Jolkn, here's the summary sheet/supporting documents you requested. It was a good exercise
For me to undertake in that I Found I made a mistake in my First request. We, in fact, need an
addendum for $21 6, O 1 6—$52,000 more tkan I initially tkouwht. Please take a loot at the
attacked and let me know if you have any questions, then let us I6ow kow we can wet back into
Requisition # +7' ,201 to revise tkc fiwure.
Note: The one scan created tke attached two documents.
Angelina 5anckez-5prague I asanclierspragueGtcgov.com
City OF Port Collins i ro box 5so I Fort Collms, CQ so522 I C.15A
Tel+I J70 ZZI 65Z5 I Fax +1 9702z+613+ I Fcgov.con,
3/15/2012
Mar 12 12 03:28p Wattle & Daub (970) 493-2229 PA
RC Heath Construction Co. Cx.AINGE ORDER REQUEST
141 Racqueue Drive No. 00001
PO Drawer H Phone. 970-221-4193 �—
Fort Collins, CO 80524
TITLE: Transom Framing
PROJECT: L 1B0504 Avery Block Bldg Expansion
TO: Attn: Spiro Palmer
Avery Building, LLC
3711 IFK Parkway, Suite 340
Fort Collins, CO 80525
RE: To:
Item Descriptlon Stock#
00001 Fmm nvnsm inlieu of base
bid nheb iliwan of rxisUns
fmminc.
00002 GC OH&ProfittIs%)
By.
Date:
r,,N. e s
From:
Quantity Units
1A00
1.000
DATE: 9/30/2011
JOB: 1 L B0504
CONTRACT NO:001
Number:
Unit Prlee Tax Rat* Tax Amount Net Amount
S12,991.00 0.071. S0,00 S12,99100
SI.948.80 0.07/.
Unit Cost:
Unit Tax:
Total:
so.00 S1,948.10
$14,940.80
$0.00
S14,940.80
By:
Shawn Anderson
Date:
RC ]Heath Construction CO.
CHANGE ORDER REQUEST �
141 Racquette Drive
No, 00002
PO Drawer H Phone: 970-2214195
Fort Collins, CO 90524
TITLE: Install Metal Band i � vnY - . �
DATE: 9/30/2011
PROJECT: I IB0504 Avery BlockBldgExpansions �y
JOB: 11 B0504
TO: Attn: Spiro Palmer
CONTRACT NO: 001
Avery Building, LLC
3711 JFK Parkway, Suite 340
Fart Collins, CO 80525
RE: To: From:
Number:
Rem Description Stock# Quantity Units Unit price Tax Rate Tax Amount Net Amount
00001 W&D fume and,hcach fnr 1A00
maul bond per All. N2
S1,555.00 0.00°G Sam SI,585.00
00002 RMS 0Ibm4h&in11.11 mcW 1.000
band'per All. 42
31,200.00 0.00% 50.00 SI �OO.W
00000 GC (Ncrhn &Ym01O5%) 1.000
S417,75 a-W% $0.00 S417,7S
Unit Cost: $3,202.75
Unit Tax: $0.00
Total: S3,262.75
By: By- —--✓ �—
Spi brier Shawn A derson
Date: Date: / Z
e.r.aum e
DR
HISTORY<2,e.�
January 10, 2012
Ms. Angelina Sancliez-Sprague
City of Fort Collins
Community Development and Neighborhood Services
PO Box 580
Fort Collins, CO 80522
RE: Project #2010-02-048
Exterior Preservation and Reconstruction of Avery Block
Contract Period: 3/1/2011 to73/1/2013
Dear Ms. Sanchez Sprague:
% 114 oby
JAN :.8
Enclosed is a fully executed copy of Amended Contract #2010-02-048A for the above State Historical Fund giant
award. Please retain in your files. Please review the List of Submittals (revised Exhibit C of contact) for a fist of the
required progress reports and deliverables and then due dates. We also ask that you attach a Project Deliverables
Checklist (copy enclosed) when submitting deliverables; this helps us process your deliverables more efficiently.
If you would like technical information or assistance regarding your project, please contact your SFIF Historic
Preservation Specialist Anne McCleave at (303) 866-3536. If you have administrative of contractual questions, please
contact Grant Staff: Contracts Officer, Janette Vigil at (303) 866-3067, Contracts Coordinator, Susan Frawley at (303)
866-3043, or Contract Specialist, Victoria Giannola at (303) 866-4028.
