HomeMy WebLinkAboutRESPONSE - BID - 7336 SHIELDS STREET & LAPORTE AVE BRIDGE REPLACEMENTCity of
F6rt Collins
Purchas_ i g
Financial Services
Purchasing Division
215 N. Mason St. 2"" Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
(cgov. com/purchasing
SPECIFICATIONS
CONTRACT DOCUMENTS
FOR
SHIELDS STREET BRIDGE &
LAPORTE AVENUE BRIDGE
REPLACEMENT
BID NO. 7336
PURCHASING DIVISION
215 NORTH MASON STREET, 2ND FLOOR, FORT COLLINS
FEBRUARY 22, 2012 — 3:00 P.M. (OUR CLOCK)
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and comprehensive. This
statement must be notarized. If necessary, questions may be answered on separate attached
sheets. The Bidder may submit any additional information he desires.
1. Name of Bidder: Za.K orY —:T.Y\.G 1
2. Permanent main office address: 9A `
HLP � ►.phle BaSU`{
3. When organized: IgLLO //11
4. If a corporation, where incorporated: &1DV-c, An
5. How many years have you been engaged in the contracting business under your present
firm or trade name? 3
6. Contracts on hand: (Schedule these, showi ng the amount of each contract and the
appropriate anticipated dates of completion.)
S4�3D t 0.oucrC.�erry'Lrc�k�4ilio�,$'12.� April
$�� A►�. over-1- as -� $,��o�� c�-.,tea
7. General character of Work performed by your company:
n 1 14 - - \ - ...,I_ ...1 - '1 '4
8. Have you ever failed to complete any Work awarded to you? Y n
If so, where and why?
9. Have your ever defaulted on a contract? nZ)
If so, where and why?
10. Are you debarred by any government agency? Y \O
If yes list agency name.
Rev10/20/07 Section 00420 Page 1
11. List the more important projects recently completed by your company, stating the
approximate cost of each, and the month and year completed, location and type of
construction.
SGc 0
12. List your major equipment available for this contract.
Sew A ��jc-he.d
13.
Experience in construction Work similar in importance to this project:
14. Background and experience of the principal members of your organization, including
officers:
15. Credit available:$ sonfoon 60
16. Bank Reference: S 2 C U�Ie�
17. Will you, upon request, fill out a detailed financial statement and furnish any other
information that may be required by the OWNER?
18. Are you licensed as a General CONTRACTOR? uw
If yes, in what city, county and state? (4,1 &AA, , V-"s. &
What class, license and numbers? Bola-4%115453 r�
19. Do you anticipate subcontracting Work under this Contract?
If yes, what percent of total contract?_ S/3
and to whom? Se- stJno^ 430- Sck�.�k-c o4 Su.bcz�4e"a5
Rev10/20/07 Section 00420 Page 2
20. Are any lawsuits pending against you or your firm at this time? O_
IF yes, DETAIL
21. What are the limits of your public liability? DETAIL r-�) I�—G Q f �LiGtiIGl1
What Company?
22. What are your company's bonding limitations? Q0iC)C>D.�
23. The undersigned hereby authorizes and requests any person, firm or corporation to
furnish any information requested by the OWNER in verification of the recital comprising
this Statement of Bidder's Qualifications.
Dated at CO this IC� k day of 201a
7-n_k ►r� Z hC�
Name of Bidder
County of wa,�l
being duly sworn deposes and says that he is
rof 71ik ;t4.Z vte and that (name of
organization) the answers to the foregoing questions and all statements therein contained are
true and correct.
Su scn led and sworn to before me this QQY day 20A
ry Public
My commission expires My Commision Expires 03/25/2014
Rev10/20/07 Section 00420 Page 3
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors performing over
15% of the contract.
ITEM
SUBCONTRACTOR
Section 00430 Page 1
COLORADO DEPARTMENT OF TRANSPORTATION
33 10
ANTI -COLLUSION AFFIDAVIT
L, rT,4I
ro�-� oll�hs Co
I hereby attest that I am the person responsible within my firm for the final decision as to the prices) and amount of this
bid or, if not, that I have written authorization, enclosed herewith, from that person to make the statements set out below on
his or her behalf and on behalf of my firm.
I further attest that:
f. The price(s) and amount of this bid have been arrived at independently, without consultation, communication or
agreement for the purpose or with the effect of restricting competition with any other firm or person who is a bidder
or potential prime bidder.
2A. Neither the price(s) nor the amount of this bid have been disclosed to any other firm or person who is a bidder or
potential prime bidder on this project, and will not be so disclosed prior to bid opening.
2B, Neither the prices nor the amount of the bid of any other firm or person who is a bidder or potential prime bidder on
this project have been disclosed to me or my firm.
3A. No attempt has been made to solicit. cause or induce any firm or person who is a bidder or potential prime bidder tc
refrain from bidding on this project, or to submit a bid higher than the bid of this firm, or any intentionally high or non-
competitive bid or other form of complementary bid.
3B. No agreement has been promised or solicited for any other firm or person who is a bidder or potential prime bidder
on this project to submit an intentionally high, noncompetitive or other form of complementary bid on this project.
4, The bid of my firm is made in good faith and not pursuant to any consultation, communication, agreement or
discussion with, or inducement or solicitation by or from any firm or person to submit any intentionally high, noncom-
petitive or other form of complementary bid.
5. My firm has not offered or entered into a subcontract or agreement regarding the purchase or sale of materials or
services from any firm or person, or offered, promised or paid cash or anything of value to any firm or person,
whether in connection with this or any other project, in consideration for an agreement or promise by any firm or
person to refrain from bidding or to submit any intentionally high, noncompetitive or other form of complementary bid
or agreeing or promising to rib so on this project.
6. My firm has not accepted or been promised any subcontract or agreement regarding the sale of materials or
services to any firm or person, and has not been promised or paid cash or anything of value by any firm or person,
whether in connection with this or any other project, in consideration for my firm's submitting any intentionally high,
noncompetitive or other form of complementary bid, or agreeing or promising to do so, on this project.
7. 1 have made a diligent inquiry of all members, officers, employees, and agents of my firm with responsibilities
relating to the preparation, approval or submission of my firm's bid on this project and have been advised by each of
them that he or she has not participated in any communication, consultation, discussion, agreement, collusion, or
other conduct inconsistent with any of the statements and representations made in this affidavit.
8. 1 understand and my firm understands that any misstatement in this affidavit is and shall be treated as a fraudulent
concealment from the Colorado Department of Transportation, of the true facts relating to submission of bids for this
contract.
I DECLARE UNDER PENALTY OF PERJURY IN THE SECOND DEGREE, AND ANY OTHER APPLICABLE STATE OR
FEDERAL LAWS, THAT THE STATEMENTS MADE ON THIS DOCUMENT ARE TRUE AND COMPLETE TO THE BEST
OF MY KNOWLEDGE.
V On V9go IS Lm, ui cc,,, panty n.m9
rc,n
TIIIa
"M9 hfrtl or GOTp2ny ❑2Pi9 U, 10911 v9111,1re)
Y
Dale
T,I,e
Sworn to before me this day of, 20 1a
Nona
c
My C 9$lorl mpw
My Commision Expires 03/25/2014
NOTE: This document must be signed in ink.
CDOT Form 4606 1102
COLORADO DEPARTMENT OF TRANSPORTATION Project #:
BIDDERS LIST DATA and UNDERUTILIZED
Location:
DBE (UDBE) BID CONDITIONS ASSURANCE b D� I►'tS.CO
Prime Contractor Instructions: This form has two sections, both must be completed and submitted with your bid. Complete
Section I to list all subcontract quotes received (non -DBE and DBE). Complete Section II to report only Underutilized DBE
(UDBE) participation percentages which qualify under the contract goal specification for this project. Please review CDOT Form
#715 instructions before completing Section II. Attach additional sheets as necessary.
It is the policy of the Colorado Department of Transportation that underutilized disadvantaged business enterprises have equal
opportunity to participate on projects financed with federal, state or local entity funds. Consistent with 49 Code of Federal
Regulations (CFR) Part 26.11, the Bidders List data provided by the Contractors will provide CDOT as accurate data as
possible about the universe of DBE and non -DBE firms actively seeking work on its highway construction contracts, for use in
setting overall DBE goals.
SECTION I: CDOT BIDDERS LIST INFORMATION (Non -DBEs and DBEs)
1) Are all subcontract bids (quotes) received by your firm for this project listed below? A Yes ❑ No
2) If No, make certain any additional subcontract bidding information is submitted to the CDOT Business Programs Office
before 4:00 pm on the day after bids are opened to ensure CDOT has the best data possible for setting future DBE goals
(use the same table format as below):
CDOT Business Programs Office
4201 E. Arkansas Ave., Room 200
Denver, Colorado 80222 FAX: 303-757-9019 EMAIL: eo@dot. state. co. us
3) The most recent CDOT Bidders List will be posted online at: www.dot.state.co.us/EEO/DBE Program Page. htm
Name of firm submitting Bid/Quote
Certified
DBE firm?
