Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - P1124 CIVIL ENGINEERING ANNUALEXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS and Atkins North America DATED: March 30, 2012 Work Order Number: 0 1 -254902 10 1 -AK I -12 Project Title: Shields Bridge & Laporte Bridge Replacement Post Design Construction Engineering Support Commencement Date: April I, 2012 Completion Date: June 30, 2013 Maximum Fee: (time and reimbursable direct costs): not to exceed $10,000.00 Project Description: Post Design Construction Engineering Support Scope of Services: This purpose of this work order is to provide as -needed post -design services to the City for the construction of the two bridge replacement projects. See attached for additional details. Service Provider agrees to perform the services identified above and on the attached fors in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms), the Services Agreement shall control. ServiceProvider pQ PP �p/nnnn Date: 4-/Z /Z O 1 Z Approved By: Purchasing Agent over $60,000 The attached forms consisting of one (1) page are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. City of Fort By: Date: T (Z [Z SCOPE OF SERVICES: 'l'he Atkins team provides staffing continuity throughout construction with the involvement of the same task leads that completed the engineering design and plans. Design engineering support services will involve: Interpreting project plans On -site meetings (as needed) Responding to requests for information (2CI's) General support (as needed) Design modifications for minor contractor requested changes or changed field conditions are anticipated and are included in the engineering support services. All design disciplines are available as needed however; the major activitiesareexpected to involve the structures, and roadway elements. Structures — In addition to the support services listed above, Atkins will also provide as directed review support forcontractor submittals for the structural bridge and culvert elements as defined in the construction plans, project special provisions, and MOT Standard Specifications for road and Bridge Construction. Anticipated submittals include shop and working drawings, design calculations, and manufacturer specifications and cut sheets. Shop drawings will be reviewed for general conformance with the design concept and general compliance with information given in the contract documents. These documents will be returned and will include a review stamp stating the approval status. Other submittals will also be reviewed in the manner of the working drawings. Roadway —Atkins will provide to the contractor and construction personnel, electronic files of the geometric layout and 3D model. This data will be used to ensure the project is staked and constructed correctly and also is used to obtain additional information where necessary. Additionally, Atkins will respond to contractor questions and modify construction documents as necessary. i