HomeMy WebLinkAboutCHANGE ORDER - BID - 7287 ADDITON & RENOVATION TO MAIN BRANCH LIBRARYr Collins
Change Order Form
PROJECT TITLE:
Poudre Library
PROJECT NUMBER:
PO# 9116852
CONTRACTOR:
Heath Construction
CHANGE ORDER NUMBER:
Change Order # 2 .
OPERATION SERVICES
Project Managaman, Planning ft Design
300 LaPorte Avenue
P.O. Box 580
Fort Collins, CO 80522.0680
970.221.6610
970.221.6634 - fax
In preparing change orders show In order as separate numbered paragraphs the following:
1. Reason for change 2. Description of change
3. Change in contract cost 4. Change in contract time.
1&2 See attached sheet for detail.
Changes compensation from fixed fee to time and direct cost basis with a not to exceed.
3 The contract cost will not be effected.
4 There will be no change In contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
$2,620,200.00
$15,544.38
$252,721.86
$24,720.68
0.94%
11.18%
$2,913,185.92
ACCEPTED BY: X= DATE: �2
Bath strucfbn Prof epresentative
REVIEWED BY: AI944�DATE:
Library Distrig (CFC Facilities) Project Mgr
APPROVED BY: DATEt2Z-dd�—�
PRPLD Library Director
C�Contractor ORIGINAL
Purchasing
Project Foe
CHANGE ORDER
Drive141tRO 80522 No.00003Heath FPOrDH
construction Phone: 970,221.4195
Fax: 970-221-2907
TITLE: CO #3 DATE:2/28/2012
PROJECT: 12BO507 Poudre Public Library JOB: 12BO507
TO: Attn: Holly Carroll CONTRACT NO: 0001
Poudre Library District
201 Peterson Street
Fort Collins, CO 80522
RE: To: From: Number:
DESCRIPTION OFCHANGE'.:'`,IR
CO #3 - COR's #34 and #49
rZ.Quaatlty��Unitnr
s,six ; UnitPciee,TAx`Rate`TuAmoan[`rN Amount
00001 CO #3 - COWS #34 end 049 1.000 s24,651.40 0.00% $0.00 $24,831.40
Unit Cost: $24,851.40
Unit Tax: $0.00
Unit Total: $24,851.40
The Original Contract Sum was .................. ............. ................... ................. .....„.......... $2,620,200.00
Net Change by Previously Authorized Requests and Changes ..». ................. ..... .............. » S40,265.06
The Contract Sum Prior to This Change Order was $2,660,465.06
The Contract Sum Will be Increased „„„ „ .. „._.„...„...._...»„..„.„.. .„„„ .... ..„ $24,951.40
The New Contract Sum Including This Change Order $2,685,316.46
The Contract Time Will Not Be Changed „_ „ ...„..„..„„.„„. ...„„..„„..... ... „„..„ .„ „
The Date of Substantial Completion as of this Change Order Therefore is „
ACCEPTED:
R.C. Heath Construction Co. Poudre Library District Oz Architecture
By:
Paul Ehrlich
Date:
r.pa44a.e
By: By:
Holly Carroll
Date:
Date:
Kate Fields
R.C. Reath Construction Co. CHANGE ORDER REQUEST
PO DMWW M Na 00634
141 Recanafts Dilve Pb. 0771.391 I"
TITLE: PR-4 Overhead Doan
PROJECT: 12BOS07 Poudre Public Lftwy
TO: Aft Holly CaffoR
Poudre Library District
201 Petersc® Street
Fort Collins, CO 8022
DAM 1/31012
JOB: 12BO507
CONTRACrNO:0001
RE: TO:
From:
Number:
AdMnd Scapa ofWark not is Ca*wt PRA Omhand Dw A Read C=Mw Dom ead KVAC chaW
b666t6l
cost D&Z Swd cod
IA00 S814A
OM
sea
$914A
00007 rheDWOM
IA00 320DM
am
30.40
M00.00
00003 DDW7=d
1.000 $1~
am%
SIM
SIAM
00004 FVACW
IA00 $720D
DAN
sea
sun
wx 341=00
GAM
Sam
34=00
OOM
IAM $1.7K79
0W8%
30A
S1,7K79
o=7 Pbm2w*
1.000 S1.971JI
8.00K
Sam
$1,971.31
000011 0C0w4rh
1.000
$0.90
SM51
8-dO%)MdJkPrA(%%),
Byl
Seeffid
Date.
