSFaaieet rr-�rit�I'�-r�€�a-R-.,-. m«ro..�wsa-d+raetly-sw eitdirretfv-raleted-to-th�ertipW}meat-aFstt;;lrparson-lr}- f•rrr-o�:L fg"�ar-rt: T�RRy othet=reason ' SAi claims; for d crimper, ,other than.to the Rork. Itself, because of !nlury to or destruction of tangible provertp wherever, hicu_teil: Including loss. of'iusc resulting therefrom; and '1 4i6 claums for dam gcsbecause ofbodilt mjur}• or death of -any. person or property dttainge nrstrig oiit of the uivnership, .maintenance or use Of,' any motor vehicle. The•polietesof in s6rance so,required by,zhis•parag,aph 5.4 ' to be purch.t_ced and ivamtained :skull- .5AT Nvith respect to instrranee. required :by, paragraphs SA3 throueh•.5.46 inclusive and J49. include as • (lditionol Ineured.. (Subject'to ani•- ' L aomary ceiilu ion in' ;reflect of ;prof sivM- I liability) OWNER: 6NUINEER ENUINEEKs rits Comudtaand anv other persons or entities identified in. the Supplcmcntary Conditiom all of whom shall be listed its additional insurads;..tnti ncluda coverage for ' the respective •officers arid einployecs'• of all such adrLuorial i sureds; iA.3. include, the specific- covers es•and be, written for not. leis than the lint its of liability prof ided in the. ' Supplementay Cottdiuons-ix required b1 EJ\Y5. or, Rcgulati=, whichever Ist+rtnter, i.a,9, rncludemmpletediipara[irinsinsurani:e; ' CtCUC6HNhY 4L,i;OVI]I'CIUr+.�',t 9111.d (1!YJn E�i.i2(q WICT(Y OK -FOR I' COLLIP ; moUQ lc,d FI0N5 im%,=Iroa0i 11 s:4.10 irtcluck contridual, Iinbility. irisumhce, covering CONITRAC?TOR'i• indemnity- Obligations under pargraphs 6, l 2- 6.16i and'o`.31 thiv+ugh o S 3: i:4;PL mnrain•ii-provision or endomemenc,thgt the coverage afforded will not be cancelled mat eritdly changed or renewal refused until dt least thirty days' prior written notice has-been. given to.0\ NTift.arid' CON7f R.NL1'0R and to each other additignul'insure d identified in the Supplementary Condittons to`whom a certificate of. insurance has teen issued (anti the cartiticmes of ,insurance famished by , the ( O(JNMlCTOR pursuant.to paragaph 53.2 will so provide)', -4.11 remain"m clfcct at.least until,fum6 payment and at al Ltirites thanes@cr w•hcn CU(v°t' Rr�E'f<)R may be coircctir>_. removing or replucirig elefeerrve .lVor(; in accordance smith paraerapli 1 3:1?, ainl. .4.13. withrespect to- .completed' operations tnsurance,ancfany•iftsurance coverage written .(in.'a dainis;made hasis, remain in effect•for st-least two rearsafter final payncntrand CONTR 1C 1Ok shall tuniiiih CVNFR anil!cacit tither:addltiuntl insured identified. in the Supplcmenuiry Conditions to-whpm. a certificte. or insumiicerlias-liecn.issucd evidence satls8tctoiy to 01,WER and am'such additioisil insured of continuation of such J•insurance.at- final. payment and one year thereafter): OTKVEkLta&UgrInsitrance: i. In addition to uisurance required to be provided by CONTRACTOR UmVr p1raittiphi.J ()WNT , it, VERs oPiicn,: may. purchiisa :aid maintain at OIVNER's espensc-01VN'ER's own liability, innuanca ns will protect Ql-CRayiirisL elamis li}ucli m ty arise; frtun olieratiore uii(l:r the �gntraci Pocunicncs. • ' f3aperti, 'ins-urrmce: J6,--Cinlessrr[henvi-{xtivided=in[he Srlpplenienuiry Eoiicittions;--OCVNZC< .shall ptaciwx--and--rnainttiih piopeny-insertilerupan-t}ie=War{�at-t#ttsitrirrthe�ttmtwitt of t}ta-full-rbplaeament ,fist• -Cheroot, (Nrbiect-tip-siwlt dadiictitila-amcwnts-Fis-m --Juppkmentary-Gonditiems-or requiiedl�. [:aws-avid Tie�ulauoFrs}=-ilpsustrrnnea�>hnit - 5.6. h- inoludc—tine—interest,--oF--f}bVYER; Fi EIS F1i iFi6�-EEP v-C-fctsrilteril�.-unit-ai>�soFls-i# erittttas-idantthed-in-th�uppkman[ary �on(litinns; eaeirot ivhaim n deemed to havrarrinsurablrintarest and staid-f rhsted its ern-u surad;oraddtu u it nsrire l ?6-?:-bra-svriiterrsxi-irliutlder s-fii.,lr�el I-risk=or (rp2n-th.`Fii-ijFS'Fe`b1t1}-Cate `{S dt-1c1 f,+Eltlbl—f ?ffil--Ei3Rt s{utl4-xt-leasp-tntlude�irtrurart.........rfoFphvswu4-t<> + dRins<_>r-tart}tr-FV�k-tzatpvrary-kwilcltr>s:-Ea4:;zwark at{d-IkeFk-is:;-�:;ai.-acid-shell-ieei+�- _.R�rII,,,,^�• 'at t<Fist tha--f.�1 kyrtittu-pr.�ri4s=-l�irr=-lt�thtaa=t>at�iirl�l I cevzrrw_�-thaft van usin- ma- LlOief,-, nil ilh,F H l sw 4"A IY- � rrplacdliient u jfvpqtt�( clud btit-wv [im4e. F.' HPd QU�4;9 'F�O, te-- n i Fitift--4ir Nip'. fm�4 Imtten notrce issurtk 3,9- OWNER -ILA not be: cesFonstble ,for purchasing -and maintiimula any pmperlv "iitstIiance t6 protect th� '4uereas of CON—FRACTOR! Subcmthicklvs ki'oihdrs in 4 ff-GONT4LA6'TOR-r64ut h- in im. the WC1 Ilf OF FORTCOLLI!,S MODIFICA I IOM IRAV-11MI14) , �-theF. -4i.Q; R .1dd me OWN17, ll--Fights 4S,G 'ye On m . age —to, R2+ `tc_ ['Jufk ufisirw; vot-or. "T-! resu lwlgff cmv-rtraOi "odler, EaFt6 ,14-2-0 m loss-of-damaga- tt+-fl id-cempleted pen4efe4i46".:2d b resulting fivm4rt ov..o'Lh'cFim I urcd:qcfil-eoyefed 0 -niai Re* i- _Oil 4he., dU Tuqswnr—to , yment WSS FeleFu446qfl-this- pftm . . . . . . ffeet46R pwm,%q... I I I llL II I I I I I [-I I I I I I I I 11 1 1 i JII 1 1 1 1 I I 1 11 1 1 i 1 1 1 re.;cw•ary o�_atrist-Rrw-eE=GOiv"f[�\6l'.C�R: Sub;cvtttuctots: 1 E24G riatnL+Yitnd--thb-(+Wicerp, tiiieetc�rmpluyees.Food-a�rRtsaF-aa�Ethertr Receipt and Applicatlun of Insurance Prbceet& 5.12. any insured loss under the policies of insurance required by.liaragmphs _5..6 and 5.7 will be' adjusted with OWNER and made payable -to OWNER a liduc art} fyr the .ui5ureds. as their interests may appear. appear. •subject to the requtrements. of xn4 applicable_ mortgage clause and of paragraph 5.13. QIVNER shall depositin a separate account any moriey so received; an1shall distribute itin aecerdanee with such Humment as the parties in interest may reach if•no other speeinl agreement is reached the damaged Work dial l.6rrepaired or rcplaiiciL the moneys so received applied on account -thereof and the Work and the wshthercof covered by an appropriatc.Changc Order or Writicn .Amendirient.. 5.13: OWNER as fiduciary, shall .Have power to adjust and settle any lass with the insurers unless one.of the: padres in interest -shall object in writing within filtcen,clays after flue occurrence of loss to OWNER.'s.exercise of this power, It such objecron i , made, OWNERfiduciary shall 6qkz settlement with die insurers in nccordtnce with such agreement as the parties in interest may reacta, if no. such agreement among tlic.parucs in interest 'is reached,. OWNE'R;as fiduciary shall adjust and settle the.lyss�with hc. msurem "A'--PoEtllifed-al-WTki iyg 1;Y-HfW4RFty=4 Acceptance of 6mneiv: and 7q uganc e; Opdan to Replace: 5,14. it' �CPQ FFRAPTP OIVNEK has any uhjectittn w the urvcn:igc•atlortkd try- t other provesions,of the Lidnds-or, ihsurance'required to h tit accordancc with Vticle S on the Imsis ice*wrth the Comrict, Documents, the tit writing will the certi ticates PruKin[, U61i;ution-Property' lnsu nine er,: i.l i. If OWNER finds it necessary to occupy car use, a portion. or portions of the Work prior to Substaraial FA'UC-t;EtiF7GV: coNUl'n6m, t 91 G'3 (17a1 E&Bticia tt'/ CITY OF FORT' COLLI!N; 9lUUIPIG\ IIO\'S 1 REV ACOnOi Completion of all the Work.:srtch use or'decupuicy may be 'accomplished in accordance with panq7iiph 14alt, provided hat no such useor occupancy;shall'commence before, the insurers providing theproperg•-trtsurance have ucknowledied notice tnere4if and irr writing &t dc'd any ,clian es a1'e6vemac nece rated,hcrebk, The iniurers providing the PmNrtv•.•insurance• shall consent by endorsement- on the._piilicv or policies; but die. property insurance shall not be -cancelled or permitted to lapse on accountof.aaVWelt partial us.: or occupancy.. ,A-Kric t.E. 6--CONTPW-rows RESPOINSIMUTIES ,iNperi'ieion and Superbavidenca, q.l. CONI'RAC'r0R shall supervise inspect and direct they Work cempetemly and efficiently devating such attetition thereto rind applying, such skills and expertise-as,may be necessary to, perform the Work in accordance .with ahe Contract _Uacumenr_s. CON rRACTOK shal I hewlcly respo.rmhie far the means, ntcthuis, tecnnti � lqueq�- ri ucncnd' procedures •of - construcuikn but r.ON RACIOR shall not Fc responsible for the negligence or.oihem in the dasiah orsix6fication 61' it.- specific mearts: mahcd, technigrie, sequencer or proccdure'6(eonstrucu6nwhich is ,hewn or indicated in and expressly required -by the Cwitract Documents. CONTRACTOR shall"bc re.,*wilile to, set that the conipicted Work complies aces ratoly with the Contract Documents. G.'. CONTR\CTOR-shall keep on the Work at all ,times during its pl`cigriss a competent resident superintendent, who shall noube repliced.wihout written notice to OIVrMlk and ENGINEER except under �:xiraorduvary9ir^umsrutecs; The superintendentwill'bc CON C2CGT0R� roprcr2nu t ez at lie site and shall have authonty to act on bwhalf of MF RACIFOR: All' comnturuaitions to the`"supetimendent shall lie as binding as if gigcn to CO 7f RACTOR . Labor. Jlaterig(s'eutd Egrirpnrenr.' 6.3. CONTRACTOR shrill' provide competent_ suitably qualified personnel to survna , lay .cut and uorcdruct the - Work as required 6y the, Contract Dcaments, COIMACTOR'snall at till times maintain gyti discipline and order.atthe site. Except as otherwise requited. for thc' safety or protection of person or the Work. or property at the site or adjacent thereto. and except asothervise indicated in the Contract Dccumenv all Work, at the:site shall_be•perfmmed duririg.regular i6orking hours anti CON RACTOR hill notpernit overtime work-orahe performance of W'ork•on Saturday, Sunda} or any foul holiduv without O`.VNER's written consent. _riven after prior written notice to ENG INEEL CONTOAC'TOR shall submit requests to the ENGRNEER no less than. 48 hours in advance of an4 Work to be perfarncd On Saturdav; Sunday. Midays,ur outside. the: Reeidar Working Hours: CAUnless otherwise specified in the General. Requirements;. CONTRACTORshrillfumish and asstime full respornibility for all materials, equipment labor. transportation, construction eiluipment and machinery, tools, appban CS. fuel. podcr. light: heat. telephone: water s. nitaiv facilitie-s,temporary taeilitias and all other facilities and ineidentals necessary for the 6mtishin_; performance, testing, start-up and completion of the Work 6.4:1. Purchasing, Rcstrictivac CONTRACTOR musLeomply. with.the C:itv's purchasing restrictions: A copv of the resolutions are available for review in the offices of the Purchasing and Risk Manacernmt Division or the Citv Clerk's office. 6.4.1 Content Rrsuiaionc: Cir• of Fort Collins Resolution 91-121 rcquires'thal suppliers and produvcrs- of cement or products containing cement to'ccnifv that the cement was not made in cement -kilns that bum hazardous waste ass fuel. F.S.. All materials and equipment shall be of good. quality and new, except as otherwise: provided in the Contract Documm m All warranties and guarnnte,•s'. spcciticallycallcd' for by the Spcci ricarinas shall expressly run.todtchemefitof AIVNIM.R. 1frcquircdbvFhlGiNT:F.R, CONTRACTOR. shill fumish satisfactory evidence (including reports dr required tests)'tcc to the kind and quality of materials and equipment. :VImaterials and equi[,+mem. shrill be'applied. installed, conmci:t•der , ecte,. d used, cleaned and condi6cned. in accordance with instructions of. the applicable Supplier; except as otherwise provided in the Contract Documents. Progresk.SJtedute: 66: COYMACI'OR stall adiere to the pmgress schedule established in accordance with lamatiraph 19 as it may lie'adjusittl Crum dine to time as provided bclow'. 64.1. CONTRACTOR shill suhmit to ENGINEER for acceptance (to• the extent' indicated in paragmph2.9) proposed adjustments in,thc proems .scficdule that will not chartgedie Conran Times.(or ivblestones), Such adjustments will conform generally td,the piouress schedule then in efrcr:t anti additionally will, cortiply with any provisions of the General, Requiremens applicable thereto. 