HomeMy WebLinkAboutCHANGE ORDER - BID - 7136 LINCOLN CENTER ADDITION AND RENOVATIONSCity of
�,.Fo_rt ollins
Operation
Services
Change Order Form
OPERATION SERVICES
Project Management, Planning & Design
300 LaPorte Avenue
P.O. Box 580
Fort Collins. CO 80522-0580
970.221.6610
970,221.6534 - fax
PROJECT TITLE: Lincoln Center Additions and Renovations
PROJECT NUMBER: Bid #7136
CONTRACTOR: Bryan Construction Company q10 3 SssiL--
CHANGE ORDER NUMBER: 9
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change 2. Description of change
3. Change in contract cost 4. Change in contract time.
1&2 See attached sheet for detail.
Changes compensation from fixed fee to time and direct cost basis with a not to exceed.
3 The contract cost will not be effected.
4 There will be no change in contract time
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
$5,514,309.00
$738,599.00
c------------$0100 $74,745.00
1.36%
14.75%
$6,327,653.00
ACCEPTED BY: &A, �/L�— DATE: fi Itj I(
�(Co�mpany Narpe & P(�erson's Name)
APPROVED BY: j(pJ(LiI z LE DATE:
City of Ft. Collins)
APPROVED BY: DATE:
(Purchasing Agent over $60,000)
cc: Contractor
Purchasing
Project File
.rsy .x4 .t & 4 U
NORTHERN COLORADO GROUP
Change Order
Project:
10-024 Lincoln Center Addition 8 Reno
417 West Magnolia
Fort Collins. CO 80521
To Contractor:
Bryan Construction, Inc.
161 E. Saturn Drive, Unit 2
Fort Collins. CO 80525
The Contract Is changed as follows:
CO #9 - Additional Items
18 COR NIS -CO#9 Items
The original Contract Amount was
Net change by previously authorized Change Orders
The Contract Amount prior to this Change Order was
The Contract will be increased by this Change Order in the amount of
The new Contract Amount including this Change Order will be
The Contract Time will be unchanged.
The date of Substantial Completion as of the date of this Change Order therefore is
NOT VALID UNTIL SIGNED By THE ARCHITECT, CONTRACT AND OWNER
Bryan Construction, Inc.
ARCHITECT CONTRACTOR
161 E. Saturn Drive, Unit 2
Fort Collins, CO 80525
Change Order: 9
Oate: 11118/2011
Architect's Project:
OWNER
(Signature) (Signature) ftt4naa re)
Date
161 E. Saturn Cnve. Una 2
Fan Collins. CO a0525
Phone: (9701317,0937
S74,745.57
$5,514,309.00
$1,333.597.64
S6.847,906.64
S74,745.57
56,922,652.21
®' 'Pr�a kh �'�' 8� ����. i•3KA
NORTHERN COLORADO GROUP
To: Steve Seefeld
City of Fort Collins
300 LaPorte Avenue
East Building
Fort Collins, CO 80522-0580
Ph: 970-221-6227 Fax:(970) 221-6534
Description: COR #18 - CO # 9Items
Change Request
Number: 18
Date: 11/1111
Job: 10.024 Lincoln Center Addition 8 Reno
Phone:
tat E. Satum Cnve, Unit 2
Fort Collins. CO a0525
Phone: (970)377.0937
We are pleased to offer the following specifca(tons and pricing to make the following changes:
1. Item #105 - Per ASI #21, Landscaping Changes - Additional Concrete Pad for Bike Racks
S3,655.00
2. Item #114 - Per RFI #186, Add door in Canyon West Room on South wall at Storage Closet. Paint Door to match wall and rubber
base.
S730.00
3. Item #120 - Per Owner Request, Install Owner provided bar equipment
S8,344.00
4. Item #123 - Per Owner Request, Credit for deleting new handrails at followspot platform stairs
(-5100.00)
5. Item #124 - Per Owner Request, Install Breakmetal around pipes in area A at Grand Stairs and Storefront: and at Elevator.