Work item(s) description
Firm being
used? a�
Yes No
Yes No
1. Gfa�cZA Ce.,�.u�� ,1,.,.,
Ct"ULA-1--c sV%UL�
x
2. 'S &,LejL
C�� � FIwE �o �► �Q�r��
x
r
4. ► btN�.., CelOa.fdo TrUaM�
/
lQi� ecnllR� r
X
5. Opine-s Sc¢vtc��
✓
J2a�% '(yn��o I
X
6. &kl A 41 ' & ,..,_
'�
—Fr ti
7c
7. we R'J(, Q.10 6"At'-'�
/�Q'�4ac�
�bc1., Tyi
X
1
8. &Vkt 1�✓w i.D �s'1cS
'�
cc � 11
Yet+- C./"'S�a� C.a', 4za "1 S. -i11)
9. 3Pt7 --L.,,.
Sped;
x
10, G4%1A Assec,.l<,
✓
taost.'r C„�(,2,1 q Se�a.n pad<s�x:a.. Q..� l
X
11. Dowell (��s�s¢a�.�
✓
L
£py Sf Otif t,^,6 r.1 Q0 ( � SK�p.w
c
12.
SI C LA.) I. SG
�" /�
teorw C'-JC. 4— ,cc
X
13. ./t 5 l a•.ds�n ,z
6471x../ S�s✓,n
k
14. �t BI2.1C �+t5�:,.
✓
//6"410' r%-
(OvtG12e �c ru u{
X
Pagel of 2 Previous editions are obsolete and may not be used CDOT Form #714 4//08
COLORADO DEPARTMENT OF TRANSPORTATION Project #:
BIDDERS LIST DATA and UNDERUTILIZED �33(Q
Location:
DBE (UDBE) BID CONDITIONS ASSURANCE b D(I I�S,CD
Prime Contractor Instructions: This form has two sections, both must be completed and submitted with your bid. Complete
Section Ito list all subcontract quotes received (non -DBE and DBE). Complete Section II to report only Underutilized DBE
(UDBE) participation percentages which qualify under the contract goal specification for this project. Please review CDOT Form
#715 instructions before completing Section II. Attach additional sheets as necessary.
It is the policy of the Colorado Department of Transportation that underutilized disadvantaged business enterprises have equal
opportunity to participate on projects financed with federal, state or local entity funds. Consistent with 49 Code of Federal
Regulations (CFR) Part 26.11, the Bidders List data provided by the Contractors will provide CDOT as accurate data as
possible about the universe of DBE and non -DBE firms actively seeking work on its highway construction contracts, for use in
setting overall DBE goals.
SECTION I: CDOT BIDDERS LIST INFORMATION (Non -DBEs and DBEs)
1) Are all subcontract bids (quotes) received by your firm for this project listed below? x Yes ❑ No
2) If No, make certain any additional subcontract bidding information is submitted to the CDOT Business Programs Office
before 4:00 pm on the day after bids are opened to ensure CDOT has the best data possible for setting future DBE goals
(use the same table format as below):
CDOT Business Programs Office
4201 E. Arkansas Ave., Room 200
Denver, Colorado 80222 FAX: 303-757-9019 EMAIL: eo@dot.state.co.us
3) The most recent CDOT Bidders List will be posted online at: www.dot.state.co.us/EEO/DBE Program Page. htm
Name of firm submitting Bid/Quote
Certified
Dee firm?
Work item(s) description
Firm being
used? jo
`°
Yes No
Yes I No '
1. 1/1/4/0b"54 C aj.
Fl o -P#
X
3. "Ceto �r r,(TC
lP^L1LGCc F(4�WesK i act
X
4. ,T S u.cz co-.Cw..l-'
ie�uc/ti G(afw.v�
X
5. aceas., cwY'ta.�
Sburrs ,
x
6. Les ark4
✓
Sko¢'n5 H �I,� CrlanL wotx
`F
�
7. mc++ L �ISY.
✓
fir /��c f�iLi✓in
x
8.
K
9. rvt s Cc,
✓
e (Z"*1 f LOV "r-
X
10. L
✓
iD5 TGY! S I a+4 r n �a�L
x
1t.
✓
54a��E.11.Q�i �o,d ea�>n
x
12, Ra�� yMr%
13. lr-
14.
Page 1 of 2 Previous editions are obsolete and may not be used CDOT Form #714 4/08
COLORADO DEPARTMENT OF TRANSPORTATION Project #:
BIDDERS LIST DATA and UNDERUTILIZED
Location:
DBE (UDBE) BID CONDITIONS ASSURANCE 8 a�I j�S,Co
Prime Contractor Instructions: This form has two sections, both must be completed and submitted with your bid. Complete
Section I to list all subcontract quotes received (non -DBE and DBE). Complete Section II to report only Underutilized DBE
(UDBE) participation percentages which qualify under the contract goal specification for this project. Please review CDOT Form
#715 instructions before completing Section If. Attach additional sheets as necessary.
It is the policy of the Colorado Department of Transportation that underutilized disadvantaged business enterprises have equal
opportunity to participate on projects financed with federal, state or local entity funds. Consistent with 49 Code of Federal
Regulations (CFR) Part 26.11, the Bidders List data provided by the Contractors will provide CDOT as accurate data as
possible about the universe of DBE and non -DBE firms actively seeking work on its highway construction contracts, for use in
setting overall DBE goals.
SECTION I: CDOT BIDDERS LIST INFORMATION (Non -DBEs and DBEs)
1) Are all subcontract bids (quotes) received by your firm for this project listed below? ox Yes ❑ No
2) If No, make certain any additional subcontract bidding information is submitted to the CDOT Business Programs Office
before 4:00 pm on the day after bids are opened to ensure CDOT has the best data possible for setting future DBE goals
(use the same table format as below):
CDOT Business Programs Office
4201 E. Arkansas Ave., Room 200
Denver, Colorado 80222 FAX: 303-757-9019 EMAIL: eo@dot. state. co. us
3) The most recent CDOT Bidders List will be posted online at: www.dot.state.co.us/EEO/DBE Program Page. htm
Name of firm submitting Bid/Quote
Certified
DBE firm?
Yes No
Work item(s) description
Firm being m
used?
Yes No ems°
1. SL.J � s --F
nn /I
au-K I YtLa✓�
X
2. Ke/Ot
4.
5. /+�A (�✓fSrL�tc/D�s
✓
ConLRL�G SZS
X
mac•
6. /f, ,11
n°�
��/t �y-M l�nv�
CyO,
x
7. I�fI ^y
`
.rlc1rc�u,
],
x
8. %:if� Car�rtt �c
✓
C'C,r F /w..s a
X
10. �u17 n Co7r•Sf<
�
�� -�
11.
12.
13.
14.
Page 1 of 2 Previous editions are obsolete and may not be used CDOT Form #714 4/08
Name of firm submitting Bid/Quote
Certified
DBE firm?
Yes No
Work item(s) description
Firm being
used? ��
Yes No �b
15.
16.
17.
18.
19.
20.
SECTION II: UNDERUTILIZED DBE (UDBE) PARTICIPATION COMMITMENT
1) Total eligible Underutilized DBE (UDBE) percentage amount from Box A below: 13. 00 %
2) Will your company's Underutilized DBE (UDBE) participation commitment meet the contract goal? ff'Yes ❑ No
3) List the UDBE firms, committed work items, and eligible UDBE percentage of your bid committed to each.
UDBE Firm name
Certification #
Committed work item(s)
% Commitment
toward DBE Goal*
1 �ka{�w mashes, Y��.
5�32
[ice CoRiea� �k t jo r�
IZ .31
2. G (d d Asso�r•r��s
$30,
[�bS,a �.,keo l La„ds�Pr.�
( %
3.
%
4.
%
5.
%
BOX A: TOTAL ELIGIBLE UDBE PERCENTAGE AMOUNT (Round to nearest hundredth) 4 3 • cc) %
Detailed instructions on how to calculate DBE commitment amounts are available on CDOT Form #715 and in the "Counting DBE Participation
Toward Contract Goals and CDOT's annual DBE goal" section of the "DBE — Definitions and Requirements" in the Standard Special Provisions.