.r.l
Usk C89L. $13,647.61
Unk MM. $0.00
TOWL. S13,647AI
BY.
Paul Ehrlich
.-1
R.C. Heath Construction Co.
CHANGE ORDER REQUEST
PO Drawer H
No 49
141 Racquette Drive Phone: 970-221AI95
Fort Collins, CO 80522 Fax: 970-221-2907
TITLE: PR-17 Perimeter Wall 2nd Floor Ext
PROJECT:12BO507 Poudre Public Library
TO: Attn: Holly Carroll '
Poudre Library District
201 Peterson Street
Fort Collins, CO 80522
DATE: 2/9/2012
JOB: 12BO507
CONTRACT NO: 0001
RE: To: From: Number:
ON OF PROPOSAL'.*.
ork not in Contract. PR-17 2nd Floor Perimeter Drywall Repairs above Heat Registers.
to-Dexriptlon Stbckq:-_';. Qusntlty Units'_' -,r� Unit Price - `Tax RateTaxAmount Net Amount-
800 Option 1 - Phan 2 ` 1.000 $9 918.61 0.00% $0.00 $9,918.61
J002 Optian xiMM Paining 1.000 $651.00 O.00V. $0.00 S651.00
k
Supervision
Bond(M)
GC o�P
APPROVAL:
Steve Seefeld
Date:
r's. o
63yda 1 2a3.7 5
Unit Cost: ,
Unit Tax: $0.00
Total: ,
1G3.�5
9U� By: (?
Cz+tzF°.lds Paul Ehrlich
OZ 0kzLM1fC-CT0P11 1
21Z l l (2 - Date: "Z
of ollins
Change Order Form
PROJECT TITLE:
Poudre Library
PROJECT NUMBER:
PO# 9116852
CONTRACTOR:
Heath Construction
CHANGE ORDER NUMBER:
Change Order # 4
OPERATION SERVICES
Project Nmmgennent Pfarrrnrng & Design
300 LaPorte Avenue
P.O. a" 560
Fort Collins, CO 80622.OBW
970.221.6610
910.221.6534 - fax
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change 2. Description of change
3. Change In contract cost 4. Change In contract time.
1 &2 See attached sheet for detail.
Changes compensation from fixed fee to time and direct cost basis with a not to exceed.
3 The contract cost will not be effected.
4 There will be no change in contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
$2,620,200.00
$65,116.46
$200,814.30
$27,056.16
1.U3%
$2,913,186.92
ACCEPTED BY: vAJI `'� f DATE: Z-7-1-«
—nth CQn Project Representative
REVIEWED BY: DATE a
Library Distrl '(CFC Facilltles) Project Mgr
APPROVED BY: (' DATE,.?
PRPLD Library Director
cc: Contractor Purchasing , f
Project Fie
R.C. Heath Construction Co. CHANGE ORDER RZQULW
eon H No. 00042
141 Impme Dd" Fbeew M221-4195
Pon cwftco SM Fan 970-221-2907
MILE: M - 3 casework / radiator conflict DATM2=12
PROJECT 12MM Poudne Public IAUW JOB- 12BOS07
TO.. Attn: Holly Carroll CONTRACTNO.0001
Poudze LJbMY District
201 Peterson Shed
Fort Collins, CO SOS22
RE: To: From Number.
Addid000l Swp afWwk cat In ConuvaL PR,3 RaidwADowm* Ca ggaw
-TRWI"fibrAM"
0=3 U06ftmftow 1.000 S1067" OWN on S1067"M
am ==a IA00 VII" OA0% son 31.700"
MM PVA cW 140 9XIOLM t00% SOJO S&IMM
0=4 RM2000 1.010 370443 UM MA VMS
GM Oen i. &pfOftO% JAM $917.76 OA% SM 3927.76
awd(ISO
Unficat.. $16,213.79
Unit Taw $0.00
Tatak 516,213.79
ArrMMvN
By: Bp -
Paul EhM&
Daft: D..