Sincerely,,
Victoria Giannola
Grant Contracts Specialist
VC:
c:\docunrent\10161405.dac
Appm.,,[/puny e.,maed a.,,&d contract
HisTORY COLORADO CENTER 1200 BROADWAY DENVER COLORADO 80203
Form 6-AC-02A (R5/91)
or
the Colorado Historical
APPROVED WAIVER FOIL\I -Amendment 837
CONTRACTAMENDMENT92010-02-048 A
TH[S .-1MENDIvfEI�tT, made this %�� day of by and between the State of
Colorado for the use and benefit of the Department of Higher Education, History Colorado, the Colorado Historical Society,
1200 Broadway, Denver, Colorado 80203, hereinafter referred to as the State and/or History Colorado, and the City of Fort
Collins, 300 LaPorte Avenue, PO Box 580, Fort Collins, Colorado 80522, hereinafter referred to as the Grant Recipient,
hereinafter referred to as the "Contractor', and Avery Building, LLC, Owner of Property, 3711 JFK Parlovay, Suite 240, Fort
Collins, Colorado 80525, hereinafter referred to as the Property Owner
FACTUAL RECITALS
Authority exists in the Law and Funds have been budgeted, appropriated and otherwise made available and a sufficient
unencumbered balance thereof remains available for payment; and
Required approval, clearance, and coordination has been accomplished from and with appropriate agencies; and
The Parties entered into a contract dated February 25, 2011, (the "Original Contract"), for SHF Project #2010-02-048,
wherein die Contractor agreed to undertake the performance of certain work and services in consideration for which the State
agreed to make certain payments; and
The enactment of State laws effective July 1, 2009 concerning the monitoring of vendor performance on State contracts
and inclusion of contract performance information in a statewide Contract Management System (CMS) require a new provision
referenced in 3.6. of dris amendment to be added to the original contract; and
The Project Budget is being revised to more adequately reflect die actual bid from the selected contractor, and
The State and the Contractor both wish to bring die project to completion in order to fulfill the objectives of the Original
Contract.
NOW THEREFORE, it is hereby agreed that:
1. Consideration for this amendment to the original contract, C.E. Number 1002048, Contract Routing Number NIA
Approved Waiver Form, dated Febmaqr 25, 2011, consists of the payments which shall be made pursuant to this amendment
and the promises and agreements herein set forth.
2. It is expressly agreed by the parties that this Amendment is supplemental to the original contract, as amended Number
#2010-02-048, dated Febmary 25, 2011, referred to as the 'original contract," which is, by this reference incorporated
herein, that all terms, conditions, and provisions thereof, unless specifically modified herein, are to apply to this amendment
as though they were expressly rewritten, incorporated, and included herein. ,
3. It is agreed the original contract is and shall be modified, altered, and changed in the following respects only.
a. Provision 45 of die original contract, the Project Budget is revised as reflected in die attached Revised Exhibit B:
Project Budget.
b. A new provision is added to the original contract as follows:
STATEWIDE CONTRACT MANAGEMENT SYSTEM: If die maximum amount payable to Grantee under this
Grant is $t00,000 or greater, either on the Effective Date or at anytime thereafter, this §3.b. applies.
Grantee agrees to be governed, and to abide, by the provisions of CRS §24-102-205, §24-102-206, §24-103-601, §24-
103.5-101 and §24-105-102 concerning die monitoring of vendor performance on state contracts and inclusion of
contract performance information in a statewide Contract Management System.
Page 1 of 3
Grantee's performance shall be subject to Evaluation and Review in accordance with the terms and conditions of this
Grant, State law, including CRS §2.4-103.5-101, and State fiscal riles, policies and guidance. Evaluation and Review of
Grantee's performance shall be part of the normal Grant administration process and Grantee's performance will be
systematically recorded in the statewide Contract Management System. Areas of Evaluation and Review shall include,
but shall not be limited to quality, cost and timeliness. Collection of information relevant to the performance of
Grantee's obligations under this Grant shall be determined by die specific requirements of such ohhgations and shall
include factors tailored to match die requirements of Grantee's obhgadons. Such performance inforrnualin shall he
entered into the statewide Contract Management System at intervals established herein and a final Evaluation, Review
and rating shall be rendered within 30 days of the end of die Grant tern. Grantee shall be notified following each
performance Evaluation and Review, and shall address or correct any identified problem in a timely manner and
maintain work progress.