I understand that, if my company is determined to be the low bidder for the contract on this project, I must submit a completed
CDOT Form #715 CERTIFICATION OF UNDERUTILIZED DBE PARTICIPATION for each firm listed in Section II of this form
to the Transportation Department by 4:00 pm on the third work day after the day bids are opened. The actual amounts
submitted on each CDOT Form #715 must equal or exceed the DBE percentage commitments documented on this
form. In addition, if my company does not meet the DBE/UDBE goal for this project, I must submit a completed
CDOT Form #716 DBE GOOD FAITH EFFORT DOCUMENTATION before 4:00 pm on the day after bids are opened.
CDOT Form #715s submitted for firms not included on this form, OR for amounts exceeding those listed on this
form, will be accepted but NOT counted as Good Faith Efforts. Only the efforts the contractor made priorto the bid
opening will count as Good Faith Efforts.
I understand my obligation to abide by the Policy stated above Section I. 1 shall not discriminate on the basis of race, color,
age, sex, national origin, or handicap in the bidding process or the performance of contracts.
I DECLARE UNDER PENALTY OF PERJURY IN THE SECOND DEGREE, AND ANY OTHER APPLICABLE STATE OR
FEDERAL LAWS, THAT THE STATEMENTS MADE IN THIS DOCUMENT ARE TRUE AND COMPLETE TO THE BEST
OF MY KNOWLEDGE.
Company Name:
Za. ; �
Date:
' /
r, %-T mac,
Compan
icer Sig ur
5. s
T
preS't ae-VtA -•
Page 2 of 2 \ \ \\ Fttious editions are obsolete and may not be used COOT Form #714 4/0e
ZAK DIRT. INC.
COMPLETED PROJECTS
Contract Project Name Project Description Completion
Amount Date
$7,261 ,795.00
State Highway 9 Roadway Widening
Widen roadway to four lanes, drainage
OCT, 2010
Hwy 9 - Breckenridge, CO
improvements, bike path relocation, new
pedestrian bridge, retaining wall, wetland
mitigation, sediment basins
$3,839,052.00
State Highway 7 Bridge Replacement
Bridge replacement and CBC, shoulder
SEPT. 2010
Hwy 7 & 85 - Brighton, CO
widening & striping.
$2,950,516.00
State Highway 287 Slab Replacement
Conrele slab repair crack sealing, cross
NOV, 2010
Hwy 287 - Lafayette, CO
stitching, MSE wall,erosion control,
milling, filing.
$553,143.00
State Highway 138 Drainage Bridge
Headwalls, wingwalls, CIP 6' of CBC
DEC, 2010
Hwy 138, Sterling, CO
barrel, struct. replacement
$676,534.001
State Highway 138 Timber Bridge
Remove extg timber bridge, replace
OCT, 2010
with concrete box culvert, ABC.
signage striping.
SECTION 00300
BID FORM
ZAK DIRT, INC.
$585,950.00
Horse Creek Reservoir
Repair toe drain and outlet
Mar. 2010
Hudson, CO
structure at reservoir
$640,789.00
Fort Lupton Pedestrian Bride
Concrete bikeway, block wall,
Au . 2009
HWY 85 & Hwy 52 Ft. Lupton
concrete cl b bridge, railing,
fencing, seed, mulch, electrical,
ri ra , crusher fine path
$1,422,919.00
Wildcat Bridge Replacement
Demo/construct bridge, traffic
Aril, 2009
Sterling/Brush
control, bridge rail, guard rail,
seed, mulch, erosion control,
rem/preprem/prep asphalt, box culvert,
vmt marking
$127,339.00
Horse Creek Reservoir Flume
Dewaterin , remove concrete
Dec. 2009
Hudson, CO
walls & fillets, construct new
outlet structure walls, cutoff
wall, construct measuring
structure, realign ditch
$5,243,454.00
SH 9 Roadway Widening
Roadway widening, 5" HMA,
Oct. 2009
Breckenridge, CO
curb & gutter, noise wall, storm
drain, embankment, landscaping
si nalization, luminaries, conduit,
erosion control, striping, seeding
ZAK DIRT, INC.
$2,228,280.00
Crow Lane Reservoir
New dam construction, earthwork,
Sept. 2008
Lyons, CO
major concretespillway, ri ra
$2,116,118.00
Larimer County Bridges
Build 2 bridges, reconstruct
Oct. 2007
CR 38E Masonville, CO
roadway, 3 riprap drop sturctures,
stream diversion.
$5,253,484.00
Poudre Rest Area Relocaion
New buildings, grading,
Jan. 2007
Harmony Road Fort Collins
bridge construction
$1,105,122.00
Saint Wain State Park
Park Improvements, pipe
Nov. 2006
Firestone
installation, earthwork, roadway
construction
$3,313,311.25
Re ion 4 Safety Project
Road widening in various
July, 2006
Various
locations, earthwork
$180,000.00
Jackson Reservoir
Shoreline Rehabilitation,
Feb. 2006
Fort Morgan
ri ra /earthwork
ZAK DIRT, INC.
$1,500,000.00
Wiggins Bride
Bridge removal and replacement
Nov. 2005
Wiggins, CO
$430,000.00
Foothills Dam Rehabilitation
Dam Rehabilitaiton
Dec. 2005
Mead
earthwork
$250,000.00
Vance Brand Airport
Runway improvements,
Nov. 2005
Longmont
earthwork, install roadbase
$280,000.001
Ryan Gulch Spillway
New dam Construction
July, 2005
drainage work, grouted ri ra ,
earthwork
$1,149,131.00
McKay Lake dam
Dam rehabilitation
August, 2005
Westminster
70,000 CY embankment, outlet
works/structures, ri ri
$1,614,330.00
Airport Road Improvements
Road widening, paving, flatwork,
Sept. 2005
Longmont
jearthwork
ZAK DIRT, INC.
$570,000.00
CDOT Region 4 Box Culvert
Bridge replacements,
Nov. 2004
Brighton
dewaterin
$400,000.00
WC Road 7 Hi hwa 119
Intersection improvements,
October, 2004
Del Camino
roadway construction
$650,000.00
CDOT Region 4 Safety Project
Road widenin s in various
Sept. 2004
Various
locations throughout Colorado,
earthwork, asphalt paving
$250,000.00
Arrowhead Dam
Dam rehabilitation, earthwork,
July, 2004
outlet works/structures, ri ra
$110,000.00
Mulligan Lake Restoration
Lake dredging, 100,000 CY
June, 2004
excavation
$2,545,013.00
9th Avenue Widening
Roadway widening, road
Aril, 2004
Longmont
construction, ri ra
ZAK DIRT, INC.
