HomeMy WebLinkAboutCHANGE ORDER - RFP - 7089 WATER WW AND SW UTILITIES INFRASTRUCTURE DESIGN AND CONSTRUCTION SERVICESRECONCILIATION CHANGE ORDER NO. C-1 PROJECT TITLE: CIPO WO #14 — Pre -Purchase Precast Concrete Pipe CONTRACTOR :�Garney-Construction Co. P.O. NUMBER: 9106688 CHARGE NUMBER:`5040452244.529290.6 DESCRIPTION: 1. Schedule of Values used Unit Pricing and project was constructed using Time and Materials pricing, resulting in savings. 2. Cost savings from difference between unit pricing for 24", 78" and 84" RCP and actual cost of fabricating pipe, bends and specials. 3. Decrease Contract Cost by <$1075.19>. 4. No change in Contract Times. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF ORIGINAL CONTRACT, THIS CO: TOTAL % OF ORIGINAL CONTRACT, ALL CO'S: ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: i y� ( ntractor ep esentative) REVIEWED BY: (Project Manager) 9 APPROVED BY: (Chief Engi neer) APPROVED BY: $597,641.00 $0.00 $0.00 -$1,075.19 -0.2% -0.2% (Water Engineering and Field Operations Manager) CC: Finance Purchasing Contractor Project File $596,565.81 DATE: 3 DATE: 1 DATE: DATE: /ZAZ 1 NOTE: Signature of Contractor indicates agreement herewithin, including any adjustmer in contract sum or contract time., I:Eng/pmmanual/general/forms/change order form PROJECT: CIPO WO #14 - PRE -PURCHASE PRECAST CONCRETE PIPE RECONCILIATION CHANGE ORDER #C-1 SUMMARY 10/24/2011 Carney . CONSTRUC'RON SCHEDULE OF VALUES ITEM NUMBER DESCRIPTION QUANTITY UOM UNIT COST COST ACTUALLY INSTALLED TOTAL DIFFERENCE ITEM NUMBER 1 84" RCP 1,260 R $242.00 $304,920.00 $290,076.97 ($14,843.03) 1 2 96"x 84" RCP Transition 1 ea $3.730.00 $3,730.00 $4,965.15 $1,235.15 2 3 84" RCP x 48" Manhole A9 1 ea $2,160.00 $2,160.00 S4,070.23 $1,910.23 3 4 84" x 24" Blockout Al2 1 ea $54.00 $54.00 $0.00 ($54.00) 4 5 84" x 30" Blockout A13 1 ea $54.00 $54.00 $1,978.94 $1.924.94 5 6 84" RCP x 48" Manhole A10 1 ea $2,160.00 $2,160.00 $4,070.23 $1.910.23 6 7 84" RCP Bend A8 & A9 2 ea $2,270.00 $4,540.00 $8,694.22 $4,154.22 7 8 84" x 36" RCP Tee At 1 ea $810.00 $810.00 $2,729.66 $1,919.66, 8 9 84" x 48" RCP Wye At & At 2 ea $1,190.00 $2,380.00 $6,216.81 $3,836.81 9 10 78" RCP 619 If $209.00 $129,371.00 $123,715.37 ($5,655.63) 10 11 84" x 78" Transition 1 ea $2,270.00 $2,270.00 $4,099.24 $1,829.24 11 12 78" RCP Bend At 1, Al2 & A13 3 ea $2,270.00 S6,810.00 $11,786.92 S4,976.92 12 13 9' x 4' RCB 252 LF $424.00 $106,848.00 $102,091.11 (S4,756.89) 13 14 9' x 4' x 78" Transition 2 ea $2,429.00 S4,858.00 $9,857.15 S4,999.15 14 15 48" RCP 56 If $75.00 S4,200.00 $2,657.43 ($1,542.57) 15 16 48" RCP Bend A16 & A17 2 ea $1,190.00 $2,380.00 S3,422.27 $1,042.27 16 17 36" RCP 72 H $47.00 $3,384.00 $2,638.56 ($745.44) 17 18 36" RCP Bend A15 1 ea $520,00 $520.00 $844.60 $324.60 18 19 30" RCP 256 If $33.00 S8,448.00 $10,771.02 $2,323.02 19 20 30" RCP Bend At 1 ea $520.00 $520.00 $1,879.93 $1,359.93 20 21 24" RCP 344 It $21.00 $7,224.00 $0.00 ($7,224.00) 21 TOTALS $597,641.00 $596,565.81 ($1,075.19)