Should the final performance Evaluation and Review determine that Grantee demonstrated a gross failure to meet die
performance measures established hereunder, the Executive Director of the Colorado Department of Personnel and
Adunuiistradon (Executive Director), upon request by CHS, and showing of good cause, may debar Grantee and
prohibit Grantee from bidding on future grants. Grantee may contest the final Evaluation, Review and rating by: (a)
filing rebuttal statements, which may result in either removal or correction of the evaluation (CRS §24-105-102(6)), or
(h) under CRS §24-405-102(6), exercising the debarment protest and appeal tights provided in CRS §§24-109-106, 107,
201 or 202, which may result in the reversal of due debarment and reinstatement of Grantee, by din Executive Director,
upon showing of good cause.
4. The effective date of this amendment is upon approval of the State Controller or December 15, 2011, whichever is later
5. Except for the "Special Provisions," in the event of any conflict, inconsistency, variance or contradiction between the
provisions of this Amendment, and any of the provisions of the Original Contract, die provisions of this Amendment, shall
in all respects supersede, govern, and control. The "Special Provisions" shall always be controlling over other provisions in
the contract or amendments. The representations in the Special Provisions concerning die absence of bribery or corrupt
influences and personal interest of State employees are presently reaffirmed.
6. FINANCIAL OBLIGATIONS OF THE STATE PAYABLE AFTER THE CURRENT FISCAL. YEAR ARE
CONTINGENT UPON FUNDS FOR THAT PURPOSE BEING APPROPRIATED, BUDGE=, AND
OTHERWISE bIADE AVAILABLE.
Page 2 of 3
IN WITNESS WHEREOF, the parties hereto have executed this Amendment on the day fast above written.
"Persons signing for Contractor hereby swear and affirm that they are authorized to act on Contractor's behalf and acknowledge
that rite State is relying on their representations to that effect.
CONTRLICTOR:
(Grant Recipient)
City of Fort Collins
.Legal Name Contracting Entity
yc
*Signature of Authorized Officer
Date II
I�VL' r/'^Sf
Print Name of Authorized Officer
Pratt Title of Authorized Officer
Avery Building, LLC
egat Owner
«�yanaq�_
j-Signature of Legal Own r
l''jZ;� I
W &AM M
STATE OF COLORADO
John W Flte enlooper, GOVERNOR
BY:
�
Exectrilve Director or Designee -
Edward C. Nichols, President
History Colorado, the �C(olom o/H�storical Society
Date:
Department of I-hgher Education
STATE HISTORICAL FUND
BY: �C v�''°✓ S7
Director t5,13esignec
Steve W. Turner, Vice President OAHP & SHF/Deputy SHPO
Date: 12�2g ! 2-otI
WAIVER CONTRACT REVIEWER
Contracts Officer or Designee
Janette Vigil, State Flistorical Fund
Date: (7'[-7-ce
ALL CONTRACTS MUST BE APPROVED BY THE STATE CONTROLLER
CRS 24-30-202 requires that the State Controller to approve all Snte Contracts. This Contract is not valid until
signed and dated below by the State Controller or delegate. Contractor is not authorized to begin performance
until such time. If Contractor begins performing prior thereto, the State of Colorado is not obligated to pay
Contractor for such performances or for any goods and/or services provided hereunder.
Approvo s T orm
Deputy City Attorney
STATE CONTROLLER
`Y David J. McD �rrgo it, CPA
Susan S. Rielil
CHS, Chief Financial Officer
Date: / )- /z // / // -
Page 3 of 3
Revised, September 27, 2011
c\Dom,mu\n I5495adoc
Appm,il/C.rance Amendmrnr/Scope a(woek w/ Owner @Time G,cmiun
City of Fort Collins
Exterior Preservation and Reconstruction
Projectl#2010-02-048
PROJECT BUDGET
TASK
PROJECT
COST
A. Architectural Services
$ 25,000
B. Preservation and Reconstruction
1. Masonry Restoration Work
$112,000
2. Window and Doors Work
$ 77,271
3. Storefront Work .
$ 211,154
4. Pressed Tui Cornice Work
$ 24,880
Contractor Services
$144,360
Includes: General Conditions, Contractor Overhead/Profit,
Permits, Fees, insurance, taxes, payment and petformance
bonding.