S1,596.00
6. Item 7t 125 - Per Owner Request. Paint Curved Stage Walls in Mini Theater with special Black paint (not shown on drawings to
receive paint)
$639.00
7. Item #126 - Per Owner Request, Change soffit paint colors in area A after painted per drawings
S852.00
8. Item # 127 - Per Owner Request, Paint East Wall under Acoustical Fabnc where fabric is incomplete
S548.00
9- Item #128 -Per Owner Request, Fire Suppression - move sprinkler line in Shell Storage
S680.00
10. Item # 129 -Per Owner Request, Fire Suppression -move sprinkler line at Performance Hall Follow Spot
S710.00
11. Item 0130 - Per RFis #68, 180 and Field Issues. Install gas regulator and shut-off valve at meter
$7,859.00
12. Item #131 -Per PFA Request, Relocate Existing Inspector Test Valve
S1.108.00
13. Item #132. Per Owner Request. Re-route cable bench (Additional LF) in Perf Hall from ASI #12
S757.00
14. Item 0133 -Per Owner Request. provide Wood Base Trim in Canyon `Nest Room
S600.00
Page 1 of 5
161 E. Saturn Dme. Unit 2
Fon Collins. CO 80525
Pr=e.(970)377-0937
NORTHERN COLORADO GROUP
$2.077.00
16. Item #135 - Per Owner Request, add closure piece at North Stair Spandrel
S506.00
17. Item # 135b - Scaffolding Overage
$35.193.00
18. Item #136 - Per Owner Request, Change out Stone top to Cherry Wood Top at MiniTheater Bar gate
S275.00
19. Item #137 - Per Owner Request, cut down drawer at MiniTheater Bar due to equipment conflict
So
20. Item #138 -Per Owner Request. Add 2 cobble landscaping swales at Sand E sides of building
S558.00
21. Item #139 - Per PFA Request, Add Smoke Detector at 2nd Floor Lobby, Relocate HomlSlrobe to new FOC location, and addtl
speaker strobes in Canyon West.
S2,431.00
22. Item 0140 - Per Owner Request, Add switches for lobby lights in vomilonum
S663.00
23. Item If141 - Per City of FC Request, Overexcavate curb at handicap ramp on bleldrum, per Wayne Leonard
51,113.00
24. Item #142 - Cost for LC in-house rigging repair from grout damage 3125r11 during Performance Hall Fixes
(-S5.986.00)
25. Item #143 - Per RFI 918, Demo and pour radius curb on SW parking lot for trucks
S2,849.00
26. Item #144 - Per existing field conditions, Ramp Canyon West Room Floor to try and level prior to flooring installation
S2,088.00
27. Item #145 - Per existing field conditions, Additional drywall - rips to cover existing brick at shell storage, chase at Ticketing
storefront to hide plumbing (RFI #84). Bulkhead at roof access, etc.
S1,422.00
28. Item 9146 - Per existing field conditions. Stone and sack existing concrete columns in lobby
S1,438.00
29. Item 9147 -Per Owner Request. Relocate louver for EF-2 at 12' in Performance Hall
$1,158.00
30. Item #148 - Per Owner Request. Credit for deleting new fence around water feature: paint existing
(-S800.00)
31. Item 0149 - Per Owner Request, Demo and Replace concrete at Plaza
So
32. Item 9150 - Added exterior low water cut -of and temp control bailer alarms per state inspector requirements
S1,784.00
Total: $74.745.00
The total amount to provide this work is
S74,745.57
Page 2 of 5
e R
p r� ly' tot E. Saturn Cnva. Unit 2
� , 7 t Foncono:,co aoszs
CONSTRUCTION INC. Phone; (910"77-e9"
NORTHERN COLORADO GROUP
The schedule is not affected by this change.
If you have any questions. please conlact me at.
