WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
DATED:
Work Order Number._ Z -b
Purchase
Project Ti
Commencement Date:
Completion Date:
Maximum Fee: (time and reimbursable direct costs):
Project Description:
Scope of Services:
Service Provider agrees to perfonn the services
identified above and on die attached forms in
accordance with the terms and ro,ditimss conumied
herein and in die Services Agreement
between the parties. In the event of a conflict bemxen
or ambiguity in the terns of Ore Services Agreement
and this work m<ler (including the attached forms) the
Services Agreementshall control.
City of Fort Collins
By:
Date:
c�/ZlZZ7
j�� Director of Purchasing and Risk Management
Sevic rrovider ' �OJ(' rum Over$30,000
Date:=7-i-I- _-
CC: Purcluuing 2
"171e attached forms consisting off/ _ (i pages ate
hereby accepted and incorporated herein by this
reference, and Notice to Proceed is heeby given.
HPZIjIj
q iffox
Pump Cl Controls, LLC
PO Box 100, Henderson, CO 80640
Ojflee: 303-227--1900 Fax:303-202-9202
Name / Address:
City of Fort Collins Parks and Rec.
413 S. Bryan Avenue
Fort Collins, CO 80521
Proposal
Date: 1219/2011 Proposal# 103035
Project Name: Pump/Motor Inspect & Rebuild
Estimated Delivery Time: 20-25 Business Days
Payment Terms: Net 30
NOTES: Price does not include Freight
Charges, Taxes aad Permit Fees and will be
added at a later date.
Customer Phone: 970-416-2062 Estimate is good for 30 days, due to commodity
Customer Fax: 970-221-6849 metal prices, yet may be withdrawn if not
Contact Name: Eiden Scholl accepted withiitg IS days.
P.O. Number: PENDING
Warratt • All work performed by Equinox Pump and Controls, LLC is covered for 90 days from the date of
' completion: Warranty of materials Is limited to the Manufactures Warranty. Mechanical Seats do
i not carry a warranty due to many reasons outside of our control, ifpayment is not received within
I 15 days of due date the warranty Is void and a 2% Finance Charge will be applied
Description
Qty
Cost
Total
Rolland Moore Park -installation of New Pumps while utilizing the existing Motors.
New 25hp, Complete Vertical Turbine Pump rated for the following design point:
1
7,874.45
7,874.45
TDH: 231
GPM: 250 lj,rh' rl"
Total Pump Length: 142.5"
Bowl Size: 9WALC
No. of Stages: 8
Cast Iron, Type A Pump Head- 4" discharge, with 10" Motor Base
Material of Bowl: Cast Iron
Material of Impellers: Bronze
Material of Lineshaft: Stainless Steel
Material of Spider Bearings: Voluted Rubber
Material of Collets: Stainless Steel
Material of Hardware: Stainless Steel
NOTE: The placement of the discharge Flange on the new pump will differ from the existing
pump enough to warrant some modifications in the field on the existing piping. Equinox will
need to inspect the pump station to see what modifications will be necessary to fit the new
pumps into place.
If you have any questions or concerns please feel free to contact me.
Thank 4 W ne Cass
Subtotal
Sales Tax (0.0%)
Authorized Signature printed Name Date
When this document is signed, it constitudes a legal and binding
Total
contract with Equinox Puma & Controls. LLC_
rage r
I
t� mox
PnarP dl Controls, LLC
PO Box 100, Henderson, CO 80640
0fftce: 303-227-1900 Fax:303-202-9202
Name / Address:
City of Fort Collins Parks and Rea.
413 S. Bryan Avenue
Fort Collins, CO 80521
Customer Phone:
970-416-2062
Customer Fax:
970-221-6849
Contact Name:
Eillen Scholl
P.O. Number:
PENDING
Proposal
Date: 12/9/2011 Proposal# 103035
Project Name: Pump/Motor Inspect & Rebuild
Estimated Delivery Time: 20-25 Business Days
Payment Tetras: Net 30
NOTES: Price does not include Freight
Charges, Taxes and Permit Fees and will be
added at a later date.
Estimate is good for 30 days, due to commodity
metal prices, yet may be withdrawn if not
accepted withing 15 days.
Warran • All work performed by Equinox Pump and Controls, LLC is covered for 90 days from Ote date of
completion. Warranty of materials is limited to the Manufactures Warranty. Mechanical Seals do
not carry a warranty due to many reasons outside of our control If payment is not received within
15 days of due date the warranty is volt/ and a 2% Finance Charge will be applied
Description
Qty
Cost
Total
New 50hp, Complete Vertical Turbine Pump rated for the following design point:
7
7,581.83
7,581.83
TDH: 231
GPM: 6001
Total Pump Length: 142.5'
Bowl Size: 12WALC
No. of Stages: 4
Cast Iron, Type A Pump Head- 6" discharge, with 12" Motor Base
Material of Bowl: Cast Iron -
Material of Impellers: Bronze
Material ofLineshaft: Stainless Steel
Material of Spider Bearings: Voluted Rubber
Material of Collets: Stainless Steel
Material of Hardware: Stainless Steel
NGTB: The placement of the discharge flange on the new pump will differ from the existing
pump enough to warrant some modifications in the field on the existing piping. Equinox will
need to inspect the pump station to see what modifications will be necessary to fit the new
pumps into place.
Shop Labor to fully assemble the pumps offered above.
20
65.00
1,300.00
Labor to install the above mentioned equipment: This is to be determined after site visa to see
0
85.00
0.00
what modifications will be necessary for install.
Ifyou have any questions or concerns please feel free to contact me.
Thank you, W ne Cass
Subtotal
Sales Tax (0.0%)
Authorized Signature Printed Name Date
When this document is signed, it constitudes a legal and binding
Total
contract with Equinox Pumo & Controls. LLC
raga z
am &MI 9�lV�a
Prnriy dl Courro7r LLC
PO Box 100, Henderson, CO W640
Office: 303-s27-1900 Fax: 303-202-9202
City of Fort Collins Parks and Rec.
413 S. Bryan Alvenue
Fort Collins, CO 80521
Customer Phone:
970-416-2062
Customer Fax:
970-221-6849
Contact Name:
Eilien Scholl
P.O. Number)
PENDING
Proposal
Date: 12/9/2011 Proposal # 103035
Project Name: Pump/Motor Inspect & Rebuild
Estimated Deliver}, Time: 20-25 Business Days
Payment Terms: Net 30
NOTES: Price does not include Freight
Charges, Taxes and Permit Fees and will be
added at a later date.
Estimate is good for 30 days, due to commodity
metal prices, yet may be withdrawn if not
accepted witbing 15 days.
Tap : All work performed by Equinox Pump and Controls, LLC is roveredfor 90 days from the date of
completion. Warranty of materials is limited to the Manufactures Warranty. Mechanical Seals da
not carry a warranty due to many reasons outside of our control. If payment is not received within
115 days of due date the warranty is void and a 2% Finance Charge will be applied.
Description
Qty
Cost
Total
Freight/Shipping
Charges are to be determined. -
1
0.00
0.00
Boom Truck necessary
for lifting the equipment safety for maintenance.
3
172.94
518.82
NOTE: Removal
orexisting pumps, teardovm of existing pumps and Motor Repairs will be
billed on a separate
invoice referencing P.O. 9117293
Ifyou have ony questions or concerns please feel free to contact me.
Thank u, W e Cass
Subtotal $17,275,10
Sales Tax (0.0°/a) $0.00
Authorized Signature Printed Name Date
When this document is signed, it constitudes a legal and binding
Total $17,275.10
contract with Equinox Pump & Controls. LLC.
rage s