Subtotal $594,665
Grant Administration"* $ 7,000
PROJECT SUBTOTAL*** $601,665
Contingency* $ 0
PROJECT TOTAL $601,665
Crash Match (64?4%) $386,530
Grant Request(35.76%) 5215,135
Easement Acceprance Fee $30,000
Grant Award Totals w/ easement fees $245,135
`Contingency - Must receive written approval from SHF Staff prior to use
Exhibit B
Revised 10/11/2011
**Gant Administration cannot exceed 15% of Subtatal:unount
*"Grant payments will be based off Project Subtotal amount.
$Easement Fees —Thus itern may not be used on other tasks and tray not exceed budgeted
amount
Fb\Conmacts\2UI0\IOU2048 Exhibit D_Re6,s d 111.112011.dac
Background for support of request for addendum for PO 911606'
SHF Grant $430,270
25,000 Less Slater Paull Architechts PO # 9112702
7,000 Less Grant Adm fee
$398,270 Initial Heath Const. PO# 9116064
SHF Revised Contract Total 601,665 See. Rev 10/11111 Exhibit B
7,000 Less grant admih fee
25,000 Less architect's fee
569,665 See Draw 5 Schedule of Values Orig. Conti
44,621 Plus Change orders 1-5; see SV approved c
614,286 See Draw 5 Schedule of Values, Adjusted C<
398,270 Less initial PO 916064
216,016 Amount needed for Addendum
216,016.00 i
1841016.00 -
321000,-00
City of Fort Collins
Exterior Preservation and Reconstruction
Project #2010-02-048
PROJECT BUDGET
TASK PROJECT
COST
A. Architectural Services $ 25,000
B. Preservation and Reconstruction
1. Masonry Restoration Work $ 75,325
2. Window and Doors Work $ 86,810
3. Storefront Work $ 90,846
4. Pressed Tin Cornice Work $ 23,716
Contractor Services $ 82,573
Includes: General Conditions, Contractor Overhead/Profit,
Permits, Fees, insurance, taxes, payment and performance bonding.
Subtotal $384,270
Grant Administration** $ 7,000
PROJECT SUBTOTAL*** $391,270
Contingency* $ 39,000
PROJECT TOTAL $430,270
Cash Match (50%) $215,135
Grant Request (50%) $215,135
$Easement Acceptance Fee $30,000
Grant Award Totals w/ easement fees $245,135
*Contingency - Must receive written approval from SHF Staff prior to use
**Grant Administration cannot exceed 15% of Subtotal amount
Exhibit B
***Grant payments will be based off Project Subtotal amount.
$Easement Fees —This item may not be used on other tasks and may not exceed budgeted
amount
H:\Contracts\2010\1002048 Exhibit B.doc
City of Fort Collins
Exterior Preservation and Reconstruction
Project #2010-02-048
PROJECT BUDGET
TASK
PROJECT
COST
A. Atchitecmral Services
$ 25,000
B. Preservation and Reconstruction
L. Masonry Restoration Work
$112,000
2. Window and Doors Work
$ 77,271
3. Storefront Work -
$ 211,154
4. Pressed Tut Cornice Work
$ 24,880
Contractor Services
$144,360
Includes: General Conditions, Contractor Overhead/Profit,
Permits, Fees, insurance, taxes, payment and performance bonding.
Subtotal $594,665
Grant Administration** $ 7,000
PROJECT SUBTOTAL*** $601,665
Contingency* $ 0
PROJECT TOTAL $601,665
Cash Match (64.24%)
$386,530
Grant Request (35.76%)
$215,135 —
#Easement Acceptance Fee
$30,000
Grant Award Totals w/ casement fees
3245,135
Exhibit B
Revised 10/11/201t
*Contingency - Must receive written approval from SHF Staff prior to use
**Grant Administration cannot exceed 15% of Subtotal arnount
°**Grant payments will be based off Project Subtotal amount.
$Easement Pees —This item. may not be used on other tasks and may not exceed budgeted
amount
1-1:\Conrncm\2010\1002043 Eahibic 8—Revised 711.I I3011.doc
s
0
G"
S L A T E R P A U L L
A I C A I T E C T S
NOTES
PROJECT. Pi�6J�y� yy7' DATE:
0" PAIR CENT PAL I3DITR 600 / ISIS ARAPAROI 3T l DENVSR CO 8090E 1 TELEPR ONE 303.6OI-nOn I FACST WILE 303A07.0767 I W W W.RLATRRPAOLL.CON
Page 1 of 4
SCHEDULE OF VALUES AND CERTIFICATE FOR PAYMENT NO.05 v J
PROJECT TITLE: City of Fort Collins - Exterior Preservation and Reconstruction OJ.
