Loading...
HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9121888EXHIBIT "A„ WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS and CTL THOMPSON DATED: March 22, 2012 Work Order Number: 3-902211.3851.W-12 Project Title: Tumberry Road — Structural Design of Pedestrian Underpass Commencement Date: March 26, 2012 Completion Date: April 20, 2012 Maximum Fee: $10,000 (not to exceed) Scope of Services: See attached proposal dated 3/19/2012. Service Provider agrees to perform the services identified above and on the attached forms In accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms), the Services Agreement shall control. Service Provider �.4Lr% O` By: �t� aaa Tl�wvs..J Date: Approved By: Purchasing Agent over $60,000 01 /z/M( The attached forms consisting of three (3) pages are hereby accepted and Incorporated herein by this reference, and Notice to Proceed is hereby given. City of F r Callt s Date: 7)/9 Q/' 7- - CTLITHOMPSON March 19, 2012 Mark Laken City of Fort Collins Engineering 281 North College Avenue Fort Collins, Colorado 80522-0580 Subject: Structural Design of Pedestrian Underpass Lind Property at County Road 11 Fort Collins, Colorado Proposal Number: FC-11-0379 P2 Mr. Laken, CTLIThompson is pleased to present this proposal for structural engineering services. We have previously performed a structural review of project plans by Stantec / Sear -Brown for the proposed box culvert and retaining/wing walls for the above mentioned project. As a part of our previous review, we outlined items that were noncompliant with the most recent AASHTO LRFD Bridge Design Specifications, Colorado Department of Transportation (CDOT) Bridge Rating Manual, and the Latimer County Urban Area Street Standards (LCUASS). We also made further redlines and comments to ensure adequate structural design for the proposed cast -in -place box culvert, wing walls, and retaining walls. It is our understanding that new design drawings are to be drafted to reflect these changes. We propose to provide the following: • New construction drawings and details in the same general format as the current sheets 705 through 710, and selected details on sheets 711 and 712. Other sheets are to be drafted by a civil engineer. • Bridge design calculations for the cast -in -place flared end box culvert and retaining/wing walls. • Coordination meetings with City Engineering. • Coordination with Lonco for an independent bridge rating at 75% design. • Three sets of construction drawings stamped and signed by a licensed engineer. It is our understanding that the clearance height will remain at 9'-0" despite the fact that the LCUASS requires a 10'-0" minimum clearance height. We also understand that the City will review shop drawings for the precast section of the box culvert. The City will coordinate a separate contract with Lonco for the structure rating. We propose to provide these services for a lump sum fee of $10,000. CTLIThompson will make appropriate effort to complete the work described within a reasonable period. We anticipate completing the task within 3-4 weeks from your notice to proceed. Our Mr. Wayne Thompson will be the Project Manager and your key contact. Thank you for your consideration. We look forward to the opportunity to work with you on this project. When you are ready for us to begin work or if you have any questions, please contact the undersigned. Respectfully Submitted, CTL I THOMPSON, INC. Wayne Thompson, PE Project Manager 151 Linden Stieet, Suite 140 I Fort Coli ns, CO 80524 1 Phone: 970-206-9455 1 Fax: 970-206-9,141 1 mviv.ctlt.com