Submitted by:
Cc
Approved by:
Date:
Page 3 of 5
NORTHERN COLORADO GROUP
Description: CDR #18 - CO It 9 Items
Description
Item 0105 - ASI #21, Landsc. Changes
& Addri Pad for Bike Racks
Item #114 - RFI #186, Door in Canyon
Nlest
Item #120 - Install Owner bar
equipment
Item #123 - Delete handrails at
followspot stair
Item 9124 - Breakmetal around pipes
in area A
Item 9125 - Paint Curved Stage Walls
in MT
Item #126 - Change soffit paint colors
in area A
Item At 127 - Paint E Wall under
Acousl. Fabric
Item 0128 - Move Shell Storage
sprinkler line
Item # 129 - Move PH Fallow Spot
sprinkler line
Item #130 - Gas regulator & meter
shut-off valve
Item 9131 -Relocate Existing PFA
Test valve
Item 0132 - Reroute ASI12 cable
trench in PH
Item #133 - Wood Base Trim in CW
Room
Item #134 - Adjust existing woad doors
Item #135 - Add closure at N Stair
Spandrel
Item #135b - Scaffolding Overage
Item 0136 - Swap Slane top to Cherry
at MT Bar
Item 0137 - Cut down drawer at MT
Bar
Item 0138 - Add 2 cobble swales on S
and E
Item #139 - Smoke Det, Hom/Sl, and
speaker
Item #140 - switches for lights in
vomitonum
Item #141 - Overex Curb at Meldmm
he ramp
Item #142 - LC rigging repair from
grout
Item # 143 - RFI 018, radius Cum on
SW side
Item 0144 - Ramp CW Room Floor
Change Request 18 Price Breakdown
Continuation Sheet
Labor Materlal Equipment
161 E. Saturn Drive, Unit 2
Fort Collins. Co 80525
Phone: (970)377-0937
Subcontract
Other Price
S3.432.00
S3.432.00
S685.00
$685.00
$7,834.80
$7,834.80
S-100.00
S-100.00
$1.498.63
S1,498.63
$600.00
$600.00
S800.00
$800.00
S515.00
$515.00
S638.08
S638.08
S666.41
S666.41
57,379.00
S7,379.00
S1,040.14
$1.040.14
$71 L00
$711.00
$563.78
$563.78
S1,950.00
S1.950.00
5475.00
S475.00
S33,045.42
S33,045.42
$258.22
S258.22
$524.00
S524.00
S2.282.70
S2.282.70
$622.18
5622.18
S1,045.00
SI.045.00
S-5,986.00
S-5.986.00
S2.675.00
S2,675.00
$1,961.00
51,961.00
Page 4 of 5
r 1R!%MwAs
tar E. Saturn Drive. Unit 2
® 'I N Y7 Fon Collins. CO 80525
CONSTRUCTION INC. PM1OOe `970'J17.09J1
NORTHERN COLORADO GROUP
Change Request 18 Price Breakdown
Continuation Sheet
Description: COR #18 - CO # 9 Items
Description
Labor Material Equipment Subcontract
Other Price
Item 0146 - Slone & Sack lobby cone
S1.350.00
S1,350.00
columns
Item #147 - Relocate louver for EF-2 to
S 1,087.00
SI.087.00
12'
Item #148 - Delete new fence at water
S-800.00
S-800.00
feature
Item #150-Ext low water cul-off and
S1.675.00
S1,675.00
temp control boiler alarms per slate
inspector requirements
Subtotal:
369.763.36
Bond
$76.649.36
1.00%
S766.49
Insurance
$76.649.36
0,50%
S383.25
BCI O&P
S76.649.36
5.00%
S3,832.47
Total:
$74,745.57
Page 5 of 5
II%
Lincoln Center Additions & Renovatia"M
�a
own.rcon CONSTRUCTIONN INC. lnc.
As o[62620n voaw,wr c,.,ua,c.,u.
Base contact $5.514.309
Oe—I Can
CM1angaOrderpl (PaNal) 5460." P.dcoaauad-S. -,at Nd--lua
Ordai, it. (PaNtl)
Lh'engeONaG/2tTP1a1 _;�: ., N,2.. a'Tnw<wgaa
Change Order 53 read SI@,7" CW Fee 4uwn>ian eM ant. AS. gF1a Y4
Chen,. Ord., M Total SM.123 F.P. in MNau WOgon a; w_c. Pffaa O.'iiargph
change Order SSTobI S139.M5 PFl, seaerLw.ASl no, atlmc), Part wuStaedd
/n.',.J,CIian9a Order, 118.T,ta1{ � r,,.�, Av 5121;56]ti?. ,a ,a(Aianikai WOAln Pafmrns" w. � - .. ..I rvw d
•ii-�lGhanpa Older (/:Total „}'- +Nv'S41 Jt6y „a�'frSl.aanMaa.Av- la;ulr m opFl ieuaferi
Ordar/81Total „ ;;yd�_a°l+ $IfW 12f�..';�yyg,,,,$R i�'1, .vi�ai xz zx wl tt:1n1 7x ex ep. vevm.�.
uf,(,1v,,,,Chan9e
pi�LCheipa Ober WlTotalNow
ReriUed Contract S9,9C7,907
It.. a
66nnt.
