HomeMy WebLinkAboutCHANGE ORDER - BID - 7073 MASON CORRIDOR MAX BRT FINAL DESIGN (9)�R- f F6rO®ll'nsFrtlsort Plannino, Development & TransportatlonCI$y281 College Avenue ih Colln, CO 805220580 970,221.6605 970.221.6378 - fax rcgov. convangrneerrng CHANGE ORDER FORM PROJECT TITLE: Mason MAX BRT Project PROJECT NUMBER: 400903280,521120.90 CONTRACTOR: Michael Baker Jr., Inc, (PO#9957149) CHANGE ORDER NUMBER: 9 In preparing change orders show In order as separate numbered paragraphs the following 1. Reason for change. 2. Description of change. 3. Change In contract cost. 4. Change In contract time. 1 &2. This Change Order will Increase the total contract cost pursuant to RFP #7073 dated 12-01-09. See attached for reason and description of change. 3. The contract cost will Increase by $12,179,76. 4. There will be no change to contract time. ORIGINAL CONTRACT COST $3,052,480.20 TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: tra SUBMITTED BY: . r act Manager) ----,->r, APPROVED BY: (City Engineer) $891,511,57 $0.00 $12,179.76 $3,956,171.63 DATE: 2 115 1 i Z DATE: 2 Ply APPROVED BY: DATE: (Purchasing Agent) cc: City Clerk Contractor Purchasing Project File Title: 7073 Mason BRT Project CHANGE ORDER #9 Date: 2-15-12 CONTRACT CHECKLIST FOR NON-COMPETITIVE PROPOSALS (SOLE SOURCE) Checklist Item Contract File Comments Location 7) Independent Cost Estimate The City made and documented an Yes independent cost estimate before receipt of proposals, 10) Unnecessary Experience and Excessive Bonding Unnecessary experience and excessive NA bonding requirements were not included in this solicitation or contract documents, 11) Organizational Conflict of Interest (OCI) If there is an apparent or potential OCI the solicitation contains provisions to eliminate or mitigate the conflict (e.g. by inserting a clause NO that prohibits the contractor from competing for the follow-on contract to the current design or research contact) and OCI Certification is submitted by the contractor. 12) Arbitrary Action There was no arbitrary action in the procurement process, (An example of arbitrary action is when award is made to NO other than the contractor who most satisfied all the City requirements as specified in the solicitation and as evaluated by staff. 13) Brand Name Restrictions Brand Name or Equal. When it is impractical or uneconomical to provide a clear and accurate description of the technical requirements of the property to be acquired, a "brand name or equal" description may be used to define the performance or other salient characteristics of a specific type of property. The City must identify the salient characteristics of the named brand that NA offerors must provide, When using a "brand name" specification, the City does not need to reverse -engineer a complicated part to identify precise measurements or specifications in order to describe its salient characteristics. FT A's "Best Practices Procurement Manual," (BPPM) contains additional information on preparation of specifications including examples with specific language. 14) Geographic Preferences The solicitation contains no in -State or local NA geographic preference except where Federal statutes mandate or encourage them, 15) Contract Term Limitation The contract period of performance for rolling stock and replacement parts does not exceed five (5) years inclusive of options without prior NA written FTA approval. For all other types of contracts, the procurement file contains evidence that the contract term is based on sound business judgment. 18) Award to Responsible Contractor The City made a determination that it was awarding to a responsible contractor considering such matters as contractor integrity, compliance with public policy, record of past performance, and financial and 1. y technical resources. 2, y 1. Appropriate Financial, equipment, facility 3 y and personnel. (YIN) 4 y 2. Ability to meet delivery schedule. (YIN) 5. y 3. Satisfactory period of performance. (YIN) 4. Satisfactory record of integrity, not on declined or suspended listings. (YIN) 5. Receipt of all necessary data from vendor. (YIN) 19) Sound and Complete Agreement This contract is a sound and complete agreement. In addition, it includes remedies Original contract dated 12-1-09 for breach of contract and provisions covering termination for cause and convenience. 