Dpwwft 6
Pr RC. Beath Construction Co. CHANGE ORDER REQUE9I
TITLE: PR-S Cmb& Veoity & Elea Chug"
DATE:113IM2
PROJECT:12BO507 Poud:e PoWic L:bmry
JOB: IZB0507
TO: Atto: Holly CwwU
CONTRACT NO.0001
Poodre L&Mry District
201 Peterson Sheet
Fart Collins, CO 80522
R& To: From:
Nnm6m:
DB8CRIPTION t1P PWP08AL
ml oosps of Werkea to Cmhaet P&s Caitmq, Vaetty mcd
Sketob t+teatrkal
Skew.
CBeogas pwamwhw Meee�t Dnwinge am
° 8toea Q�4 UeW
UnUP*&-. Ten RateTuAmmon* NotAswmt
o=1 omi :r.�,:aaewo„unt.m ]AN
MAR CAM ra.m taa:At
Mon Bexpan °w°uat Inw
S7X7Ao oa.% SAM r:.anao
soma OCoraamanne,Wfq :.mo
o,sepay
Nmp 000x man Sam
Yf_� ��� ff'TIIV.
ReeAr6A- rP.S
APPROVAL:
.04
revs Kate, F-iods
Date: OZ-Aqakib dlxG
gwhh s 4201;w 12,
Unk Coat:
6
Unit Tex:
$0.80
Total:
$8011.16
Pant Ehrlkh
Date±
R.C. Heath Construction Co. CHANGE ORDER REQUEST
PO Drawer H No. 0
141 Racquette Drive Phone: 970-221-4195
Fort Collins. CO 80522 Fax: 970.221-2907
TITLE: PR-2 Temp IT Room for MIS
PROJECT:12BO507 Poudre Public Library
TO: Attn: Holly Carroll
Poudre Library District
201 Peterson Street
Fort Collins, CO 80522
RE:
To:
DATE:1131/2012
JOB: 12BO507
CONTRACT NO: 0001
From: Number:
DESCRIPTION OF.PROPOSAL
Additional Scope of Work not in Contract. PR-2 Build temporary IT Room on 2nd Floor to accommodate MIS Systems Relocation.
Item *
Description Stock#
Quantity . Uults
Unit Price .
OOODI
Phase 2 cost
1.000
S928.66
00002
Sturgeon Electric cost
1.000
31.131.91
00003
WOvatteed&Proat(S%X
1.000
S123.64
Bond(W.)
APPROVAL:
By; 0 al ao I
Steve Seefeld
Date:
&,.ei. A
Kate, Fits
OZ A"iTFCTVk6
2./Zg/ZOIz
Tax Rate Tax Amount Net Amount
0.00% $0.00 $928.66
0.00% 30.00 51.131.91 (tUvt�e,
O.00SS SO.00 $123.64
�oY
Unit Cost: s2, mai 11 hys
Unit Tax: $0.00 AaLt
Total: $2,184.21 d16 iw
dD �
By:
Paul Ehrlich
Date:
Fo Drawer H
Fort cou;na CO CO soszz
Heath 141 ��"` 90
construction Phone: 970-221.4195
Fa:: 970-221-2907
CHANGE ORDER
No. 00004
TITLE: CO #4
DATE:2/28/2012
PROJECT:12BO507 Poudre Public Library
JOB: 12BO507
TO: Attn: Holly Carroll
CONTRACT NO: 0001
Poudre Library District
201 Peterson Street
Fort Collins, CO 80522
RE: To: From:
Number:
DESCRIPTION OF.CHANGE^
CO #4 - COM #33, 35 and 42
Iteme Deicripdoa : ; „.. h . S6oektl.- .,4 ,: Quaotlty e.. Units - -
Unit Prke Ta: Rate Tai Amount Net Amoaat
00001 CO 04 - CORK 033, 35 end 42 1.000
r27,056.16 0,00% 50.00 $27.056.16
Unit Cost: $27,056.16
Unit Tax: $0.00
Unit Total: $27,056.16
The Original Contract Sum was _...... ._ „_. _..__.._._.. _ _.... „ $2,620,200.00
Net Change by Previously Authorized Requests and Changes »„..»»»»„...._..».». ._ $65,116.46
The Contract Sum Prior to This Change Order was $2,685,316.46
The Contract Sum Will be Increased _..___» _ _ . __.__ „ _. „..„ _ »». ».„ $27,056.16
The New Contract Sum Including This Change Order $2,712,372.62
The Contract Time Will Not Be Changed
The Date of Substantial Completion as of this Change Order Therefore is
ACCEPTED:
R.C. Heath Construction Co. Poudre Library District Oz Architecture
By:
Paul Ehrlich
Date:
rpNbae •
By: By:
Holly Carroll
Date:
Date:
Kate Fields
Fort Collins
Operation
Services
Change Order Form
PROJECT TITLE:
Poudre Library
PROJECT NUMBER:
PO# 9116852
CONTRACTOR:
Heath Construction
CHANGE ORDER NUMBER:
Change Order # 2
OPERATION SERVICES
Project Management, Planning & Design
3001aPorte Avenue
P.O. Box 560
Fort Collins, CO 80522.0560
970.221.661e
970.221.6534 - lax
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change 2. Description of change
