Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 7018 FENCING CONTRACT ANNUAL (2)EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Homeland Fence Dated: Work Order Number: Purchase Order Number 9 1 Z2Z Project Title: Fencing @ 4028 Highlands West Drive Commencement Date: 10/1/2011 Completion Date: 1/30/2012 Maximum Fee: $8,137.83 Project Description: Remove existing iron fence and replace with 6' cedar privacy fence installation. Scope of Services: Remove and dispose of existing iron fence along the north side R.O.W. of trail ramp'at Cty Rd 38E adjacent to 4028 Highlands West Drive. Replace with 6' high picture frame style cedar privacy fence. Length of Fence is approx. 200 feet. —J� L 5 Acceptance Park Planning & Development User Service Provider agrees to perform the . services identified above and on the attached forms in accordance with the terms and ` conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached fors) the Services Agreement shall control. The attached forms consisting of one M pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. Service Provider City of Fort Collins � thy By: -' � j By: Date: /9 / 2 Date: CC: Purchasing Director of Purchasing and Risk Management if over $30,000 Lesondak Construction l(c Dba Homeland Fence 6204 Jackpine Dr Bellwe, CO 80512 (970) 218-0433 Bill To City of fc parks planning 215 n mason Ft Collins, Co 80524 Invoice Date Invoice # 1/30/2012 436 RECEIVED ay/stutrman at 10:10 am, Apr 18, 2012 P.O. No. Terms Project highland west dr Quantity Description Rate Amount 16 Labor for 2 laborers for each hour(4 men)- remove approx 200' existing metal fence, 70.00 1,120.00 cut up material remove concrete and haul for recycling- remove approx 12' wood fence and haul off 16 Labor for 2 laborers for each hour(4 men) - dig holes - install posts and layout for 70.00 1,120.00 stepped heights, install ledgers on pillars removing necessary bricks for install. 6 6x6x10 rough cedar post 47.685 286.11 14 6x6x8 rough cedar post 45.01214 630.17 concrete labor 173.80 173.80 1 concrete- 244.20 244.20 80 2x4x8 cedar 5.467 437.36 6 2x4xl0 cedar 8.80 52.80 60 2x6x8 cedar 8.80 528.00 4 2x6x10 cedar 11.00 44.00 1 box 3" coated screws 104.00 104.00 1 box 2" galy ring shanked nails 88.00 88.00 30 3/8" wedge anchors 1.10 33.00 480 Ix6x6 cedar pickets 2.134 1,024.32 1 4x4x8 rough cedar post 12.07 12.07 0 Labor for 2 laborers for each hour(4men) install structure 3 laterals, top cap,- step 70.00 0.00 fence and chamfer post tops 16 Labor for 2 laborers for each hour- install pickets ( cut each down 2"), install end 70.00 1,120.00 section and cut pickets to match opposing fence slope. 16 Labor for 2 laborers for each hour- pattern, cut and sand arches,(25) cut, fit and install 70.00 1,120.00 arches, All work is complete! Total $8,137.83 APPROVED By jstutzman at 10:42 am, Apr 20, 2012