24) Clear, Accurate, and Complete Specification A complete, adequate, and realistic specification or purchased description was YES available and included any specifications and pertinent attachments which define the items or services sought in order for the bidder to properly respond. 38) Sole Source if other Award is Infeasible The contract file contains documentation that award of a contract was infeasible under small purchase procedures, sealed bids, or competitive proposals and at least one of the following circumstances applies: (1) The item was available only from a single source. (Verify prices are no higher than price for such item by likely customers.) (2) Public exigency for the requirement did YES —NUMBER 1 not permit a delay resulting from a competitive solicitation. (3) An emergency for the requirement did not permit a delay resulting from a competitive solicitation. (4) The FT A authorized noncompetitive negotiations. (5) Competition was determined inadequate after solicitation of a number of sources. 39) Cost Analysis Required Cost analysis and profit negations were performed (initial award and modifications) And documented for price reasonableness YES AND IN FILE established on the basis of a catalog or market price of a commercial product sold in substantial quantities to the general public or on the basis of prices set by law or regulation. 40) Evaluation of Options The option quantities or periods contained in the contractor's bid or offer were evaluated in order to determine contract award. (To be NA eligible for Federal funding, options must be evaluated as part of the price evaluation of offers, or must be treated as sole source awards. 42) Written Record of Procurement History The file contains records detailing the history 1. of this procurement. At a minimum, these yes records include: �, es SOIe so urcee Y (1) the rationale for the method of 3. yes procurement, 4. Baker, FHU and AECOM price (2) Selection of contract type, review (3) reasons for contractor selection: or rejection, and 4 the basis for the contract price. 43) Exercise of Options The grantee exercised an option on this contract adhering to the terms and conditions of the option stated in the contract and determined that the option price was better NA than prices available in the market or that the option was a more advantageous offer at the time the option was exercised. If an option was not exercised under this contract, check NA. 44) Out of Scope Changes The grantee amended this contract outside the scope of the original contract. The amendment was treated as a sole source YES procurement (complying with the FTA requirements for a justification, cost analysis and profit negotiation). 45) Advance Payment Provisions The contractor did not receive an advance payment utilizing FTA funds and the contract CORRECT does not contain advance payment provisions or, if it did, prior written concurrence was obtained from FTA. 46) Progress Payment Provisions The contract contains progress payments based on costs incurred (as opposed to percent of completion) and the contract contains a provision giving the grantee title to YES property (materials, work in progress, and finished goods) for which progress payments are made. The contract may contain other security in lieu of obtaining title. 47) Time and Materials Contracts This is a time and materials contract; the grantee determined that no other type of NO contract is suitable; and the contract specifies a ceiling rice. 48) Cost Plus Percentage of Cost This is not a cost plus a percentage of cost NA type contract. 49) Liquidated Damages Provisions This contract contains liquidated damages provisions and the assessment for damages NO is specified in the contract at a specific rate per day for each day of overrun in contract time. 50) Piggybacking 1) The file contains: Assignability provisions. NO 2) The procurement file contains: Price reasonableness determination. 