3. Change in contract cost 4. Change in contract time.
1 &2 See attached sheet for detail.
Changes compensation from fixed fee to time and direct cost basis with a not to exceed.
3 The contract cost will not be effected.
4 There will be no change in contract time.
ORIGINAL CONTRACT COST
$2,620,200.00
TOTAL APPROVED CHANGE ORDERS
$15,544.38
TOTAL PENDING CHANGE ORDERS
$252,721.86
TOTAL THIS CHANGE ORDER
$24,720.68
TOTAL % OF THIS CHANGE ORDER
0.94%
TOTAL C.O. % ORIGINAL CONTRACT
11.18%
ADJUSTED CONTRACT COST
$2,913,186.92
(Assuming all change orders approved)
ACCEPTED BY: .f2"'� '!�� i(" �J DATE:
each C struction 2 roje epresentative
REVIEWED BY: i cC DATE:
Library Dlst ' (CFC Facilities) Project Mgr
APPROVED BY: C' DATEbZ�
PRPLD Library Director
cc: Contractor
Purchasing
Project File
R.C. Heath Construction Co. CHANGE ORDER REQUEST
PO Drawer H No. 0000
141 Racquene Drive Phone: 970-221.4195
Fort Collins, CO 80522 Fax: 970-221-2907
TITLE: Tree Protection & Mulch Roads
DATE: 1/23/2012
PROJECT:12BO507 Poudre Public Library
JOB: 12BO507
TO: Attn:HollyCarroll
CONTRACT NO:0001
Poudre Library District
201 Peterson Street
Fort Collins, CO 80522
RE' To: From:
Number:
DESCRIPTION OF PROPOSAL.
Additional scope not part of the Contract Cost to provide tree protection and mulch roads per the City of Fort Collins
Item Degerlition Ste" Quaatlty Units
00001
Uak Ptiar Tax Rate Tan Amount Net Amount
ManinAt yoaa-equlpmw and
labor to Pro" mkh,aeds 1.000
S1,793.00 0.00% so.00 $1,793.00
Per the Cary of Fen Collin,
00002 Hach Camnuction eat 1.000
00003 tabor Ready _. ...
$950.33 0.00% 0.00 $B)0.)7
$
1.000
00001 CC W d Rofh ()%), 1.000
SI,421.97 0.00% 0.00 $1,421.97
d
Sand (l%)
(1%)
$243.92 0.00% moo S243.92
Unit Cost: $4,309.22
Unit Tax: S0.00
Total: $4,309.22
APPRffzii
�0,,�,,�By: lB
K
Paul Ehrlich
Date: OLA Q�
yI21112
Date: d?.a I - I
.
R.C. Heath Construction Co. CHANGE ORDER REQUEST
PO Drawer H No. 0�1
141 Racquette Drive Phone: 970-221-4195
Fort Collins, CO 80522 Fat: 970-221.2907 af.
