HomeMy WebLinkAboutCHANGE ORDER - BID - 7273 N COLLEGE IMPROVEMENTS PROJECT - VINE TO CONIFER (3)Woor City OF [v Planning, Development & Transportation Engineering 281 NaM College Avenue ngineerin P.O. Box 680 Fart Collins, CO 80522.0580 970.221.6806 970.221.8378 - W Change Order Form PROJECT TITLE: N. College Rd. Improvements PROJECT NUMBER: 400903900.6 (Bid #7273) CONTRACTOR: Connell Resouces, Ina (PO #9116026) CHANGE ORDER NUMBER: 1 n prepanng cnange orders snow In order as separate numoerea paragrapns me rollowstg 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change In contract time. 1&2. See attached sheet for detail. 3. The contract cost will increase by $5,140.00 4. There will be no change In contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming an change orders approved) ACCEPTED BY: REVIEWED BY: SUBMITTED BY: 0.08% 0.08% $6,111,000.00 $0.00 $0.00 $5,140.00 $8,116,140.00 APPROVED BY: DATE: 4- a 4- I Z (glepartment Head) APPROVED BY: DATE: (Purchasing Agent over $60,000) cc Contractor Purchasing Project Flle to "•": OFAOR_W=r-,:gsgi2zr.,�!ai ...m, _... (' u.+�gk-i�q��y��+3Egµ .:, x 1i u4w.S YiYt 9iS.tw1J!'3.+.v P .Ae Item lQuantity I Unit 1 $/Unit I Total Mix Design Credit -RCI -1 LS $ 2,133.50 $ (2,133.50) Total Cost $ (2,133.50 M&e4 REASONiFOR;CttANGEQa. The mix design for the reflective crack interlayer (RCI) paving from the College[Willox project was submitted and approved by CDOT and the City. Connell did not need to run a new mix design for this project resulting in a cost savings shared with the City 50/50. ��Ji$' ssa',,..m, s- WH(EN jPOSTED `LPeY:AP.tilication�#3._.._ m of Planning, Development & Transportation EOglueedng F///C��+►►►it`/ Collins 281 North College Avenue 6rt nglneenng P.O. Box 580 FORCOIgne. C080522.0580 670.2Z1.6608 970.221.8378-fax Change Order Form PROJECTTITLE: N. College Rd. Improvements PROJECT NUMBER: 400903900.6 (Bid 47273) CONTRACTOR: Connell Resouces, Inc. (PO #9116026) CHANGE ORDER NUMBER: 8 n prepannq change orders show In order as separate numbered paragraphs the c Owlnq: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1&2. See attached sheet for detail. 3. The contract coat will decrease by 4. There will be no change In contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL %OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming ail change orders approved) $1,383.50 •0,02% 0.38% $6,111,000.00+ $0.00' $24,585.10' ($1,383,50) $6,114,181.60 �R� ACCEPTED Sr. �J�-�`-- DATE: (Contrec s Represent ) REVIEWED BY: DATE: ( nglhBar) SUBMITTED BY: DATE: (Project Manager) r �� APPROVED BY: DATE: L4 ' a'r' i z- 41 MDeparbtent Head) 07 APPROVED BY: _. DATE: (Purchasing Agent over $60,000) cc contractor Purchaeing Project He North College - Vine to Conifer SUMMARYfOF�1WQRFt'+�c Item Quantity Unit $/Unit Total Mix Design Credit -SG(PG 64-22) -1 LS $ 1,383.50 $ 1,383.50 Total Cost $ 1,383,50 An alternative mix design for the SG (PG58-28) for side street reconstruction and private parking lot - reconstruction was submitted for review. Connell proposed using City approved mix SG - PG 64-22 with concurrence from CDOT since the SG mix is not used on CDOT's facility. The cost savings was shared with the City 50/50 �a.�'.S �3 "'�>.'£ .: ..td _ , -__ , !-e:r?