HomeMy WebLinkAboutBID - 7312 ROSELAWN OFFICE BUILDINGAddendum 1 – Roselawn Office Building Page 1 of 7
ADDENDUM No. 1
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of BID 7312: Roselawn Office Building
OPENING DATE: 3:00 PM (Our Clock) January 9, 2012
To all prospective bidders under the specifications and contract documents described above,
the following changes/additions are hereby made as follows:
The Bid Opening date has been changed to January 9, 2012 – 3:00 P.M. (our clock)
General Notes
Bidding contractors shall allow for use of NM Cable (with separate ground wire) for the
wiring methods inside the pre-fabricated building. Utilize only Copper NM Cable inside
the building. Aluminum NM Cable shall not be allowed. Insulation rated for interior
application.
All exterior wiring shall be installed in EMT, GRC or PVC as applicable to the specific
installation. Insulation shall be rated for exterior application.
Contractor to provide conduit stub-ups in the wall to the attic space for future data work.
Locations of data to be per drawings. Bidder to provide jet-line in stub-ups for future use.
Each bathroom to receive a ventilation fan, ducted to the outside.
Design-build ducted system to accommodate all rooms with heat and A/C. Condenser
location TBD. System requires a minimum of two ducted returns: 1 - in the conference
room and 1 – in the hallway area.
Existing phone line located at Southeast corner of existing on-site building. Contractor to
tie-in per drawings at this location.
AND the following sections of this addendum are hereby added:
Exhibit 1 – Questions & Answers
Exhibit 2 – Revised Drawing Sheet A104
Please contact John Stephen, CPPO, LEED AP, Senior Buyer, Buyer at (970) 221-6777
with any questions regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN
STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS
ADDENDUM HAS BEEN RECEIVED.
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
Addendum 1 – Roselawn Office Building Page 2 of 7
EXHIBIT 1 – QUESTIONS & ANSWERS
1. Q. Is it allowed to quote only the building and not the site work?
A. Bidder to bid both.
2. Q. Can the city award to different vendors for the site package and the building?
A. No. Project to be coordinated through the bidder.
3. Q. To propose only the prefabricated building what licenses and or permits would be
required? The building would have a State of Colorado approval seal.
A. Whatever Larimer County and other authorities having jurisdiction require. This is up
to the contractor to research.
4. Q. On the bid form for the building only it includes “handrails”. Can you clarify where
these are? If they are outside of the building could that item be moved to the site
work scope of work?
A. ADA grab bars are required per sheet A101. Exterior hand rails are required per SD1
if steps are needed at entrance (To Be Determined). This would be included in line
item #5 of the Alternate Pricing section of the Bid Schedule.
5. Q. On the bid form for the building only it includes a grinder alarm panel. Would the
connections other than power supply to the panel and or the wiring to the grinders be
by the site work contractor?
A. No, bidder to provide.
6. Q. Would the telephone service on plan sheet E1.0 be the responsibility of the site
electrical contractor?
A. No, bidder to provide.
7. Q. Please confirm Larimer County as the Building Designation.
A. Yes, they are the authority having jurisdiction.
8. Q. Are bidders to include permits fees? Are there any other exemptions regarding
"traditional" building permit fees due to the project's public nature?
A. Contractor to include permit fees. Work will be tax exempt.
9. Q. Foundation engineering/design is not part of the current bid doc's, are bidders to
include engineering/design services?
A. Yes.
10. Q. Several energy design components have been called out (ie wall thickness, ceiling
insulation, window glazing design, etc). Based on permitting jurisdiction, it may be in
the best interest of the public to identify an energy compliance minimum requirement
and let the bidders define the energy design components. Please confirm.
A. Work to be done to Larimer County Green Code Design.
Addendum 1 – Roselawn Office Building Page 3 of 7
11. Q. If modular building is an acceptable alternative, please clearly identify all required
information for bidders to integrate into bids.
A. Bidders responsibility. Build to specification notes on drawings.
12. Q. Is the Pre-Fab'd building to be included or excluded in Bids? If excluded, City will
need to provide clear specifications and scope definitions between "Modular Home
Builder" and Site Construction General Contractor. If included, City will have
formulate specifications and possibly a per-determined list of acceptable "Modular
Home Builders".
A. Bidders responsibility. Build to specification notes on drawings. There will not be a
pre-determined list of acceptable “Modular Home Builders”.
13. Q. If we want to provide an alternate bid for a site built building, how do we submit with
the current bid format?
A. Submit your price in the bid schedule for a stick built or modular type building. Lump
Sum Bid.
14. Q. Is the general contractor responsible for builder’s risk insurance?
A. Yes.
15. Q. Please confirm a 2-year warranty period is applicable for this project. Ref: RFP Spec
01740
A. Yes.
16. Q. Please clarify the scope for electric secondary and underground communication
conduit between the transformer and the building. There is conflicting information as
to whether this is part of the general contractor’s scope. Also please clarify
responsibility for asphalt patching of any trenches for electric secondary and
communications conduit.