6.6.2. proposed adjustments in, the proyessschedule that, will change the Conract Times (or 4hlesturio) shill be submitted in nccyrdarne with the rcquiremens� of pam4raph I21. Such adjustmenL% may only be-� made by: a Change (order or Written Amendment in accordance with Article 11 6.7. Subnritutwnnd "Or-6quid" ItenrS: 6.7.1. Wfienever an item or'malcnal or equipment is specified or described in the Contrad: DMUMent'by usin_ the namc,of a proprietary item or the name of a. particular Supplier; the specification or description is intended to establish the type_ function and quality requi red: Unless 'the specification or description FJC'UCtiEDlEA.',1. CO v'UI'11 Ui it 1911) S 0594 EdilicaI Id' u•/CITY OF PORT COLLINS \IOUl14Cd'l10`SIRGYni2anR1 contains or is followed by words reeding that no like, equilalcnt.ar "or-equal":item or no-sttbstimiion is, permittmL- other items of .material or equipment or matC•rial ass equipment of other Suppliers may be accepied by R,iGIAtEER under the following circumstances: 6:7.1.1. bah Uqudl` If in CaNIGI-' iEks sole discretion an item of material eu equipment prtcpbsed by CC)N"TRACTOR. is fur 6011ally` equal to that rimed and sufficiently similar su that no change in relateil \York will he regtiued, it may Fe considered by FNCINEE'R''-nt tin "or -equal" item. sir which case review and approval of'thc proposed "iiIlm may;, in F,NGfNF'PR's' sole discretion. f -. accomplished' trithout cnimplianac 'With some or all or the requirements for acccpmncc ofpmposed.substitute itmts. 617.1.2. Shl;3irnrte ltmaxi If in ENGLNIIEER's,sole: discretion an item of material or equippment. propus-d by; CONTRACTOR sloes not qualify as an "orequal" item unrlersubparagraph 6:7.Ll, it will be considered a proposed suhstitutc itc[n: CONTPm.woiz shall strhitiit sutficient infomiation as provided tclow' to allow, ENGI,rT;FR to dctemtinethat the .item of matcriil .or equipment proposed ic,csscrttially equivalent to that,ramcil and.an acceputhle.5tibstitute theiefbr- The procediird for review by the ENNOMTER will -include the following as :supplemented in the General Requirements and as ENGiNEEP: may .deeidc is. nppropoatc under the circumstances. Requests .for review of proposed subs6tutc items of material or cquipment will not be accepted by FNGft�1FE'R From arname miser then CONTRACTOR_ 1f CONTR \(70R wishes to rumish or usea-substitute item, of material or zquipmeitt CONTRACTOR shall first make Britten-appliwtion to C\'GNTEER for acceptance thereof, ecnifdmg.ihar the propascd;subsiitutrwill pertom'i adequately the hinctions and achieve the rrtsults called for by the Cenral desmi.'be similar. in substance to that specifiedand be suited to the same use m that specified The application will .stare the e\•tent if any. to which'the evaluation aridacceptance or the proposed substitute will pr2judice. CONTR.V7.OR'sa achievement of Substantial Completion on ume, whether or not . acceptance of the substitute Cor use in the Work will ;gIuire n change_ in ariy of the Contract Documents (or Mr the provisions of any other direct contrw act with OWNER for ork un the .project) to adapt the desigm to the, proposed substituteand whether or riot incorporation or use of'the substitute in connection with the. Work is subject to payment of any license nee or royally. :VI variations of the pruptsed substitute from that _specified will be identified in the applicauim and available ruaintewnce; "repair and teplaccment service will be imlic:rfed The, nppfication will also contain an itemized estimate of all cuss or credits that will resultdirectly or indirtx:6 front acceptance of such substitute. including .costs of reds g and claims of tither mntraetors,affeeted I i 1 by the resulting change:., ap' of, which' -wilt lw considered!. ,by ' Ei3GINEER' iner•tiluating the p bposedsubst lute.' GL EER' mFty reeqyuire CONTP \CTOR• to [impish additiohaE deta.aboui the proposed_ subsiiiute. - 6.7.1'.3.- C0Ai7R.4CT0R's Espztua: All Plata to be p avidd h by G'ONrRXcTOR iir, sulJNri at- any proposed "or -equal" or aubsuwti; item will he ,at CO\1T.RACl'OR'5cNPense;. 63.3. Substitute Cwistrurtfon SIaIhocty or Pmeeifurzs:: If -a speaitic means,.mediod. teclimclue. :sequence- or prcccdurof consiructi6w is ,huhvro or mdicntcd in:nnd 14ressly- ntluired by' the Contract ,I7oeumentL , COWrR.-\ rOR may funirsh or utilize, i. -substitute, meats: method: tecltruque, sequence-,ur procedure of conslniction.acccptablc to.FNCrINf. F.R.. CU�?"l'Rr\C'LUR'shalt submit -sufficient information to allow FNGINEEPL m HNrGl,1 FFl.s sole discretion, to. determ'r that. the Substitute prupased is cgwvalent,hi [lilt qxressly calledfor by.the Contract Tlouuinents. The gracedure flu.aview by-E'NGNEF.R, will Ix sirnilnr tothatpmvided'iri,subp;rngmph'6:71,2: 6;73 Fngineer'.s F.vaivarrem F1WjTKlTP will. -he allowed aj,-asonahle time within which to evaluate each proposal or submittals .made ,pursuant.. tit paragrapfs 6:7:1.1.i ui 6,7:", LNGn\%R will bethe sale judge of acceptability, 1\tp 'br..gaa1"' or .w. bsututewillbeordered,'installed'orutihnd"ivnhout FNCrINF.ER's.pnpr wnacn ace litimcz,which•tvill be evidenced by either a Chango_Order'or an approved Shop ;[)nwing. OWNER. may - require G(jN7RACTOR la,, furnish at CONTRACTOR's expense a. special perfoniiance gualyntee• or other .surety with respect to arty oaqual" nr substitute, CNG(iNLER. will record time required by ENrGLN.'EER aitct ENGINEER's Consultants in evaluating ubstittutgs proposed at- Submitted by -CONMACTOR ptrrsuftnE w ptrtgt-phs y 7 1 -aml. 6,7:2. and in making changes Lf the Contract Doclmtents (or in, die li�oyc;ions.of'any other direct contract with: OWi FF.R. for '!,vork tin the- ProjecQ, occasioned thereby, 'Whether or rwt ENGINEER acEepti a substitute itetu so proptised'or submitted by CO\'TR:\CTOR. CO.VPR•\CTOR shalt reimburse OWNMZ for the chines of N-GNEER -and GN'GEN'E•ER's Consultants for cyaluatirw cleft such propos�ddsubstitute item. 6_8. ,Conceming Subcontractors, Suppliers. and Others:• ' 6.8.1- CONTRACTOR shall not .employ any S4Kxmractor;6uppticr or other persi nor orgamptiem ('mcludln_ tlwsc ucceptable' to ! WIi Ind .LNGENT-ER-as. irtdicaLed in paniuraph o:$. "-). whether initially or as a subSitSutc, against whbnt OWNER. or 13MGLNEER may have, reasomtble objection- CONTILACTOR shall not be required to employ any Subcantnctor, Supplier or other person or.or anrzanon to furnish cr perlorm any of the, Work against whom CONTRACTOR his masooable objection. EICUC'OtNEKAL (10() t:iitiCIIJ M CSIY OF Fo14'r COLLI N.S NIODI17CTION51 RL' V.I CGua)' !.9 CONTRACTOR .;hall oerfomt- nitt leas than 2b. ercent of the Work, with iLs otvn: Curczs (that is; without subcontfiktinla): The 20 percent requirement shall be -understood to reler-to die -Work the value of .whichtotals not'less• Itan'_0 rxrcent'of the Contract ..trice. - 6:8:_',[f—tFta--luppkindnFary-Gcin"ditions Uiddutg Documents require' the 'ideritiN, at. certain Subcanu-aetors Suppliers ur ether persum or oruanizations (includiru3 those who are to lurfusn the pnnctrral items of material., or 'equipment)` io .6d submitted, to OWNER -in- advance -of the. peeifitd_ 6w prior to die Effective•Dato.ofthe AgrcemenLfor OWNER's. or''ENCI NFFRsi acceptance (either in �wnung or by 1-ailing to make writtenobjection thereto by the date' indicated far acceptance or objection in ITIGINTF,R of nny s ch Sultvntrnctar, Supplier or other fxrson or orgati=u n shall constitute a waiver of any right of OWNER, or'F.N HMEEIR. to igltst- 69.L -CONTRACTOR shall be fully responsible to OWNIE2 for all acts and omissions of .the SlUbCOnlraclors; Suppliers and other lxrsons and organizntions perfium ing or funushmg any of the Work tinder a direct or indirect contrae( witli ONTR\CE'OR rust as COvr-R\( TOR is responsible .for CONTRr\CTOR's own acts and omissiora: Nothing-ih the Contract Dccurnems shall For create the benefit of- any such Suhcontmctor: Supplier or other perscin or �rganiiation any contractual- relationship _ between OWNER or 6'i NTI ER and any suchSubcimuactor, Supplier or Other person or-organi2ati,bn, nor shall it create any obti4ation on thepart of OWNTHR or;FNGElTEER to pay or to set, to the payment of any money •-due any �uchi Suktionuae[or. Supplier qr other person ur or anjration cxxeptas may otherwis< be aquvedby Lawsand Regulatiurci, OWNRRpCEDGlbfF.ER'ma�' furnish to any stibcrninlctur- supplier or other person or or anvation. avidcnce .uF_ amounts . paid _ to. C ON 1 RAC',I'OR in accordance with r'0YrR.ACTUR'S "Applications for NvmenC. IN C071, CONdTR ACTOR shaft he solely responsibto ror �schedtiline .and caordinatio_, the Work of Sicbcontiriaors. Suppliers and other persons and orvaniiatiuns performing- or furnishing any of the Work under a drect.c,r indirect- contract with .CONTRACTOit CONTPAC; OR shall require all Subaintraaors, Supplizrs and such other perverts; aria grganiaitions perfornvirn orfurruslainne airy of the Work to cammurucate with the L'i`IGLtZ'ER through CUA74R.-1C'L'O(L- 6.11). •The divisions andsectiorci i)f Lhe Specif<aitibis and the ,identifications of any Dirtwings shallr not controli CONTRACTOR in dividing the Work aniong Suhconimetorsor Suppliers or delincatino_ the Work to be pereornicdl bt anyspcahc trade; 6.11. All Weak perfchned for. C:ONTRACT..OR by, a Subcontractor or Supplier wdtbe pursuantto tin appiopnatc ascemciat bLnvccn .CONrh ACTOk and the Subcontractor or Supplier which spprcifically binds the. Subcontractor -tar Supplier to the, npplicable rernis and conditions of thd' Contra et Documents for the benefit of Prnent Fee.., and Roraltiesr 6A2, COVT?U\CTQR.shall pay all license Coe.,and royalties anti •nstrne all costs incident to the use in the perfornfancc of the. Work.oc the incorporation at the -Work of any, invention, Lk -sign, n, process, product. or device which is the -subject of patent rights or copyrights held b.• others. If a particular invention desigri, piocass. product or".,levied •is >pccifcd in the Coraeaci Dixutnents for use in the performance of the Work and if to the actual knowledge of OWNTR 3r ENGL� 1ER its use is subject to patent rights or copyrights tilling for the payment of any license fee or royalty to others; the exisicicg oC such rights Shall be dIscloscd by OWNEEv in the Contract Documents. `to the.. aillest extent perrnitted by Laws and Regulations.. CONTRACTOR_ shall indemnilIv and hold harmless OW NUR. ENGM=R_ ,GNGI_N _ER's Consultants and the officers, dirt tors, empl.x des, agents and other consulLints oCedch aril Crry ot:them frona .and avausl alDclaims, costs: [osscs.and damages arisinct out of or resulting lion any udiinuemcnt of �itrnt rights be copyrights itiGdent to the use in the performance of the Work or resulting"tFum, the incorporation ih .the Work of any inventiort .desist nroccss, product or device not spxciticd in the Contract Documents. [3JC:UC GE�EK4t. i:i�idU!'I1J,l'S U U)S 119vV HtGtitnl 14 tvt CITY OI�Fo[tT_COLLCS \IOU1FlCA'ff0�5 r121i\`dn OtIR1' Permits o I-3Unless othawise provided in.the Supplementary ccndihow, CONrRAc'TOCL shall obwin and fixity for all construction pernuts and liccaies. OWNER shall assist. CUNt rR.4Gl.OR whets iiceessary_ in Obtaining such permits ancl'litensrs: CONTRACTOR' shall .pay ulf ?yernmBntal' charges•arnl.inspaction ties necessary tier the prosecution of the Work, which are applicablentt. the time of eperag of Bids: or. if thcre'are no. Bids, cn the Effective Dateof the Agrg ement- CON R.-M- OR;shall Pay is; for. connections to die Work,and ihWNER shall pay Alt charges -of _s, ch.utiliry w uncrs for capital Costsrelated thercto such as. plant "irivestment,Cees. - 6.14.. Luicsand Regulations., 6.14;1. CONTPAC:TOR,start[ give, alF nctiCesL and comply- with all f arvs and Regulations applicthlc, to lurmshin6 ind _perCemiance of the Work. Except" Where otherwtse uspressly, required F>, applicable F•aws -and Regulations,' rfcidacr. OWNER nor. Et2ilr\r6:F:It shall be responsible for inonit6nng CON'rR.A(.TOhs compliance with any lairs dr Regulations, 0.14.1 'tf CONFCR:\CTOR pertprms _ any %Vnrk knowing orltaving reason to know that it is contrary to i;aws or Rccula_tio[fs, CC)Ni'RACfOR:shall hear, all clatms, costs, losses and darnwes caused by, arising out of or resulting thcrefei nn;!6veva;-it shall' not be CONTRACTOR's primary,responsibitity.to niak-e ecnainrhit the Specifications :and Dr-mvines arc' in nccordanwvith I;atvs and.Rcgulauons, but this shall not relieve CONTRACTOR , of C;ON'I' RAC.'fOR's obligaticins'under parrnraph .'.3i': Tares 6:1+, CONIMAOTOR' shalt pay all ale , consumer, use and other similar taxes required to be- raid by C'ON'TRAGTOR in accordance with the Caws and Regulations of th..• place of the Project which are applicableduring the, performance. of the Work. r.f;; 1. •OWiNTR is cxampt from Colorado State -anti! local sties and use tiers on materials to .be peminricntly int:&N . ted_iruu the pioiect. Said taxes shall not be included in the.Contract Rice. CONI'RAC'TOR. must• aWly Cur. and receive, a Certificate .of-Esemptnon'.lram 'the- Colorado Department of Revenue for construction materials to be. phes=Ily_incorporaled into the,.pra�ecp •t This- Ce i I,catipn of Esem ion nrot tdas that the CONTRACTOR shall neaher.cav nor include in his Bid. Sales and Oise Taxes. on i}tosc�buildirig and construction materials physically •incorporated into theoroiecl.. Address: Colorado Delnrtinenibf Revenue State .Capital Annt� H I 11 1 F 1 1 1375 Siknnan'Street _ Denver: COIMIEIO,JSO261 Sales -and (Ise; Tases- for the, State of Colorado. Resional Tmrisiwrtation District' (RTD) and certain Colorado -counties are, collected bV the. State of Colorado .and'.are• included. -in the Certitiratiod.of Exemption. All applicable Sales and Use Tuxes.