No preview available
HomeMy WebLinkAboutRESPONSE - RFP - 7300 CONSULTING ENGINEERING SERVICES FOR CLEARVIEW CHANNEL IMPROVEMENTS & FUTURE MINOR CAPITAL IMPROVEMENTS (2)No Text 1/18/2012 Presentation Outline I. Introduction 11. Project Team n Clearview Channel Project General Qualifications Questions and Answers L--- - - Introduction ICON'S Strengtf J :IGiU WIJJ: a:ull 77 Triple Bottom Line (TBL) project approach Regional water quality Stream stabilization & habitat Consideration to use of city crews Sustainability Clearview Channel Project Background 1 Project Location DRAFT Guidelines Clearview Channel SU Stream Assessment (2011 DRA 'Reach A.1 is severely degraded and has multiple compromised structures. A couple of ade control structures in danger of being flanked, and a property fence is being undercut Id at risk of future collapse. The city is already planning to rehabilitate this reach.' 1/is/2012 2 Clearview Channel Project Challenges 1 i ROW Easement 10' North; 30' South 22' wide construction li Floodway Split Flows s �^ ,Wr =. e Spill Flows to Sp Id Dr/ &Village Lane ,. _ - ,_•, }�.� jai Clearview Channel IX /-IN..,,. hm I � _ i 1/18/2012 3 Clearview Channel Project Approach — Phase 1: Alternatives Analysis Review drop type, costs, effectiveness, habitat considerations Integrating or reducing existing side slopes (approx. 1.5:1) Evaluate bank protection, TRMs, vertical wall options, soil lifts vegetated coir logs, live gabion lifts, etc. Maintenance considerations L view and Permitting tion of habitat improvement criteria & enhancement feasibility 1/18/2012 4 Clearview Channel 0 Project Approach — Phase Z Final Design Intention for construction by city crews! General Qualifications Analysis and design of Minofap7tawl ater Capital and Maintenance Projects (Minor Projects) Hydrologic and Hydraulic Modeling Floodplain Modeling Studies (Including CLOMR's and LOMR's) Preparing and Updating Stormwater Master Drainage Plans Stormwater Quality: Design, Monitoring, And Management Plans Channel Stability Studies M M 1/18/2012 General Qualifications Analysis and design of Minor Stormwater Capital and Maintenance Projects (Minor Capital Projects) Mason and Olive Storm Sewer Manhattan Pond Detention Pond Harmony Ridge Nelson Farm Detention Pond West Orchard Ponds General Qualifications Floodplain Modeling Stuffl (Including CLOMR's and LOWS) Most Design and MP Studies Floodplam Review Fossil Creek Trail &l Floodplain Permits LLn !' uuuacror tur General Qualifications rologic and Hydraulic Modeling Master Plan Updates Canal Capacity Analyses i W Vine S Michaud, . HEC-Ri�S—Steady mi.. - General Qualifications ®-- and Uodatina Plans 2001 MP Updates (Fossil Creek, Fox Meadows. McClellands) - Stone Creek mini -MP WO MP for Howes. Udall, Magnolia WO Updates for Master Plans (2012) Lone Tree. Windmill, Dove FHADs. MDPs Clear Creek FHAD and MDP 1/18/2012 General Qualifications Stormwater Quality: Design, Monitoring, and Management Plans WO MP for Howes, Udall, Magnolia WO Master Plan Updates West Orchard Pond Design Master Plans WQ De ` WQ Designs for Aurora. Denver, SEMSWA, UDFCD etc. ih General Qualifications Stream Stabilization Fossil Creek Master Plan Stanton Creek Stabilization General Qualifications Stormwater Quality; Design, Monitoring, And Management Plans HL IMPUILIARLL Of WLILANDS u r. .. a 1/18/2012 General Qualifications Other Water Quality I Stabilization Solutions: r Z � ���NATIVf PLANTS Conclusion Understanding and approach for Clearview Channel project Strong team qualifications for minor capital on -call services Understanding of City's needs & goals for future projects Motivation and desire to continue working for the City of Fort Collins! 1/18/2012 r