�'TtL�—•�i��l�i �'�i�_'c ;..:�=�'�° North College - Vine to Conifer t�o�r`-FT,71 77775 177SUMMARY OF Connell Resources Item Quantity Unit $ / Unit Tntni 606-01340 Type 3D End Anchorage 2 EA $ 2.000.00 $ 4.000.00 606-01370 Type 3G Transitions 4 EA $ 2,635.00 $ 10,540.00 606 Guard Rail Connectors 2 EA $ 800.00 $ 1,600.00 606 Type 3H Transitions (credit) 4 EA $ (2,750.00) $ (it 000.00) TOTAL 5,140.00 ,W�.s"FYRMMN'iJ[IREASONfFq(:�RrCHAtJGEi� Quad Guardrail System was incorrectly spec'ed and called out on the plans. Certain connections were not called out on the plans. Revisions to guard rail system recommended by manufacturer and reviewd by designer for approval of changes. Credits given for bid tab items being substituted. Submitted to CDOT for review. Item is a non -participating CDOT change order paid with local funds. 1i-Yo s•� N."Vn.:i 'VJ!t N;F OST,€at2c '`_ .'`ii��/A - 1.4t!`% t l(Ist§IMO RR`i' City ofntilneering rt Collins�r Planning, Development & Transportation 281 Nodh Colle9aAvenue ' ngfneerin P.O. aox 880 Fart Collins. CO 80522.0580 970.221.6805 070.221.6378 - ra% Change Order Form PROJECT TITLE: N. College Rd. Improvements PROJECT NUMBER: 400903900.E (Bid #7273) CONTRACTOR: Connell Resouces, Inc. (PO #9116026) CHANGE ORDER NUMBER: 2 n prepanng change orders s own order as separate numbered paragraphs the following: 1. Reason for change. 2. Descriplion of change. 3. Change in contract coat. 4. Change In contract time. 1&2. See attached sheet for detail. 3. The contract cost will increase by 4. There will he no change In contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTEDE REVIEWED E SUBMITTED $10,400.00 0,17% 0,26% $6, 111.000.00. $0.00 - $6,140.00 $10.400.00 $6,126,640.00 Yi&i It 2- �/ L-�; // - �, (� _z3-1Z (Project Manager) APPROVED BY: QA U3 IMJ, DATE: 4 ' a4 ' LZ (Department Head) APPROVED BY: DATE: (Purchasing Agent over $60,000) cc: ConVaclor Purcinstn9 ProjectRa "TAM`L%.vt19i,'ls ° ' :v. girl° r:'."s-�i �''3'�3 MR North College - Vine to Conifer "_"-`w'''za SU WMAjiY Item Quantrity Unit $ / Unit Total 604-19210 Inlet Type R L10 (10 FOOT) 4 EA $ 6,250.00 $ 25,000.00 604-19105 Inlet Type R L5 (5F00T) - Credit 1 EA $ (3,530.00) $ 3,530.00 604-19110 Inlet Type R L5 (10 FOOT) 3 EA $ (3,690.00) $ 11,070.00 Total Cost $ 10,400.00 .dt. 4'`x+.1'',' `te �f; ' P $'1' Inlets A3, El. G2 and G5 were incorrectly called out on the plans. No bid tab item provided for Inlet Type R L10 (10 Foot). Quantity of 4. Credits for 4 incorrect inlets provided. ,7:1il,r?'�1.,rx>'1 ��,3"g„W-,t1EN(POSTE0�1L_,�:, �•aYLAPPIcat14.�3&rye"s''�v��+'�ki�°s� :,��`�'?.,e�i City of n F6rtCollinseel Planning, Development & Transportation Engineering Noah College Avenue Engineerin P.C. sox sea Fort Collins, CO 666220660 970.221.6608 070.221.8376 -fax Change Order Form PROJECT TITLE: N. College Rd. Improvements PROJECT NUMBER: 400903900.6 (Bid 97273), CONTRACTOR: Connell Resouces, Inc. (PO #9116026) CHANGE ORDER NUMBER: 3 n prepanng change orders snow in order as separate numoerea paragraphs me tonowing 1. Reason forchenge. 2. Description of change. 3. Change in contract cost 4. Change In contract time. 1&2. See attached sheet for detail. 