Loading...
HomeMy WebLinkAboutPrebid - BID - 7289 FOSSIL CREEK TRAIL AT STANTON CREEK (2)Fossil Creek Trail at Stanton Creek PRE -BID MEETING NOTES Wednesday, September 28, 2011 10:00 L INTRODUCTIONS/WELCOME II. ATTENDANCE SHEET III. BID OPENING IV. SCHEDULE 10:15 V. SUMMARY OF WORK VI. HIGHLIGHTS FROM GENERAL CONDITIONS AND GENERAL REQUIREMENTS VII. SITE PLANNING & COORDINATION VIIL TRAFFIC CONTROL AND WORK AREA SAFETY IX. HIGHLIGHTS FROM PLANS & TECHNICAL SPECS 10:30 GENERAL QUESTIONS 11:00 PROJECT SITE TOUR Fossil Creek Trail at Stanton Creek PRE -BID MEETING NOTES Wednesday, September 28, 2011 I. INTRODUCTIONS Craig Kisling, A.S.L.A. - Project Manager COFC, Park Planning (970) 221-6367 John Stephen, C.P.P.B. — Senior Buyer COFC, Purchasing (970) 221-6777 II. ATTENDANCE SHEET - Be sure to register. III. BID OPENING October 13, 2011— 3:00 P.M. (OUR CLOCK) at Purchasing Office 215 North Mason 2°d Floor, Fort Collins "Questions received less than seven (7) days prior to the date for opening of the Bids may not be answered" per section 00100. IV. SCHEDULE Notice of Award — approximately a week after opening Pre -Construction Meeting - Prior to issuing Notice to Proceed Colorado Stormwater Discharge Permit — Pulled Prior to Starting Construction Construction - As soon as possible after Notice to Proceed TIMELINE REQUIREMENTS — Completion Dates for the Project Substantial Completion — 90 Calendar days Final Acceptance —15 Calendar days (105 C. day's total) V. SUMMARY OF WORK The City of Fort Collins Fossil Creek Trail at Stanton Creek includes erosion control, minor earthwork, 2 new 30' pedestrian bridges, 1 new 55' pedestrian bridge, 1 new 60' pedestrian bridge, 10' wide colored concrete trail, 2' & 4' retaining walls, a 4' shadow box privacy fencing, 4 - 12" & 18" culvert pipes, hydro -seeding and hydro -mulching for any areas disturbed by construction and surveying. 0a Fossil Creek Trail at Stanton Creek PRE -BID MEETING NOTES Wednesday, September 28, 2011 VI. HIGHLIGHTS FROM GENERAL CONDITIONS AND GENERAL REQUIREMENTS Bidder's Qualifications — Note pre -qualification requirements for award of contract including, but not limited to section 1000, 1.04 Conditions of Work Superintendents - General Contractor is required to provide a designated full time superintendent on site at all times that Work is progressing. Weather Days —As defined in Section 01310 —Construction Schedules. Monthly Anticipated Calendar Days Lost to Adverse Weather Conditions. Liquidated Damages - As defined in the Agreement Section 00520. Warranty — City contract requires a two-year warranty period Construction Hours - 7:00 A.M. to 6:00 P.M., Monday through Friday, except legal Holidays. Weekend work and Night work may be allowed on a limited basis to construct improvements to take advantage of favorable weather conditions. Construction Surveying - Provided by the City of Fort Collins. See Spec 01340 Survey Data. Contractor will be responsible for the cost of misplaced or damaged survey monuments, pins or stakes provided by the City. Geotechnical and Materials Testing - Provided by Owner. See Spec 01450, 1.02 Project Meeting - Once a week, to be determined. Progress and Schedule Revisions - Schedules shall be updated weekly. 3 Fossil Creek Trail at Stanton Creek PRE -BID MEETING NOTES Wednesday, September 28, 2011 VII. SITE COORDINATION WITH OTHER CONTRACTORS - Section 00800 - Staging & Storing Equipment - Site and Adjacent Property Access (HOA) - City of Fort Collins, Utilities - Fort Collins Loveland Water District - Adjacent Property Owners VIII. TRAFFIC CONTROL AND WORK AREA SAFETY Traffic Control for the project will be paid for Lump Sum and will include all costs for all traffic control associated with the project. The Contractor shall provide, at Contractors expense, all work area safety control devices, such as barricades and safety fence around all excavations, trenches, and drop-offs. IX. HIGHLIGHTS FROM PLANS & TECHNICAL SPECS • Contractor is responsible for all permits required for this Work and the expected times required to obtain permits. Including but not limited to the following: State of Colorado Stormwater Discharge Permit. Usually 10 day turn around for permit. GENERAL QUESTIONS? M