Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutRESPONSE - RFP - 7300 CONSULTING ENGINEERING SERVICES FOR CLEARVIEW CHANNEL IMPROVEMENTS & FUTURE MINOR CAPITAL IMPROVEMENTS (2)No Text
1/18/2012
Presentation Outline
I. Introduction
11. Project Team
n Clearview Channel Project
General Qualifications
Questions and Answers
L--- - -
Introduction
ICON'S Strengtf
J :IGiU WIJJ: a:ull
77
Triple Bottom Line (TBL) project approach
Regional water quality
Stream stabilization & habitat
Consideration to use of city crews
Sustainability
Clearview Channel
Project Background
1 Project Location
DRAFT Guidelines
Clearview Channel
SU Stream Assessment (2011 DRA
'Reach A.1 is severely degraded and has multiple compromised structures. A couple of
ade control structures in danger of being flanked, and a property fence is being undercut
Id at risk of future collapse. The city is already planning to rehabilitate this reach.'
1/is/2012
2
Clearview Channel
Project Challenges 1
i ROW Easement 10' North; 30' South
22' wide construction li
Floodway
Split Flows s �^ ,Wr
=. e
Spill Flows to Sp Id Dr/
&Village Lane ,. _ - ,_•, }�.� jai
Clearview Channel
IX
/-IN..,,.
hm
I � _
i
1/18/2012
3
Clearview Channel
Project Approach — Phase 1: Alternatives Analysis
Review drop type, costs, effectiveness, habitat considerations
Integrating or reducing existing side slopes (approx. 1.5:1)
Evaluate bank protection, TRMs, vertical wall options, soil lifts
vegetated coir logs, live gabion lifts, etc.
Maintenance considerations
L
view and Permitting
tion of habitat improvement criteria & enhancement feasibility
1/18/2012
4
Clearview Channel
0
Project Approach — Phase Z Final Design
Intention for construction by city crews!
General Qualifications
Analysis and design of Minofap7tawl
ater Capital and
Maintenance Projects (Minor Projects)
Hydrologic and Hydraulic Modeling
Floodplain Modeling Studies (Including CLOMR's and
LOMR's)
Preparing and Updating Stormwater Master Drainage
Plans
Stormwater Quality: Design, Monitoring, And Management
Plans
Channel Stability Studies
M M
1/18/2012
General Qualifications
Analysis and design of Minor Stormwater
Capital and Maintenance Projects (Minor
Capital Projects)
Mason and Olive Storm Sewer
Manhattan Pond Detention Pond
Harmony Ridge
Nelson Farm Detention Pond
West Orchard Ponds
General Qualifications
Floodplain Modeling Stuffl
(Including CLOMR's and
LOWS)
Most Design and MP Studies
Floodplam Review
Fossil Creek Trail &l
Floodplain Permits
LLn !' uuuacror tur
General Qualifications
rologic and Hydraulic Modeling
Master Plan Updates
Canal Capacity Analyses i W Vine S Michaud,
. HEC-Ri�S—Steady mi..
-
General Qualifications
®--
and Uodatina
Plans
2001 MP Updates (Fossil Creek,
Fox Meadows. McClellands)
- Stone Creek mini -MP
WO MP for Howes. Udall, Magnolia
WO Updates for Master Plans
(2012)
Lone Tree. Windmill, Dove FHADs.
MDPs
Clear Creek FHAD and MDP
1/18/2012
General Qualifications
Stormwater Quality:
Design, Monitoring, and
Management Plans
WO MP for Howes, Udall,
Magnolia
WO Master Plan Updates
West Orchard Pond Design
Master Plans WQ De `
WQ Designs for Aurora.
Denver, SEMSWA,
UDFCD etc.
ih
General Qualifications
Stream Stabilization
Fossil Creek Master Plan
Stanton Creek Stabilization
General Qualifications
Stormwater Quality;
Design, Monitoring, And
Management Plans
HL IMPUILIARLL Of WLILANDS
u r. ..
a
1/18/2012
General Qualifications
Other Water Quality I
Stabilization Solutions:
r
Z � ���NATIVf PLANTS
Conclusion
Understanding and approach for Clearview Channel
project
Strong team qualifications for minor capital on -call
services
Understanding of City's needs & goals for future
projects
Motivation and desire to continue working for the
City of Fort Collins!
1/18/2012
r