IddL
`''ZAK
Zak Dirt Equipment
Available as of February, 2012
HEiAU1YCDUTY'TRU;CKS
1999 KENWORTH T-800
1986 FORD 1600 GAL WATER TRUCK
1997 INTERNATIONAL WATER TRUCK
EXT.R`A;HEAUtYE=DUTY�TR,U;CI(S;r
2008 KENWORTH TRACTOR
EQUIPMENT
1973 GRADING TRACTOR MF-40
1987 CAT 14-G MOTOR GRADER
1979 VERSATILE 875
1999 CAT D6M DOZER
1996 CAT D-8R DOZER
1988 CAT 966E WHEEL LOADER & FORKS
3CY
MARK ML60-30 FORKLIFT
1992 CAT 980-F WHEEL LOADER
4CY
1980 CAT 950-A WHEEL LOADER
2 CY
2001 JOHN DEERE 210-LE TRACTOR
.75 CY
2004 246E SKID STEER LOADER
2001 CAT 325-BL EXCAVATOR
2000 CATERPILLAR 345BL EXCAVATOR
1995 RT500 GROVE CRANE
30 TON
2000 VOLVO A35-C HAUL TRUCK
20 CY
1999 CAT TELEHANDLER TH83
2005 BIDWELL PAVER 36' & ACCESSORIES
2007 KOMATSU PC400 EXCAVATOR
PORT -A -POUR CONCRETE BATCH PLANT
2005 140H MOTOR GRADER
2005 IR SD 77DX COMPACTOR WHEEL
2007 966H CAT LOADER
4 CY
2005 325CL CAT EXCAVATOR
1999 CAT 615C
16 CY
2008 GROVE CRANE
50 TON
AL
_`
`-'ZAK
ZAK DIRT, INC - Projects similar in importance
to this project (item # 13)
STATE HIGHWAY 9 ROADWAY WIDENING
Widen Highway from Valley Brook Rd to Coyne Valley Road
• Owner: Colorado Department of Transportation
• Engineer: Bob Smith CDOT
• Location: Breckenridge, CO
• Awarded: 06-04-09
• Scheduled Completion Date: July, 2010
• Contract Amount: $6,105,597.00
• Scope of Work: Widening to four lanes, new approaches, drainage
improvements, bike path relocation, new pedestrian bridge, retaining
wall, sediment basins, and wetland mitigation
State Highway 9 Roadway Widening
Roadway Widening/Curb & Gutter/Noise Wall
• Owner: State of Colorado Department of Transportation
• Engineer:
• Location: Summit County, Colorado
• Awarded: 11-27-08
• Completed: October 27,2008
• Contract Amount: $5,247,400.00
• Scope of Work: Roadway widening, 5" HMA, curb & gutter, storm
drain, noise wall, embankment, landscaping, signalization, luminaries,
conduit, erosion control, striping, signing, seeding, mulching
• Contract Amount: $5,247,400.00
State Highway 7 Bridge Replacement
Replace Bridge on State Highway 7 over Platte River
• Owner: Colorado Department of Transportation
• Engineer: Jason Lucerna CDOT
• Location: Brighton, CO
• Awarded: 05-19-09
• Scheduled Completion Date: September, 2010
• Contract Amount:$3,597,791.00
• Scope of Work: Bridge replacement and CBC, which also includes
shoulder widening and striping
• Contract Amount: $4,772,315
gth Avenue Road Widening
Road Widening
• Owner: City of Longmont
• Engineer: Sear Brown
o J. Temple (970) 482 — 5922
• Location: Longmont, Colorado
• Awarded: July 2003
• Completed: April 2004
• Contract Amount: $2,545,013
LARIMER COUNTY BRIDGES
BUILD 2 BRIDGES, RECONSTRUCT ROADWAY
• Owner: Larimer County
• Engineer:
• Location: Fort Collins, CO
• Awarded
• Completed: October 1, 2007
• Contract Amount: $2,116.118
Wildcat Bridge Replacement
Replace Bridge on CO Highway 52 — Morgan County
• Owner: State of Colorado Department of Transportation
• Engineer:
• Location: Colorado Highway 52, 6 Miles North of Fort Morgan
• Awarded: 08-28-08
• Scheduled Completion Date: April, 2009
• Scope of Work: Demo existing bridge, construct new bridge, traffic
control, bridge rail, guard rail, seed, mulch, erosion control, remove
pavement, place new asphalt, box culvert, pavement marking
• Contract Amount: $1,727,816.28
Dan Sewczak
Current Position: Chief Estimator
Project '97 —'98 Twin Lakes Dam Fort Collins, CO
Management Dam rehabilitation and spillway enlargement
Experience Civil Engineering Intern: Structure layout, material testing, survey
Jun '99 —Aug '99 Carl Smith Dam Hotchkiss, CO
Dam rehabilitation
• Civil Engineering Intern: Material testing, quality assurance
1999 Elder Reservoir Dam Larimer County, CO
Outlet Works Replacement
• Project coordination, resource scheduling, materials, production logic, form design
Dec'01—Apr'02 Union Ditch Diversion Dam Milliken, CO
Dewatering, earthwork, structural concrete, air bladder gates
• Project coordination, resource scheduling, materials, production logic, form design
Nov'03—Apr'04 WCR 13 Bridge
Longmont, CO
Three span bridge structure, dewatering, riprap
• Project coordination, resource scheduling, materials, production logic, survey
Apr'04 — Jul '04 Arrowhead Dam
Dam rehabilitation
Evans, CO
• Project coordination, resource scheduling, materials, production logic, scheduling
Sep '04— Nov'04 CDOT Region 4 Concrete Box Culverts CO
Bridge replacements in Red Lion & Holyoke, CO
• Project coordination, resource scheduling, materials, production logic, scheduling
Dec'04—Jun'05 McKay Lake Dam Westminster, CO
Dam rehabilitation
• Project coordination, resource scheduling, materials, production logic, survey
Jul'05— Nov'05 Wiggins Bridge Replacement Wiggins, CO
Four span bridge 450' long: structures, riprap, earthwork, roadbase
• Project coordination, structure layout, materials, production logic, scheduling
Mar'06 — Aug '06 Saint Vrain State Park Boulder County, CO
SECTION 00300
BID FORM
PROJECT: 7336 SHIELDS STREET BRIDGE & LAPORTE AVENUE BRIDGE REPLACEMENT
Place
Date
1. In compliance with your Invitation to Bid da ed Jo20jA and subject to all
conditions thereof, the undersigned V1G • a (Corporation,
yftgiife�l laCa } rJ §1p rYQkr) authorized to
do business in the State of Colorado hereby proposes to furnish and do everything
required by the Contract Documents to which this refers for the construction of all items
listed on the following Bid Schedule or Bid Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in
good faith, without collusion or connection with any other person or persons Bidding for
the same Work, and that it is made in pursuance of and subject to all the terms and
conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the
detailed Specifications, and the Drawings pertaining to the Work to be done, all of which
have been examined by the undersigned.
3. Acco. } m anyir�g this Bid is a certified or cashier's check or standard Bid bond in the sum
of ram' �'olak 61 A fM/ LE
($ ) in accordancb with the Invitation To Bid and Instructions to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and
a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days
from the date when the written notice of the award of the contract is delivered to him at
the address given on this Bid. The name and address of the corporate surety with which
the BiOgr proposes to furnish the specified performance and payment bonds are as
follows:.l ry )GY Dea'&OKAk:E6n p NLG i cn+p0 w�
aQbk tt- u r e, 2 sv3aa
5. All the various phases of Work enumerated in the Contract Documents with their
individual jobs and overhead, whether specifically mentioned, included by implication or
appurtenant thereto, are to be performed by the CONTRACTOR under one of the items
listed in the Bid Schedule, irrespective of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or Bid
Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.
.7 through a .
Rev 10/20/07 Section 00300 Page 1
Park improvements
• Project coordination, resource scheduling, materials, production logic, survey
Dec'06 — Mar'07 Fulton Ditch Brighton, CO
Bridge replacement
• Project coordination, resource scheduling, materials, production logic, survey
Dec'06 — Mar'07 Weld County Road 38E Masonville, CO
Remove & replace 2 bridges, 3 boulder drop structures, earthwork &
paving
• Structures project manager
Oct'07 —Spring 2008 Crow Lane Reservoir Pinewood Springs, CO
New dam construction: 2,500 cubic yards of structural concrete & 500'
outlet pipe
• Project coordination, resource scheduling, materials, production logic, survey
August'10 — February, 2011 State Highway 287 Slab Replacement Broomfield, CO
Remove/replace concrete slabs
Project coordination, supervise night crew, resource scheduling, materials,
production logic
February, 2011 — Current 84`h Avenue over 1-25
Project coordination, resource scheduling, materials coordination, coordinate &
control night time highway closures/work/openings.
Education Colorado State University Fort Collins, CO
• B.S. Civil Engineering
Angelo Mancina
Position Operations Manager
Project '97 —'98 Twin Lakes Dam Fort Collins, CO
Management Dam rehabilitation and spillway enlargement
Experience • Civil Engineering Intern: Structure layout, material testing, survey
Jun '99 —Aug '99 Carl Smith Dam Hotchkiss, CO
Dam rehabilitation
• Civil Engineering Intern: Material testing, quality assurance
Aug '01 — Jan '03 South Taft Hill Road Widening Fort Collins, CO
Road widening of 1.5 miles. box culverts, earthwork, structural
concrete, bituminous pavement, aggregates, concrete trails
• Master schedule, subcontractor management, crew management
Dec'02 — March '03 Mariano Reservoir Loveland, CO
Box culvert extension, sand blanket, toe drain, embankment,
tunnel lining, pressure grouting
• Master schedule, subcontractor management, survey, material testing
Jul'03—Apr'04 91"Avenue Road Widening Longmont, CO
Road widening
• Master schedule, subcontractor management, crew management
Sep'04 — Sep'05 Airport Road Improvements Longmont, CO
Road widening
• Master schedule, subcontractor management, crew management
Mar'05 — Jul '05 Ryan Gulch Spillway Loveland, CO
Construct new riprap spillway
• Master schedule, subcontractor management, crew management
Sep'05 - Dec'05 Foothills Dam Rehabilitation Hygene, CO
Dam rehabilitation: excavate the core of the dam and replace
with moisture conditioned fill
• Master schedule, subcontractor management, crew management
Jan '06 — Feb '06 Jackson Reservoir Wiggins, CO
Shoreline rehabilitation
• Master schedule, subcontractor management, crew management
Feb '06 — Jan '07 Poudre Rest Area Fort Collins, CO
Relocation of rest area, demolition of old rest area, concrete
pavement, building, earthwork
• Master schedule, subcontractor management, crew management
2007 Larimer County Bridges Masonville, CO
Build 2 bridges, reconstruct roadway
Master schedule, subcontractor management, crew management
2008 State Highway 9 Breckenridge, CO
Road Widening, Curb & Gutter, Noise Wall
Master schedule, subcontractor management, crew management
2009 — Current Various Projects in Denver & along the Front Range
Visit all jobsites, assist Superintendents and Project Mangers, trouble
shoot on site, safety reviews, keep lines of communication open with
owner, subcontractors, suppliers & public
Education South Dakota School of Mines Rapid City, SD
• B.S. Civil Engineering
Pete Sewczak
Position Project Manager
Current Work Oct'07 — April '09 Wildcat Bridge Replacement Fort Morgan, CO
Experience with Bridge Replacement
Zak Dirt, Inc. Crew management, short term scheduling, quality control
May'09—August'10 State Hwy 7 Bridge Replacement Brighton, CO
Bridge Replacement
• Crew management, scheduling, quality control
August'10 — February, 2011 State Hwy 287 Slab Replacement
Remove/Replace concrete slabs
• Crew & subcontractor management, scheduling, quality control.
