Loading...
HomeMy WebLinkAboutCHANGE ORDER - PURCHASE ORDER - 9113890(‘IIAN(iL ORI)LR No. I A-iihini j/,/.o,; PRoJ l(’ I’’l’I’l’I J: I )WR I Coatings & I Iulni(hlwat ion (M—WR1 —2() I I —6) CON’Ilj\( “1()I: 1 lydro ( ‘onstruclion (‘oinpany, Inc. P.O. N(iMI3ER: 91 I18)() VENDOR NI. JMIILR: 109420 CHAR( i NI JMBLR: 50363 15304.565080.6 DESCRIPTION In preparing change Or(lers show inorder as separate numbered paragraphs the foil ow i ii: I . Reason Acpt:caoon ‘or Payment PROJECT: DWRF Coatings & Humidification (M-WRF-20’Il-E) Page 1 of 2 OWNER: City of Fort Collins - Utilities CONTRACTOR: Hydro Construction Co., Inc. APPLICATION NUMBER: 4 FINAL 700 Wood Street 301 0. Lincoln Ave. APPLICATION DATE: 10/1/2011 Fort Collins, CO 80522 Fort Collins, CO 80524 PERIOD BEGINNING: 9/1/2011 PERIOD ENDING: 9/30/2011 ENGINEER: N/A P0 NUMBER: 9113890 CHANGE ORDERS: PAY APPLICATION: RETAINAGE: NUMBEF DATE AMOUNT Appl:cation is made for Payment as shown below in connection with the Contract. The present status of the account for this Contract to as foltows. Original Contract Amount S 198,962.00 Retainage to Date: S 9.94810 Net Change by Change Order 9gne8 etainage Previous S 9.94810 Reeised Current Contract Amount: $198,962.00 Chan in Retainage: S Total Work Completed and Stored to Date: ess evious Payrn st Amount due this Pay Application before rctainage/ S 26,214.91 Less Pefainage. 5 9,948.10 Net Change by Change Order S0.0D AMOUNT DUE THIS APPLICATION: S 16,266,81 Change Order ‘U 0 00’U CEF1FICATION. e undersigned CON7PAC”OR nerbties :hat a/ cbtigahor.s of CONTRACTCF wourred in connection wi/n , :v i.CRK rsve been sa1:sfed as required in paraaanh ‘4 3 of he General Ccr,bitionu c’ the Contract. a abovevo tD S pp at c is eqs uted : : of the acove Amount Due This Aoplicabcn is re:onmended : 7 °c:’-en D’i’rv a2ove AO’ou’t Due Tb’s ‘n / a:: has bete/ewed by the O’A’I1ER’S Pro/cot Manage’. Doe . By: °s.”e’: of he above Amosnf Due ‘ms Anol;catior is approeed by the OWNEF : ‘ By 11-01-241 Apphcation for Payment PROJECT: DWRF Coatings & Humidification (M-WRF-2011-6) Page 2 of 2 OWNER: City of Fort CoFns - Utihties 700 Wood Street Fort Collins, CO 80522 ENGINEER: CONTRACTOR: 1-lydro Construction Co., Inc. 301 E. Lincoln Ann. Fort Collins, CO 80524 APPLICATION NUMBER: 4 FINAL APPLICATION DATE: 10/01/11 PERIOD BEGINNING: 09/01/11 PERIOD ENDING: 09/30/11 SCHEDULE OF VALUES P0 NUMBER: 5113890 Item Job — Contract Summary Billed This Period Billed Previous Billed Total to Date Stored Total Billed Cost Billed Percent 9 Code 8 Description 5y UOM Unit Price Total Amount Amount y, Amount Qty. I Amount Materials & Stored to Date Remaining Complete ‘ Bond & csran:e 1 LS 53,084.00 5 3.084,00 100% 5 - 101% S 3,130.00 100% S 3,130.00 S - S 3.13000 S (46,00) 101% 2 General Conditions 1 LS 514.82400 S 14 824.00 1% S 86.81 69% S 10,301.84 31% S 10,388.65 S - S 10.38865 4,435.35 100% 3 Coalir.gs 1 LS 5119.718.00 S 119718.00 0% S - 111% 5 133219.49 74% S 133,219.49 5 - S 133219.49 S (13.501.49) 100% 4 i-iurr dAcalior 1 LS 536.79600 S 36,796.00 44% S 16.180,00 9 18,628.33 0% 5 34,808.33 5 - 5 34,808.33 S 1987.67 100% Contract Summary: Sub-Thtats i 5 174,422.00 S 16,266.81 S 165 279.66 S 181,548.47 S 181.546,47 5 (7,124.47) 100% : r.xe0 ree cnornes S 2454002 0%’ S - 100% S 24,540.00 55% 5 24.540,00 S 24,540.00 5 - 100% GRAND SUB-TOTALS: S 962.00 S 16.265,81 5 189.819,66 5 205,086.47 S 206,086.47 5 (7,124.47) 100% Pend’rg Issues: H H H H Pending issues Sub-Totals: S PAY APPLICATION TOTALS: 5 190,962.00 $ 16,266.81 S 189,819.66 $ 206,086.47 $ 206,086.47 br change. 2. l)escription of change. 3. Change in contract cost. 4. (Thangc in contract lime 1. Additional elTon required beyond the scope of the contract 2. Atmospheric conditions (humidity) beyond the contractors control required considerably more ebbont and sta 3. $7,124.47 4. No change in contract time. (Attach additional sheets as required) ORIGINAL CONTRACT COST $198,962.00 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $7,124.47 TOTAL % OF ORIGINAL CONTRACT, THIS CO: 3.46% TOTAL r/ OF ORIGINAL CONTRACT, ALL CO’S: ADJUSTED CONTRACT COST $206,086.47 (Assuming all chaiwe or(jrs v ) ACCEPTED . DATE: /// /ZMZ_ (Contictor, epiesentative) REVIEWED BY: DATE: (Project Manager) APPROVED BY: , DATE: - (Water Resources and Treatment Operations Manager) CC: City Clerk Purchasing NOTE: Signature of Contractor indicates Contractor Project File agreement herewithin, including any adjustment Storrnwater Finance Manager in contract sum or contract time.