Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 7082 ROOFING SERVICESWORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND RTN ROOFING, LLC. DATED: March 1, 2010 Work Order Number. 443256 Purchase Order Number: Project Title: Re -roof of Gateway Water Treatment Plant Commencement Date: 12/19/11 Completion Date: 1/31/11 Maximum Fee: (time and reimbursable direct costs): $16 378 00 Project Description: Provide re -roof of the slate roof at Gateway and the two smaller roof areas per the attached RTN Rooting proposals dated 12/9/11 1219111 & 12/12/11 Scope of Services: Provide all labor and materials Acceptance &! User Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and In the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (Including the attached forms) the Services Agreement shall control. The attached forms consisting offalte 6 pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. City of Fort Collins By: Date: CC: Purchasing Service PrJider By: Date: PROPOSAL Contact: Ethan I City of Fart Collins December 12, 2011 Address: 117 N. Masan, P.O. Box 580, Ft. Collins, CO 80522 This Proposal shag ernir, in se days Anoreseaufed. Phone: 970-221-6273 Fax:970-221.6S34 This contract is between the Owner or their duly authorized agent as cell: 970-222-0329 Phone 2: described at left, hereineRerrefamed toae'Owner; and RTNRoofing, LLC hereinafter refened to as'RTN.' Email: Ecozzens@fcgov.com Project Name/Description: Remove Slate Roofing and Replace with Shingles Approx. Size Information Address Location: I Ft. Collins WTP-5216 Poudre Canyon Road Belivue CO 80S12 30Squares Scone of Work 1. Remove existing slate roofs and replace with new Owens Corning Oakridge Dimensional shingles. (Color to be determined from the manufacturer's list of standard, regional colors. Must initial color option at the bottom of this proposal.) This proposal includes for both slate roofs. 2. Install standard Owens Coming starter shingles. 3. Install new 309 felt underlayment. 4. Install new drip edge metal at all eaves. S. The entire roof substrate of both slate roofs will be re -decked with new 1/2" 0511. (See Item #14 below 6. The slate roof will need to be removed. As much of it will be salvaged as possible, but no guarantee can be made. 7. New Ice and water shield will be installed at all perimeter edges Of the slate roofs. 8. The two existing 20' vents will be detached and reset as necessary. All stack flashings will be removed and replaced as necessary. 9. Ail roofing debris will be cleaned up daily. Every effort will be made to keep the site clean and presentable throughout the project. 10. Anticipated completion time is 3 days. 1L Due to the location of this structure, access is an Issue. This proposal Includes associated costs for the tear -off, disposal, and hand -loading of the roofs. 12. No permit or use tax is included in the price below. 13. Price includes all necessary labor, materials, licenses, deliveries, miscellaneous Rashings, sealants, and clean-up as may be required for a complete installation as described herein. All work will be performed in a courteous, professional, and workmanlike manner. 14. It Is possible that the existing substrate may continue to dry rot under the OSB. RTN is covering the existing substrate with 1/2" OSB and is not responsible for any deterioration caused by or to the existing substrate. 15. Shingle Manufacturer's Standard Warranty: LIFETIME 16. RTN Roofing, LLC Leak Proof Workmanship Warranty: 5 years We propose to furnish material and labor In accordance with above scope for the awn shown below. Prices valid for l0 days. Base Price Owens Corning Oakridge $ 12,548.00 Option 1 Weather6uard HIP, Class IV Impact -Rated Dimensional Shingles Add $ 630.00 Option 2 N/A Color To Be Determined Please initial acceptance of colaraption chosen at left. Payment Balance In full due Immediately upon completlon.