Public relations
February, 2011 — Current 841" Avenue over 1-25
Remove & replace 84" avenue over 1-25
• Quality control, risk management, public relations, crew management,
scheduling
2004 — 2008 Colorado State University Fort Collins, CO
Education B.S. Construction Management
Malt Kaup
Position Superintendent
Experience Aug '01 —Jan '03 South Taft Hill Road Widening FortCollins, CO
Road widening of 1.5 miles: box culverts, earthwork, structural
concrete, bituminous pavement, aggregates, concrete trails
• Task schedules, material ordering, crew management
Oct'02 — Dec'02 Giffin Reservoir Carr, CO
Muck excavation, riprap
• Task schedules, material ordering, budget management
Dec '02 — March '03 Mariano Reservoir Loveland, CO
Box culvert extension, sand blanket, toe drain, embankment,
tunnel lining, pressure grouting
• Task schedules, material ordering, budget management
Jul '03 —Apr '04 gthAvenue Road Widening Longmont, CO
Road widening
• Task schedules, material ordering, budget management
Sep '04 — Sep'05 Airport Road Improvements Longmont, CO
Road widening
• Task schedules, material ordering, budget management
Dec '04 — Jun '05 McKay Lake Dam Westminster, CO
Dam rehabilitation
• Crew management, project scheduling, material & subcontractor
coordination
Sep'05 - Dec'05 Foothills Dam Rehabilitation Hygene, CO
Dam rehabilitation: excavate the core of the dam and replace
with moisture conditioned fill
• Task schedules, material ordering, budget management
Jan '06 — Feb '06 Jackson Reservoir Rehabilitation Wiggins, CO
Shoreline rehabilitation
• Task schedules, material ordering, budget management
Feb'06 — Jan '07 Poudre Rest Area Fort Collins, CO
Relocation of rest area, concrete pavement, building, earthwork
• Task schedules, material ordering, budget management
2007 State Highway 60 Larimer County, CO
Constructed concrete intersection, realigned the highway &
installed a traffic signal
• Task schedules, material ordering, budget management
Sep'06—Sep'08 Crow Lane Reservoir Pinewood Springs, CO
New Dam Construction
• Crew management, project scheduling, material & subcontractor
coordination
2008 State Highway 9 Breckenridge, CO
Road Widening, Curb & Gutter, Noise Wall
• Task schedules, material ordering, budget management
2009 Fort Lupton Pedestrian Bridge Fort Lupton, CO
• Task schedules, subcontractor management, public relations,
Owner communications,
2009-2010 State Highway 7 Bridge Replacement— Brighton, CO
• Budget management, project scheduling, material & subcontractor
coordination, public relations.
2010 State Highway 9 Phase II
• Public relations, project scheduling, material & subcontractor
coordination, crew management
2010 State Highway 287 Broomfield, CO
Subcontractor/supplier management, scheduling, public relations,
owner communication
2011 Havana over Cherry Creek Denver, CO
• Owner communications, material/supply coordination, crew
management, public safety, public relations, crew management
Education Garden City Community College Garden City, KS
• Criminal Justice
KEY PERSONNEL
James S. Sewczak, President
• 39 years experience in earthmoving, drainage and construction
• Ownership of business 30 years
Larry D. Crouch, Vice President
• 36 years experience in earthmoving, pipeline and drainage construction
• Ownership of business 9 years
Kerry Sewczak, Secretary/ Treasurer
• 30 years experience in accounts payable/receivable, payroll and insurance
`-'ZAK
CORPORATE INFORMATION
DATE OF INCORPORATION: October, 1976
STATE OF INCORPORATION: Colorado
CORPORATE OFFICERS: James S. Sewczak President
Larry D. Crouch Vice President
Kerry K. Sewczak Secretary/Treasurer
INSURANCE AGENT: Ewing Insurance Agency — Steve Ewing
4025 St. Cloud Drive, Suite 100
Loveland, CO 80538
(970)679-7333
Bonding Company: Berkley Regional Insurance Company
Bonding Agent: IMA — Sheryll Shaw
1550 17t' Street, Suite 600
Denver, CO 80202
(303)615-7418
ACCOUNTANT: Bauerle & Co - Ken Kresl
1720 S. Bellaire St., Suite 1110
Denver, CO 80222
BANK: Guaranty Bank & Trust Company
401 Main St.
Longmont, CO 80501
Greg Ludlow — (303) 675-1146
FEIN: 84-0713877
DUNS NUMBER: 08-0395619
COMPANY SIZE: Currently 35 employees
STATE OF COLORADO
DEPARTMENT OF TRANSPORTATION OT
Contracts and Market Analysis Branch ECEIVE
9 4201 East Arkansas Avenue, e Floor
Denver, Colorado 80222 DEC 14 2011
Telephone: (303) 757-9736
Facsimile: (303) 757-9868
December li, 2011
NOTIFICATION OF PREOUALIFICATION
ZAK DIRT INCORPORATED
14290 HILLTOP RD.
LONGMONT, CO 80504
Limit: 20,000,000
Vendor ID: 801A
Reference is made to your application for registration as a qualified bidder on Colorado Highway work,
dated December 2, 2011. Your file has been reviewed and determined to be complete. Your firms Vendor
ID is indicated above and must be shown on your bid proposal.
Bids from a general contractor will be received subject to any limitation stated above, and with due
consideration to the amount of work presently under contract, past performance on highway contracts, and
the contractor's financial status at the time of bidding. It is further understood that the bidder has available
the organization and equipment adequate for any project on which a bid is submitted; that the contractor's
organization and equipment will be available to undertake the work on which bids are currently made,
promptly after award of contract; and that the work will be carried on expeditiously and under proper
supervision.
This notice supersedes all previous notices. This prequalification will expire on December 31, 2012. You
must file a new application 10 days prior that time to remain current. It is the contractor's sole
responsibility to obtain and file the necessary forms each year prior to expiration. Forms are available on
the Internet at littp://www.dot.state.co.us/Biddin2/BidForms.htm. If you need forms sent to you, they
may be requested at 303-757-9354.
Sincerely,
tt C T Award Officer
(3 3)757-9006
REO;ro
FILE COPY: (K. Gonzales)
Kansas Phone: 785-296-2235
Fax: Impaired
- 711
Dwight D. Eisenhower State Office Building � Hearing Impaired - 711
700 S.W. Harrison Street Department of Transportation publicinfo@ksdot.org
Topeka, KS 66603-3745 Division o Operations publicinfo@ksdot.org
W. Rankin, Acting Secretary Sam B http://@.ksdot.org
ck, Governor
M. Patrick, P.E., Director
Mark A. Morrison, Assistant Director
January 4, 2012 ECEIoiE
ZAK DIRT INC JAN 0 ] 2012
14290 HILLTOP RD
LONGMONT, CO 80504 BY.
--
A review of your financial statement has been made and you are now qualified with the Secretary of
Transportation, Kansas Department of Transportation, to bid on the class, or classes, of.work indicated
below thus (X).
The aggregate amount of your contracts with the Secretary of Transportation, plus the unearned amount
of all your other contracts in this state and/or any other states, shall, not exceed $11,500,000
A. (X) Grading.
B. (X) All Structures.
C. (X) RC Box Structures, Culverts and Other Miscellaneous Concrete.
D. (X) Light Surfacing, including Subgrade Modification, Bituminous Sealing, Bituminous
Surface Treatments, Aggregate Surfaces. .
E. (X) Base Courses - Pugmill Type Bases, including Aggregate Base Concrete and Road Mix;
except Plant Mix Bituminous and Portland Cement Concrete Base Courses.