56) Clauses This contract contains the appropriate FTA YES required clauses. Excluded Parties Search EPS run and include in the file. YES Excluded Parties List System Page I of I > Advanced Search > Multiple Names > Exact Name and SSNlrIN > MyEPLS > Recent Updates > Browse All Records View Cause and Treatment Code Descriptions > Reciprocal Codes > Procurement Codes > Nonprocurement Codes Agency & Acronym Information ,Agency Contacts > Agency Descriptions > State/Country Code Descriptions OFFICIAL GOVERNMENT USE ONLY > Debar Maintenance > Administration > Upload Login Search Results for Parties Excluded by Firm, Entity, or Vessel : Michael BakerJr., Inc State: COLORADO Country : UNITED, STATES As of 15-Feb-2012 5:25 PM EST Save to MyEPLS Your search returned no results. Back New Search Printer -Friendly � > Search Help >Advanced Search Tips > Public User's Manual >FAO > Acronyms > Privacy Act Provisions > News System for Award Management > (SAM) Reports >Advanced Reports > Recent Updates > Dashboard Archive Search - Past Exclusions > Advanced Archive Search > Multiple Names > Recent Updates > Browse All Records Contact Information > For Help: Federal Service Desk https://www.epls.gov/epls/search.do 2/15/2012 City of Fort C` Date of Estimate: 3-Feb-12 Contract Type: T&M Existing Contract or PO (Y/N): Y Michael Baker Jr., Inc. - Change Order 1119 Independent Cost Estimate Mason Corridor MAX BRT Final Design Description of Goods (A) or Services (B): B Provide supplemental consulting services for system design of the PA System, LCD Monitors and LED VMS. Baker/IBI will update drawn igs and specifications to include these project elements into the final bid documents. Rates are based on previous contracts and/or CO's with Baker. Rates are compairable to other consulting firms. I have obtained the following estimate from; Published Price List / Past Pricing (date) Engineering or Technical Estimate (performed by) Independent Third Party Estimate (performed by) Other (specify) Item/Task: Cost Estimate Details: (Eslimate calculated in US Dollars) Source Cost of Services, Repairs, or Non -Standard Items Materials or Work Description Other Direct Costs Labor Rate (S) Labor Hours Labor Class Allocated Overhead SGi Profit TOTAL Prof Mgr $ 160.00 8 1,280.05 Systems Engineer $ 90.00 60 5,400.00 CAD $ 80.00 40 3.200.00 0.00 0.00 0.00 Total 9,880.00 'Sgrinp, Ganwai nno hlminytrpir� Eapames Signature of Prepares Z — 3 Date: City of Fort Collins DATE: February 10, 2012 TO: Jim O'Neil FROM: Terry Tyrrell, CPM Planning, Development & Transportation Engineering Department 281 North College Avenue P.O. Box 580 Fort Collins. CO 80522.0580 970.221.6605 970.2216378 - fax lcgov. corn/engineering RE: Mason Corridor (MAX) Bus Rapid Transit Project Cost Analysis— Baker CO#9 —1 D73 Michael Baker Jr., Inc. (Baker) requires a supplement for the BRT project due to the addition of necessary Project related systems components that will be bid as part of the MAX BRT Construction Project. Previously, this portion of the project was going to be complete by City Forces, however due to timing and project cohesion the Management Team required these elements be part of the larger construction package for economy of scale. As such, we recommend a budget supplement of$12,179.76. Attached please find the proposed Change Order #9 from Baker. I have prepared an Independent Cost Estimate (ICE) also attached, which was in the amount of $9,880. In preparing my ICE for this change order, I used previous change order personnel rates from Baker and compared them to other consultants doing similar consultant work, such as FHU and ALM, and found Baker's rates to be reasonable. For the ICE, I based the estimated number of hours to perform this scope of services from my previous experience with Baker and ALM and other projects of similar complexities. Baker's initial request for these services dated February 3, 2012 was $15,732.23. Upon further negotiations, the agreed upon CO#9 budget was $12,179.76. Baker should be utilized for this particular work effort since it would be less cost effective to have another consultant do supplemental systems design work as Baker has been engaged with project through Final Design. Based on my experience, I believe the requested Change Order 99 for the amount of $12,179.76 is reasonable for the work remaining during the final design phase of the BRT project. As such, I recommend approval of this fee estimate. Terry Tyrrell, PE Michael Baker Jr., Inc. A U-*W-V( had eo4n c.ry ,.don 165 S. Union Blvd Suite 200 Lakcwood, CO 80228 (720) 514-1100 FAX (720) 514-1120 February 7, 2012 Ms. Erika Keeton, PE Mason Corridor Project Manager 281 North College Avenue PO Box 580 Fort Collins, CO 80522-0580 Re: Change Order # 9, Fort Collins BRT Dear Erika: Attached please find documentation of additional work for the Mason Corridor BRT project, this additional work is required due to changes in direction from the City as to the preparation of the BRT Bid documents. Prior to the