A. All electrical secondary and communication conduit to be part of the bidder’s scope.
Contractor is also responsible for all asphalt/concrete patching too.
17. Q. Please clarify responsibility for the water meter pit and ¾” service line to the building.
A. Site contractor will bring water and sewer to within 5 feet of the building. General
Contractor is responsible for the tie-in. Site contractor is responsible for the meter pit.
18. Q. Please clarify responsibility for the sewage grinder pump, grinder alarm panel, 4”
building sewer to the grinder, and 1 ¼” HDPE pressure sewer line.
A. The sewage grinder pump is installed. The grinder alarm panel has been supplied by
the site contractor. Bidder to install and connect the alarm panel. bidder to tie-in the
existing 4” sewer. Bidder to coordinate start-up with City of Fort Collins, site
contractor and grinder pump manufacturer before grinder pump start-up.
Addendum 1 – Roselawn Office Building Page 4 of 7
19. Q. Please confirm the propane tank is to be provided by owner, as clarified at the pre-
bid.
A. This is correct.
20. Q. Please provide anticipated depth of asphalt and any base course requirements for
the patch along the north side of the building.
A. Meet code minimum.
21. Q. Please provide required depth of concrete paving and any base course requirements
for the handicapped parking stall.
A. Meet code minimum.
22. Q. Are soil amendments, topsoil, or seeding required for the graded areas disturbed
during construction?
A. No.
23. Q. A 3’ width section of sidewalk is shown south of the handicapped parking on C1 and
C4, but not on SD1. Please clarify.
A. Contractor to provide per C1 and C4. Include price in line item #5, Alternate Pricing
of the Bid Schedule.
24. Q. RFP section 01050 requires a final improvement survey. Please confirm if this is still
required with most of the site utility work being completed by others.
A. City of Fort Collins to provide.
25. Q. Are spoils from the crawlspace to be hauled off-site, or is there an on-site stockpile
location.
A. There will be an on-site stockpile location.
26. Q. Please confirm the foundation perimeter drain should drain to a sump located in the
crawlspace. Daylighting of the drain doesn’t seem feasible.
A. Yes.
27. Q. Are sound batts desired in the interior partitions or restroom partitions?
A. Yes.
28. Q. Please confirm R30 batt insulation is acceptable for the floor insulation. This would
meet the minimum energy code for floors over unconditioned space.
A. This is acceptable.
29. Q. Can hollow metal steel door frames be used for interior doors (plans reference wood
frames)? Are solid core flush doors acceptable? Any preference on species of
wood?
A. Please reference revised sheet A104.
Addendum 1 – Roselawn Office Building Page 5 of 7
30. Q. Please clarify window types desired, i.e. material, cladding, interior material,
sills/aprons, jamb treatment, casing, etc. Only glass type is specified in the plans.
A. Contractor to provide. At a minimum, all windows must be triple pane insulated per
sheet A104. Bidder to install drywall casing, poplar sills, finish / paint to match.
31. Q. Please clarify exterior door specifications, i.e. material, cladding, glazing, interior
material. Please confirm handicapped door operators are not required.
A. Please reference revised sheet A104.
32. Q. Is sheet vinyl or VCT required in the janitor closet? Plan and finish schedule calls out
both.
A. Sheet vinyl. City of Fort Collins to pick colors.
33. Q. Is there a standard specification for flooring materials (type, manufacturer, etc) that
can be used for bid purposes.
A. Bidder to provide.
34. Q. Is FRP desired in the janitor closet? Should the fixture be a mop sink or a utility
sink?
A. Meet code minimum. Mop sink.
35. Q. Are any toilet accessories or building accessories to be supplied or installed by the
contractor?
A. No. City of Fort Collins will provide.
36. Q. Is any exterior lighting desired on the building?
A. Meet code minimum.
37. Q. Please provide a minimum efficiency standard for the A/C condenser?
A. Meet code minimum. HVAC system, including heating and A/C, to be design-build by
bidder. To be reviewed and approved by City of Fort Collins.
38. Q. Will the City of Ft. Collins except a concrete and steel structure? As an option? The
City seems pretty set on the design and specs provided.
A. No.
39. Q. Has the building received zoning and planning approval? There is a reference in
the bid docs about needing it, how will this approval play into the schedule and
liquidated damages?
A. Yes. Any approvals delaying the time frame of the project will be taken into
consideration and will not affect liquidated damages.
40. Q. The bid docs reference that the city will pay for the building permit and the contractor
needs to pay for the building permit, which is it?
A. Bidder to pay for the building permit.
Addendum 1 – Roselawn Office Building Page 6 of 7
41. Q. Was there a certain manufacturer used for basis of design if building is
prefabricated?
A. No.
42. Q. In Section 01030 the alternates listed in this section do not match the alternate listed
on the bid form. Please clarify.