F. Plant Mix Bituminous Mixtures.
G. (X) Portland Cement Concrete Pavement. Lc r ; t G .4 10.000 sIjorc lor'As
H. Seeding and Roadside Improvement, excluding Rest Area Structures and Buildings.
I. (X) Rest Area Structures and Buildings.
J. Electric Lighting and Traffic Signals.
K. All Signing and Delineation.
L. Minor Signing (Post Mounted).
M. Pavement Marking.
N. Guard Rail and Fencing.
O. Bridge or Structure Painting.
P. Miscellaneous (Light Construction not otherwise classified):
f ,r
Catherine M. Patrick, P.E. Director,
Division of Operations
7336 ADDENDUM 2 - REVISED BID TAB 2-17-2012
ITEM NO.
DESCRIPTION
UNIT
QUANTITY
UNITCOST
TOTAL
201-00000
CLEARING AND GRUBBING (ARTHURS DITCH)
L S
1
$ 1,500.00
$1,500.00
201-00000
CLEARING AND GRUBBING(SHIELDS BRIDGE)
LS
1
$ 3,000.00
$3,000.00
202-00010
REMOVAL OF TREE
EACH
5
$ 1,000.00
$5,000.00
202-00019
REMOVAL OF INLET
EACH
5
$ 650.00
$3,250.00
202-00200
REMOVAL OF SIDEWALK
SY
267
$ 5.75
$1,535.25
202-00203
REMOVAL OF CURB AND GUTTER
LF
768
$ 2.50
$1,920.00
202-00206
REMOVAL OF CONCRETE CURB RAMP
SY
13
$ 28.00
$364.00
202-00210
REMOVAL OF CONCRETE PAVEMENT
SY
1.045
$ 8.00
$8,360.00
202-00220
REMOVAL OF ASPHALT MAT
SY
2,296
$ 3.50
$8,036.00
202-00240
REMOVAL OF ASPHALT MAT (PLANINGX1--4- DEPTH)
SY
288
$ 6.50
$1,872.00
202-00250
REMOVAL OF PAVEMENT MARKING
LS
1
$ 4,400.00
$4,400.00
202-00400
REMOVAL OF BRIDGE
LS
1
$ 40,000.00
$40,000.00
202-00495
REMOVAL OF PORTIONS OF PRESENT STRUCTURE (CONCRETE BOX CULVERT)
L S
1
$ 20,800.00
$20,800.00
203-00010
UNCLASSIFIED EXCAVATION (COMPLETE IN PLACE)
CY
589
$ 15.00
$8,835.00
203-00100
MUCK EXCAVATION
CY
200
$ 69.00
$13,800.00
203-01597
POTHOLING (ARTHURS DITCH)
LS
1
$ 2,200.00
$2,200.00
203-01597
POTHOLING (SHIELDS BRIDGE)
LS
1
$ 4,500.00
$4,500.00
206-00000
STRUCTURE EXCAVATION
CY
2,328
$ 14.25
$33,174.00
206-00100
STRUCTURE BACKFILL(CLASS I)
CY
1,712
$ 30.00
$51,360.00
206-00200
STRUCTURE BACKFILL (CLASS 2)
CY
58
$ 13.50
$783.00
206-00510
FILTER MATERIAL (CLASS A)
CY
108
$ 56.00
$6.048.00
206-00520
FILTER MATERIAL (CLASS B)
CY
308
$ 50.00
$15.400.00
206-01750
SHORING (AREA 1)
LS
1
$ 14,000.00
$14,000.00
206-01750
SHORING (AREA 2)
L S
1
$ 9,700.00
$9.700.00
208-00002
EROSION LOG(12 INCH)
LF
717
$ 3.30
$2,366.10
208-00034
GRAVEL BAG
LF
62
$ 6.60
$409.20
208-00045
CONCRETE WASHOUT STRUCTURE
EACH
3
$ 560.00
$1.680.00
208-00070
VEHICLE TRACKING PAD
EACH
5
$ 1,480.00
$7,400.00
208-00205
EROSION CONTROL SUPERVISOR (ARTHURS DITCH)
LS
1
$ 7,300.00
$7,300.00
208-00205
EROSION CONTROL SUPERVISOR(SHIELDS BRIDGE)
LS
1
$ 16,500.00
$16,500.00
210-04010
ADJUST MANHOLE
EACH
2
$ 500.00
$1.000.00
210-04050
ADJUST VALVE BOX
EACH
2
$ 350.00
$700.00
210-00810
RESETGROUNDSIGN
EACH
2
$ 250.00
$500.00
212-00006
SEEDING(NATIVE)
ACRE
0.7
$ 600.00
$420.00
212-00032
SOIL CONDITIONING
ACRE
0.7
$ 1,750.00
$1,225.00
r�r Department of Transportation �
t?t .
�, - :, Prequalifications Office
�- 5300 Bishop Blvd. ffr ,M
Matthew ti. Mead Cheyenne, WY 82009-3340 John F. Cox
Governor
Director
Zak Dirt, Inc. December 8, 2011
14290 Hilltop Road
Longmont, CO 80504
Dear Mr. Scwczak: CONTRACTOR PREQUALIPICATION
Your firm has been given a'STANDARD' evaluation for firms that have not completed a Wyoming Department
of Transportation (4VYDOT) project in the past three (3) years. The Standard rating factor of 9 is multiplied by
your net worth, if you have an audited financial statement or by your net worth up to a maximum of S500.000.00
if you Have an unaudited financial statement, to determine your Maximum Prequalification. Your cooperation and
quality performance on WYDOT projects will help insure that your firm stays in "Good Standing" with the
Wyoming Department of Transportation.
You have been given a maximum Prequalification Rating of 313,800,000.00 to bid on Minor Grading, Pipe,
Concrete Surfacing (Streets), Rumble Strips, Minor Concrete Structures, Minor Bridge Work,
Underground Utilities, Sidewalks, Curb & Gutter & Wingwalls fhrougli Deccnilicr.31, 2012, as detemined
by your Prcgiaalification Questionnaire and the Financial Statement dated September 30, 2011.
Your firm's Bidder ID Number (Contractor Number) for the purpose of bidding on WYDOT projects is 00960.
Nothing contained herein shall be construed to deprive the Transportation Commission of Wyoming of the right
to reject any bid, or refuse to award a contract to the low bidder where circumstances or developments have, in the
Opinion of the co'nomission, changed the qualifications or responsibility of the bidder.
For information concerning the WYDOT bidding system and for other pertinent information, please visit our web
site at: http://dot.gtate.yry.us//
If you have questions or comments about your Prequalifiication Rating or your Contractor Performance Evaluation
Rating Forms for your current WYDOT projects, please contact Andy Long, P.E„ State Construction Engineer at
(307)777-4425 or myself at (307)777-4056.
Your attention is called to the necessity of placing your Bidder Ill Number on the bid proposal EXACTLY
as it appears above on this prequalification letter.
If you are planning on bidding on WYDOT projects, do not forget that you need to send the E-103 (Work
Affidavit each month. The E-103 can be found on our well page or on the second to last page of the PQ-2.
JAM/jam
Sincerely,
James A. Messer
Prequalification Officer
OFFICE OF THE SECRETARY OF STATE
OF THE STATE OF COLORADO
CERTIFICATE
1, Scott Gessler, as the Secretary of State of the State of Colorado, hereby certify that, according to the
records of this office,
ZAK DIRT, INC.
is a Corporation formed or registered on 06/29/1976 under the law of Colorado, has complied with all
applicable requirements of this office, and is in good standing with this office. This entity has been
assigned entity identification number 19871306981.
This certificate reflects facts established or disclosed by documents delivered to this office on paper
through 02/17/2012 that have been posted, and by documents delivered to this office electronically
through 02/22/2012 @ 08:12:48.
I have affixed hereto the Great Seal of the State of Colorado and duly generated, executed, authenticated,
issued, delivered and communicated this official certificate at Denver, Colorado on 02/22/2012 @
08:12:48 pursuant to and in accordance with applicable law. This certificate is assigned Confirmation
Number 8173339.
Secretary of State of the State of Colorado
++++++++++++++++s+*s*s*s*s*s»s+s++++++»++»»++End of
Lice: A certificate issued electronically from the Colorado Secretary ofState's Web site is filly and immediately valid and effective. However,
as an option, the issuance and vandhy of a certificate obtained electronically may be established by visiting the Certificate Confirmation Page of
the Secretary of State's Web site, htto://ivuw.sos.state.co.us/bic/CerlificateSearchCriteria.do entering the certificate's confirmation number
displayed on the certificate, and following the instructions displayed. Confirming the issuance of a certificate is merely optional and is not
necessary to the valid and effective issuance of a certificate. For more information, visit our Web site, hap://mi rtv.sos.state.co. us/click Business
Center and select `Frequently Asked Questions. "
CERT GS D limsed 0812012008
SECTION 00410
BID BOND
KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned Zak Dirt, Inc., . as Principal,
and —as Surety, are hereby held and firmly bound unto the City of Fort Collins. Colorado. as
OWNER, in the sum of"'$ (5%) for the payment of which, well and truly to be made, we
hereby jointly and severally bind ourselves, successors, and assigns.
