HomeMy WebLinkAboutCHANGE ORDER - BID - 7204 VETERANS PLAZA AT SPRING CANYON COMMUNITY PARKCHANGE ORDER NO. 97 PROJECTTITLE: Veterans Plaza CONTRACTOR: Landtech PROJECT NUMBER: 7204 PURCHASE ORDER NO.: DESCRIPTION: Add a new flag pole, add a stone cap to statue base & sawcut 1. Reason for change: donated flagpole retrofit costs would be as much If not more than the purchase of a new pole, the bronze footer of the statue does not cover the entire mounting pedestal so addining a stone cap to cover exposed concrete, sawcut existing stage to add seat wall that houses band electrical outlets. 2. Description of Change: donated flagpole retrofit costs would be as much If not more then the purchase of a new pole, the bronze tooter of the statue does not cover the entire mounting pedestal so addining a stone cap to cover exposed concrete, sawcut existing stage to add seat wall that houses band electrical outlets. 3. Change In Contract Cost $4,919.00 4. Change In Contract Tline: 0 days TOTAL APPROVED CHANGE ORDER DoD,GOu.VD TOTAL PENDING CHANGE ORDER $0.00 TOTAL THIS CHANGE ORDER $4,919.00 TOTAL % ORIGINAL CONTRACT, THIS C.O. 2,50% TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S 47.30% ADJUSTED CONTRACT COST 290,264.95 (Assuming all change orders approved) Larry D.Overlay Pre4ldentlCEO DATE: Ad✓?�// ACCEPTED e ,MC , Contractors Representative ACCEPTED BY: DATE: /` ` Project Manager REVIEWED BY: Title: APPROVED BY: Title: APPROVED BY: Purchasing Agent over $30,000 x City Clerk Architect Convector Engineer PmJect File Purchasing DATE: DATE: DATE: City of Fort Collins 215 N. Mason Street Fort Collins, CO 80522 Phone Number: 97G-416-2260 Fax Number. 970-221-6586 Project: Vetrans Plaza at SCCP Attention: Kathleen Benedict Job Number: 1 3056 Date: l8eptember 30. 2011 ® TECH ContractoArs. /174C. DENVER HEADQUARTERS 525 N. Laredo SL Aurora, CO 80011 FM 0 (303) 344-1618 E90ma5n9/Comtructlan Fax 0 (303) 344-4669 Phone 0 (303) 344.4465 Change Order Request COR# From Title Status 16 Kevin Brin le Pro eel Mager PENDING Request Authorization for the following changes to this contract: 3- Description QTY. Unit Unit Price Total Install W thick Colorado Buff Sandstone Cap for the base of the statue per site visit on 9/27/11 1 LS material $174.00 labor $1,392.00 $1.566.00 Saw cut and remove existing concrete sta e 1 LS labor to remove $400.00 labor to haul away and dis se $293.00 total $693.00 .lnstalh45' Fla ole 1 LS $2.660.00 !l 6- Change Order Total I 54.919.UUI Qualifications No work will start until a faxed, emailed or signed confirmation is received. This Change order will result in an extension of the completion date by_0_days Install manufactured veneer on concrete statue base. Veneer Is installed on wire mesh with mortar. Thank you, Kevin Bringle Project Manager City of Fort Collins 215 N. Mason Street Fort Collins, CO 80522 Phone Number: 970-416-2260 Fax Number. 970-221-6586 Project: Vetrans Plaza at SCCP Attention: Kathleen Benedict Job Number. 1 3056 Date: ISeptember 30 2011 ® TASCH Contractors. /rnc. _M&jWAG r11,Y4TACOeqeb— DENVER HEADQUARTERS 525 N. Laredo St. Aurora, CO 80011 Fax 8 (303) 344.1618 EallmalingiConatruclion Fax S (303) 344-4669 Phone A (303) 344d465 Change Order Request COR# From Title Status 1 16 Kevin Brin le Project Mana er PENDING Request Authorization for the following changes to this contract: Description QTY. Unit Unit Price jTotal Install 6" thick Colorado Buff Sandstone Cap for the base of the statue per site visit on 9/27/11 1 I-S material $174.00 labor $1,392.0D $1,566.05 Saw cut and remove existing concrete stage 1 I-S labor to remove $400.00 labor to haul away and dis ose $293.00 total $693.00 Change Order Total 1 $2,259.001 Qualifications No work will start until a faxed, emaiied or signed confirmation is received. This Change order will result in an extension of the completion date by _0_days Install manufactured veneer on concrete statue base. Veneer is Installed on wire mesh with mortar. Thank .you, "� e7 Kevin Bringle Project Manager \k aen[lagpole Insigne. American Flagpole & Flag Co. 3546 bake Elmo Ave. N 3 Lake Elmo, MN 55042 Phone (651) 777-0172 www.afiag.com Fax (6511777-1925 Name J Address Lmdtecb Contractor% Inc 525 North Laredo Street Aurora, CO 80011 Ship To Estimate Date Fatimats# 10J26R011 1 6375 P.O. No. Terms Jayne Prepald Oty Description Cost Total 1 25 Ft Concord Sentry internal hslyerd, ground set, cone -tapered, aluminum Ilespole. Includes pole, corrugated steel foundation sleeve, Internal halyard System, locking aeae door, rope. sash collar,hall same size as bun diameter, comter-welght, retalner ring, revolving track asac ably and two bate snap hooka. Sim: 25' x 5" z 125" I Shipping and Handling - dscounted Subtotal American Flagpole 8, Flag Co. ti Date Customer Signature Date Sales Tax (0.0%) 50.00