(includine Stale collected taxes): on amp items other than construction and buildire materials phvsicailv'incorpomled into.thc projectare to be paid by CONfRACI'OR and are.to be included in appropriate bid items, Use of Premises: 6;16. CONTRACTOR, shall confine construction equipment. the storage of materials find'equipment uric] die operation -ot workers to the site ind.-lanri and areas' identified in and permittedby the Contract:D&uments and - other land and -areas prrmilted _fry Laws and, Regulations. riefits-of-way, permits and casements, :and- shall inot trnreasooably encumber tfie premises with construction equipment or other materials- or equipment. CONTRACTOR shall atiaaunc full nzgwnsiblhty for any damage, to any such land or area, or to the owner or o ccupaht thereof or orany adjacent laid or areas, resulting tiom the pertormrmcr of the llrork. Should anv shun be madehy any such owner or occupant hccat' of the performance of the Wort., CON:rhAC fORAWI promptly -settle with such other party by negotiation or otherwise resolve the claim by arbitration or other dispute resolution proceeding or. at late. C;ONTR V.TOR .shall, to.the fullest .�Ment permitted by Laws and Regulations, inu.mnlfy.and ]hike leirmless. 6wNN : ENGNEUR, LNGNEERn Constilf ant and anyone directly or uadireetry employed by any of then[. from and tagairistill claunN costs, 'los -s and damages arising out of or resulting from env cluim or aytim. legal or equitable, .brought by any such owner or .occupant . against OWNER E GNMER or env other party' indemnified hereunor to the extent reused 6y or based upon CONTRU-kCTOR's performance of the Work. 6.17, Dearing ihe.proyress of the Work, CONTRACTOR shall k&p the premises free from acctunulatiofis of waste materials. rubbish and other debris restlhmg •boor the Work At the completion of the Wort: CONTRACTOR shall remove all waste materials, rubbish -and debris from and' about .lee .premises aswell as all toili.. epplinnccs:. construction equipment and machinery and surplus materials. CONTRACTOR shall leave the site clean and ready for occupancy by, OWNTER..at. Substantial! Completion of the Work. CONTFLACTOR:shall restore to orivimal condilion,tdl propertynot designated-C6ralternion by the Contract Do cumetiLs. 6:I8: CONTRACTOR shall not load nor permit any part of anv structure tube loaded: in any matirui fiat will enter er the structure, nor'sIaall COINTRriCTOR subject. any part of the Work cr.adjacent property to stresses or pressures.that will endangcr it: Record Uncuiuents: Et('pCLtl:\E'lG1L.CO:vU1Ti(i\ti I eJ I tt i (17Ji1 EuStieen 'a•! Q�IY" OF PUa'f CV LLI [t; :\10U1PICdTIOd'S IItL•l'.1.^_Vurl! 'G.19; CONTRACTOR' shall maintain in a safe place at she site one reuoid copy'of'all Drawings. Specifications, Addena; Written Amendments, Change Orders. Work .Change Directives'- Field bider; -und: written -mterprotatiaii and' claRfctitibris. (issued pursuant, to paragraph a! good order and annotated to show all eharp es made durin,, constmetiort These record dMailents. 6'gedier wah_all. approve[] Samples and a counterpart uf' all approved Shop Drawings Will be available to ENGIINEER for reference. Upon completion of the Work and prior to refense.of final MR co these record documents, Samples.und'Shop Drewings will be delivered toENClNEILR fdr OWNER. ,Safeky mrd.Proreuion: 6?6. CONrlL1Cl'OR ,Full' be responsible lur. initiating, maintamarag-•and-'supervising- all salew precautions and programs in connectionwith. the, Work. (XN RAC TOR shall fake.all n•cecsary precautions fgr sae safety oD, and shall provide the necessary protection to prevent damage, injury tit losvto: 6'2(L all persons on the lhork site &-who may b affected Iry the Work: ' .all the Work and'mattrials and equipment to Ix incorpututed ahercin, whether in storage on of oaf tit. site; and 6.20.3. other propertyat the site or adjacent thereto, including trees, shrubs:.lawm walks:, pavements, roadways, structures: utilities and Underground Facilities not designated for.removal, rclocition or replacement in the course of construction: CON• RX.'TOR shall' conipfy :wilt all ipplicahle Laws and Regulations,of imy public body having -jurisdiction for saralV of persons or property or to protect them tram damage_ ui)ury or. loss :end shall ueet slid maintain all necessary safegu sad, for such safety and .protection, CONTIL\CTOR shsU notify tmmen; of adjacent property and of Undernlound Facilities and,utili[y, owners when prosecution of lee Wiaik may affiect them. and shall cooperate with them in the protection, removal, relocation and replacement' of their property. All damage. injury or loss to any property reterred to in pamyaphsu.2112 or 6.20.3 Caused,directly or indirectly, in wholeor in part, by CONTRACTOR any Subcuhutctor. Supplier or any other person or .organization directly "or indireixly emploved by anv of themrt&f5errorm or furnish any of the Work or anyone For'tvhose acts any'uf them may be liable, shall be retuedied by -CONTRACTOR (6ccept damage cc loss attribuaable to ilic fault of Dmwvrgs of SN611cations or to the, acts or omissions of OWNER -orLNGLNMER tin DIG NEER's Consultant or anyone employed by any of than or anyone tau whose acts tiny ofthem may be liable, and nor attributable: directly or indirectly, in whole or in paL to thc.fault or ncoigcrse of cb.\rrR c'roR or any Sub:unhaclor. Supplier or other person or organization directly- or indirectly employed by any of them), CONTRACI'OR's duties andrespomsibi liucs for the m fety and protectionofLhe ]fork shall cominue until "such time itsaII' the Work i_s completed and INGIt TR has issued notice to OWNER and, CONTRACTOR in accordance with paragraph 14, I'_i that the W6rk is acceptable (except as odienvisee eepressly provided in conmectiyn with Substantial Completign)., 6.2i. Sdjetp Repreten-mrive: i-ONTRACLOR shall desienata a qualified and e.\=encid!safc8+representative at the site whose duties Mid responsibilities dull be the prevention of accidents and the matnuining and supervising of safety"predautibns and pr< grams- Hd;nrr(Connnumicnfion Programs: 6,2'_, CONN'RA(,TOR. ;shall bL responsihlc wr wordinutom any exclumge of' data streets tir other hazard'cemmunicnlion.information—required'to he made available. to or cxchaL d between' of among employers at the site ih accordance iwith laws Pr .Regdlations. kinergencier. ti 23. In emergencies affecting the cntct4 or protection of persons or die- Work or -property at the site or adjacvu thereto. COiVf R.aC:I'QR, wuthom spmal'.insuucuon or auduirizauun. rratu OIVNF. R or ENGINEER: is obligtitcdto act to prevent threatened damage, injury or loss. CONTRACTOR, shtll give FNIMPEPR. prompt written noticeif CONI'Rt%G OR Believes that any significant changes in the Wort, or variations from the Contract Documents have been emexd thereby. If ENGINEER dcn:mines that a chanac in the Contract. Documents is required Ixcmueof the action.taken by CONTRACTOR in response to such an emergency, -a Work Clunge Directive or Change Order will he issued in document the consequences of such action. 6.24. .Shop Drawingv'atid Snn[p(es 6:24,1. CCMR_ACTOR shall submit Shop Drawings to CTGINT forreviewand approval inaecordance. with, the accepted,. schedule of Shop Drawings, and Sample submittals (see pamernplh _' a). ell sutimimals will. be identified as ENGM-FA may. require andiri die number of copies specified in the General, Requirements, The data shuwn on the Shop.Drawims wtill be complete with respect to quantities,, dimensions, specified performance and design critena; material; and similar data to show ENGNEER the niaterial's and equipment C:O,%rfFACrOR proposes to provide -and to curable .ENGINEER to review the .information for the limited' purposes required by ,pamivmph 6.26. 6.24.2. CO\`TRACTOR shill also-s bruit Samples to ENG tNEER for review and approval in accordance with said accepted schedule of Shop_ Drawings turd Sample submittals. Each Sample will be identified clearly as to material Supplier. pertinent data such as Caralcxa number t and the use for which intended and olhentase as ENGINEER may require to enable FVGh[EER, to review the submittal for ilia limited W('.UC GE�k1Lti. CO\DL'IlC1bi 17 U)Va 09411 lieGtinml 16 ter CTCPT 06 FOR TCULLUMMOD1F1C."vr10\S 1RLl'n 20od1 purpa.es required by poradraph6,26. The numbers, of tachSample to be,submittedwill he.as sncitizd in theSpecificatiom, _6.25,. Sub.minal.Procedurea- 625.1. Before .submitting each 'Shop Dmtviri¢ or. Samplc. CONTRACTOR shall' have determined and ,verified: 62i.I,i: all fizld measurements, quanritiea_ dimension:, specified performance criteria, installation requirements, materials, ctmlov numbers and similar infomistiom with respect thereto,. 6.25.1.2. all`mareriuls with respect to intended use., t'abncation,. shipping, handling, uomggC. ;assembly and installation pe m n ng to d a perromtanec'of the lVork,.and'- 62i,1.3. all mtonnturon relative to CC)NTRAGI.OR's sole. responsibilities in respect of means, methods techniques, sequences .and prceeduresol erinvtruction and safcrq precauuomn and pro,,rinms.incident,thereta, CONMACTOR sl ill' also have reviewed .and coordinated each Shop Dmwirm or San iple. with other Shop Dr wines and. samples and with the requirements cif. -the %Vork and the Contract Documents.. 6.25.2. Faeh'subminal ,will hear a stamp or specific written intlirotion,that CONTRACTOR. has satisfied CCl_NrR\CTOR's obligatiom under the Contract Documents with,respect to CONT',R VC I:OR's review Anil approval oftivnt suSinittal. 6.23.3, At the -time of each submission, CONTRACTOR ::has give ENGINEER Npecitic hvntten notion of such vanritions.. if any^ tKit the Shop Dmu%me orSmmple submitted may have from die requirements 6f the Contract Documents, such notice to be its a written.cornmunication sepgrate Vasa the submittal: and .in addition, shall cause a specific notation to be rode 06. each. Shop Drawing hind Sample submitted to ENGNEER'for review and approval of each such variation. 6_6 GNG110El2 will review anti approve Shop Dra%vi%,s and Samples in accordance with the schedule of 'Shop Drawings and Sample sulnnitlals accepted by ENO rNEFRats 'required by paragraph 2.q. ENGINEER's 'review and approva will tie only todetimtine if the hems covered by the submittals will, alter irisuallgtion or incorporation: in the Work: cnnlbian to the inkirmation aiven in the Conrmct Documents and be compatible with the design concept of the completed T3oject its- is functioning whole as indigated by the' Contract Documents. ENGNEER's review and approval will not extend to means, methods, wchniqu.L , sequences or procedures of construction (except whew a p;ulicular means'. method, technique; sequence or procedure of 1 1 11 I I I I I I I I I I I Fj I I I I construction is wecifically And expressIvL called for by the Contract Dociuments'), or.to %arety.premutiow or proitrarm; incident thereto. The review and appi6vul 61.a se6arute item as such'%-%I'U not indicate approval of the assembly in which the iLtan (unciicins. CONTRACTOR shall make co,rr&tioris, r4ire'd by EVG1,NP2R,.am1 cfialt- ecturri' the required number okurrccted copies bl'Shop Diawirigs and submit a I s required new. Samples for xc4iew and approval. CONTPLACTOR shalYdirect specifiu utter ition , I , n , Ntrrtina to revisions' other than the: corrections' 'called for by D0 4,2 1_--R*9npr�vioutrtiijbrmtmls . _ 4E , ­ .. . &_17. ENGNHER's revietw .and approval of;Shcip Drsayings or. Samples shall not relieve CONTRACTOR form responsibility for a I ny vanation-Fri3ni the requirements of the contract Documents unless ICONTRAC rr)R hm'in %vntins culled ENGINEE16 utteritiun to each. such variation it the Eirric, or subniist;ion is required by paragraph '6.25:3' and ENGINEER has 6vcn vtritteta .approval of 0 . ach such. variation by I specific written notation thereof incorporatcd in 4 acccxmpany m& the! shoo Drawing or Simple approval; nor will anyy appi4a( by NNUINEFIR. relieve t0NrFTZACt'()R lama responsibility i6r cornplyiii& %iikh the requirememt; of panigoiph 6 25:1t 6,28 Wrh,. a Shop Dranving or Smiri�le• is required by. the - Contract Documents or, the s6heduicer Shop Drawing and Sample submissions accepted by ENGNMER'. its re uu cd .1y paragraph 2.9. anki r6ited 'Work- per tbtrntd P,q l d ipproval,61pertinent�rtinr )or to � \T(j fNF�Rs reviewan sub untr . tal will be at the sole expense anct'responstbility, or CONTRACTOR. C. ,gatinaht-rhe Work: 6� 29 C0NTE.?jkc7bR shalt carry on the Work arid adh&,I6 the progress schedutc.durihs all disput"� air disagreements Jv;th�OWNTR No Work shall be delayed or i.tgicmd pending resolution of any d4utes or 2, except I 'c critsex pt-a��vmiittedbvpor, mplil55or-Lis OW-N.