PROJECT TITLE: CIPO WO #14 — Pre -Purchase Precast Concrete Pipe
CONTRACTOR :�Garney-Construction Co.
P.O. NUMBER: 9106688
CHARGE NUMBER:`5040452244.529290.6
DESCRIPTION:
1. Schedule of Values used Unit Pricing and project was constructed using Time and Materials
pricing, resulting in savings.
2. Cost savings from difference between unit pricing for 24", 78" and 84" RCP and actual cost of
fabricating pipe, bends and specials.
3. Decrease Contract Cost by <$1075.19>.
4. No change in Contract Times.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF ORIGINAL CONTRACT, THIS CO:
TOTAL % OF ORIGINAL CONTRACT, ALL CO'S:
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED BY: i
y� ( ntractor ep esentative)
REVIEWED BY:
(Project Manager)
9
APPROVED BY:
(Chief Engi
neer)
APPROVED BY:
$597,641.00
$0.00
$0.00
-$1,075.19
-0.2%
-0.2%
(Water Engineering and Field Operations Manager)
CC: Finance Purchasing
Contractor Project File
$596,565.81
DATE: 3
DATE: 1
DATE:
DATE: /ZAZ 1
NOTE: Signature of Contractor indicates
agreement herewithin, including any adjustmer
in contract sum or contract time.,
I:Eng/pmmanual/general/forms/change order form
PROJECT: CIPO WO #14 - PRE -PURCHASE PRECAST CONCRETE PIPE
RECONCILIATION CHANGE ORDER #C-1 SUMMARY
10/24/2011
Carney .
CONSTRUC'RON
SCHEDULE OF VALUES
ITEM NUMBER DESCRIPTION QUANTITY UOM UNIT COST COST
ACTUALLY INSTALLED
TOTAL DIFFERENCE ITEM NUMBER
1
84" RCP
1,260
R
$242.00
$304,920.00
$290,076.97
($14,843.03)
1
2
96"x 84" RCP Transition
1
ea
$3.730.00
$3,730.00
$4,965.15
$1,235.15
2
3
84" RCP x 48" Manhole A9
1
ea
$2,160.00
$2,160.00
S4,070.23
$1,910.23
3
4
84" x 24" Blockout Al2
1
ea
$54.00
$54.00
$0.00
($54.00)
4
5
84" x 30" Blockout A13
1
ea
$54.00
$54.00
$1,978.94
$1.924.94
5
6
84" RCP x 48" Manhole A10
1
ea
$2,160.00
$2,160.00
$4,070.23
$1.910.23
6
7
84" RCP Bend A8 & A9
2
ea
$2,270.00
$4,540.00
$8,694.22
$4,154.22
7
8
84" x 36" RCP Tee At
1
ea
$810.00
$810.00
$2,729.66
$1,919.66,
8
9
84" x 48" RCP Wye At & At
2
ea
$1,190.00
$2,380.00
$6,216.81
$3,836.81
9
10
78" RCP
619
If
$209.00
$129,371.00
$123,715.37
($5,655.63)
10
11
84" x 78" Transition
1
ea
$2,270.00
$2,270.00
$4,099.24
$1,829.24
11
12
78" RCP Bend At 1, Al2 & A13
3
ea
$2,270.00
S6,810.00
$11,786.92
S4,976.92
12
13
9' x 4' RCB
252
LF
$424.00
$106,848.00
$102,091.11
(S4,756.89)
13
14
9' x 4' x 78" Transition
2
ea
$2,429.00
S4,858.00
$9,857.15
S4,999.15
14
15
48" RCP
56
If
$75.00
S4,200.00
$2,657.43
($1,542.57)
15
16
48" RCP Bend A16 & A17
2
ea
$1,190.00
$2,380.00
S3,422.27
$1,042.27
16
17
36" RCP
72
H
$47.00
$3,384.00
$2,638.56
($745.44)
17
18
36" RCP Bend A15
1
ea
$520,00
$520.00
$844.60
$324.60
18
19
30" RCP
256
If
$33.00
S8,448.00
$10,771.02
$2,323.02
19
20
30" RCP Bend At
1
ea
$520.00
$520.00
$1,879.93
$1,359.93
20
21
24" RCP
344
It
$21.00
$7,224.00
$0.00
($7,224.00)
21
TOTALS $597,641.00 $596,565.81 ($1,075.19)