PROJECTNUMBER: CHSISHF Project#2010-02-048
INSTITUTIONIAGENCY: Avery Building LLC
For Period: 02/01112 - 02129112
SCHEDULE OF VALUES
Attach supporting detall sheets:
TOTAL
VALUE
VALUE OF WORN COMPLETED
PERCENT
COMPLETE
PREVIOUS
VALUE
VALUE"
THIS
REPORT
CURRENT
VALUE
TO DATE
' -
A
C
0=8+C
E=01A
ORIGINAL CONTRACT ( sum of P3 forms)
569,665-00
353,1300.00
46.019.75
409,019.75
T3.5%
APPROVED CHANGE ORDERS ( sum of P2 forms
. 43,772-47
19,619.52
22,202.75
41,82227
95,5%
ADJUSTED CONTRACT TOTAL
61 .47
382.619.521
68,22250
450,842.02
73.5%
LESS: RETAINAGE
bm 18,G Al
38,261.951
5,822.25
45,084.20'
_
NET REQUISTION AMOUNT
344,357.57
61.400.25
405,757.82.
Amount This Certification
The undersigned Contractor requests payment of (hat portion of the contract price shown on the last line
of the foregoing Schedule of Values, and represents and warrants to (he Owner that (1) the data shown on the
Schedule of Values is accurate and correct; (2) the Work covered by this Certificate hasbeen completed in
eccardance with the Contact Documents; (3) all previous progress payments received from Owner on account of Work done
under this Contract have been applied to discharge in full (exceptfor allowable re(ainage) all obligations of Contractor
Incurred In connection with Work covered by prior Certificates for Payment numbered 00 through 0 inclusive; and
(4) Lille to all materials and equipment for which payment is requested in this CerSfite, cawhether or not incorporated
in said Work, will pass to Owner at time of payment free and dearof all liens, claims, security interests and
encumbrances (except such materials and equipment which are covered by a Bond previously accepted by Owner),
FEIN P. 84-073858T Contractor. Heath Construction and Wattle 8 Daub Contractors
Date: 29 FE8. 2012.By: M30M
Type Name: Byron McGough
ARCHITECTIENGINEER CERTIFICATION
This Is to certify that, in accordance with the terms of a contract for Project Number 2010-02- 049 executed
the day of by and between,
C N viP Far} CO U'S . the contractor, and Avery Building I.I.C.
Owner, for work at AV" Nock gL1O�Mi'r\p rr�� , there 1is due to the
Contraclor(heameunlof �M-OVIe'ihbosc 1C1 -GQr I�t?'�dy-ul 4Y1 1 /100
Dollars, let, $too•2$
A/E: `St.A1F.2.PAL)LL AyC-Ili+LCN%
Type r-'
By. , A1k Name: C,urglIG. Ford, ALAr Date: 3/5 u 2
Amount approved for payment this certificate is:
By
By:
Title:
AGENCY ACTION
Dollars ( )
,.eC— Date:
Date:
Page 2 of 4
SCHEDULE OF VALUES AND CERTIFICATE FOR PAYMENT NO. 05 (continued)
APPROVED CHANGE ORDERS
PROJECT TITLE: City of Fort Collins. Exterior Preservation and Reconstruction - Avery Building
PROJECT NUMBER: CHS/SHF Project 42010-02-048
For Period: 02101/2012 - W2912012
CHANGE
ORDER
NUMBER
CHANGE ORDER
DESCRIPTION
TOTAL
VALUE
VALUE OF WORK COMPLETED
PERCENT
COMPLETE
PREVIOUS
VALUE
TO DATE
VALUE
THIS
REPORT
CURRENT
VALUE
TO DATE
A
- B
C-0-8
D=AxE
E
1
Transom Framing
14,940.80
14,940.80
14,940.80
100
2
Metal Band
320275
1,500.00
1.702.75
3,20275
100
3
Ext. Paint Extras
408.00
408.00
40B.00
100
4
Permit Credit
-1,729.2B
-1.729.28
.1.729.28
' 100
5
Masonry Wall
27,798.95
4,500.00
20,500.00
25,000.00
90
UBTOTAL APPROVED CHANGE ORDERS
44,621.22-
19,619.521
22,202.75
417822.27r
:.