November submittal, the City instructed the Baker team to show the VMS, LCD and PA systems as to be installed by others. This was due to the decision at that time for the City to procure these vendors separately from the BRT contract and instruct the BRT contractor to coordinate with these vendors. The reasoning at the time was that since the BRT and STC were on different construction schedules and could have different contractors, that the City would procure a single vendor for these items to ensure compatibility for the STC, BRT and the maintenance facility. The City did ask Baker and IBI to support them in the creation of the RFP for these elements. IBI made the modifications to the sheets for inclusion in the November submittal. The specs for these items were removed from the spec package. As instructed by the City we did leave "place holders" for these specs. IBI started talking to Dean Erickson about the RFP's for these three elements starting in December. As time went on, further internal City discussions revisited the direction for these. Dean Erickson had rewritten the specifications for the VMS, LCD and paging systems and asked IBI to review. IBI reviewed these specs and provided comments. Dean and IBI then held a conference call to coordinate the recommended changes. During this call other requirements such as Audio\Visual equipment for the conference room in the STC were requested. This required more revisions and coordination as IBI had taken over the modifications to the specifications. On January 19`h while in Fort Collins to deliver Revision one of the plans, Craig Friesen was informed that the City decided to combine the STC and BRT packages in one construction package. This required combining the specifications and coordination with the STC consultant. On February 5", a conference call between the City, Baker, IBI, and ALM was held to coordinate the specs for the two construction documents. This call led to additional requirements to be included in the BRT project that initially was in the STC project. These additional requirements will require additional coordination with ALM and Dean. The budget for the original contract is $3,052,480.20. The following change orders have already been processed: • Change Order #1 was executed March 30, 2010 for Mason BRT MIS Component design services in the amount of $191,334.91. • Change Order #2 was executed July 16, 2010 (including: drainage cost estimates, drainage bid alternates, DTC modifications, Operations Analysis, Raptor survey, bridge rating, RR ROW exhibit support, irrigation design, PUC support, EA support and Casey Carwash analysis) in the amount of $140,163.11. • Change Order #3 was executed to extend the contract time through October 21, 2011 • Change Order #4 was executed October 15, 2010 for the McClelland re -design and environmental re-evaluation services in the amount of $170,723.13. • Change Order #5 was executed January 3, 2011 for environmental evaluation and testing for the demolition of the public service building in the amount of $6,669.92. • Change Order #6 was executed March 2, 2011 (including: MSO design, Prospect trash enclosure, NRRC and SIT renderings, Dellenbach retaining wall, PSCO demolition plans, add BNSF information to MIS plans) in the amount of $52,708.89. • Change Order #7 was executed March 22, 2011 (including: University Station/CSU changes, Spring Creek no -rise certification, irrigation at Whole Foods and King Soopers and WQ changes) in the amount of $57,692.36. • Change Order #8 was executed February 2, 2012 in the amount of $272,219.25. Change Order #9 in the amount of $12,179.76 includes $10,910.16 for 131 and 8 hours at $158.70/hour for Craig Friesen for coordination and incorporation into the bid documents. This brings the total contract value to $3,956,171.53. Should you have any questions, please contact me at 720-479-3173 or by email: cfriesen@mbakercoro.com. Sincerely, MICHAEL BAKER JR., INC. Craig M. Friesen, PE IBI Group IN 1401 Street —Suite 610 Denver(3rCO 80202 USA tel 303 713 1013 fax 303 713 1014 February 07, 2012 Mr. Craig Friesen Michael Baker Junior, Inc. 355 Union Blvd. Suite 200 Lakewood, CO 80228 UPDATES TO MIS/ITS COMPONENTS AT STATIONS AND STOPS Dear Mr. Friesen, We are please to submit our fee proposal for City of Fort Collins requested updates to the 100% ITS design package. These updates are in response to the City of Fort Collins combining the