CHANGE ORDER NO. _ 1 Fort
of
PROJECT TITLE: Soapstone - Pole Barn o f t Collins
CONTRACTOR: Finishing Touch
PROJECT NUMBER: OP-439467
DESCRIPTION: Pole Barn forsoapstone
In preparing change orders show in order as separate numbered paragraphs the following:
I. Reason for change: OSB sheathing forthe extedorwalis of the pole bam.
2. Description of change:Provide all labor and material for the installation of OSB to the pedmeterwalls of
e pole bam per the aLtached Finishing rouch proposal ate 6120111.
3. Change in contract cost: This will increase the contract price by $043.00.
4. Change in contract time: N/A
(Attach additional sheets as required)
ORIGINAL CONTRACT COST
$39,930.00
i TOTAL APPROVED CHANGE ORDERS
$0^00
TOTAL PENDING CHANGE ORDERS
$0.00
TOTAL THIS CHANGE ORDER
! TOTAL % OF THIS CHANGE ORDER 2.11%
Total C.O. % of Original Contract 2.11%
ADJUSTED CONTRACT COST
_ $40,773.00
(Assuming all change orders approved)
ACCEPTED BY:
CoAractors pepresentative
Date
ACCEPTED BY: ,t
Project Ma ger
REVIEWED BY: _ _��L�
Print e
APPROVED BY:
Print Name
cc: City Clerk
Contractor
Engineer
Project File
Purchasing
Date
Finishing Touch
PO Box 1303
Phone: 970-834-1764 Ault CO 80610 Fax: 970-834-2734
Email: FinishingTouch@Slrybeam.com
Date: 6-20-11
PROPOSAL
TO: Ethan Cozzins Re: Soap Stone pole barn
Here are the options you requested:
Inclusions:
1 Remove 29 guage metal siriing
i .Ad 2 :Y3:0 x4 and 24'i�4'x4." concreEe'appro-a . _-
3.A d G os wood siding. l t6 shEpfTp wit rim. a .
4.Add Ghostwood siding. 1x8 shiplap with trim. (Mat.)
- ,1 900 00
,:+`$60�3.`O '
+ 7,44Z.00
+$5,842.00
5.Add labor to install Ghostwood siding_
+$3,248.00
_walls for sidding' ('Mat..)' - -
+8_42A0,
The labor for the metal siding was left in the pricing to cover the labor for
installing the OSB.
Thank (rou