A. Use the alternates on the bid form.
GFI
WALL-MTD. SINK
ZURN PINT FLUSH URINAL
3 PC. S.S. GRAB -BARS
DUAL-FLUSH CHINA TANK TOILET
4X4 CERAMIC TILE
TO 4'-0" A.F.F.
3' - 0"
3' - 4" 1' - 6"
1' - 7"
2' - 8"
3 PC. S.S. GRAB -BARS
DUAL-FLUSH CHINA
TANK TOILET
4X4 CERAMIC TILE
TO 4'-0" A.F.F.
3' - 0" 0' - 4" 1' - 6"
1' - 3" 2' - 3" 1' - 0"
PRE-HUNG. WD.
DOOR WITH
WINDOWS
PRE-HUNG.
WD. FRAME
RE: SCHED. 0' - 0 3/4"
0' - 0 3/4" RE: SCHED. 0' - 0 3/4"
PRE-HUNG. WD.
INTERIOR DOOR
PRE-HUNG. DBL WD.
DOOR WITH WINDOWS
1 2 3
1
1t A 1t 1t
B C
2' - 10 1/2"
3' - 0" 3' - 10 1/2"
3' - 0" 3' - 10 1/2"
1' - 10 1/2"
5' - 10 1/2" 1' - 0"
3' - 0"
NOTE:
ALL WINDOWS ARE
TRIPLE PANE
INSULATED
A104 1
3
2' - 7 1/2" 4' - 8 1/4" 1' - 6 5/8"
1' - 3 5/8"
1 2 3 4 5
A
B
C
D
PROJECT
DATE
DRAWN
1015
712 WHALERS WAY SUITE, B-100
FORT COLLINS, CO 80525
(970) 223-1820
www.aller-lingle-massey.com
NOT FOR CONSTRUCTION
FORT COLLINS COLORADO
A104
SCHEDULES, TYPES, INT.
ELEVS
8/12/11
SJM
CITY OF FORT COLLINS
ROSELAWN OFFICE
Project Status
Door Schedule
Mark Thickness Height Width Type Material Finish Fire Rating Frame Type
Frame
Material
Frame
Finish Comments
1 0' - 2" 6' - 8" 3' - 0" 1 WOOD PAINT - PRE-HUNG WOOD PAINT WD TRIM
2 0' - 2" 6' - 8" 3' - 0" 2 WOOD PAINT - PRE-HUNG WOOD PAINT WD TRIM
3 0' - 2" 6' - 8" 3' - 0" 2 WOOD PAINT - PRE-HUNG WOOD PAINT WD TRIM
4 0' - 2" 6' - 8" 3' - 0" 2 WOOD PAINT - PRE-HUNG WOOD PAINT WD TRIM
5 0' - 2" 6' - 8" 3' - 0" 2 WOOD PAINT - PRE-HUNG WOOD PAINT WD TRIM
6 0' - 2" 6' - 8" 3' - 0" 2 WOOD PAINT - PRE-HUNG WOOD PAINT WD TRIM
7 0' - 2" 6' - 8" 5' - 8" 3 WOOD PAINT - PRE-HUNG WOOD PAINT WD TRIM
Room Schedule
Number Name Area Base Finish Floor Finish N. Wall N. Wall Fin. S. Wall S. Wall Fin. E. Wall E. Wall Fin. W. Wall W. Wall Fin.
Ceiling
Finish Comments
11 CONFERE
NCE
427 SF RUB. CARPET
SQUARE
G.B. PNT. G.B. PNT. G.B. PNT. G.B. PNT. G.B.
12 ENTRY 176 SF RUB. CARPET
SQUARE
G.B. PNT. G.B. PNT. G.B. PNT. G.B. PNT. G.B.
13 OFFICE 94 SF RUB. CARPET
SQUARE
G.B. PNT. G.B. PNT. G.B. PNT. G.B. PNT. G.B.
14 MENS 62 SF RUB. CERAMIC
TILE
G.B. PNT./TILE G.B. PNT. G.B. PNT./TILE G.B. PNT./TILE G.B.
15 WOMENS 69 SF RUB. CERAMIC
TILE
G.B. PNT./TILE G.B. PNT. G.B. PNT./TILE G.B. PNT./TILE G.B.
16 JANITOR 56 SF RUB. SHEET
VINYL
G.B. PNT. G.B. PNT. G.B. PNT. G.B. PNT. G.B.
1/4" = 1'-0"
1
Elevation 1 - a
1/4" = 1'-0"
3
R.R. WALLS
1/4" = 1'-0"
DOOR & FRAME TYPES
1/4" = 1'-0"
WINDOW TYPES
1/2" = 1'-0"
2
ENLARGED RR PLAN
PROVIDE SCHLAGE ACCESSIBLE
HARDWARE AT ALL DOORS WITH PRIMUS
KEYING. PER CITY OF FORT COLLINS
REQUIREMENTS
WOOD TRIM STYLE TO BE ANDERSON OR
EQUAL
MENS RESTROOM SHOW WOMENS SIMILAR
1