HomeMy WebLinkAboutCHANGE ORDER - RFP - 7149 ARTERIAL INTERSECTION PRIORITY STUDYI City Of Fort Collins Planning, Development & Transpor(aflon rneedng 81N.MClepe Aven 281 oM alue P.O. BOX 680 ngl noorin Fad Cc91ns, CO 80622.0580 970.221.890s 970,221.6378. fez Change Order Form PROJECT TITLE: Intersection Priority Study PROJECT NUMBER: 400901806.521020.3 CONTRACTOR: Muller Engineering Co. (PO #9104367) CHANGE ORDER NUMBER: 1 n preparing change orders snow In order as separate numoerea paragraphs me tonowing 1. Reason for change. 2. Description of change. 3. Change In contract cost. 4. Change in contract time. 182. See attached sheet for detail. 3. The contract cost wig Increase by $ 10,876.00 4. There will be no change In conlracl time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % THIS CHANGE ORDER TOTAL C.O. % ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: REVIEWED BY: SUBMITTED BY: $153,047.00 $0.00 $0.00 $10,876.00 $183.923.00 DATE: APPROVED BY: UALL DATE: a" al •(a apartment Head) APPROVED BY: DATE: (Purchasing Agent over $60,000) ca Contractor purahaeine Proleal Flle February 15, 2013 Mr. Dean Klingner, P.E. Civil Engineer III City of Fort Collins 281 North College Avenue Fort Collins, CO 80522-0580 Re: Arterial Intersection Prioritization Study— Contract Amendment Request Muller Engineering Company, Inc. Consulting Engineers 777 S. Wadsworth Boulevard, N4-10C Lakewood, Colorado 80226 3031988-4969 FAX 303/988-4939 Dear Dean: The purpose of this letter is to request additional project budget for work items that Muller Engineering completed, which we believe are beyond the original scope of the project. This work includes the following: 1. Assist withNFRMPO TIP Applications At the request of City staff, Muller Engineering Company prepared intersection analyses and calculated intersection delay savings (current and future year) for the Horsetoothfrimberline and Timberline/Kechter intersections. One option was provided for the Timberline/Kechter intersection and two options were provided for the Horsetoolh/Timberline intersection. This information was used in thepreparation of the City's CMAO TIP application to the NFRMPO. Labor and Expenses 4 hours of Project Manager: 6 hours of Engineer I: Subtotal Labor Cost: @ $143/hour = $572.00 @ $82/hour= $492.00 $1,064.00 2. Prepare Vine/Shields Alternative Analysis At the request of City staff, Muller Engineering Company evaluated a roundabout option and a traditional intersection option for the Vine Dr/Shields St intersection. The two options were evaluated to provide acomparative analysis. The results of the analysis were documented in a technical memorandum that summarized operational and safety conditions, right-of-way, capital cost, constructability, and multi -modal considerations. Labor and Expenses 4 hours of Project Manager: 16 hours Project Engineer: 30 hours of Engineer I: Subtotal Labor Cost: @ $143/hour = $572.00 @ $112/hour = $1,792.00 @ $82/hour = $2,460.00 $4,824.00 3. Revisions to Vine/Shields Alternative Analysis At the request of City staff, Muller Engineering Company completed revisions to the Vine/Shields roundabout layout to avoid major impacts to the gas station on the northeast corner. Several layout options were evaluated to determine the best fit design. A cost estimate was prepared for the revised layout and the Alternatives Analysis report was updated to reflect the changes. Labor and Expenses 8 hours of Project Manager: @ $143/hour = $1,144.00 12 hours Project Engineer: @ $112/hour = $1,344.00 Ourston Roundabout Engineering Fee: $2,500.00 Subtotal Labor Cost: $4,988.00 Total Cost of Labor and Expenses: $10,876.00 Letter Dean Klingner February 15, 2012 Page 2 of 2 Muller Engineering Company respectfully requests the City review the above labor and fees for additional payment under the Arterial Intersection Priority Study. Please let us know if you require additional information or have any questions. Sincerely, Muller Engineering Company Karl Buchholz, PE Project Manager