Loading...
HomeMy WebLinkAboutCHANGE ORDER - PURCHASE ORDER - 9115226RECONCILIATION CHANGE ORDER NO. C-1 PROJECT TITLE: NORTH COLLEGE SANITARY SEWER - PHASE I CONTRACTOR: Connell Resources, Inc. /09y45 P.O. NUMBER: 9115226 CHARGE NUMBER: 5030473901.563040.6 DESCRIPTION: 1. Reason for change. 3. Change in contract cost. 2. Description of change. 4. Change in contract time Schedule of Values used Unit Pricing and project is being constructed using Time and Materials pricing, resulting in savings. 2. Primary savings from reduced by-pass pumping and service reconnections. 3. Decrease Contract Cost by <$32,964.35>. 4. No adjustment to Contract Times. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF ORIGINAL CONTRACT, THIS CO: TOTAL % OF ORIGINAL CONTRACT. ALL CO'S: ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: (Contractor's -17.6% -17.6% $186,875.00 $0.00 $0.00 ($32,964.35) $153,910.65 DATE: �1 REVIEWED BY: /`/DATE:O/'Oq-2DI2 T(Project Manager) —� APPROVED BY: %O/<����l�& �G 6.P� l I DATE: J c% — Z (Chief Engineer) APPROVED BY: r -1( DATE: 7' z (Water Engineering and Field Operations Manager) CC: Project file Purchasing NOTE: Signature of Contractor indicates Contractor agreement herewithin, including any adjustment in contract sum or contract time. I:Eng/pmmanuaVgeneral/forma/change order form NORTH COLLEGE SANITARY SEWER - TEST SECTION RECONCILIATION CHANGE ORDER #C-1 SUMMARY 12/19M 1 -----) SCHEDULE OF VALUES ACTUALLY INSTALLED ITEM NUMBER DESCRIPTION UOM QUANTITY UNIT COST COST UNIT COST TOTAL DIFFERENCE ITEM NUMBER 10 MobTvn6m (Mob. Su mftim, Temp Facates) LS 1 S17.M.00 517,200.00 SIO.814.27 S18,814.27 $1.614.27 10 20 Tm61c, Comt,ol - By COFC LS 1 $0.00 WAD 50.00 50.00 SOLD 20 30 QM9ty, Comm? d Testeg-By COFC LS 1 $0.00 $0.00 SO.OD $0.00 $0.00 30 40 Sorveylmg - EasameM LImOe 6 McMoles LS 1 51,720. W 51,720.00 5928.37 5928.37 ($791.63) 40 W SWMPd MaiMance is 1 56,970.00 51,970.00 W.00 W.m (54,970.00) W W By -Pass Pumping DY 2 58,060.00 $16.120.00 52,514.16 55.028.33 (511,091.67) 60 70 Tree Removal 7 Clearelg LS 1 53.920.00 53,920.00 W.W SO.W ($3.920.00) 70 W IV SDR M Main Una - Open Cut (STA 17+26 To 17.68 d STA 21+88 To 22s60) EA 114 $08.00 $10.032.00 573.99 58.4SIE7 (SI,597.33) BO 90 Laity Relocatim RdR SIOrm(ALLOWANCE) LS 1 S3.39D00 S3.380.00 W.W So 00 (S3.380.00) W 100 Prep d P" Stoat Rest Saclgn) EA 420 5203.20 SB5.344.00 5210.67 588.482.50 53.138. W 100 110 48' Stoblary Sewer Martda EA 2 52.850.00 55.700.00 51,579.87 $3,159.74 (52.54026) 110 In Romwe EustIg Mar+wles EA 1 SB73.00 5973.m $330.29 5330.28 ($542.72) 120 130 Roctw o l Saiimry Saver Sem ces FA 5 52,320b() 511,600.00 5746.22 $3,731.11 (57.868.89) 130 140 Check Pmperty Sewer Stiv (ALLOWANCE) EA 1 57.320.00 57,320.00 53,50SM 53,509.33 (53,810.67) 140 ISO Remove/Replace Cmsspan -N. Side Hemlock SF 108 514.00 SI,512.00 W,00 $0.00 (51,512.00) 1W 160 Remove Concrete Paving (to Be Tamp Patched W/ Asphalt) SF 200 55.45 51,090.00 Sam W.00 (91,Ow.00) ISO 170 Asphalt Pevig(ALLOWANCE) BY 230 553.30 $12.259.00 539.25 59,030.41 (53,228.59) 170 1W Mac Corciale Ralwork(ALLOWANCE) SF 1W SIO.70 51,605.00 SO.00 saw ($1,605.00) lea 1% Farce Removal d Repucemer4(ALLOWANCE) LS / 52.230.00 52.230.00 50.00 W.00 (42,230.00) 190 10 Geroral Office AcV iti .4 % 1 $5.657.96 55,657.96 55.657.96 10 10 FWW OMat Aetly - 4 % 1 $5.657.96 55.657.98 55,657.96 t0 10 Ewa-.75% 1 51,14574 51,145.74 51,14574 to TOTALS 5196,675.00 5153,910.55 (532,964.35)