— We do accept Vlsa / MasterCard Terms: Late Fees: 2% per month of unpaid balance ovary days plus all costs of collection. All work and material Is guaranteed to be as specified. An work to be completed Ina ceuneom, professlonal, workmanilke manner. owner to maintain, during the course of this work, standard hameownen hazard Inturanw. RTN Is not respons[Na for conditions that may exist that are rtat readgy dlscerNbte prior to the commencement of work. Any costs aupdated wish unknown circumstances shall bathe toponsihNiry of the homeowner. RTN shall not be responsible for concrete(asphalt cracking. RTN will keep in full force, during the course of this work the following Insurances: Liability Insurance[$2,000,000) and workers compensation (Statutory limits or greater). All warranties exclude consequential damages. Work Is limited to the scope of this proposal. ACCEPTANCE OF PROPOSAL that scanorw«a,hie,and AuMrd.vanr Wmnalicaaa.0 Iola ea,eln ace decors" rout an hereby acceged by oemr, voMermure,owner Mreay, auiaonre, UN to eemmen_ewarlavtlnVadfied, avow agora, chit pavmentswll be;;A .% mnh.P. aotTm etldadabme. awrvSlgna[ure RTN Signature Printed Name Date Printed WmeRde Quit, If you would like to accept our proposal, please sign and date above then fax, mail or deliver to our office. Thank you. 5854 Lockheed Avenue - Loveland, CO 80538 a Phone (970) 667-9100 a FAX (970) 593-1119 a www.RTNruafing.com le-z -EtEB oifI"N Experience and Performance you can 7'I?U.V?' 'NameloftOwncr ,or%Authorized Name: City of Ft Collins Alta: Ethan Cozzcns Address: Ito nox 580 Ft Collins, CO Phone: (970)222-0329 Fax: (970)221-6534 F;nmil: cauzcns(nllcuov.com SERVICE PROPOSAL December 9, 2011 This /bvpo.sal shallexpire in 30 rigrs i%not executed 'Phis Contract is between the Owner or their dulyauthoriied agent its described tit lull, hereinaller referred tons "Owner,- mul RTN Itoortng Syste ns, hercinaller referred to its "RTN." Project Name/Description: Roof Repairs Information Address/Location: I Water Treabnent Plant, 5216 Pottdre Canyon Rd, Bellvuc, CO SCOPE of WORK We propose to complete the following: • Upper small roof: Remove existing roofing material down to the (leek. • Install new OSB. • Fully adhere 45 mil EPDM over the OSB. • Terminate roofedges to tascia with termination bar. • The fascia may need to be replaced by others. It For your reference, we will provide before and aller pictures within 3 days of repair completion. • Price includes all labor and materials necessary for repairs. SI-AMCE GUARANTEE: ItTN guarantees that all work performed will be dune in it professional will workmanlike nutnter in strict compliance with accepted roofing practices. RTN promises w, use'good faith' in till ol'i(s prto[ices will assessments. Unless stated otherwise in [his proposal, the workmanship and peribrina ace ul'tny rool'repair is guartmuce(I fix it period ol'22_years Itom the date O'conq,lelecl service. In order to reduce the overall cost ol'service (o you, RTN will endeavor to perlorm tiny leak repair in mconscrvutive and progressive f lshion. Therelbre, there is no expressed or implied guarantee that each individual Icak rcpuir will be succesSItil in elintinuting such Icak, only that (Ire work will he perlixmcd in good faith tis (fescribecl above. '['his means that we will bugin any Icak repair with it lititited scope ol'work and expand that scope progressively il'the previous repairs tare dcenre(I to he insunicient. This approach will prevent the more costly comprehensive scope ol'work in the initial stages ofdte service. In no case will WIN per0,rnr and charge for service work that it dues not deem necessary. Our gutrrantcc u, you is that we will endeavor to provide superior maintenance and repair service with the utmost professionalism, honesty and integrity it[ it Iafr, reasonable and honest price. Any warranty claim is n.» it,•d u. correednt. auv liu,hv work that RTN ncrfonme(l. Guarantee snecifcally exclueles anv claini lixcunseyuential dwmages. Begin Duration Payment'rerms Contract Amount: ASAP I Day +/-IF 100% due d.poll completion $553.00 ACCEPTANCE OF PROPOSAL T,ho `ScopeYo/.Work,iRrice and;sUrlothrir relevant inlormatlon as set orthrlherelnt+are deemed