HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9121828EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS and CTL Thompson, Inc. DATED: March 14, 2012 Work Order Number: 1-254902101.6-12 Project Title: Laporte and Shields Bridge Replacements — Materials Testing Commencement Date: March 20, 2012 Completion Date: July 31, 2013 Maximum Fee: (time and reimbursable direct costs): not to exceed $ 22,700.00 �n�zo spl�f 13i I1a6�2 Project Description: The project includes all the work necessary to perform materials testing for the Laporte and Shields Bridge Replacement project. Scope of Services: The work will include, but will not be limited to, materials testing for earthwurk, asphalt pavement, concrete pavement, structural concrete, and h-pile observation. Documentation outlining results of the materials testing will be provided to the City, signed and stamped by a licensed professional engineer of Colorado. All materials testing shall be in accordance with applicable standards as outlined in the Larimer County Urban Area Street Standards and the Colorado Department of Transportation's Standard Specifications for Road and Bridge Construction. Materials testing frequency shall meet the specified frequencies outlined in the project's form 250. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms), the Services Agreement shall control. ProviderService By: afA� % ,mot Date: March 14, 2012 Approved By: __ Purchasing Agent over $60,000 The attached forms consisting of two (2) pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. City oFFo t Collin j p By: re Date: March 14.y2012 _ IW -U Irim II W,Jgq-sq : !IL'svT n[31f:7 March 9, 2012 Revised March 13, 2012 City of Fort Collins Engineering Department 281 N. College Avenue P.O. Box 580 Fort Collins, Colorado 80522-0580 Attention: Mr. Jin Wang Mr. Kyle Lambrecht Subject: Fee Estimate for Construction Observation and Materials Testing Services Arthur's Ditch Replacement at Laporte Avenue and Whitcomb Street and The Replacement of the Shields Street Bridge over Larimer County Canal No. BRO M455-100 Fort Collins, Colorado Proposal No. FC-12-0097R Construction Project Code No. 17905 At your request, CTLIThompson, Inc. is pleased to provide this revised fee estimate for Construction Observation and Materials Testing services for the Arthur's Ditch Replacement at Laporte Avenue and Whitcomb Street and the Replacement of the Shields Street Bridge over Larimer County Canal No. BRO M455-100 projects located in Fort Collins, Colorado. We have revised our previous fee estimate to reflect additional laboratory testing required in the CDOT Form 250. We anticipate that the city will use our estimate for the basis of establishing a budget forthe project and to issue a purchase order for our services. Our estimated scope of services and associated fees were prepared according to the terms and conditions of our professional services agreement with the City of Fort Collins and are presented below. Earthwork: Compaction testing will be required for culvert subgrade, culvert backfill, sidewalk subgrade, curb and gutter subgrade, ramp subgrade, and pavement subgrade. We estimate atotal of 43 site visits will be necessary for this project. We further estimate 6 proctors/soil classifications and 4 gradations for filter material will be necessary. Engineering Technician 45 days x 2 hrs/day x $60/hr $5,400.00 Modified Proctor 6 tests x $80/ea $480.00 Standard Proctor 2 tests x $80/ea $160.00 Sulfate Testing 4 tests x $40/ea $160.00 Atterberg Limits 20 tests x $60/ea $1 ,200.00 Gradation 26 tests x $70/ea $1,820.00 Subtotal: $9,220.00 351 Linden Street I Suite 140 1 Fort Collins, Colorado 80524 Telephone: 970-206-9455 Fax: 970-206-9441 Concrete Testing: Concrete testing will be required for the culvert, sidewalk, curb and gutter, ramps, and pavement. We estimate 35 concrete tests consisting of 5 cylinders each will be necessary. We further anticipate that we will be requested to test the percent air content for the first three trucks during concrete placement. Concrete Cylinders Additional Cylinders Sand Equivalent Testing Testing of Additional Trucks 40 tests x $160/test $6,400.00 40 tests x $10/test $400.00 3 tests x $70/test $210.00 40 hours x $50/hr $2,000.00 Subtotal: $9,010.00 Asphalt Testing: Compaction testing will be required during asphalt placement on Whitcomb Street and Shields Street. We estimate 5 site visits and 6 samples will be necessary. Engineering Technician 5 days x 4 hrs/day x $60/hr $1,200.00 Lab Density (Rice) 8 tests x $80/ea $640.00 AC Content/Gradation 8 tests x $150/ea $1,200.00 Subtotal: $3,040.00 H-Pile Observation: We understand that the City will observe the installation of the h-piles, but that our assistance may be requested for the first day. Engineering Technician 1'day x 8 hrs/day x $60/hr $480.00 Subtotal: $480.00 TOTAL ESTIMATED FEE: $21,750.00 Cocnrete Coring: CDOT may require concrete coring for the pavement on Laporte Avenue. We understand 10 cores may be necessary. Engineering Technician 1 1 day x 8 hrs/day x $50/hr $400.00 Engineering Technician 2 1 day x 8 hrs/day x $50/hr $400.00 Measure Cores for Thickness 10 cores x $15/ea $150.00 Subtotal: $950.00 TOTAL ESTIMATED FEE WITH CORING: $22,700.00 ra CITY OF FORT COLLINS BRIDGE REPLACEMENTS AT LAPORTE AVE. AND WHITCOMB ST. AND AT SHIELDS ST. nn i�oonenc n, .,n cn_��nnn�o dui We would also be available to perform reinforcing steel observations if requested. It should be emphasized that this estimate is based upon assumptions of actual quantities and contractor's schedule. The fee will be charged only for the actual hours and.unit rates presented for tests and observations requested by the owner, contractor or subcontractors who schedule the services. If we can be of further assistance, please contact us at your convenience. Very truly yours, CTL I THOMPSON, INC. Heather Grubb Field Department Manager CITY OF FORT COLLINS BRIDGE REPLACEMENTS AT LAPORTE AVE. AND WHITCOMB ST. AND AT SHIELDS ST. CTL I T PROPOSAL NO. FC12-009713