THE CONDITION of this obligation is such that whereas the Principal has submitted to the City
of Fort Collins. Colorado the accompanying Bid and hereby made a part hereof to enter into a
Construction Agreement for the construction of Fort Collins Project, 7336 Shields Street Bridge
& Laporte Avenue Bridge Replacement.
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the
form of Contract attached hereto (properly completed in accordance with said Bid) and
shall furnish a BOND for his faithful performance of said Contract, and for payment of all
persons performing labor or furnishing materials in connection therewith, and shall in all
other respects perform the Agreement created by the acceptance of said Bid, then this
obligation shall be void; otherwise the same shall remain in force and effect, it being
expressly understood and agreed that the liability of the Surety for any and all claims
hereunder shall, in no event, exceed the penal amount of this obligation as herein
stated.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety
and its BOND shall be in no way impaired or affected by any extension of the time within which
the OWNER may accept such Bid; and said Surety does hereby waive notice of any such
extension.
Surety Companies executing bonds must be authorized to transact business in the State of
Colorado and be accepted by the OWNER.
*14290 Hilltop Road, Longmont, CO 80504
"Berkley Regional Insurance Company, 11201 Douglas Avenue, Urbandale, IA 50322
***Five Percent of Amount Bid
Rev 10/20/07 Section 00410 Page 2
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals
this 22nd day of February , 2012, and such of them as are corporations have caused their
corporate seals to be hereto affixed and these presents to be signed by their proper officers, the
day and year first set forth above.
PRINCIPAL
SURETY
Name: Zak Dirt, Inc. Berkley Regional Insurance Company
Address: 14290 Hilltop Road 11201 Douglas Avenue
Longmont, CO 80504
By:
Ti
ATTEST:
By:
Cot-• Scc�Tl-eaS
(SEAL)
Urbandale, IA 50322
Title: Nicole L. McCollam, Attorney -in -Fact
(SEAL)
Rev 10/20/07 Section 00410 Page 3
No. 7724c
POWER OF ATTORNEY
BERKLEY REGIONAL INSURANCE COMPANY
WILMINGTON, DELAWARE
NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully.
KNOW ALL MEN BY THESE PRESENTS, that BERKLEY REGIONAL INSURANCE COMPANY (the "Company"), a
corporation duly organized and existing under the laws of the State of Delaware, having its principal office in Urbandale, Iowa,
has made, constituted and appointed, and does by these presents make, constitute and appoint: Sheryll Shaw, Nicole L. McCollam,
Sue Wood, Bradley J. Jeffress, Kristen L. McCormick, Sarah Finn, Robert L. Cohen, Robert J. Reiter, Jennifer Bub, Michael
Lischer, Jr., Philip J. Monasch or Jessica Talbot of IMA, Inc. of Denver, CO its true and lawful Attomey-hrFact, to sign its
name as surety only as delineated below and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with
the exception of Financial Guaranty Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S.
Dollars (U.S.S50,000,000.00), to the same extent as if such bonds had been duly executed and acknowledged by the regularly
elected officers of the Company at its principal office in their own proper persons.
U
This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware,
o without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the -following
.v ? resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on August 21, 2000:
T C
U U
"RESOLVED, that the proper officers of the Company are hereby authorized to execute powers of attorney authorizing and
qualifying the attomey-in-fact named therein to execute bonds, undertakings, recognizances, or other suretyship obligations
`o 0 on behalf of the Company, and to affix the corporate seal of the Company to powers of attorney executed pursuant hereto;
and further
o .o RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances,
v or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the
F ` manner and to the extent therein stated; and further
RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attomey-in-fact named; and
further
R RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any
° c power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or
V• other suretyship obligation of the Company; and such signature and seal when so used shall have the same force and effect as
though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any
U �
person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have
o ceased to be such at the time when such instruments shall be issued."
.� 7 IN WITNESS WHEREOF, the Company has caused these presents to be signed and attested by its appropriate officers and its
0
o corporate seal hereunto affixed this S- day of F 12012.
o Attest: / Berkley Regional Insurance Company
(Seal) By By
F Ira S. ederman Cef "y . Haftei
6 '$ Senior Vice President & Secretary Senior Vice President
WARNING: THIS POWER INVALID IF NOT PRINTED ON BLUE `BERKLEY" SECURITY PAPER.
z
STATE OF CONNECTICUT )
ss:
COUNTY OF FAIRFIELD )
N p
c Sworn to before me, a Notary Public in the State of Connecticut, this .J day of i— 2012, by Jeffrey M. Hafter and
Ira S. Lederman who are swom to me to be the Senior Vice President, and the Senior Vice Presi ent and Secretary, respectively, of
Berkley Regional Insurance Company. EILEEN KILLEEN
v NOTAF 7 PCrSLIC
MY COMMISSION EXPIRES JUNE30fXl'f' Notary Public, State of Connecticut
I °
v CERTIFICATE
2 r I, the undersigned, Assistant Secretary of BERKLEY REGIONAL INSURANCE COMPANY, DO HEREBY CERTIFY that the
c2 foregoing is a true, correct and complete'copy of the original Power of Attorney; that said Power of Attorney has not been revoked
s or rescinded and that t5e; autl ority. of the "Attorney -in -Fact set forth therein, who executed the bond or undertaking to which this
Power of Attorney is at; chedjs in' fil; force and effect as of this date.
Given under my hand and seal of the'Company, this 22nd day of February 2012
(Seal)
Andrew M. Tuma
212-00100
TREE RETENTION AND PROTECTION (ARTHURS DITCH)
LS
1
$ 1,000.00
$1,000.00
212-00100
TREE RETENTION AND PROTECTION (SHIELDS BRIDGE)
LS
1
$ 4,500.00
$4,500.00
213-00002
MULCHING (WEED FREE HAY)
ACRE
0.7
$ 900.00
$630.00
214-00230
DECIDUOUS TREE (3 INCH CALIPER)
EACH
9
$ 500.00
$4.500.00
304-05000
AGGREGATE BASE COURSE (CLASS 5)
TON
783
$ 28.00
$21,924.00
403-32821
HOT MIX ASPHALT (GRADING SG) (100)(PG 58-28)(TEMPORARY PAVEMENT)
TON
95
$ 87.50
$8.312.50
403-32821
HOT MIX ASPHALT (GRADING SG) (100) (PG 58-28)
TON
369
$ 87.50
$32,287.50
403-33821
HOT MIX ASPHALT (GRADING S)(100)(PG 58-28)
TON
125
$ 88.65
$11,081.25
403-33851
HOT MIX ASPHALT (GRADING S) (100) (PG 64-28)
TON
60
$ 149.00
$8,940.00
412-00600
CONCRETE PAVEMENT(6-INCH)
SY
23
$ 47.50
$1,092.50