-TIR at goe in , I& CONNTRAWTOR� may othenvise -a 6.30. Ci)J�TR,ICTOR's Centirid .14i Wv, and Guamaree: j ;j TRAe art to 0, 1. CdN _'TOR warrants go. itid nets -O%VNUZONGDMER mid"ERNIG12\711ETs Consultants U-tarall work will be Ln : -accordancc,ikh the Contract Doctitneiiis. - and - J4Rl' not ' be 'jeftctive. CONTIZACTOWs warninty JIM aicludc5detects lor w1magccaused lay; 6.30.1-A.. abuse: modification or improper maimenance.,or operition by-persons,other than CONTRACTOR; Subcontractors or'Suppliem.or 6.301.': -normal %vmr andi'tear under normal' us;t!gC: COINTTP.-\C:1`01Z's obligation to, pe:­Conn and complete thc'W6rk.in accordance with the Contract .Documents shafl-bc abs6lute. None- of the C61lowul. will' constitute in acceptance of Work thm, is not in I,) I rKs (I tp)o HLitiatj. Jv/0 E-Y OF FOP, !`COLUN,,; moriwicirioNs i REV 1;'000) accordance with't hcContmet D6curnears or a release of CONTRACTOR's obligatioh to;perfurm the Work- in accordance with the Contract Documents: 6.39.1k, ubscrvatimLs.byENGLN'EER_ 6.30.12. recommendation oC say progress or V ytnentbyUqGNEER; 630..11 the :issuance- of .a certificate of or any'paymcriL by* OWNER to,1C0NZqRACT0R. LiMJir ibid ConiruU _Docurfients;, 6 3­012A use or cocuffancy of the Work or any partthcrcofby,0W.1JER;, 6,3(Q.5� any, , acceptance by,OWN.Eft orimy .fififutaIo do SO,:. 6.30.16.. any, ryim and approval of a..Shvfi Dtarwiraz orSample.mbirtittal or theistacince'ofa notice tfacceptability by ENUINN . EFR I pursua - at 10 paragrapbo 14-13" anyriirirxcdontcsL-or. approval -by ,6thcr.: or 6.30.1$t, ari}% c6rrteti6n of� rklkrivie Work by towi�!FR' 6 31. To the fullest cxtcnt: permitted by Lawa and Aejulati ' oms, CONTRACTOR shall indernnify.and hold haniiles.. •OWNU,4" NLTR ENGNT-ERs Co.nsrilianits,and the office-m day errs, enif5ioyea.", agents and' other consulmrim 617 each and any of them from and against tIL ct;limscosts. 16sseg and aiuna-ges (in&dioi,,� but, nor" limited to, -lilt fectll and charges at ., crigineem archite�t,,f. iiciorneys and other profesoibrials and all court or arbitration or other dispute resolution costs) Caused by, arising out of or.resulting tiom the performance of die Work. provido&diat aiiv such ciiin, cos4 loss or damage 'i attributable to bodily Injury. sicknesi, disease or death!or I,,uty.to or destruction,of tangible property (other than the . Vork iLAf) - including the losslof use resulting, therefrom, Arid (U)i, caused in whole ora'n Pali by any negligent act or'unission of CONTPACI'6R, any Subcontractor, -,In)- S >upplit;r. any, person or,6rgan.ization directly or,indirectly employed by any of them to perform or rtinnish any aLLhe Work or-tunvcitc for %vh= uju any of ihern may be liable; regiadless 'of whether or not caused in part by any neglience or orn I I ssicin of . it personor entity .iridemnified hereurider or whether liability is imposed upon such indemnified paily by Linvs tend ,kcgulations 'regmtoikst; o(the mi;1i6ence oldriy such person ur entity_ 6.32. Ira_any and till claims _aujifislt' OWNER or ENG fl-ErR or env 6C their rvspecttvc consuftant& w-'erits- officers, directors wernployees by'any employee {or the %ury ivcr or r.,;rsonil reorestcritative, of'such LmployLc.) of CONTRNCTOKI any Subcontractor. arq Supplier, any persopi or orginim tion directly-6r indirectly emptt,iyed by 17 1 any of them to perform or furnish, any of the Work or anyonefor' whose nets airy of :them may be liable; the indemniticaticin obliiiation under Ftiragraph6.31 shall .not be limited in any way by -any limitation Linthe.aniotuit or t}pe'ofhdamia es. compcn,ation or benefits payable by or for (-0 I11 RACrOR or any such, Sulx:ontmctor, Suppl iarer other person or organization under workene compensation acts_ disability or other Employ& benefit tcts, 6.33. The indemniliwtion obligations of CONTRACTOR dnder:piraLTaph63l shall not extend to the Iiabilatyof EN6L,,EER and E\GNEER's Co uul ants; ofticzrs.. directors employees nr.agznts mused by, the. pro[essionaL neglieence, errors or omissions of any of them. ..Stott va[ ofObirignerinx 6.34: All n:pr senntatiam-, indemnificationswarraimics andguurantees made in. rcquimdby orgiven'in acccadanie. with the Contmct'Dccumcntz. as well as all continuim; obligations mdi6atcd in the Contract Ducumenu will: survive final ,payment, 8(mpteticn,ancl acceptance of. the. Work and termination orrcompletion of die Ae,Jcemcrtt. ARTICLE 7--OTTIF..R \VORK Related Work at Site: 7,1., OWNER ,may perform, other, work related to the Project at, the sit, by OUN'ER's own.fouees, or et other direct contracts therefor which shall contain .GenemL Conditions similar to thcse,.orhave aiiher work performed be utiLh owners, If the fact that sitch.othcc work is to be pi.rfimgcd :was hot noted in t e Contract Documents; bien:. (i} written notice thereof will be.6ven to CONTIL\CTOR prior to starting, any stick other work and (ii) CONTRACTOR m av� make a, ,claim therefor an provided in Articles I I and 1"ifCONilL\CTQR_believes thaLsuch perl'onnancc will involve additional experise.(a CG, ITRACIOR or requires additional time and the -parties are unable to agree as to the anrount or cxn:nt thu'eoC 7,?. CON-FRACTOR shaltallord etch other contractor who is a party, to such a direct contract and each utility 6dmcr (and OIVN-ER. if, OWNER Ls patornting the additional work with OWNZR's employees) proper and snfz access'to the site.arda reasonable Opportunity for the 'introduction and'storage of inaterials :nd equipment and - the execution ofsuch other-work.andshall properly connect aril coordinatc the Work with theirs. Unless otherwise provided in the Contnict Documarm CONTRACTOR shall do all cuuinp;'htt1 11 and patching of.thz Work that may be required to make it szvael parts come.together properly and ink rate with such other avoik. CONTRACTOR shall not cndan_erany work ofothers by cuttui_. e cuJating or othcrwise alterinu, their work an& will only cut or alter their work: with the writtrn consent of .agGNEER and the others whose work will be :i(Fectcd: The duties andrujionsihilitics of CON b'RACI OR under ihis paragraph are ter the bcnefii of such utility owner and other contractors to the cxtent.'that there are comparable EJCDCc;ENMIL COdDMO 5 HtPstt996 E(56air wICITY 01; FORT COLUNs stgpuFIC.Ylious MLA' acmioj �provjsions for the. benefit. of. CONTRACTOR in :grid ,direct i ontracts between 0\4'NGR and such utility.owners. and oil-imcentractors. TY It' the proper execution or, results of any pan of CUNI R \(L'ORs 1Vort,' depends upon work. performed by others • under this Article 7, CONTR ACTOR shall Ii sjeet. such -other wark and promptly,rocrt to PNG.INEER in writing. any delays, detects or daticiencies in such other work that render it unavailable;or unsuitable tar the proj)er execution aril results of CO\rrRACTOR's ,Wort.. CONTRACTOR's failure so to report. ,will' constmae, stiacceptance of such. other work: as fit and proper for .intcuratiurf with CONTRACT.OPis Work except for latent or normpparent dz(ects and'defmkpnctzs in such odier :cork, CririrrEnution: 7.4. (f UWINFR contracts with others' for the perh.rmancr of other work on the Project at the site: the .11illow•mg will he sat foci iiiSupplernantary Conditions: 7.91 the person, firm or corporation who µ-it[ have authority an& responsibility for coordination `of the rcuv lies among the various -prime contractom w 1l, be identified; 7:42: the specific-miatters to Lie covered by such authority and usponsibility wW'be itemized) -hind. 7,4-,: the extent of, such authority and respaRsihihties will Irc provided. Unless othcrwiiw provided in the Supplementam -C;<mditions, shall have sole .authority and responsibility in respact;of such coordination. .tRIFICLG &-OW N-GR'S RESPO\STI I[MIES. g.l. Except as othenv providcd,in these Geneml Conditions, OWNER shill' issue it] conimuiticatio,m to CONTRACTOR through I IG NEER. In, case of tetmutation of the employateot of L't`iGNEER: 0 N-ER shall' appoint an engineer against whom-EE>N%-FR�\< TGR-makes-no-rrEnaoirlblrobjzi�Eicxe whose statusunder the Contract Documents shell'be that of the former ENGNCCR S.3. OW TER shall 'Cumish the data required ot. OIYNER under the Contract Docurrwr s:. promptly' and shalt make payments to.CONTRACTOR prumptl}-when that are duo has provided in paragraphs 14.4and 14,t3. 4A. O\Vi<TCRs duties in ,-aspect of providing lands 'and eascmienLs and providing engineering surveys to esbablishrefcrencc points are set forth in,paragraphs4.1 and 44 Psragrriph4:2 rcCcrs to'OWNTM'-., identifying and making available to CONTRACTOR copies of reports of explorations Hoot tests of subsurface conditions at the sire -and drawings of physical conditions in existing. 0 1 �jI 1 �I 1 3.2. In accordance with Section 8-160 of the Code of the City of Fort Collins in determining whether a bidder is responsible, the following shall be considered: (1) The ability, capacity and skill of the bidder to perform the contract or provide the services required, (2) whether the bidder can perform the contract or provide the service promptly and within the time specified without delay or interference, (3) the character, integrity, reputation, judgment, experience and efficiency of the bidder, (4) the quality of the bidder's performance of previous contracts or services, (5) the previous and existing compliance by the bidder with laws and ordinances relating to the contract or service, (6) the sufficiency of the financial resources and ability of the bidder to perform the contract or provide the service, (7) the quality, availability and adaptability of the materials and services to the particular use required, (8) the ability of the bidder to provide future maintenance and service for the use of the subject of the contract, and (9) any other circumstances which will affect the bidder's performance of the ' contract. 3.3. Each Bidder may be required to show that he has handled former Work so that no just claims are pending against such Work. No Bid will be accepted from a Bidder who is engaged on any other Work which would impair his ability to perform or finance this Work. 3.4 No Bidder shall be in default on the performance of any other contract with the City or in the payment of any taxes, licenses or other monies due to the City. 4.0 EXAMINATION OF CONTRACT DOCUMENTS AND SITE ' 4.1. It is the responsibility of each Bidder, before submitting a Bid, to (a) examine the Contract Documents thoroughly, (b) visit the site to familiarize himself with local conditions that may in any manner affect cost, progress or performance of the Work, (c) familiarize himself with federal, state and local laws, ordinances, rules and regulations that may in any manner affect cost, progress or performance of the Work, (d) study and carefully correlate Bidder's observations ' with the Contract Documents, and (e) notify Engineer of all conflicts, errors or discrepancies in the Contract Documents. L 4.2. Reference is made to the Supplementary Conditions for identification of: Subsurface and Physical Conditions SC-4.2. 4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work ' required by the Contract Documents and such means, methods, techniques, sequences or procedures of construction as may be indicated in or required by the Contract Documents, and that the Contract Documents are sufficient in scope ' and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. I 1 1 1 1 structures at or contiguous to the sita that have been}iIi7zd bt-ENG NFER hi prepeuing )hc Cuhu* Docftmeni.,_ riot-etttitntutnw� lalsrltR•--anc{--prirprrty-trtsuran�-:rrc: set. fonh.if+parngraphs �-�-theute�rrlti:. 8.6. ()WWER isobligated to execute. Changc Orders as iiiiliivkril in paragzzph.It).;}. . 