saHsfactoryyand areEheraby accepted,by;atiOwner, !Furthermore Owner he ebyYauthor1ie— tRrN to.,comme`nce ywork4hereln+spec`ifled tOwner'agreesi hat' payments;wlll(bexrnade asyPecthe Payment,Terma specified'ebove tByrslgning,,below Own'erllurtharnricknow/edges:iece/p(;oI' r "EXH431t; ' ii,iibinding pert; ofith/s.agrsement{ Owner Signature Date 14"IN Sigimitim Date �rl'shI /Vle/mIl.l«uA '46(rtel j( .' Printed Name mid'I'ftla Primcd Name antlTitle 5854 Lockheed Avenue • Loveland, CO 80538 • Phone (970) 593-1 100 • FAX (970) 593-1 1 19 WWW.rhtroofing.cont i N EtA9 pooF► Experience and Performance you can TRUST NltmerofOwner-orAuthorizedAgent-.—' $ Name: City of Ft Collins Atln: Flh:m Cozens Address: PO Box 580 R Collins, CO Phone: (970)222-0329 Fax: (970)221.6534 Email: ccozzetsUTlegov.cum SERVICE PROPOSAL December 9, 2011 Tlt;.r l bnpusi(.chrrU r.rpirc in .ill dater Unit executed This Contract is between the Owner or their duly -authorized agent as described to let), ha'cinnller referred to as "Owncf;' and RTN Roofing Systems, hcrcivaller rel'crrcil to as " TN. - Project Name/Description: Roof Repairs Information Address/Location Watcr'[Ycauncnl Plant, 5216 Poudre Canyon Rd, 13cllvua CO SCOPE of WORK We propose to complete the following: • Lower roof Aller existing roof is torn o11•and re -decked by others, install rusS strip around walls. • Pally adhere 45 mil IiPDM over OSB onto runs strip and up walls at least S". • "Terminate EPDM to walls with termination bar. • Outer edges to be terminated to the fascia board with termination bar. • Fascia may need to be replaced by others. • For your reference, we will provide before and alter pictures within 3 clays of repair completion. • Price includes all labor and materials necessary for repairs. SERVICE GUARANTEE: R'rN guarantees Uun all work perli,rmcd will he clone in it prolessiunul and workmanlike manner in strict conyaliance with accepted roofing practices. RTN promises to use *good Ihith' in till ol'its practices and assessments. Unless stahal otherwise in this proposal, the workmanship and perlbrmance ol'auy ruul'repair is guaranteed liar a period u1'2 years from the late of completcd service. In order to reduce the overall cost ol'service to you, RTN will endeavor to perlimn any leak repair io it conservative and prtgraaive fashion. Therelbre, there is no expressed or implied guarantee that each individual leak repair will be succeasl'ul io eliminating such Icak, only that the work will be perlbrioctl in good fault as described above. This means that we will begin any Icak repair with a limited scope ul'work and expand that scope progressively if tluo previous repairs arc deemed to he iostaucient.'mis approach will prevent the more costly comprehensive scope of work io the initial singes of the service. In no case will RTN perlbrin and charge for service work that it does not deem necessary. Our guarantee to you is that we will endeavor to provide superior nutiotemutcu and repair service with the uunost prulessiututlism, honesty nod integrity at it litir, reasonable and honest price. Any warranty claim is 1;... a,.,t 1n.•nrr,vI;.... nn� lindty wnrk thnt UTN nerfixnuvl. C:uaranice snecifically excludes anv claim lift consequuni;d daotagea. Begin Duration Payment Terrns Contract Amount: ASAP 2 Days +/- 100% due upon completion F $29647.00 ACCEPTANCE OF PROPOSAL ;The ScopeFof Woik "Price, aril;•nl! oth3r,ie/evantilnforrnot/on as set forth}heraln are(daemod-satlsfactoytand ace hereby acgepted rbg' Ownei: F,urtliermore, 'Owner'hereby,'jauthtirizeS•TRTN,t`o, commence tworkrhereln'spec!%Ied.,,OwrieN,ag/eeg that payments wllhbermede`;as.per.theJP,,ayment Terms,:spddlfiodiabove"'By,'slgn'1 g.r6elow`Owner further:acknow/edges.recelpt of "EXHIB/T-A" ,as(afbindlogipart ofdhls,agreement:.' 12 I Owner Signature Dale n Ilf'IN Signatum (� littlelittleYiSfi0 Mli��l/ �'tf N�G(illtt l(I 14(V. ILA <r Printed Name and Tide IF minted Naa,c and "rime 5354 Lockheed Avenue Y Loveland, CO 30533 o Phone (970) 593-1 100 o FAX (970) 593-1 1 19 www.rtu rooriillg.corn