TITLE: Additional Drywall Restroom 2nd FI DATE:1/27/2012
PROJECT:12BO507 Poudre Public Library JOB: 12B0507
TO: Attn: Holly Carroll CONTRACT NO: 0001
Poudre Library District
201 Peterson Street
Fort Collins, CO 80522
RE: To: From: Number.
DESCRIMON OF PROPOSAL'..tir
Additional Scope of WOrk not in Contract Additioml Drywall in Rest oom on 2nd Floor caused by delaminetion of existing drywall •..
not to be removed.
Item
Dexeie Mptlon
Quan?'•. "
':. ^ • UnkPrlea % Tax Riti A a-Tamouct Net Amatat
00001
Phue2 Cost
1.000
s2,950.00 0.00% so.00 S2,930.00
00002
W Orahmd 3 Roth (5%)
1.000
$175.80 0.00% $0.00 $173.80
Bond(1%)
APPROVAL:
By: 91/1DO// q—
Steve Seefeld
Date:
Ewalt..
rdter* s
a Mc`Iditt rc
2-121IM 12 .
Unit Cost: $3,105.90
Unit Tax: $0.00
Total: $3,105.80
r
Paul Ehrlich v
Date: r .a ( - /L
R.C. Heath Construction Co. CHANGE ORDER REQUEST
PO Drawer H
141 RM queue Dive Phone: 9T0 221 4195 No. 00012
FortCollin,_CO RM77 _70 1
TITLE: Additional Req. by FD to get TCO
PROJECT:12BOS07 Poudre Public Library
TO: Attn: Holly Carroll
Poudre Library District
201 Peterson Street
Fort Collins, CO 80522
DATE:1/27/2012
JOB: 12BO507
CONTRACT NO:0001
RE: To: From: Number.
DESCRIFHON OP PROPOSALS' '. .
Additional Scapa of Worldt not in Contract Additional Requimn by Padre Fire Authorit
y prior to receipt ofTCO aignatura
Item Desartptlo� ytoeWk;
00001 SNIP=* am to ass wos Quautl000 Udt Prke , Iran Rate Tax Amount Net Amount!
Eya "d tail sism 1.32.777.32 0.00% taco s2.777.e2
00002 OC Ovabod & Piea1(!%). 1.000
and(1%) f 166.67 0.00% $0.00 3166.67
APPROVAL:
By:
Date:
e.p r a
00
M A'r0h ftr&r'C
Z/Z1/201L
Unit Cost.
$2,944.49
Unit Tax:
S0.00
Total:
S2,944.49
Paul Ehrlich v
Datr. o� ?/- h,
R.C. Heath Construction Co. CHANGE ORDER REQUEST;
PO Drawer H No. O 5
141 Racquette Drive Phone: 970-221-4195
Fort Collins, CO 80522 Faz• 970-221-2907
TITLE: PR-19 Change Back Flow Preventor DATE:1/27/2012 .
PROJECT:12BO507 Poudre Public Library JOB: 12BO507
TO: Arta: Holly Carroll CONTRACT NO: 0001
Poudre Library District
201 Peterson Street
Fort Collins, CO 80522
RE: To: From: Number:
DESCRIPTION OF PROPOSAL
Additional scope of work not part of the ContracL PR-19 Change to Specified Back Flow Preventor - Wilkins 350XL - 2" double
check valve.
Item : `'Descdpthii "' . 1, StoekN' .. Qaand* Unita .,, " > UnitPdea.Ii Taigain TaiAn"tNot Amount
00001 Lied° Phunbmg met 1.000 (5767.00) 0.00%
$0.00 (f767.00)
00002 Boad(I%) 1.000 (37.67) 0.00%
$0.00 (37.67)
Unit Cost:
($774.67)
Unit Tax:
$0.00
Total:
(3774.67)
APPROVAL:
/=aCZs4/a
By: ��d5 By
Steve feld peal Ehrlich
Date: OZAQCtt1TEC pfz oZ O�J /L
?12t'201 Z Date:
R.C. Heath Construction Co. CHANGE ORDER REQUEST
Po Drawer tt _ No. 00�
141 Ra a Drive
Fat Collins,liroPbone: 970-221.4195 CO 80522 Fart: 970-221-2907
TITLE: RFI-015 Hi Abuse Gypsum
PROJECT:12BO507 Poudro Public Library
TO: Attn: Holly Carroll
Poudre Library District
201 Peterson Street
Fort Collins, CO 80522
DATE:1/27/2012
JOB: 12BO507
CONTRACT NO:0001
RE: To: From: Number:
DESCRIMON OF PROPOSAL
Additional Scope of Work not in Contract. Added cost for Hi abuse Gypsum in GypswnAmuanot identified on plans . RFI-01 S Hi Abuse
Item- Descriptlow. . StwM , ? `. Qoantly' Uinta:- , i_
Unk Prlcu. Tu'Rate Ta Amount Net Amount.