8'7_ OWNGR's responsibility in respect of, certsiih inspections, tests and .approvals '.is set forth.in paragraph 13:4,. (n connecdon with OWNf Rs 'night tc stop Wort: or suspend Work, scc: (nragnphs13111 and 15,1, FuLragroph l5.2:deals -with• QWAR's right to terminate services of CONTRACTOR under cermin'circumstances- C,9. The OWNER shall not supervise:, dire[ or have control or authurity over, nor be responsible for. cC) em-aC'rows nienris, methods, techniques; sequences arproeedi res of construction or the safety precautions and pmsnms. incident -thereto, of for. any tailure of CONfRA('rOR- io comply, with Laws rail R.egulatibns' applicable to tfic,,fumrahing or perlonnnnce or the Work, OWNER will not be responsible for CCO T RAC1Ol s failure to pLTfunn or turnWi the- Wnrk in icoordarn:a with the Contract Documents. - S-Li)=QL4?SE R's-: easpansiEiility-in-rspast��undisstoud -Asbesno;;— _ r-o Rii�itre-\•fatemis-nrteekrzd-t r�.�„ ;-eat-tltrsrta-is set-ti�rth=in-pn'-+- r<tent-A�F?:�acrzi=?ert�c'*.v-t[nifvh. rri�_, Trrai�r�r)�r���hla--e4l.3rne�-Ekatt-Fnnaiieail' aitfangimants-_ have'-brm-made-to--,<�(isCv-OW?.`E[F's -naw��tktltk¢• r,. ?rear - responsnbil ity-ut-respect-thereof-w i11-Lu-irstsat-fiat[-in• t he Supplementary Gojidit ions- mrrICLF' 9-ENGINF,FR'S STATUS DUMN-C' COYSCRUC-ROir O{t'NER'i Roresenttrt(Ye:- ,),J. ENGNMUZ will ba OWNERs represeiitnti4e during theconstructiun perik The duhex and resgwnsibilities. .Hnd the limitations ofauthority of ENGLNEER as OWt' Ek's representative during. construction are, set . forth in the Contract.Docutrients and shall not be extended tdithout written consent of OWNER nnd'CJG fNLER 4isifs.tn Site. 9:: E\GINEER wilt make.visits to.the site at intmals, appropriate to the. various ..stages of .construction as ENGNrEER' deems necewory in order tb: observe as an esperienced and qualifiM design pioCzscional the pnkgrc!s. tiA'OC'tiENE1LV. Co.,wrnomit, lq- 119YqEaitiuii cot CS 17 OF POKT COLLf hS \f OUIPIC ATION:i �-Ftyn' -I ^(iuu) that'has been m de'ind the quohty of the various aspects of CONTRACTOR'S eeecured' Work, Eased' on information obtained.during such -visits and ob. a aticins. 1 N)EN -ER twill endeavor Cor die benef i of O6VNER"to determine: in rncral it. the Work is proceeding in accordance with thy. Contract lkvimtents- ENGLNEER will not bexquiied'te Make-axhaustive or continuous on- sitt-..inspections to check:' the quility. or tivantity of the N Work. ENGEE•R'3 efY6rts- witl be -directed toward providing tor. OWNER it grrdtcr dt_ree.ol cont[denot that the completed Work will c.onfor[tigenerally to the .Cpnimad Docutnents. On the basis of such visits aiiq- n"- site. observations, F.eKihNEER will keep OWNER. informed of the progirsi oC Ilse 1Vork and willendeavor to guard OWNER aeautst def dive Work L•NGINFE.Ws visiLs •and on -site observations are suhjc& to all the limitations on ENGI,NEER's authority and responsibility set f6nh in paragraph 9, 13, grid particularht but without. limlLnliort during or as a result of EiIGINEER's.un-site visits or obs<.rvitions of (ONTRA(irOR's Work ENGINEER. [trill not supervise direct. control or hate authority over or be .responsible for CON-fRAC'1'OR's means; methacts, techniques, sequences or procedures of construction, or the snfcty precautionsand pro ams incident thcrcto, nr for any failure of CON rhAUOP to comply twidr (,am ind' Rc'gulnbonsi ipphc.gble to the tumnshmg or perfomimicc of the W6rk. 'Project Rrpresetitdtive.- '93. If OWNER and f:NGLNFER agree, ENGINEER trill furnish a Resident .project R..rescntativz to assist ENGINEER in providing more continuous observation of the Work 'rhe responsibilides and d -authority .and limitations thereon of any such Resident Project ReprescttLniive,.and isistmus will Ix as. provided [it(xtmgraphi9.3 and 9.13, a fwlF in-tha SuppIWine nti Conditions of these General! Conditions. Jf OWNER designates .another ieprcsenlative, or agent tut represent .OW'YER aethe site who is not: ENGLGEERs Consultant, agent or employee; •the re. onsibitities and authority -and limitations, thereon of such other person. will, Sc. as Lxovided,in the inppFeeetery oltdtnns rngrnph 9 of theseGcnuglConditions. ffthe F\rrCrrNF,F.R'tumishrs I Resident Pro ir-t.Rep ;c tative (RM or other aisiistanls, r if.the OWNER desianntes a Represenmtive or asen[,'all as provided in paraemph 9.3 of the General Contliliorvx Iheie_Representatives shall have.the authority and limitationsas provided in Envscrap9.P3 of, the General C:onditrons andshall be.subiect to the toilowine: 9.3j. The Pe rEeesentauves dealings in matters pcnainine tathc.on-site work will_ in cenerak ae with the FNGNFF.R and COINTRACTOP_ But, the Representative will keep jhe OWNER -properly advised about .§uch matters. - The_R_epresenlatii•e's denlines.with sutx;ontractorsmill only be'throuth or with the and approval .ol the CO'I'I' CLOP -9.3:=. Duties and.Ro'pomibilities:.. Reoresenmtive Mill: 9_3.1.I_Schedules - Review [he . rp a_'nec schedule -and otlxr schedules prelxired lw the. t ONTRACTOR• tmrl consult wish the ONG(\itEERconcemiritiacu ability: 93.T_. Conferences and kleetine - Atumd meetiru «ith the CONTRACTOR such as. preconstructionco - cnccs._Rroacss mcctings and. other -job .conic ences._and _preMire anj- -93.23. Liaison 9.3.2.31'. S•rvc as ENGFNERR'S liaison with CONTRACTOR workim, princicvlW throtieh CONTRACTOR'S superintendent. to assist the C.ONTLL4CrOR in understanding the Conti -act Decummu 932.3:3 3ovt in obtainine liom.O%Wi ER additional daaihs or intlomiation, when required- for protxr examtiun of the. Work., 9.3,2 33. Advisc the ENGINEER and COIJ'rRACTOR of the commencement of anv Work requiring -a -Shop Dmtvine=or sample submission it the submission,his-rol becnaoproycd bvthe FNrGINFFR. 9'3�'_.J.2eviery or W�iuk�R;z{1 coon. of Dete�:[isa: %Voile; Inspection anc Tests- 9 i.2.4.1- Condud on -site okisenations of the Work in VnNpzss to.assist the ENOINEER in determininey,that the %York is.proeadLim in, nccar&nce w•iih.the C ontraCLDocuments. . . 2,.��Q3„Accamtmny visiting�insp�Ytors. represrntin, oubtic orotheraerncizs tim•ine jurtstlicucui over the Project reoord.the resrdts- uf these instxctions and report' to� the ENG WEER 9.3=.: Guerpretrtton of Conwacu Documents.. Retort too-NGLNEEI. .when clarifications.and iruerptetations of the Contract Documents are needed. .and transmit to COifrRAL•COR chtrilica(ion and intcrprdgtion of the Contract. Dpl:tlments as issual by the E%TGFNEER 93.16: \4oditicatitms.. Consider and elminme CO (TRAM ORBS supgesLnlK for E'JCUC<)ENFR-U, Ct}tJUPn OnY t:/10-5.(I!i9ti Li6ti�•il n4 CT[YOIL WR r COLLINS SIODIPIC.IMUNS I KLVdi`Nat mcditiuitibn in Drawings -or Sj)ecifcatioris ;in rtipert.. these recommenthniun_ s to EDiti;_GER, Accurateiv- transmit to: .CO,N'rR4CTOR decmuos issued by the ENG ENTT.R 9:3:23: Records. 9.3:2.5 t. Furnish LNgDgEER kxriodic rcpi r-s. as tegi iced- of tho prrunss. of llie Work and of the CONFFRACCORS compliance witFl tliEpi'.pereic�sclicdule arul schedule of drop Drawim, anddsampla submit -iiLL Consult with LNGFNEER_iin advance- of whecluling majaL teats, insixciions br tart of imortant plates of the Work: 9-3.2:33. Draft oroptked Chlriee Orders and Work_Direcuvc Changgs; obtaining bfr;kup .umtoal from the CO-.\,n AC:r6R nnil_recommend to ENGINEER. Ghangc Orders, Ayork Dirzctivc Charm_es and - field orders. 9.323A Regan unmetliawN to ENGLVELR' and OIVNTR the cccurrence or uny accident. 9.3?.9. Pavntent Reuusts. Review npplicationi For payment with CONTRACTOR for compliance with the- established praxdurc- For their submission and tinvard with recommendation to 1 1 1 1 1 1 1 1 i 1 1 1 i 1 1 1 1 I 1 1 ENGMTMPR notitia particularly the relatiortskip of :Ifie pavrn'ent requested'[o the schedhale of value. - .work completed , and and materials -and:-eUulurnent. dehvered.at. the -site -but not,incorporated'in the work:' -- 9.:'_:U): Complctien. 9_3:3if4.i._ Oefur—j[_iGr-.\=— ssjo a Certificate. df�suhtattial Commnfeuot3.'submit to CoNTP_ACTOR a list of observedi.items. reauainEt correclionor coat lei tion 9:3.2.10.2 Conduct final inspection, in the ompany,of-the FNUIVFIi ZI OWNER --and CONTTRA(,rOR .and nEctxare- a final list of items to be corrccted'or completed. -9.12.163. 'Observe that all items on the - final Lisa have. been corrected 'or completed and make recommendations- to 'EsORv"EER concernine acceptance: 9.3'.3. .Limitation of Authoritt': The Representative. shall not •t)33:1. Authorize ant deviations from the Contract DocumentS -or accept- any substitute materials fir equipment_ Inlei aumh tz- I by -the F.NGINF.ER -L 9.3.3:1.. .6zcecd..limitations. of HN'6 RER'S authorim, is set forth in the Contract Documents. 9.333: AUndcrt lkc. anv.of,the responsibilitics or the .CO\rrRACI'OR_ Subcontractors_ ur C'Oy,TIL TQt2_S_so xi'm ndcnt: 9:3: 3:4 Advise on- 7irrisvue dirtctions_relative to_ or assume_ control of er my spec[ of O g mcarts, methods techni tics, s.:ciu�rn�v_or' procedures for`e;orisittia.non unleisucn ic- _uGcally called for in the Contmcl'Documents: 93.35: Advise an or issue diirectibns reward' oc :usume eontrul over eaten^ precautions and preULtrfis'.in connecuons with. [lie• Work: -- \_cccptt$ko�`Draiplc submittals fromant•one.•'other than tha- CO\*rRACTOR - - 9.3.3.7. .:authorize OWNER to _ occupy. L Ihe' Work in whole or in part.' 9.3^3:3. Partibi atP a in spceiklizedGeld or laboratory tests or inspections conthtcted by others_ czcept is spccificcilly authorized bv_ Ina h�IGINEER.. C(arilicatio ss and hiterrretationc 9.4. ENGINEER xili issue with reasonable promptness Such-writteii clarifications. of interpretntipris of the, tatucot•Ntxit:.Covorr air; ivit>~s fitN)a+eenlau ;vt a'n orrot(r mLt.i � ; atootrtc.trltirs n(zv.+P_niva? hquirements of•thd Contract Dasuriients (in the form of '.Dnminys,or othenci:x) as.[.NGrNMER'.mav deleritiina necessary ., which .shall tie consistent with -the intent of -and rea,wnabl}' inl*,rable from the Contract Documents. Such - written clariti66ons and, ihlerprtations will be binding on UWNER and. WNrRA(9OIj_ If QV1NFR o5 +COhT&QCTOR'believesthat• a .wrtten clarification, or interpretation'' Mifics.airadju.sRnent ui Co ntract ontract-Pried or the CuntrtcC Times and:'the parties -.are unable to. aSree, tothe amount or, eetent thercull if 'arty. OWNER or CONTRACTOR mat make -a'written claim, therd6i. i.ls provided inAr6Ot 1.1 orAiiicic`i2. Muth dazed .Variations in. tVorki 9;5, ENGtgIE61Z luny ruthorii.& minor dariations in m .the work rrothe reyutrements of the Contract Dmtinwritvachi�h do not involvc an a.lfustmenc in the, Contract Price or the Contract Tuacs and are: compcatibic: .with the Jesign wnd.cpt .of do com plct..d I'rofcct .ac a funct+onng whole as indicated by the Contract Documents_ These mny tie•ncconipleshed by,n Field Order' and will bebindi ai OWNER and ,also art ,CO jVFRA(-..TOR-vvho,stiall rertomi .the Work involved .promptlyIf O, N} h 6r CpPrf 12 \E3'OR txh vcs that a Field Order)ustihcs an adjusmtent in the,[ onnet Price>or .thc,C•mtncr Tiru,s and:thie pancs i..are unable to agree as .to the, -'amount or cztcnt- diereol; O\bi\FR ar COv'TRACTO R'rnayahake a Written•Clain[ tiXeC161- as pr6vidcd in rticic t 1 or 11 Rejeetrng-0cfeetrte It%ork: R6. F.NGIIdF,RR,}will havc'authority to disapprove or reject dVrA which FNrGrYFFR believes; to he a'vfective, or that ENGNEER believes wall not prodbee a completed WQj'Cd that cdinfgrms to the Gontrac[ Daxuments or. It eat will. prejudice _thd_ inIt*iry•wPthe design concapt of7the completed Project as a. funcuonng'whole as indicated•by rhd (onvact Du umutts.. FNGIv"EER will alSohacv, afithonty to requt e special inspection or testirie- of the -Nark as provided in para_raph I3Dl.whether or -not the. Work is:fabricatzd. installed or completed. chop Drmviitgf, CIi<urge'7rrlers acid Paytn"eius: 9.7, In counfection with E'`GFNEERs Alflioriiyi'es to Stiop�Driwinc,;.santl'Samples, we paragraphs through 6.28 inclusive.. .: . 9.8, d'n.connectibn tvitfi LNG=, -IT_ S authority as to Change Orders, see lrticksUt Fl.aru112 44..'liiconn�•clionditk.E�iGibFEER's•eulhcri[y zs lo' Applicationsfor'Payment`see,Micle 14 - - - Deternrinationsfdr Urfil ticesi, 'Jell). ENGLNEER. will; detemtine.the actual"quantities and classilictiion5 of Unit Price kV6rl, p'e6ormed by Cv\ZR.