Deemip[Ion of Il.m
Coal
Approved
Comments
APPROVED ITEMS
OPEN ITEMS
1050
ASlrnl
L.Msm' Cha m-AddiaamlC Akv Pad for BAa Pa .
S3.655
I
1140
RFI at.
AM hq in C.., Went Rmn m$dYM1—..I Shay, Cmet
Paint Dow ad—.h wall ant rvbbiabw.
$]�
..
12p.
MmrRpN
Install Conn .v4M bar
ti. J
{
IMINOuWF
$'.ell-Daela :L In.an Lltaa.
i
123.0
O.rmrP 'Y
CAM in, dMen ,x narWna..1 ininaa1 e.—tans
s1W
".'a Per Saw i.... n-s,
t/
1240
C,v_nan.
Intl, Bruin... —MI ppm in a, -A al Grant St. -ant
anralmnl; ant at Elwatr.
$1,5%
125.0
M^arR".
Pxd Cuwa]$1 ,Walla I nAn, noalw with. ial Mack'Ant
639
126.0
OwmrnpM
Ch. nd.»Ibl ml Cobn In and A a ha mattM per dnavion,ii
$852
1270
D narR 'Y
Paint EA at Well uMa Awwanal Fab& Nhre fa land is inm ale
R
128.0
Ov,—Rpa
n,a Su ".M. lit» in shell Sbr a
6R0
129.0
O—Ran, it
Ford Su 'nWm line in Part Hall FdbwSpot
710
IJ0.0
F a^
Install 9M tMWab and shdoll calve al meter
S7,859
•�
1J10-
PFA Renard
Reltt Ie E.0 bu a Tml Vahe at PFAR neat
sl IN
1J2()
Dann RqV
R, WCada bFvan AM,annel L-Ft in PMF Hall fRT A51012
]5]
nanwadO G.ru 1,o, l
1 0
6—rR -
Imlae Wmd Onot Trim in Canton Wert R^am
Epp
1340
Darr R,.
AM.t.vinta m exulart, dma
52077
1J5()
owmq n
Add dean at Novi S., nd'at
5506
IUD
s-H.W Duw a
35193
IJ6.0
0.r«R ',
Chants. —t Stan. Id, bC inliax! To, a1 JAa r tav Bw said
$275
137.0
O,wRa,ia
Cut dwn drm, at ANnhealw Bad due in, wMadant mMd,n
TBD
1Mr0
Oam,Rac'Y
Add 2-.lad— rvnlm at S.. E.-.1 Cul53
weed $u.e..mid dlt
IN.0
PFAR ywN.FCC
Add Smite pW.lnr at 2M i LoEby, Rea,ale H aobeb
Lvand. Md Mcin ]pe04Y 5.. in CadvM WYL
$2,4j1
Aepowd ny SUN SaaIe1]9Y11
1400
Oamineag
Add Aw for bbby lgM Nvmubvm
$66J
5dW$0EN.
1410
Cay Rant
(A —and N,b al nand—, nmo m hlydwn. Pw W.,
Lannind
$1113
142.0
F,b 1.
C , ad, LC-housemine Ad- fmn raid damye Y2W,I
dun, Pat.. Had Fuse
(35,9B6)
1430
Rfl ale
Onm ant.[ nianaa cwn on 55v pa., It brnucaa
52,849
144.0
FatlUu
Ramp CMWn Want PmnFI%, b ay and lnval
$2.069
145.0
FAb I—
'-"'" nInWaPa
arY.
d. evlm,.Nramynralm4my"cav Yw arcaeo
,ea4 Ua+�l.a.
$1422
146.0
F..I—
Sboe nM hack eai." aN .mlumna in fibby
$I.4W
147.0
Oh —RN.
RJacne buvw for i at 17 in Parlortw,xa Hall
$L159
un!ry wln.a on ra.
14e0
MmrgpY
Cn alfm dNeuy naxfs mum NaU, dame. paint eaisay
(SM)
_
1490
wmrRya
Oamo and Radace mmade at Rea
$5.m
d
I500
mapMe, Ran
Added b Inww.lac Ian Mdtampmnbd bnda,alamUpw
- $1.7M
%
s
Open [lams T.Id
M3,614
Approved Items Total:
($3,135)
Conaactx
r —
TOM clanks. Prgec11.1anag.r Steve Seefeld, Prgecl Manager
CNdro-tCmns
ALkt.
kJAI'
ILAV
Ii-RA
011m,
u•K