Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutCHANGE ORDER - BID - 7125 WATERS WAY NEIGHBORHOOD PARK (7)v CHANGE ORDER NO.6
PROJECT TITLE:
Waters Way Neighborhood Park
CONTRACTOR:
Walsh Construction
PROJECT NUMBER:
97125
PURCHASE ORDER NO.:
8111366
DESCRIPTION: Change in work request
1. Reason for change: Utilize leftover historic stone from Faireport Dam
2. Description of Change: Field Order 812 - Stone flume headgate
3. Change in Contract Cost: $ 10,856.00
4. Change in Contract Time: 7 days
ORIGINAL CONTRACT COST
- $1,216,250.00
TOTAL APPROVED CHANGE ORDER
($23,500.00)
TOTAL PENDING CHANGE ORDER
$ 9,246.24
TOTAL THIS CHANGE ORDER
$10,856.00
TOTAL % OF ORIGINAL CONTRACT, THIS C.O.
0.89 %
TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S
-1.04 %
ADJUSTED CONTRACT COST
,2 2,852.24
(Assuming all change orders approved)
ACCEPTED BY:
DATE: Z1.1 r
Contractors Representative
ACCEPTED BY: /1/�+���
DATE:
Project Manager �—
REVIEWED BY: DATE:
Title:
APPROVED BY: DATE:
Title:
APPROVED BY: DATE:
Purchasing Agent over $30,000
a: Cily cla% A heed
Co "dor Engineer
Pmjed Pge Pur .I,
Field Order"12"
Initiation Date: 10/20/2011
Project: Water's Way Neighborhood Park
Owner: City of Fort Collins
To: Walsh Construction Inc.
Requested by: Matt Day
Authorized by: Matt Day, Project Manager
Please furnish change in ewntmct sum for the change in work described below. Do not order material or start any work until approval is
received. Every effort will be made to incorporate this change into the work without affecting the contract date.
Description of Proposed Changes- Proposal Request and/or Supplemental Information
Concrete Flume
Change from a poured in place concrete flume to stone masonry (Utilize the left over stone from the old headgate). Provide
a concrete footerand lip to protect the stone work from snow removal. Provide a matching sandstone cap for the wall.
Wakh Construction tnc. , agrees to change the work described above for the change in price shown below. I have attached
a breakdown which lists all costs of labor, materials, tares, overhead, profit, and all other changes and/or charges involved. Signature of
the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time.
The Contract Time will be mercaseJ ecreased) (unchanged) by Days.
No change in Contract Sum (initial if no change) G
ADD to the Contract Sum $ ' d t p sC.
DEDUCT from the Contract Sum $
This information shall be valid for thirty (30) calendar days from the date of signature below.
CONTRACTOR'S SIGNATURE:
Contractor shall retain one (p copy and return ORIGINAL to Owner
DATE:
APPROVED BY OWNER: /y DATE:
Accepted change in work request will be included in afutureformal change order. DO NOT bill for this change until aformal change
order has been executed by all parties. Acceptance it direction to proceed with the work described herein. Not valid unless signed by
the owner and the contractor.
���.:. � repomENoftJ►�m
JOB NAME:
JOB NUMBER:
ARCHITECT:
DESCRIPTION
CHANGE ORDER PROPOSAL
WATERS WAY DATE:
10111 WCPR NUMBER
CITY OF FORT COLLINS PROPOSALNUMBER:
.CITY UNIT U.P.L. LABOR U.P.M MATERIAL.._U.P.E
111=011
FO 12
COP014
EOUIPMENT. U.P.S.
SUB
TOTAL-
S
Is
E '
s
s
INSTALL STONE FLUME PER FO
1LS
$
3
E
S.
S
S
S
S
-MASON
88
HR
s 65.00
S 572000
S
I S
S w
$ 572000
-LABOR
36
HR
5 45.00
E 1620.00
3
-.
S
-'E
S 1620.00
-MISC. MATERIALS
1
LS
-
E
E 300A0
5 300.00.
E -
f
$ 300.00.
- SAND STONE CAP
1
LS
S SW.00
S 500.00
s T 00.00
S 1 800.00
E
$
S 2,300.00
-CREDIT CONCRETE MATERIAL
1
LS
$
S 500.00
s SO0A0
$
E
E S00.00
3
S
S
$
3
S
8
$
S
b
3
S
s
s
$
Is
a
a
1
$
E
s
E
s
S
$
s
s
s
s
s
Is
$
S
s
s
$
s
s
$
s
s
3
a
a
a
E
s
E
E
E
s
$
$
is
s
Is
3
b
is
S
S
S
S
Is
s
TOTALS
--S
7,84000
$ 1,600.00
3 -
$ .
$ 9,44000
WCI ON&P:
GRANDTOTAL:
15% $ 1,416.00
s 10,856.00
ADDITIONAL CONTRACT TIME: 7 DAYS
APPROVED BY:
WALSH CONSTRUCTION, INC.
APPROVED BY:
OTMRIARCHITECT