\(_TOR. ENGINaR avitla etiew with COctIRAr'rOR. the EPGiVEER's preliminary determinations on such.matters before rendenm_ a written decieion thereon tby'reconvnandation of,an Applicnuon "L 1 for Faynientopotheruase)._ �Ghx+TFR's-writtendecision tharetxt %mitt. be final; and binding upon, OWNE2 and CONTR ACTOR, unless. within ten flays after Lhc date of any such decision. either OWNER or CONTRACTOR delivers to the other and to ENGINEER written notice of intention to ai+pz_il_ from fVOUW.F. s decision and; (i)_an appeut from CNIGIN -ER's decision is 1a4:_zn within the, tin e limits and accordance with tie•procadures .set torts in Exhibit GCA, "Dispute Resolution Agm ecenC, entered into between OWN EP andCONTRtkC'COR pursuant to Article to or (it) if no such Dispute. Resolution Airrvement- has been entered into. a lormaf p oceeding is mstlr ate l by lie appenling party in a return of crimper I enrjunsdiction.to exercise such n_}its or remedies as the appealing party may haviih respect io FNGNF.FR's deoisron. unless. btheFwiso agreed in tenting by OWNER and COPi'rRAcrOR ,Such appeal'w'ill not be subject to the procedures of paragraph 9.11. Decisions all /JLTlilres 0.11. ENGFNEFR will be the-ihitiar.inttrlfrerr of the requirementsof the Lintract Documentsandjudge of the acceptability of the llrorl: thereunder Claims,. disputes;and other matters relanng,,to the aceelxahilityof the \York or the ifiterpretation of the requirements of the Cinitntct Doeuaicros pertaining to the .peribmianceand furnishing of the Wdtk:aad claims undo Articles i l and I'_'m respect of changes in the Contract Price: or Contract Tare;: will be referred'initialiy to Ei�KiLVFF.R in writiniz with a request fora formal decision in accordance •,with this. paragraph. Written; nonce of each such claim, dispute or, other matter will N delivered by the'claauant 6 ENG[DIEER. and the other part} to the Agreement promptly (hut inno event Liter than thirty dagsT after the start of the oecurtenec or event givalgtrise_ thereto, acid written supporting•data.will! be submitted to F.NGINF.ER and the tither party ;within sL\ty days atterthe.start of -such oycurrencc-onevent unless _ , iGIi\MER allows an additional periW of iinie tor- the .submi�ion of additional'ir more accuratedata in support of suet; cLuni. dispute or other ttiatter_ The opposing party Shall submit any response to ENGRNMER and the claimant within thirty days rafter receipt of the claimant's last submittal (unless: FNGiNF.F.R allows. -additional Lillie). ENGL\TL•R will render a formal decision in writing within thlrrrdn'vs after receipt' of the oppnangpartvs-subCniital, if am'.'paragraph.- .. in'acwrlanca'tvith this pagraph. - ENCiMEER's written decision (in such claim, dispute.or,other matter will be final and binding upon OWLNUR and CONTRACTOR iintes.s: (i) an appeal front D-NGNa-R's decrsrbn is taken within ihe� time limits and in accordance with the procedures set Carth in EMIHIT GC :A "Dispute: Resolution _Agreement"', cnteaed into Extween OWNTER and CONTRACTOR pursuant to .Miele 16.. or (ii) if no such Dispute'Resotutitm Agreement. has been entered into. a written .notice- of _intention toappeal' from EN-(r I_R's 'written decision "is delivered by C WNER or CONTRACTOR to the other and to EI GIUZL•it within thirty' days deter the data uf'such decision and.a formal proceeding is institutedb_i the.tippealir>•_ party in a fdrum of cp "ercntjurrsdi "on to-ccercix such riJtts or remedies as�rhe appealins partymay'tiavewith respect Lei claim:. drsoute or ather matter in accordance with applicable Laws and Regulations within si.� dims. of the dire' of such FJC'Dr] GENF:N �il. Ce}Shcyi�Il Oi`ri U f!!S (1 y'IO IiJilipi! -- %Y/CIrt`OF FORT CO!.0 NS Sf ODIFICNQONS 11'.EYa12000P deeeion. u0ms inhrrvtse agreed in writing by'C)lrWM and CONZRACTOR -9.12: When- fimctioning:as inlerpreta and judge under. paragaphS 9.10 and M L ENGINEER trill not show partnnlrtw, to;()WNkR or, CON fCI RA*QP and trill nonce. liable in eo'nnection. with any interpratauon,or. decis'Lon rendered in good. Lrilh in such aapaciiy. Thexcridering of a decision -by. ENGL\MERpursuant-to pamiaaphs 9_. P) or 9.11, with reset. to. any, :such claim, disputeor other mauer(except anv which. have been waived bt the ma'ld ng or acceptance of final piymeni as, provI'6d: -in (ameraph14.1i) will be a condition precedent -to arty cxcxcuc by'OWNLIK or CONTRACTOR ofsuch rights or ref e&Iies as either may otherwise Have under the. Contract Docttinctim dr, by haws or,Rcoations in reseet of any such clairn, dispute or ether tnattertrstt,.r^ "isle -Fit: 9,13. Liih&iridrrs- on ENGINEER's Aufhoriry sand' Resppn.iib.Wtiec_ 9.I3.1, Neither FNGrfVEFR's authority or resporisibility under this Article y or under any -other provision of the'Contmct Ikocunients nor'any Decision made by FiJGI\FI R in good faith either to axereise or•not ezercisr such authority or respomihility or the undcrraking; "Kerciseor perfomiance'of'any authority or respomabilitvl, by ITIGRNFF.R-.shall create, impose or give' ripe -to:anyt deity' owed by LDIGNL•ER to CY7DfrRACTOR,_ any :iuhcomractor., any Supplier; any other Nrstn or organization. or.to.any surety for em or ployee or agent or'any of then;. 913.2' f,,'NGINF:FR will not supxvisc;. direct. .control or have authority over or .be rLspcaaaible for CONTRACTORS means: methods techraquzs, sequenrusor procedures of construction, cif [tic safety precautions and: pn�grtms. incident tharcto, or for any failure of (_ONTIG\CTOR to comply with Lairs find ReguLuttvtS. applicable, to tlii' furnishing or liartiirmana of the Worlc. ENG.INMR fviU not be responsible for CON CACTOR's raiture' to,perferm, or turnish the Work in accordance. with the.Contract pocuntons Y_i33. FNG(NFEI: will our he responsible for the acts or omissions of CONTIL\CTOR or of any Subcontractor, any 'Supplicr,_or of any other: person or oniancoition perform inw pr fumishmgd any of. the Work: 9.13.4, LNGINEEWs review of the final Applicaurin for -Payment acid aueompnriving documenmtiun and all maintenance and operating instructions, schedules. guamrtef.%.Bonds and certificates oCindpection tests- andapprovals and other documenuttion'requ ired to be, delivered by pxinght ph 14 t'_, ,will oniv be to determine gcncrally,ihat then contentcomplieswith the roquirenicnts k and in the case of certificates of inspi:ctions, this arid' approvals_ thud. the results certified indicate compli»nce .writ- he Contract Documents. 9AIi. The iimiinnotis. upon. .authorii:y acid 1 0 1 0 t 1 I resrke ibilityset forth in this paragraph 9,1 sl iill also _apply to ENGI`�M Mis,C'finsiiltanls, Resident 'Project Representative andassistants.. ARTICLE 10-CEIAL\CF_4'.IN.THE WORK 10.1, •Without invalidatins the Agreementand; without' notice• to'rmv surety, OWNER may„.m.imy. liinc: or Crum time io time., order adddicru; dcletwns or revisions in the Work.. Such addlnons, deletions or revismnc wllCbe- authurized-by a Written AmicnchtienL a Chartue Order_ or a Work Change Dir.ecuv,e_, Upon receipt or anysuch document; COMRAC3OR.shall promptly, proceed ycith the \Volk involved. which.\will. be paromicdunder the applicable conditions or,the Contract Documents (except as otherwise' specifically provided): 10._. it I)WNER und'.CO TRACTOR are uroble'to wree. as to the extent if arty, of an adtustment. in the t'6tmct Price or"an -adjusu»mlof the Contract Times the[ sh6uld he allowed ns a result yf a }York Chanae.Directn;6; a. claim may he inadc therefor as pnrvided. in Article I I or Article 121 103. CONTRACTOR shall not betniidedtoanmcransc. in,ihe Contract Prkc or in cxtensiim of the 'Contiact Times with respect tofanyr Work performed that is not icy' 'red1w s a the Contract. Documents amended, 'moDfied -and supplcmcmtcdispeovided inpar;'rgraphs ,Sand b, except in the casc-of an cancrgency as provided in paragraph 6:33• or 'm the cas.,- at of, uncovcre Work: is- provided in r imgmph 13:9: 10.4. OWIIM.R' iuid CONTRACTOR cxccutc appropriate Change Orders recomn)ended by LNGINLER (or Written Arne rklmentsj covering; 10;4,.1. changes in the Work whicn:a re (i) ordered- by OWrrm pursuant to p'ara_ntph-Ia V, (u) required becausc,of acceptance of &,jectfvr Work under parazrrph`13,13 cr oonecting :kfecrive. Work under ,paragraph 1314.or (iii) ngrd�ltoby lhe.pktitlk . 10.4.1 changes in ihe-Contract Price or Contract Times which are ageed toby theparties2,and 10.4:3, •oranges in the Contract Piwe or Contract Tihirs, which embody the substance- or arv, wYiuen :decasian rendered by ENGINELR pursuant. to. paragraph 911, provided tfiatt in lieu or executing any -such Change Order, an appeal .may be take n from tny'such' dacisicn: in •eccurdarice with the provisions of the C'onuact Documents and applicable Laws. and Res�ulations.'but during any such appcaL. COV'Cl2AC'CUR shall wiry on 'the -'Work and adhere .to t}ie pre*_tress :,chedule as .provided in paragraph 6:=?_ 10J. Il notice of any change ad'ectin �thc: ends l scope of-die.\York or die prov sions.pf the- Contract Documents. ErC;UCGHivewlL,cpNUITiU .t 4 I i" Wt)'jgdit(cdl. wlCS'rY OILFORT COLLI NS.:IOL)IIt1CA rIG-45 lREIN' 4U 01101 (ilicluding, but. ,not limited to, Contract Price•or.0mract 'Cimesl is.rayuireI by the provisions of`any Bond to be given to a surety,., the 6ivim, of anysuch'notice will be C'ON,iTR_\CTOR's responibilily; and the amount of each applicable. Bond will be Adjusted acconlingly: Awrict.b. iI-CELINCE�OP"CC)\ PRiCC't' PRIDE 1,1.1, Thc. Contract pride constitutes the • total cainpcn..,wion (subject to authdrizcd;adjusuncnta) payable. to CONTiL--XCTOR tier ExiOrin ing :the Work- ,\It duties, respanslbilitics•and ohligmiens assigned lo:or undertaken by ( ONTI:ACI.0R:shall he rit, CONTFLACTMR expense ,without �hanac m thcComraccPrice. 1123 Tlic C,ontract'Pricc may gnly'hc cheinged by, a Change nrd:r or by a Written AmendnenC Any claim. for an adjilstruen[ in the Contner Prtypshall 1x based.on wrawri notice delivercd'hy:die Ixlny:nlhAmg the claim th the other party rmd to,FNGDlI=- promptly theist in`no' event later, than thirty days) .after the fait. -ot the oi:currcncc or ,gventgit°mg. rise:. to the claiat and statiri'g,the - gepeml nature of the cttii it, Notice of the amount sit thie Claim With supporttn data shall be delivered within silty days after the start, of such occurrence or event (wuess ENGIN6E9 allows:addtional time for clnrmancto submit additional_or more -accurate data in support of the claim) and shall be tromp hied 6v claimant's written statement that the ❑dfusmunt claimed rovers all known amounts -to which the clmnranL is entidcd as a .result or said occurrence or event all claims for adjustment' in the Contract 060..shall be. detenliined', by Of.GIN ER in accordance 'with paragraph911 if O1WBR and COIN FvACTOK cannU otherwise agree -on the amount involved. efo .cluun tbr. an adjustment in'the. Contract Pritx swill be•valid-if`not submittedinaccordance with Ifni paragraph l L—L 1.13. Tlrc •value or, any MV Vk. coveraj'by a:CTrrnge Order orrof any claim for anadjusutieni in -the Contract Price-tvdl be.deternrineddsfollows:, 11.11. where the \York involved is covered by umt pnus- contained in the Contract Documents. by application of such unit.prices tosihe gauttities-of the items: involved (subject to did provisions, of paragraphs I19.1 through 11.9.3:*inclusivz); 11.3.2. wherc the'IG"ork involved- is not covered,by Brut paces contained in the ('on", ct Documents; by a muivatly aged paynienL.bsk including lntp aunt (which may include in:. alluvmnce for overhead. and profit. not necessarily :in accordance with ptraeniph I1.6:2): 11.3:3. where the Work involvedis not covered by unit prices contained in the C.crntntit Documents and. agreement to a Pump• sum "is-nuC retched under pa-ragraph 11.3:2; on the Davis of the C'cst of the Work. (detennined.its provided in.parargaptis 1:1A and,l 1.5.) plus a C NITRAC'1'UR's fee For odncmd and prutit ('dctcrrtincd as proyidcd in pamgaph I.1•6). Cn:K n%'ihe ID7irk. I IA_ 'rho tent Cast.of the Work mcans.the sum of.all� L:osls�necessarily inarrnid and paidtby CONTRACTOR in the proper pert'ormance.of ilia Work., F_xcept its otherwise may, h agrcc-d to in writing by OWNF-R; such costsshall' be in amounts nohigher than these preiniling in the locality of the Project, shall include only the following items and' shall not include any of the cost itemiicd in (Ztmgtaph.115: - 11',4,1-payt,oll costs for �cmployecs in the direct, rntployof CY )N'1 R \GTOR in the pertymtance or the Work under schedules of job cltissitications mareed open by OW\L:F.R and CONT.RACCOR. Such employees .shall include without limitation mperintendents, foremen and othcF, pcm. rinel, amplo7aP full-time :at the site. Piwroll Lost% for zniployees not emploved fiatkiineon the Work shall he apporiioncd on the basi> or their timc'spent. on the Work: PavrSll costs shall.atcluda; Luano(be luuited to; :diaries and Wages plus thecost, of fringe benefits' -which shall include social 'security, coittrib6tions,. onzmliloyment ekctse and ,payrgtires,, workers,. compensatibn; health rand-retiretneret benelhsrbonuLses;. seek-ktrrr,-\weeat._- — rtrf-halida)tptit, applicable thereto. The «penses of pertbnnmg. Work alter mgular working hours, on Samrdav- Sunday or legal holidays, shall kid included in the above to the extent authorized. by OWNER. 