3. The contract cost will Increase by $5,490.00 4. There will be no change In contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: REVIEWED BY: SUBMITTED BY: 0.09% 0.34% $6.111,000.00 $0.00 $15,540.00 $5,490.00 $8,132,030.00 DATE:`-3 �( (Contrac is Represen t ) DATE: z r) ' �7 77 DATE?:/ ^y C� roJect � onager) APPROVED.BY: DATE: ' oZ 4 - (Z 7(D partment Head) APPROVED BY: IJ/DATE: (Purchasing Agent over co: Contractor Pumhaarng Project File North College - Vine to Conifer Item Quantity Unit $/Unit Total 625 Calc & Plan Check 6 HR $ 75.00 $ 450.00 625 Cross sections Bridge to 19+53 31.5 HR $ 100.00 $ 3,150.00 625 Grade Check West Side North College 25.2 HR $ 100.00 $ 2,520.00 625 Credit - Pre Survey & WO Pond As -Built -6.3 HR $ 100.00 $ 630.00 Total Cost $ 5,490.00 ntc-.�r,.xs%�R����RPI�SONjFOR CHANGE?'�',�.a'.�3 �:.4.,4�.• �: ,. `�t' .'��E�.��C�"�.t�e�3�is`'��I€�`: In a presurvey meeting held prior to issuing a Notice to Proceed, the City directed Connell and subcontractor King Surveyors to do additional floodplain survey and staking above and beyond contract responsibility and original scope. Credit given for some overlap of survey work that was eliminated by revised scope. r� City of % tCollinsI Planning, Development & Transportation Engineering . NCalleOe Avenue P.Box P.O.680 ngineerin Fat Coftc CO 80622.0580 970.221.8806 970.221.6378-fax Change Order Form PROJECTTITLE: N. College Rd. Improvements PROJECT NUMBER: 400903900.6 (Bid #7273) CONTRACTOR: Connell Resouces, Inc. (PO 49116026) CHANGE ORDER NUMBER: 4 1. 'Reason for change. 2. Description of change. 3. Change in contract cost 4. Change In contract Ome. 1&2. See attached sheet for detail. 3. The contract cost will Increase by $5,688.60 4. There will be no change In contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED[ REVIEWED E SUBMITTED 0.09% 0.44% $6,111,000.00 $0.00 $21.030.00 $5,88S.60 $6,137,698.60 APPROVEDBY: clku,)" DATE: ` 21,4'lZ I(Department Head) APPROVED BY: DATE: (Purchasing Agent over Cc con9 clor Pumhasing Pmjecl Fila rwt..-vti�6jwT'Fri#ti+tf'=aU�.kS.'�.+:."u E:'9r%.{CHANG,E;ORDER 41'�',�°'e. North College - Vine to Conifer .M:�,%*'r.,'�a.'u•:-�,.s...a5 �.flAR�QF,a11YORT'�i'�!' k'cL�_°iay...... Item Quantity - ` eY'ds '^ " Unit $1 Unit N,.. r Total 211 Dewatering 1 LS $ 550.00 $ 550.00 420 Scour Stop Transition Mat 335 SF $ 10.10 $ 3,393.60 02-202 Rip Rap 1it" 23 CY $ 75.00 $ 1,725.00 Total cost $ 5,668.60 The City was contacted by the designer during construction regarding concerns about potential for scouring on the siphon with recommendations for TRM Class I, Rip Rap and Scour Stop protection on the upstream and downstream ends. Connell was directed to install protection based on a drawing and spec's provided by the designer. City Of F t CoRins Planning, Development & Transportation 281 NEngInoering Ret North Co4e09 Avenue rthC 'vr�s`/'m1�J''{w P.O. Box Sao ngineerl Dg Fort CO9lns, GO 60522.0580 970.221.6803 e70.22i.a37a - ra8 Change Order Form PROJECTTITLE: N. College Rd. Improvements PROJECT NUMBER: 400903900.E (Bid #7273) CONTRACTOR: Connell Resouces, Inc. (PO 49116026) CHANGE ORDER NUMBER: 5 nrelp.r as eennra a numbered naraora0 s the 0 oW na: 1. -Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract lime. 1&2. See attached sheet for detail. 3. The contract cost Y411 decrease by 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: REVIEWED BY: SUBMITTED BY: -$2,133.50 -0.03% 0.40% $6,111,000.00 $0.00 $26,698.60 ($2,133.50) $6,135,665.10 , - k, DATE: YI2 > f (Contra rs Repf native) DATE: ( I ear) h • DATE: (Project Manager) APPROVED BY: 04 1 A 7Ylw.t DATE: q ',A q. [I „( (Department Head) APPROVED BY: /Vl DATE: (Purchasing Agent over $60,000) cc. Cant2Ga Pumhesing Project Fie