Change Order Form
PROJECT TITLE: Intersection Priority Study
PROJECT NUMBER: 400901806.521020.3
CONTRACTOR: Muller Engineering Co. (PO #9104367)
CHANGE ORDER NUMBER: 1
n preparing change orders snow In order as separate numoerea paragraphs me tonowing
1. Reason for change. 2. Description of change.
3. Change In contract cost. 4. Change in contract time.
182. See attached sheet for detail.
3. The contract cost wig Increase by $ 10,876.00
4. There will be no change In conlracl time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % THIS CHANGE ORDER
TOTAL C.O. % ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED BY:
REVIEWED BY:
SUBMITTED BY:
$153,047.00
$0.00
$0.00
$10,876.00
$183.923.00
DATE:
APPROVED BY: UALL DATE: a" al •(a
apartment Head)
APPROVED BY: DATE:
(Purchasing Agent over $60,000)
ca Contractor
purahaeine
Proleal Flle
February 15, 2013
Mr. Dean Klingner, P.E.
Civil Engineer III
City of Fort Collins
281 North College Avenue
Fort Collins, CO 80522-0580
Re: Arterial Intersection Prioritization Study— Contract Amendment Request
Muller Engineering Company, Inc.
Consulting Engineers
777 S. Wadsworth Boulevard, N4-10C
Lakewood, Colorado 80226
3031988-4969 FAX
303/988-4939
Dear Dean:
The purpose of this letter is to request additional project budget for work items that Muller Engineering
completed, which we believe are beyond the original scope of the project. This work includes the
following:
1. Assist withNFRMPO TIP Applications
At the request of City staff, Muller Engineering Company prepared intersection analyses and
calculated intersection delay savings (current and future year) for the Horsetoothfrimberline and
Timberline/Kechter intersections. One option was provided for the Timberline/Kechter
intersection and two options were provided for the Horsetoolh/Timberline intersection. This
information was used in thepreparation of the City's CMAO TIP application to the NFRMPO.
Labor and Expenses
4 hours of Project Manager:
6 hours of Engineer I:
Subtotal Labor Cost:
@ $143/hour = $572.00
@ $82/hour= $492.00
$1,064.00
2. Prepare Vine/Shields Alternative Analysis
At the request of City staff, Muller Engineering Company evaluated a roundabout option and a
traditional intersection option for the Vine Dr/Shields St intersection. The two options were
evaluated to provide acomparative analysis. The results of the analysis were documented in a
technical memorandum that summarized operational and safety conditions, right-of-way, capital
cost, constructability, and multi -modal considerations.
Labor and Expenses
4 hours of Project Manager:
16 hours Project Engineer:
30 hours of Engineer I:
Subtotal Labor Cost:
@ $143/hour = $572.00
@ $112/hour = $1,792.00
@ $82/hour = $2,460.00
$4,824.00
3. Revisions to Vine/Shields Alternative Analysis
At the request of City staff, Muller Engineering Company completed revisions to the Vine/Shields
roundabout layout to avoid major impacts to the gas station on the northeast corner. Several
layout options were evaluated to determine the best fit design. A cost estimate was prepared for
the revised layout and the Alternatives Analysis report was updated to reflect the changes.
Labor and Expenses
8 hours of Project Manager: @ $143/hour = $1,144.00
12 hours Project Engineer: @ $112/hour = $1,344.00
Ourston Roundabout Engineering Fee: $2,500.00
Subtotal Labor Cost: $4,988.00
Total Cost of Labor and Expenses: $10,876.00
Letter Dean Klingner
February 15, 2012
Page 2 of 2
Muller Engineering Company respectfully requests the City review the above labor and fees for additional
payment under the Arterial Intersection Priority Study. Please let us know if you require additional
information or have any questions.
Sincerely,
Muller Engineering Company
Karl Buchholz, PE
Project Manager