Mason Corridor BRT and South Transit Center projects into one common bid package. Tasks related to this change order include: Tasks 1. Changes to Contract Documents to Add Public Address System This task requires modifying the ITS drawing package to add the PA amplifier, speakers and associated wiring back into Contractor's bid package and not to have this subsystem procured and installed by others. A) Coordination with ALM and the City of Fort Collins on IP Based PA System specifications. B) Modifications to the existing Mason Corridor BRT MIS/ITS package to add the PA amplifier, speakers and associated wiring at all stations and stops back into the Mason Corridor BRT bid package. 2. Changes to Contract Documents to Add Variable Message Signs This task requires modifying the ITS drawing package to add the LED Variable Message Signs back into Contractor's bid package and not to have this subsystem procured and installed by others. A) Coordination with ALM and the City of Fort Collins on LED VMS specifications. B) Modifications to the existing Mason Corridor BRT MIS/ITS package to add the LED Variable Message Signs at all stations and stops back into the Mason Corridor BRT bid package 3. Changes to Contract Documents to Add Transportation Information Display Systems This task requires modifying the ITS drawing package to add the LCD monitors and processors back into Contractor's bid package and not to have this subsystem procured and installed by others. A) Coordination with ALM and the City of Fort Collins on LCD Signage Display specifications. 6) Modifications to the existing Mason Corridor BRT MIS/ITS package to add the LCD Signage Displays at all stations and stops back into the Mason Corridor BRT bid package 4. Review and Stamp Changes to Contract Documents. 181 Group is a group of firms providing professional services BI Group February 7, 2012 Our proposed fee for this change is $10,910.16. Please find attached the corresponding hours for the tasks as outlined in this letter. We look forward to your response to this fee proposal. Best Regards, IBI Group Peter Zurawel, Director Accepted by Craig Friesen for Michael Baker Junior. Inc. Date: UPDATES TO 100% ITS DRAWING PACKAGE P. Zurawel C-H Piet S. Birritteri I P, Butler C. Varela I L. Domin uez Extended $ 128.801 $ 103.94 $ 41.68 $ 32.12 $ 30.65 $ 26.44 Pro osed Tasks Sr. Professional Sr. Professional Professional Professional Professional Admin. Cost Changes han esto'ITSiCom onentstat Stations and Stops'Y 1 -�. V Yva ..+ . r.&s` I s,E V' .Qiva ., 1 Changes to Contract Documents for Public Address Speaker System A) Coordination with Baker, Alan Lingle Massey, and City of Fort Collins on PA System Specifications. 8 $ 663.79 B) Modifications to the existing BRT ITS Systems Drawing Design Package: Remove all labels on all PA Amplifiers, Speakers, and Speaker Cable at All Stations and Stops that refer to the PA being installed by others, 1 4 6 $ 914.62 2 Changes to Contract Documents for Variable Message Sin VMS A) Coordination with Baker, Alan Lingle Massey, and City of Fort Collins on VMS Specifications. 8 $ 663.79 B) Modifications to the existing BRT ITS Systems Drawing Design Package: Remove all labels on all VMS signs at All Stations and Stops that refer to the VMS being installed by others, 1 4 6 $ 911 89 3 Changes to Contract Documents for Transportation Information Display Systems A) Coordination with Baker, Alan Lingle Massey, and City of Fort Collins on Transportation Information Display System Specifications. 8 $ 663.79 B) Modifications to the existing BRT ITS Systems Drawing Design Package: Remove all labels on all LCDs and signage display processors signs at All Stations and Stops that refer to the display systems being installed by others. 1 4 4 $ 756.97 8 Review and Stamp Changes to Contract Documents 1 2 16 4 4 14 $ 5,883.28 Total Hours 1 2 16 3 40 20 1 4 Direct Labor Costs for Changes to ITS Components 1 $ 257.60 1 $ 1,663.04 $ 125.04 $ 1,284,80 1 $ 613.00 1 $ 105.76 Overhead Labor Costs for Changes to ITS Components I $ 347.35 1 $ 2,242.44 $ 168,60 1 1 $ 1,732.42 $ 826.57 1 $ 142.61 fee 10% $ 60.50 1 $ 390.55 $ 29.36 I $ 301.72 $ 143.96 1 $ 24.84 Total Loaded Rate for Changes to ITS Components at Stations and Stops $ 665.48 $ 4,296.03 1 $ 323.00 1 $ 3.318.94 1 $ t,583.53 $ 273.2t $10,460.16 Other Direct Costs E 450.00 Grand Total for Changes to ITS Componenets at Stations and Stops $ 10,910.16 2/12012 10/1