11.4.2. Cost of all malerisLs and equipment furnished "and* incorporated in thi Work: including costs, of trzn.SZ.+(irt.•titonaril atomge thcreoC,and Suppliers Geld services required in WMCctlon therewith -ul cash discounts shall' accrue to CONCR-ACTOR unless OWNER dcpesits tufi&- with CONTRACTOR wish which to make payments, in iwhich case the cash discounts shall accrue- to OWNER All trade discounts,. rebates and.refunds and ret uns.tiuin sal* of surplus- materials _and equipment shall accrue to OWNER and CONTRACTOR shalt ruakc provisions so that thev,mav he obtaine(L 11-4.3. Nvincrim made by C,ON'TR.ACTOR to the Subcontractors for Work pertotmedor furnished by subcontractom ff required by OkYNI`R. FJC'Or] (iENER.V. CP9tri'rl Oiyti U lq ti tl 9V G(Glimr "�4 u7C(TY OFFORTCOLLttS_NIOfitHCMIONS t,RLX'di7000)- CONTRACTOR :sluill obtain competitive bids from Subcontracior% acceptable to OWNTR .rand CONTRAt .'TOR and shalldeliver such bids to OAKNIR who will then determine, with the advice of ENG(__NTE&.which.bids: if any, will be uc:cepied. 11 any subcontract ",ruvidcs that the -Subcontractor is to be'paid on the basisol Cost ol-the Work plus a'fee, the Subwritr i;t&r ,Cost of the Work and fee shall be detixmined irrthe:same manner83 CONTRACTOWs Casio of the Work and fce� as prbvidcd in. paragraphs I''1 a. "l I',�; t1_6 and 113- All sub wntricti shall.tx subjecCto the giherprovisionsot the.Contr:int Documents5nnothr as applicable. 11,4:4: Costs of _siecial consultents'�(includins .hot tl m "apt limifccages. "acts, architaas, costing laboratories, sun•eyipm- attomeys; and, accountants) empyloved, for services specifically related to the. Work,. 1 1.4:5. Supplern rh6l cost%including the.falltiwing 11,4.5.1: ".The proportion, of necessary transportation, travel anti suitistvtrncczzpetrszs.ef. rgc,rrR-\CTOR's umplovecs. incurred In discharge of dutics'connIcttid-with the Wcirk, 11.4.5.2. Cost, .including trartspnrtation and maintenance. of .idl'. . materials supplies. 4ipment machinery; appliances entice and temporary ('acilities ai. the.sne and hind tools not owned by the workers, which,are consumcd'in the performance of the Work, and cost .less" -market valuciof such items used butnot consumed which remain the property of CONTRACTOR. ' - -- 1 IA:5.3:, RL6Ws or all construction .equipment and machinery. and the parts: thereof whether mntedTrom CONTRACTOR or others in accordance -with rental agrocnients:approvcd by^ O\V\iER-with the :advice.of.!TNGUGGR.and the costs of .transportation, loadirm, unloudirig, itutallatitin,distnantline and removal thereof -all in accorchnce with :leans, .or said rental agreements.. The rental 6f`are^such equipment - machines, or parts shall ceiue 'when the. use thereoris no loner nccusary toc the Work. 11.4.5A: Sales, consumer, use or similar lazes related .to'- tfie - Work' -and, tier`. which- CONTIZAC•TOR• is liable, iinp<ised by Laws and Rmulation;. ( l..5.?. Depositstostrdi causes other than nighgence of C.Ob-['. ACTOR, any. '.Subccnlractor' or tmvone dirc+c:tly or .i_ndirectly eiriploved by anyot them or Or'whose acts any ofthem may lit liable, find royalty payments and fees for perm its a hd licaiu, .. I1.4.5.6. Losses and damaaes (and related ezpenscst caused,b): damage'to the Work, not compensatedbyinswance:or elherwise..su'stained by C:eOL%RRAC:I`OR in-connecrion ,vith the performaned and tonnishing:Of' die %Vork (escepe Lizsses<an(Cd rmigcs within the deductible anlountss. of -property' insuranceestablisher! by'OW'NMR,in 'accordance with paragraph •col)' provided they. . ' have resulted from causes other. than the netligence of :CON f R.>OTOR, sxiy. Subeontracicr, or .anvonc directly or "indirtctly employed by any Of dtena or for whose. acts any of them may be liable: Such losses, shall include ' settlements made with'the wnitcn consent and upprT.al. of OWWEIC No such fosses, camag s are.�teni shall be included in the Cxst'of the arid, Work for the , purpose �of determining, C, ONTRaC'CORs fec. I4 lic4cycr: any such lass ' or damage requires reconstruction and coi mTR cToR its placed In charge thereof; . CONrRACTOR shall, be paid for services a t'ee- prriportionatc to that staacd.in p3ra graph 11,6:2. t4 rI7- he cost of utilities: fuel and _sanitary 1 aedattCS at the'. site. Minor expenses such as..tnlegrams.. long disLnncc telephone ealLs, telephone service,at thesec, caTrccsaec and similar petty cash itans:in connectienngith the Work - 11,4.5.9. Cost of pFcmiums loradditidnialZonds and inwrance required bwatisc Or.6hanars iri'the Work: 11S: 1 he tmi,C.ost of the Wnrkshall not tncltrdcnny of- tha following: ll:=,l Pay011 casts and other compensation }if. CONTRACTORS officers, executiyes, prtncijWL (of partnership alnd_ olc limpri mrshlps) gcncrd m.mugcr`s; engineers, arelutects, estimators: �atrotiievs,, auditors,. accountants, p&chas n� and ,wrivactnb agents;, expediters tuncke<pers. clerks and tither Iwrmnnel, ' emplo\ed by CO3,7TR\CTOR whether at the,aa or.uv CONZR-ICTOR's principal or a brrfch office for general administration of the Work and not specifically included in tort: agreed' -upon schedule of job ckissineafions. referred io in paragraph 1 14.1 or ;pe0ta6afly covffed bv- paragraph 1 14.4-4a11 of which are to be l,crosldC(Cd 1tlilllm5t[atnC Costs toverei by die- CONTR4CTOR's fee.. - I IS _, Expenses..of CONTRt\CTOR's principal and ' branchoffices other than C.O'NTRACTORs irlrce at thesite, 11.53. Any punt of CON7R4CT,OR's. atpitaP expenses, including interest on C.ONI'R\C'TORS. ' capital employcd for the. Work and char cs. against CONITR\CTOR:Ion delinquent payments; 41:5.4. Costof prcmvuastot all Bomb, and for all, 'insurance whether or not COI\TRACTOR is reciuired ' by the Contract. DocumrnLs to purchase and maintain the same rcvcept, or the cost or premiums covered lny subpar emph 11.4.5:4 aboriel EICIUCGHNEX:V.,4r7NC)rli(ir},I11tl:g tI`t99 Edi uu fir CI'(Y OF FGY.'t COLLI ti.i ::\tOUI1l C.1 ❑ONS (RSV .1/2000 .C4s. due to cilia negligence of CONTRACTOR. ,any Suhcdntri tor_or .anytme directly or indirectly.ciliplovttd by any of. them. or for whose 'acts: any of rthern mtiy be liable. indudint but not limited to.. the correction of ate)ectne Work, dispospl _6f materinis or equipment wrongly siipplied and making gocid any damage to property. l l o :Other overhead or eiteraf eswrise costs of any Lind and the costs Of any item not specificullyand - z�pressly i[u.lutled in paraLmph 1 1'.d. 1116. The:, COJITRACToi) fee allb%wcd- to, CONGPvaCTUR Yai overhead an profit shall be, determined asfoll owsi 11.6:1•. a mutually acceptable rNed fee: or Ito' 'if a- Exed'fec'is not -agreed upon, then ;a tee rinsed'on die following pereen agar of the' 66a l c portions of the Cast of the Work- l1,6IL for costs, 'incurred under t ira�nphs 1l 4.1 and I l.4 Ithe C ON-RACfG)R'.c fee shill he titicenpercttnr,. 11,6:12. for costs incurred ,under paragraph 11'A-31, the CONTRACTOR'sfee shall ' be file percent 1114, 2:3: where one or mare fiats of subcontractsare tin the basis ofCost pCthe Work. plus a fee and no foxed fee. is agreed' upon. the intent, ot,p;irareraplis. l I3-1, f i-4c, 11-413:and 11,62 cc that the suhcuvntmcior who acttralty performs or furnishes the Work, at lVhatever tier, ivdl he Imd'a ftc,of hllecn Ixrcent,of,the 'cosh .incurred by such Subcontractor under Imaraeraphs l t.4.1 and 11 -F.T and that my higher tier Subcgntractor and 0-NTRACTOR will each, be. Ixtid,a ter of fire-lxrevYnt-i,Etha-mnotrnF fine{-io the ez[-lower-tier-Sub onhsemr: to be neuugated tom faith %vith the_ f12 but rn,t to z_�cred ,five percent of the amount naid.to die next lower- tier _JaLV0 torac[e, . 11.6:3.4 , no fec shall be M, yab[c on the basis of costs itemized under paragraphs 1114,41 I IAA and l I r5; 11 61 the i noamt of cralit to be, allonyed by C'ON f ELAC TOLL to OWNER for any; change which results 'in�a net decrease in cost will be the aniount ofthe 'actual net decrease in cosu plus a deduction in CONiTR\C,TOR'a fee by anamount equal to five percent of such netdecTeusg: and 11'.6,2.& when both :iddiiions.irf&credils are invobrcd in anv one chan_c, :the adjusua nt in CONTPRACTOR's Cc< hall bg computed 'on the basis of the net mange ut.accordance' .With lxlra;<aphs I 1 6. 21 through 1 I.6.1 ,, inclusive_ IIJ Whenever the cost of any Work is in he 25 1 t determined phrsumt to pantgraphA11"4 anti 115. COhTtRACTOR will establish and maintain records )Hereof in accordance with generally kcepwd�accounting practice and submit in form acceptsblerto aiORNM.— <;on itemized cost 6rcakdo.vn tugether with supporting data: Cu.Ji.1110sances., 11.3.. It is:undersaiod diatCONT[GIC:TOR.has included in the 'Contract Price all aflovvanccs so .[lamed in thy Contract "Documents, and ~hall cause the Work so covenid to Lx Cuutushrd are! parfatm:Cc� r such sums zts may lie acceptable cc) OWNERand ENG.INEIT. '_COM:1'.RACLOR agrees that:. 11,8:1 the allowances include the cost .to CONt'RAC-r(;R (kss any applicable trade discounts) ocrmatcrials anddcgdfnr eat required by tiiz allowances to be delivered at the site..andall applicable taxes: acid I I:S=. COATRACTOR's costs for unloading and handling on the spa, lahor:.insta(Iarioncos2s; overhend; Profit and other espeftscs contemplated. ,for the allowanees•h.nve been included in the Contract Prices, and nor in -the allo ances. and no demandmrr additional pavmenton ncecrit of:dny or the foregoing. avid be valid. Prior to limit payment, an appropriate Change Order (vill be issuer) as recommended by'FINGINFFR to,relleetactual amounts aoe 'COArI' R.\GTQR on account or R ork,covered by allowances, and the (74ntract Price shill be concsptindingly adjusted.. 11:9: finer Price [hark: 119,1)Vfiea'ethoContrrctDdicuinents.providzthaD:dP or part of the Work is to.br UnitPriceWork, initially the Contract Price will be;d_ehned to.include f6r:ill: .Urut. price, )fork -.in antormt equal- to the stuin of the established unit prices For each separawly identified item of Unit Price Work times the estimated qu:mtity of each -item as indicated in die. Agreement. The: estimated quantities of items of Unit Price Work arc. not guaranteedand are solely :for the- purlvsc of comparistin of Di6s and determ tning an initial Contract Price,. Determinations of the actual quantities and classifications of Unit .Price Work, perforated by CONMACTOP will b, "made by Di611�=— in accordance with parngraph:9:10. 11.9;_'. Each unit price will be deemed to include an amount'considered byCONT11,WTOR to be:adequate to cover, CONrfPACTOR'soverhead and -profit for each. separately identiGed item, I LO.Olb aEfi or CONTRACfgR may make a: .claim for an adjustment in the _Ccru ai t Price in accordance with Article I I if[ 1 l `i 1 I. the qu ntity of tmy item of Unit Price, Work Performed d by CONfIZACTOR diff-s materially and significant] ' ig ificant]' from the estimated quantify of such item indicsted. in the Agreement; F,.IUDC cEUFRu. CONUt'il Utz en0:s i o9u U'Ricu p 26 a, CITY Or• roar Ctuas atooudcxnoNS (ct': •t:zami) and TIA3;2:, there is ndcarr6ponding udijustment with.respect to arw other item of Work; and L103.3: if COlFI'RA(--TOR believes [fiat CONTRACTOR is entitled to an increase tit Contract. Priceas a result, of liavtgt inciared additional . c..•pensc or. ,OWNu'L•f2believes that OW�JER rs entitled to a decrease m Cpntru l Price and the partiesgee unable: to uQee*as to:.the. amount of ariv such increase or decrease. 119:14: 'CONTRACTOR acknowledges. that the OWNER has the nnht to add or delete items in alit Bid or charge quantities at OWNF W S- 61c; discretion without.affectarg the Contract.Price et anv remainma item sci tong. as: alit deletion or addition does not execei!'twcnty-five percent of the orR inal total Contract Price. AR:rLC1.F: 12--CRANGE OFC6N-rR<tc-r T.LNLES 12.1, The Contract prima joy Adilcstdnds,} may only be changed'by a G'liange.'Order-or a Written Auicridmcht. Any claini. for anadjustnient of the -Contract Times (or blilestoncs).shall lx hased on written notice delivered by the party milking the claim to [lie: other party and. to F.'NIGIN F..R promptly. (but m my event. later than thirty days) after th'o occur-criee of -the event giving rise to the claim and stnting the general nature of the claim. Votice of3hc ement of the claim with supportima data shall lie delivered within stt'R days atter such occurrence (unless ENGINEER allows .additioictl timcto ascertain more :accurate data in support of the claim) and shall, be accompanied by the claimant's written statement that the adjustment claio)ed is the entire-adjustmn r t. to,which late dnunintltas reaam.to belieVz it i> entitled is a''result of the occutrznce of said event::Ut claims for :adjustment in the C.orttracrTimes (or.