00001 Pales 2 asq Low 12,468.43 0.00% "$0.00 $2.468.43
00002 GC Orabpd & Profit (9%). 1.000 $148.10 O.OD% 50.00 S 118.10
Bad (I%)
Unk Cost: S2,616.53
Unit Tax: S0.00
Total: $2,616.53
APPROVAL: 94(9/
Steve teefcFd fidds Paul Ehrlich
Date: 0ZAQZH1TCC Ua Date: p� . a� • %Z
E"�• z12-1 1241L
R.C. Heath Construction Co. CHANGE ORDER REQUEST
PO Drawer H No.p"
141 Racqueae Drive Phone: 970-221.4193
TPPLE: PR-8 Bldg dt Fire Depart Comments DATE:1/31/2012
PROJECT:12BOS07 Poudre Public Library JOB: 12BO507
TO: Attn: Holly Carroll CONTRACT NO:0001
Poudre Library District
201 Peterson Street
Fort Collins, CO 80522
RE: To:
From:
Number.
DESCRIPTION OF PROPOSAL:'- ..
.
Additional Scope of Work not in Contract. PR-8 Building t Fire Dept Comments
- Permit Review to provide a Rated
Corridor that
was not indicated on Permit Set of Drawings.
Deurlpttobc. ..,:.Stoeklt,_;�'::`.:.Qnaatlly:.Udtri'°;r-.'.:"-DaltPrtee.*.
Tax 9x4oIriAmouatNet Ammint,
00001 pt=e2cost
- 1.000
$11,07115 0.00% S0.00
$11.071.27
MM DWWm Ten cost
1.000
SM•42 0.00% 50.00
S3la.0o
00003 Sovpw Etacuic cm
/j
matt.
I.aoo
s3as.42 o.0ox so.ao
u13.42
sm+r .erg
a000i cc overhead t Noat Isxt
tam
—artTTEa""�WR ---saes—s,rw
—sarrse so.ao
r,o.aox
low."
Boad(1%)
7o8•b`1
�f
v UultCost: $14,3=21—
51%31
Unit Tax:
$0.00
Total:
,3—
4X01-11 "ex
ve�*W lavadv-
,
APPROVAL:
By:� / I- .�
By�
teve Scefeld /( �� j�5 Paul Ehrlich
Date: Z/11'j y Date a 1121 tt L
r..r. •
of
t Collins
Change Order Form
PROJECT TITLE:
Poudre Library
PROJECT NUMBER:
POff 9116852
CONTRACTOR:
Heath Construction
CHANGE ORDER NUMBER:
Change Order i 3
OPERATION SERVICES
Protect Mana9ernonC Planning 9 Design
300 LaPorte Avenue
P.O. Box 680
Fat Collin, 00 80622-0580
970=1.6610
970.221.6534. fax
In preparing change orders show to order as separate numbered paragraphs the following:
1. Reason for change 2. Description of change
3. Change in contract cost 4. Change in contract time.
1 &2 See attached sheet for detail.
Changes compensation from fixed fee to time and direct cost basis with a not to exceed.
3 The contract cost will not be effected.
4 There will be no change in contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
$2,620,200.00
$40,265.06
$227,870.46
$24,851.40
0.95%
11.18%
$2,913,166.92
ACCEPTED BY: DATE.
Heath / Representative q
REVIEWED BY: U / DATE: ` �y
Library Distri CFC Fadlities) Project Mgr
APPROVED BY: DATE:
PRPLD Library Director
cc: Contracts
Purchasing Project File
N1.