412-00950
CONCRETE PAVEMENT (9-1/2INCH)
SY
1,098
$ 52.50
$57,645.00
420-00112
GEOTEXTILE (DRAINAGE) (CLASS I)
SY
264
$ 5.25
$1,386.00
420-00133
GEOTEXTILE (SEPARATOR) (CLASS 2)
SY
150
$ 8.25
$1,237.50
502-00460
PILETIP
EACH
22
$ 155.00
$3,410.00
502-11274
STEELL PILING (HP 12X74)
LF
803
$ 51.50
$41,354.50
506-00218
RIPRAP(18 INCH)
CY
240
$ 73.00
$17,520.00
506-01020
GEOGRID REINFORCEMENT
SY
550
$ 9.00
$4,950.00
514-00200
PEDESTRIAN RAILING (STEEL) (SPECIAL)
LF
139
$ 86.00
$11,954.00
515-00400
CONCRETE SEALER
SY
301
$ 9.00
$2,709.00
601-03020
CONCRETE CLASS D (MISCELLANEOUS) (COLORED) TYPE 1
CY
69
$ 415.00
$28,635.00
601-03020
CONCRETE CLASS D (MISCELLANEOUS) (COLORED) TYPE 2
CY
65
$ 675.00
$43,875.00
601-03030
CONCRETE CLASS D(BOX CULVERT)
CY
444
$ 255.00
$113.220.00
601-03040
CONCRETE CLASS D(BRIDGE)
CY
378
$ 335
$126.630.00
601-05540
CONCRETE CLASS HT (DECK TOPPING)
CY
36
$ 800.00
$28,800.00
601-40300
STRUCTURAL CONCRETE COATING
SY
280
$ 11.70
$3,276.00
602-00000
REINFORCING STEEL
LB
65,546
$ 0.90
$58.991.40
602-00020
REINFORCING STEEL (EPDXY COATED)
LB
77,938
$ 1.10
$85,731 SO
602-00060
REINFORCING STEEL SPLICE
EACH
138
$ 24.00
$3,312.00
604-19000
INLET(SPECIAL)
EACH
4
$ 2,500.00
$10,000.00
604-50200
MANHOLE RING AND COVER
EACH
2
$ 750.00
$1,500.00
606-30010
DECORATIVE COLUMN TYPE 1
EACH
6
$ 2,800.00
$16,800.00
606-30020
DECORATIVE COLUMN TYPE 2
EACH
4
$ 4,100.00
$16,400.00
608-00006
CONCRETE SIDEWALK(6 INCH)
SY
221
$ 45.00
$9,945.00
608-00010
CONCRETE CURB RAMP
SY
32
$ 155.00
$4,960.00
609-21020
CURB AND GUTTER TYPE 2 (SECTION II-B)
LF
150
$ 14.50
$2,175.00
609-21023
CURB AND GUTTER TYPE 2 (SECTION II-B) (SPECIAL) (6"-12" CURB FACE)
LF
421
$ 18.00
$7,578.00
609-71000
CURB (SPECIAL)
LF
177
$ 25.00
$4.425.00
613-00300
31NCH ELECTRICAL CONDUIT
LF
1,793
$ 6.75
$12,102.75
618-00000
PRESTRESSING STEEL BAR
LB
2.397
$9.40
$22,531.80
618-06036
PRESTRESSED CONCRETE SLAB (DEPTH GREATER THAN 13 INCHES)
SF
4,254
$50.00
$212,700.00
620-00020
SANITARY FACILITY
EACH
2
$2,100.00
$4,200.00
626-00000
MOBILIZATION (ARTHURS DITCH)
L S
1
$37,000.00
$37,000.00
626-00000
MOBILIZATION (SHIELDS BRIDGE)
LS
1
$50,000.00
$50,000.00
627-00011
PAVEMENT MARKING PAINT(WATERBORNE)
GAL
8
$155.00
$1,240.00
630-00000
CONSTRUCTION ZONE TRAFFIC CONTROL (ARTHURS DITCH)
LS
1
$14,000.00
$14,000.00
630-00000
CONSTRUCTION ZONE TRAFFIC CONTROL (SHIELDS BRIDGE)
LS
1
$34,000.00
$34.000.00
630-00000
FLAGGING
HOUR
1,720
$20.50
$35.260.00
630-00007
TRAFFIC CONTROL INSPECTION
DAY
105
$75.00
$7,875.00
630-00012
TRAFFIC CONTROL MANAGEMENT
DAY
290
$380.00
$110,200.00
630-80359
PORTABLE MESSAGE SIGN PANEL
DAY
10
$100.00
$1.000.00
630-85006
IMPACT ATTENUATOR (SAND FILLED PLASTIC BARREL) (TEMPORARY)
EACH
15
$400.00
$6.000.00
TOTAL BID (FOR PERFORMANCE AND PAYMENT BONDS, AND UDBE GOALS)
$1,650,135.05
ADDITIONAL COSTS
700-70010
F/A MINOR CONTRACT REVISIONS
FA
1
$375,000.00
$375,000.00
700-70011
F/A PARTNERING
FA
1
$6,000.00
$6,000.00
700-70016
F/A FUEL COST ADJUSTMENT
FA
1
$5,000.00
$5,000.00
700-70018
F/A ROADWAY SMOOTHNESS INCENTIVE
FA
1
$3,000.00
$3,000.00
700-70019
F/A ASPHALT CEMENT COST ADJUSTMENT
FA
1
$15,000.00
$15,000.00
700-70023
F/A ON-THE-JOB TRAINEE
FA
1
$1,920.00
$1,920.00
700-70380
F/A EROSION CONTROL
FA
1
$7,000.00
$7,000.00
TOTAL ADDITIONAL COSTS
$412,920.00
TOTAL BASE BID
$2,063,055.05
two 1
TOTAL BASE BID IN WORD (CONTRACT VALUE):
626-00000
MOBILIZATION (SHIELDS BRIDGE)
LS
1
/
627-00011
PAVEMENT MARKING PAINT (WATERBORNE)
GAL
8
6 0000
CONSTRUCTION ZONE TRAFFIC CONTROL (ARTHURS DITCH)
LS
1
630-00`0D0
CONSTRUCTION ZONE TRAFFIC CONTROL (SHIELDS BRIDGE)
LS
630-00000
`F1,AGGING
HOUR
3200
630-00007
TRA IC CONTROL INSPECTION
DAY
/
105
630-00012
TRAFFIC tQNTROL MANAGEMENT
DAY
290
630-80359
PORTABLE ME)SA`GE SIGN PANEL
i
�DAY
10
630-85006
IMPACT ATTENUATOIRI(SAND FILLED PLASTIC BARREL) (TEMPORARY) /
EACH
15
\ / TOTAL BID COST
TOTAL BID COST IN WORDS: \ DOLLARS
(FOR PERFORMANCE AND PAYMENT BONDS, AND OUSE & OJT GOALS
700-70010
F/A MINOR CONTRACT REVISIONS \ /
FA
$375,000.00
1
$375,000
700-70011
F/A PARTNERING
FA
$6,000.00
1
$6,000
700-70016
RA FUEL COST ADJUSTMENT /
FA
$5,000.00
1
$5,000
700-70018
F/A ROADWAY SMOOTHNESS -INCENTIVE \
FA
$3.000.00
1
$3,000
700-70019
F/A ASPHALT CEMMEN,COST ADJUSTMENT \
FA
$15.000.00
1
$15,000
700-70023
F/A OWTHHEEJ9T BRAINEE \
FA
$1.920.00
1
$1,920
700-70380
F/A EROSION CONTROL
i
FA
$7,000.00
1
$7.000
/ TOTAL BASE BID
IN WO S: DOLLARS
The CDOT Form 347, Certification of EEO Compliance, is no longer required to be submitted in
the bid package. This form certified that the contractor/proposed subcontractors were in
compliance with the Joint Reporting Committee EEO-1 form requirements. The EEO-1 Report
must still be submitted to the Joint Reporting Committee if the contractors and subcontractors
meet the eligibility requirements (29CFR 1602.7); we will, however, no longer require
certification. For additional information regarding these federal requirements, please refer to:
http://www.eeoc.gov/stats/qobi)at/elinstruct.html
ACCEPTANCE OF FUEL COST ADJUSTMENTS:
Bidders have the option to accept Fuel Cost Adjustments in accordance with the Revision of
Section 109 - Fuel Cost Adjustment. To accept this standard special provision, the bidder must
fill in an "X" next to "YES" below. No Fuel Cost Adjustment will be made due to fuel cost
changes for bidders who answer "NO". If neither line is marked, the Department will assume
the bidder rejects Fuel Cost Adjustments for this project. After bids are submitted, bidders will
not be given any other opportunity to accept or reject this adjustment.
(Mark only one line with an "X" ):
X YES, I choose to accept Fuel Cost Adjustments for this project
NO, I choose NOT to accept Fuel Cost Adjustments for this project (if neither line is
Rev 10/20/07 Section 00300 Page 4
marked, the default is "NO", I choose NOT to accept Fuel Cost Adjustments for this project
9. PRICES
The foregoing prices shall include all labor, materials, transportation, shoring, removal,
dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the
several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid or change
quantities at his sole discretion without affecting the Agreement or prices of any item so
long as the deletion or change does not exceed twenty-five percent (25%) of the total
Agreement Price.
RESPECTFULLY SUBMITTED:
Z L t 4.1 VlL'.� -
CONTRACTOR
BY: T, &_mP_5 S • Sr-Wc za k
tSignature Date
Title
License Number (If Applicable)
(Seal - if Bid is by corporation)
Attest:
lorry S 7IG Sea yeres.
Address Ia36
�.or�a�or<i. Gd 8osv�
Telephone ��' rJZ 1 `� Lo,57
Email _ Loe-1 55Qz0-Le Al ► -i .C4)hA
1-5
Rev10/20/07 Section 00300 Page 5
SECTION 00400
SUPPLEMENTS TO BID FORMS
00410 Bid Bond
00420 Statement of Bidder's Qualifications
00430 Schedule of Subcontractors
Rev10/20/07 Section 00410 Page 1