CHANGE ORDER FORM
PROJECT TITLE: Jefferson SUSH 14 Project
PROJECT NUMBER: 400901804
CONTRACTOR: ATKINS (PO#9102518)
CHANGE ORDER NUMBER: 3
In preparing change orders show in order as separate numbered paragraphs the following
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time.
1. & 2. See attached for reason and description of change.
3. The contract cost will increase by $38,750.00
4. The contract time will be extended thru April 30, 2012.
ORIGINAL CONTRACT COST
$401,975.00
TOTAL APPROVED CHANGE ORDERS
$14,720.00
TOTAL PENDING CHANGE ORDERS
$0.00
TOTAL THIS CHANGE ORDER
$38,750.00
ADJUSTED CONTRACT COST
$455,445.00
(Assuming all change ordtelrs approved)
ACCEPTED ACCEPTED BY: 'old Lo,
DATE: Z3 1Z
t a /Raoresentttaativel
SUBMITTED BY:
/
DATE:
�--n//,�!%yC/L--�
(Pr j er)
REVIEWED BY:
APPROVED BY:
APPROVED BY: N (V'ir DATE:
(Purchasing Agent)
cc: City Clerk
Contractor
Purchasing
Project File
Atkins North America, Inc.
4601 DTC Boulevard, Suite 700
Denver, Colorado 80237
Telephone: +1.303.221.7275
Fax: +1.303.221.7276
www.atkinsgiobal.com/northamerica
January 30, 2011
Kathleen Bracke
City of Fort Collins
281 North College Avenue
Fort Collins, Colorado 80524
RE: Jefferson Street Alternatives Analysis
Purchase Order Number: 9102518
Atkins Project Number: 100015273
Time Extension Request: April 30, 2012
Additional Budget Request: $38, 750.00
Dear Kathleen:
Please accept this request for a time extension and an additional $38, 750.00 for the
Jefferson Street Alternatives Analysis Project. The purpose of the budget request is
described below.
Project Management
Billings, progress reports, and progress status updates will be provided to Fort Collins on a
monthly basis. Management activities also include management of contracts and submittals
to Fort Collins and weekly conference calls.
Agency Coordination
• Attendance at a Public Utilities Commission diagnostic meeting
• Attendance at two Technical Advisory Committee meetings
• Attendance at Executive Oversight Committee meeting
• Attendance at one other coordination meetings
Public Meetings
The consultant will participate in the final public meeting to actively engage the corridor
property owners, tenants, and general public in the process. This input will be used to
make a final decision on the preferred recommendation for the corridor.
Develop Conceptual Alternatives (continuing update requests)
Alternatives have been developed for the corridor and two intersection options including a
roundabout and traditional signal intersection. As the alternatives have been finalized,
additional request have been made to make modifications to the alternatives. Some of these
updates may include:
0 Revising cost estimates
Jefferson Street Alternatives Analysis — Additional Time and Budget Request
February 1, 2012
Page 2 of 2
• Updating alternatives according to team feedback and comments from EOC and TAC
• Responding to information requests
• Adding detail to existing altematives
• Coordination with subconsultants on roundabout specifics
Revision and Preparation of Cost Estimates
The consultant will revise and update the cost estimates for the preferred corridor
alternative and two intersection options — traditional signal and roundabout. These
estimates will include revised design drawings and urban design drawings of each
alternative.
Implementation Plan
This task will incorporate the work from all the previous tasks into an implementation
plan. The implementation schedule will reflect and integrate the work product from the
previous tasks, include a proposed budget and reflect the integration of the transportation
system. The implementation plan will serve as the guide for all elements of phasing and
transportation funding.
Task Summary Hours Cost
Project Management (6 months) 52 $7,280.00
Agency Coordination 44 $7,300.00
Public Involvement 8 $1,300.00
Develop Conceptual Alternatives (continuing update requests) 84 $14,180.00
Revision and Preparation of Cost Estimates 30 $4,250.00
Implementation Plan 24 $4,440.00
Total $38,750.00
Thank you for consideration. If you have any questions regarding this information, please
contact me at 303-221-7275, or carrie.wallis@atkinsglobal.com.
