Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7107 CARPENTRY CONTRACTOR 2010V CHANGE ORDER NO. _ 1 Fort of PROJECT TITLE: Soapstone - Pole Barn o f t Collins CONTRACTOR: Finishing Touch PROJECT NUMBER: OP-439467 DESCRIPTION: Pole Barn forsoapstone In preparing change orders show in order as separate numbered paragraphs the following: I. Reason for change: OSB sheathing forthe extedorwalis of the pole bam. 2. Description of change:Provide all labor and material for the installation of OSB to the pedmeterwalls of e pole bam per the aLtached Finishing rouch proposal ate 6120111. 3. Change in contract cost: This will increase the contract price by $043.00. 4. Change in contract time: N/A (Attach additional sheets as required) ORIGINAL CONTRACT COST $39,930.00 i TOTAL APPROVED CHANGE ORDERS $0^00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER ! TOTAL % OF THIS CHANGE ORDER 2.11% Total C.O. % of Original Contract 2.11% ADJUSTED CONTRACT COST _ $40,773.00 (Assuming all change orders approved) ACCEPTED BY: CoAractors pepresentative Date ACCEPTED BY: ,t Project Ma ger REVIEWED BY: _ _��L� Print e APPROVED BY: Print Name cc: City Clerk Contractor Engineer Project File Purchasing Date Finishing Touch PO Box 1303 Phone: 970-834-1764 Ault CO 80610 Fax: 970-834-2734 Email: FinishingTouch@Slrybeam.com Date: 6-20-11 PROPOSAL TO: Ethan Cozzins Re: Soap Stone pole barn Here are the options you requested: Inclusions: 1 Remove 29 guage metal siriing i .Ad 2 :Y3:0 x4 and 24'i�4'x4." concreEe'appro-a . _- 3.A d G os wood siding. l t6 shEpfTp wit rim. a . 4.Add Ghostwood siding. 1x8 shiplap with trim. (Mat.) - ,1 900 00 ,:+`$60�3.`O ' + 7,44Z.00 +$5,842.00 5.Add labor to install Ghostwood siding_ +$3,248.00 _walls for sidding' ('Mat..)' - - +8_42A0, The labor for the metal siding was left in the pricing to cover the labor for installing the OSB. Thank (rou George Moore