\blestone) shall be dctenm[tied by ENCI NEF.R in accordance with: pamgraph!1,11 it' OVkWM and CONTRACTOR cmiact otherwise atinx;. .No elnun for anadjustment: in the Contnfca Times (or Milestori�+) will be valid if. not 6ubmtaed in accordancd vvith'.the requirements of this pacraaphl? 1. 13:2. . All tune limits stated'inthe Contract Documents are of the essence or the Aere<ment. 1^_3: When; C'ON7RACTOR is prevented front completing. any pair of. the Work within the Contract Tums(or kfileswries) duc•to delay beyond Ihe•contioi of CONTRACTOR, the Contact Times (or i destonrs) will be. extended in arrainonot equal to tifna lust clue to such delay .if a. claim is made therefor as providedin ptnagiapi I11'. Delays 'beyond , fhc control � of CONMt ,\ TOR skill include, but not bei limited to. act a neglect by OWNf ER ants or n le t of owners or othcrcontractors rerforming other work is contemplated' by ArticleJ- tires., floods, epidemics_. abnormal weather conditions or acts. of 0M. Oelav4 attrihutable to and I I i 11 I I die SuIxontractor bi! below -be' is in saikl within control of ki or'Suppker shall, stroll paid piovid,;Ll Pqnigraph 13:9--and 12 -4. Where CONTRACTOR is prevented front 043. As othenvisd spe6C.callY proVieled in the . completing any part of the,Wwktrrithn the Coanict Timd Contract Do cumems. (tit MiLcsZone%)'due to delay heyorid the controP of, both O.WYER and 06NMACTOK. an extension of the I I i. I f Laws Or Re6ulatioris of an.v public body havmii contract Tunes (or ,,fiiestoncs) in unamount _equal,to:the jurisdiction r'�qui]re any Work (or part thereof) specifically time lost -due to such delay shall be CRA ONTCTOfes :kole, .tit be mspected,' tested or approved by e an ' rnpFuyce or and ex . ulosiYe remedy liar• such delay:. 1nnii shall' Other corcsi:ntutil e6f'such public bo(�CON ,ric-kcftall OWNER be liable. toCONT li�ACTOR,.Li!ty Subcontractor shall qssum' full ToWnsibiliLy far L;Fan6ih9 arid .any Supplier: .arty. ersi�n Or, Qrggamzatio�i c� to a y p TV �;�h Or app�6vaK' pay all'co%Ls obtamirig� i surety or or mpoyee or, Isent- of. rmy, ol"them, tdr in c4innectioh-thereivith. and Cumish HINGENER'R, the damages ari i 'Out of or, resulting from ()delays caused 'or icquircdcertificates Lof ii-ISPeCitorL or approval, fry or wi I in control of the CONTRACTOR. CON9'RACTOR shall, also be responsible for arriari,ging (ii) delays bq6nd the control oithot:b parties including; but and 6b6iiiing and shall fey all cositz in corincotion.with not limited to, firm floods- upidemi" abnormu'l. weather any in%pcc(i&ns, teas or aptivals required Fur 0MIERs conditions, acts Of Ciod or ictvar negledt by utility owners and or other contractors ptrform in- other work as.eontentplated be incorporated in the Work or ufmatgrials trux"ims. . . I .- ', '.a by:Article I- or equipment subriiinPLI tot .approvallino r to COLNTRACTOFss purchase thereof for ineurporation �in - - tKe-WOrk. ARTICL' U-TF:ks AND VNSVE'dTIONS;. CORR F.CTION,R KNtO%IAL OR ACCEFMAACK OF l3fil I (:any Work -. (or the work of otherst that is to be D F-14-.T.T/ VE- NVORK i - nsfected. tostcd , . ir I I ap .p .riv,.d is - covered by- CONTTRAC TOR without 1written concurrence, of it must, if reclu,-vil 'hy ENGINEER, be tmcuvQrcd for observation. 13.3, Unwvering.Work,ms provided in paragraph 13¢ Prompt notice of all which OWNE'R,or Shall be tit CONTR?\CTOR!s xNrise Linlens SNGiNrEfil?. have .,actual. Lri6wlcdgc will, be given 'to CONTRACTOR has viven PNUNEHIZ timciv notice of CONTIN-7OR- AX &Yective Work in av Lv rejected CONTRACTOR'S4dordion it, cover' Idic 'saine. and oirrocteciciracceptcdas priwidod m thisArti-Cre-U.I. P'NG NiFF'P Fins not,actod with reaso.rinhilc pronilimess in rcsfiomse to such notice, AlcceiLv to Work Consultarits;_ &Lher representatives . and personnel: or OWNM 1 .31, S: If ,in), NVorL is-covcredxcnnary,to the written 'it --If aider=ngi laboratories and governmental igaicics request of ENGIINFCFR, must. requested tiv wahjurisdictiontil interentswill have nces4 to he Work at GNGJZqECVbd uncovered torEN(;DIZER'a observation reitaonmble=time!i for their observation . inspecting and and replicedLaCONTRACTOR�s expense. testing CONqRX-TOR shall provide them proper and sate'conditions. for such access and adviuc- them, of 33.Qk ICENGFINT.F.R considers it necessaw ora&imble C-C)NTRACTOWs ' site safety procedures and programs so that covered Work be obseriied by. LN or that they may comply diixewnhas,apliticable, tnsp&t6d, or tested by others, CONTRACTOR- at I , sha a uricov er. exposeotherw' or Ise ENGUEER's request Te.-ax and Inspections:. make -available :for observation, inspection or taung. L- LNIGNT-M may require, that portion of dicWork- in j-3,J. coNrRACT 0 R shall Site EINGNEEK, timely question furnishing all ne&nary labotr, material and n6tice of rcadinr of the Work. Cor till requirud inspections: equipment_ if it is,found that such Work is o'zfectnv. tests or approvals: and shall cooperate with inspection and 'CONFERACTORshill. 13ay all claims,.costs, losses and c6maees cLiuwd livaristri,rout of of rc%�iliin­ from'suich u. . ncovering. ex - posaire, abs rvation, inspection and testing 11-4. C)%1vNLER shall omploy anti priv for the services of - . _,till' "tared Of satisfuetory. replacement or reconstruction - I - an intkfxndent testing loboratuiv to' i;crrornv 'comr-Ict. (includinii but not, limited to all costs of repair or msLixwons; tests, or- Lip . provaLs. required 63, tfiti ai;ern�rii of work or tither) and OWNER shiill be Documents e=pt: emitted to an appropriate decrease din the (_-'untract-Price. aniL if the purrici are- unable it, agree as to 13 ,4. L for inspcctioni. tests or.appyovals covered die.'reit)C may make a claim Lheref6r as provided 'in by, paragraph 13.5 -VLicle 11. 1C, how"er.,such Work. is, riot. found to be, clg&cfivt�, CONTRN(."['OR shall [it, allowed in incrcnsc in 13.4.1 dat,custs incurred in connection with tests the: Contract Priec.or an cmension of the contract Tirutni jiammph t3_9 .or insiveriom conducted pursuant to -'- I s I (or tMilestone or both." direcdy attributable to such 27 I I uriaivering exposnire obscivation. inbpection, testini;,. replacement and recns ovuctiori 'and,. if the • parties .are unable to arsce as .to the amount: or extent .thereof;" CON'1•RACTORmay makc:a clauri therefor as provided in Articles I L and 12: 014NER Ma Stop the 1{.ork:� 13:I0: If the Nark is defective; or CON-CRACTOR Lads to supply sufficient skilled workers or suitable materials or egwpment or fails to furnish dr perform the Work ua such a. tray that the wmpleieclWerlc will conform to the Contract 'Documents, OWNER' mayorder COINURAG'rOR to -,top the Wtork:.-or any portion lhercof, until the cause for such order has been eliminated hc%vever, this right of OWNER to stop the Work shall not an%e .rise to nnyL4uty on the part of O\VNER to -exercise this riuhl for -the benefit. of CO: rrR:\CTOR or any surety or tither party. Correction or Rani"al ofVefecnre WorR_'- li.l l'. If required by ENGINEER; COIVrRAGr0R shill: promptly, as directed, either correct all d feetitr'btork, whetheror nor fabricated, installed or completed, or, if the Work has been rejected by f3NGI VI Ii:R, removc it.f:om the site and replace it loath 'Work that is not. ciefecrive. it ie&'RA&OR. shall .pay all; claims, costs, losses and damages caused- by or:resulting from. such. correction or rernoval,(mcludiiq but not limited'to, all costs of repair or replacement of work of others), 13,12.. Correction Period: 1112:1.If tdi.hin olaw.wr two veam.after the: date of Sutistantiaf Completionorsuch longer'lvricd o. time as may be prescribed lw Laµ's.or R ulations or by the tcnma of.any,applicabu special;guarrntcc re red by. the Contract DcetanentsOr by aiav specific provision of. the Contract Documents, any Work isfouncp to tc" ckfrctfve, C014TRA\CT0R,nlv1L1 promptly, without cost to OW -PIER and in accordance with OWiICRc writt6i 'instructtore: (i) correct such rLfecfiv, War!., or, of it has. been rejected by OWL\Tr' remove it from the site aril replace ]t with Wor::. that, is not defective; and. (ii) sltisf ictordy corrector remove and replace anydamage to other Work or the work of othersresultire therefrom: It CO\' CR_\CTOR does.not parmptly conipty with the terms or s6ch instructions, or in. an"emereencvwho c, delay would cause serious. risl: of Hiss or damage, OW"ND•R may have the &kf ctive Work 0orrected or die rcjeited Work remtovcd and replaced and all seclaims,. costs. loss and' d ama_cs caused by ar•resullt gi from sucfi removal: and replacemem (including bud ntit limited to all cost; Of repair or replacement of work of oihers).will be paid by CONTRACTOR li[2.J.1n special W-cumstances' where it rarticulut itcru of equipment -is plactd in continuous service before: Substantial Completion of all the Work die' correction period for that i em may stnrt to nin from an earlier sate if so provided in the Specifications or by Written -\mcndnwrit, I.123._ Where "defective %%rork jnrid damage to other EJCDc: <i£tdMRtt, CO[YH'11GiL5 U luS (1'9V GJilipil =- cv%CTIY el6 t'Qtt7 COtLC:1_\IUDtFIC.a (IO.�5 tItL\tA20p�11 Wftrk restiltutg there roil) ♦;us. den corrected. removed or replaced under'this rmi-aumph lad `;.the correction pencil. hereurtdcr with respect. to.!uch Work avill' be e:etanded for an ndditioital period Of oche- eHF two vears after such,'ccrredion .or rcmov`al and replacement lvnslxen.citi facutrilvcompleted_ rfccepainveofDefective Work; 13,13 If; instead of requiring correction or removal`.and repl tcement. of d Jrctive Work, OV\NER'(anil prior to F.NGINEER's reeommeridaiion of firad, payment, also. HeN(.IDlF FR),preters to accept it) OWNNEX may do.-so.CONTR.�CTQR shall pay, all claims, costs, losses and damage's attributable io oWNF'R's evaluation of and cicte mination to acceptsuch df ctwe Work (such costs to he approved by ENGINEER as to reawmableness).. If any such .acceptance occurs prior to, FNGLNEER's recommendation oC [trod paymem, a:Chan¢e(hder will be .issued mcorltaratnag the necessarre-isiops in the. Contract Dcc=lents with rcpeLn 'to the Work: and OWNER shall in ha C'ontract.Price and,if thc,parties are unable to agrec.as to die amount there6f,OWNER Pay•piake a clains•dierefor" as• provided in ,matte 11, If the a c.eptance occurs after such recommendation,', pin appmpnatcamount will be paid by CON I I:AC C RR io OWNER 0!VNER Comet Defective IVorkr 13a4!If"CON PAGfOR_fids within.it reason:3bla time after written none from ENG INFER to correct defective, Work -or to rem ovo and replace rejected Work as required by FNGfh!F:ER in accordance with pragriph 13,1I, or if- cn\�FRACTOR fails to pertornt the Work in accordance with the contract Documentsor if COIITR\CTOR Cads, to comply with any other provision of ttn:; Contarct m Docuents: OWNER m`ay "after seven days written notice to CONTR\CICOR•correcl and remeO any such deticiutcy. In exercising the ridcdirs tmder' atm this paragtnph'CAVINER ,wall proceed In connection with such ccrrectne. and rcriedtxl action, OWNER may.exclutiz COVTRS\C:TOR front all.urpai t of the site. cake possesatn.of.alkor Inn of die Work,�and suspend CONTRACTOR's services rehted ihereto, take p,,vesgon of CONrR:YCTOIt& tools 'applieruies. coaaatnurion equipment :and machinery at Iha; site. and incorporate in the Wprk'.'all materials. and Liluipmem stored tit the site. or for which OWNER has paid COtirrR:\C:TOR but which are stored elsewhere. CONURACTOR hall .callow OW`NTH , OW_NECCs representatives, a cols'. and .cmployrz?. OWNEI(is'•other contractors and E IGINEER' and MiGINEERs Consultants access to the site- to enable OWNER to exercise the ngtts and'. remedies under this gcrmgaph: All claims, costs, losses anal dam i es incurred or sustained by OWNER in exmisina such nehts and remakes twill "be charged .t_ainstCONTRACTORand a ChangeOrder µill be issued' utco4,niting the necessary revisions h, the; Contract Documents with respec} to. the. Work, and OWNER shall be entitled to an appropriate decruax in the Contact P=,, i rid i f the parties are unable m aer oe'34 to the amount hereof. OWNER may make a.claam therefor -tis. provided in Article I I.. Such claims .c.a_aq Iscces and L i I J n u