SCHEDULE OF VALUES AND CERTIFICATE -FOR PAYMENT NO. 05 (continued)
Page 3 of4
ORIGINAL CONTRACT- ITEMIZED BREAKDOWN
PROJECT TITLE: City of Fort Collins - Exterior Presorvation and Restoration -Avery Building
PROJECT NUMBER: CHSJSHF Pro(eG MIO-02448
For Perlod: 02/01112, 02/29112
_
ITEM
NO.
ITEM
DESCRIPTION
CATE-
GORY
TOTAL
VALUE
VALUE OF WORK COMPLETED
PERCENT
COMPLETE
PREVIOUS
VALUE
TO DATE
VALUE
THIS
REPORT
CURRENT
VALUE
I TO DATE
--
A
D
C=D-D
D=AxE
E
.
Preservation and Reconstruction
0.1
MasonryRestoraltan Work
HCNVD
112.000
f77,271
82.000.0
8.000.00
90,000.00
8D%
8.2
Wmda and Doors Work
HCNVD
_
6t,350.D0
5,0110.00
66350.00
86%
BA
Storefront Work
HCMJD
2111_54
13 000.0a
20,000.00
152,000.00
72%
B.4 .
Pressed Tin Comics Work
HCJWD
24,880
Contractor Services
HCMJD
144,360
87650.00
2,019.15100,689.75
70%
CONTRCTTOTAL
'I
569,665
363,000.00
46,019.75
409,01.9.75
Page 4o14
SCHEDULE OF VALUES AND CERTIFICATE FOR PAYMENT NO. 05
PROJECT TITLE: City of Fort Collins • Exterior Preservation and Reconstruction
PROJECT NUMBER: CHSISHF Project#2010-02-048
INSTITUTIOWAGENCY: Avery Building LLC
For Period: 02/01/2012 - 02292012
SCHEDULE OF VALUES
Attach supporting detail sheets:
TOTAL
VALUE
VALUE OF WORK COMPLETED
PERCENT
COMPLETE
PREVIOUS
VALUE
TO DATE
VALUE
THIS
REPORT
CURRENT
VALUE
TO DATE
A
8
C
0=8.c
c=DIA
ORIGINAL CONTRACT ( sum of P3 farms)
569,665.00
363,000.00
46,019.75
409,019.75
73.5%
APPROVED CHANGE ORDERS ( sum of P2 forms
43,772.47
19,619.62
22,202.75
41,822.27
95.5%
ADJUSTED CONTRACT TOTAL
513,437.47
382,619.52
68,222.50
450,842.02
73.5%
LESS: NEB' REQUISITION AMOUNT#3
344,357.57
00
61,4.25
405,757.82
RETAINAGE AMOUNT REQUISITION #3
77 38,261.95
3.822.25
45,084.20
Amount This Certification
The undersigned Contractor requests oaymem of that portion of the contract price shown on the last the
of the foregoing Schedule of Values, and represents and warrants to the Owner that (1) the data shown on the
Schedule of Values is accurate and correct; (2) the Work covered by this Certificate has been completed in
accordance with the Contract Oocuments; (3) all previous progress payments received from Owpw on account of Work done
under this Contract have been applied to discharge in full (except for allowable retainage) all obligations of Contractor
incurred in connection with Work covered by poor Certificates for Payment numbered Q D through 0-4- inclusive; and
(4) fide to all materials and equipment forwhich payment is requested in this Certificate, whether or not incorporated
in said Work, win pass to Owner at time of payment free and clear of an liens, claims, security interests and
encumbrances (except such materials and equipment which are covered by Bond previously accepted by Owner).
FEIN ik. 84-0738587 Contractor: Heatrhh Construction and Wattle & Daub Contractors
Date: a9 r'E�i• By;
Type Name: Byron McGough
This is to certify that, in accordance with the terms of a contract for Project Number 2010- 01-048 executed
by and between,
CiiEj of Fco- - cplki t5 , the contractor, and Avery Building LLC, tt....__ t�
Owner, for work at AyLV4 ?0%0c)r-. 1!aazGic�q there is dua4o.tho- YGlc.N rICAi ' -'n
Contractor the amount of 5lX ---r Ascwt i ei ll k- KI,xldr¢-C1 }r nn}.4-Awo at,,4 "/tt4
Dollars, $ (o E�2-Z • ZS
Are h TEtzph A t AVOW, E
Type 1
"Rgnalk,,,.j1AIA Name: CaSiC )come- 4,r A)Rr Date: 315 ?Jot
AGENCY ACTION
Amount approved for payment this certificate is:
Dollars ( )
By: Title: Date:
By: rue: Date: