Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - P1123 GENERAL CONTRACTOR FOR FIRE STATION EXPANSION AND RENOVATION PROJECTSECTION 00950 CHANGE ORDER NO. 4 PROJECT TITLE: Poudre Fire Authority Station #1 Remodel BID NUMBER: P1123 CONTRACTOR: Drahota Commercial, LLC (>o cy�( sszZ DESCRIPTION: The complete remodel of PFA Fire Station #1, including asbestos removal, deconstruction, an addition, sitework, utilities and landscaping. Exterior renovation will match the existing as much as practicable. Interior finishes will include painted gypsum board partitions,ceramic tile, carpet, VCT, sealed concrete, suspended acoustical ceiling, wood and hollow metal doors and hollow metal frames. Reason for change: Incorporation of various Proposed Change Orders (PCO's). 2. Description of change: PCO #47 — Exterior Trim at Bay Doors - $1,179.16; PCO #48 — Final Electrical Changes - $644.73; PCO #49 — Bike Rack Allowance Credit — ($659.63); PCO #49 — Overhead Door Allowance Credit — ($5,595.12); PCO #49 — Underground Duct Insulation Allowance Overage — $13.04; PCO #50 — Credit for Extension Costs not Expended — ($2,633.45). 3. Change in Contract Cost: ($7,051.27) 4. Change in Contract Time: 0 Days ORIGINAL CONTRACT COST $1,189,225.00 TOTAL APPROVED CHANGE ORDERS $69554.91 TOTAL PENDING CHANGE ORDERS 0.00 TOTAL THIS CHANGE ORDER ($7,051.27) ADJUSTED CONTRACT COST $1,251,728.64 ACCEPTED BY: REVIEWED BY: Contractor's Representative Facilities Project Manager L APPROVED BY: 'PFA Special Operations Chief cc: Contractor Purchasing Architect Project File y)W lIZ Date (Z Date 1-1-4- I z Date