Carrie Wallis, P.E., Project Manager
� ,-m:=` . ,`€La .✓'E�tr,
t .9.Scou
�-.: .#u`5'
Came
Wallis
Kelly
KellL
Leadbeder
Dan Liddle
lee
Kunselman
Sco0
Barnhart
Justin
Justin
Wither,
JeffKalman
Tina
Brand
Lacey
Roddkk
Project
Manager
Protect
Planner
Alternative
Devi
Concepi
Design
Traffic
Analysis
Traffic
Analysis
Impl..,u
Finance
DANK
Graphics
Admin
Total
asks tiN.... a,S. k3r..^.-si3`:....G... ` a•'Y .....:
$� ..140
�S:n a+65,
flfa�.785
$4?t2i+f20
!$�5165:
1f 95
VM200
S: D985:
if-'=55
,.Hours;:.
,.,;Cost>TiP
Task 0: Project Management
Coordinator, billing; schedule updates
(reekly calls and .(her request thm Apnl30)
52
52
S 7,280
PMT mee4n s
f
TAC meede s 2
8
8
16
f 2,600
EOC meebn s 1
4
4
4
12
S 2,100
Other Meetings i
4
4
1
8
S 1.300
Task l: Establish decision process and comm. protocols
Orafl ect management Ian
f
Final project mans ernen! an
f
Task 2: Refine reject purpose, objective oats
Prepare ur se. ob' Eves, arts technical memorandum
S
Issues and o unifies assessment
S
Task 3: Stakeholder coordination and public involvement
Agency coordination UPRR Dis nosed
4
4
8
f 1.300
SlakeholdercoordinaAon
f
Pro ownenmrotin s
$
Public Meetings 1 meeGn
f
Exhi flurandouV esentafion preparation
f
Press releaseslmedia materials
f
Meeting abendance
4
4
f 743
OOA Merin s 2meeti s
$
Cit, Grand Meeting andlorworitsedeoni meetin
4
4
S 560
Task 4: Document exisifing condklons
Review preandus sNtlies'repais
f
lappingS
Pareas avaliaba Ineeds assessment
f
Reviewkefine model assum lions
S
UItity documentation
S
Conduct existing conditions baffeoperations anaJ,,sis
f
Environmental overtrew (including assessment of amharo
I
f
Recommend needed land use than esAeoal Policy modifications
$
EvaluMon of pamt stability and demoopmento nities
S
Pre are exisfing conditions and condor Mariana an
f
Task 5:Update currenU rejected traffic conditionsfanal sis
view arrant and future land use plans for the conidor
S
enficatia and transit, of demo hits and TA2s
f
Research and summary of national best pri
$
Develop valuation mend
$
Prepare no acted and action traffic forecasts
$
Prepare balfic conditions fechnical mernerandum
f
Preare:ralfic analfsis technical memorandum
$
Task 6: Evaluate traffic operations
Prepare transportation systemsa Ikabon technical memorandum
$
Task 7: Alternatives development
i co dentist alramaVves(containing u ate requests)
40
32
72
S 11,240
Alternatives ana sis mrksholdS
Exhibibhandou resenbston preparaffort urban feel graphics)
12
12
f 1.440
Mantling standards
$
Evaluate and trackage retraining alternatives
S
Fuller awards 3to 4 rarrianing aitemarves
f
Task 8: Sslef, Preferred alternative
Select preferred alternative Package ideal estimates
10
20
30
S 4,250
Alternatives summary repert
S
Task 9: Prepare implementation plan and finance stradgy
Implementation and finance plan
24
24 1
f 4,440
u_W31rotalT-r..s,769=1,164-10
ir1r?"S98
IOsIt64
,i-kgo
nil" O
0
`.,7$z..e0
f.M242!e,xvA;;RR242
Ourston
S 1,500.00
Total
f 78,750.00
Coco feted work
f 22,221
Movin forward
f 16,521