Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
RESPONSE - RFP - 7259 RE-ROOFING AND INSULATING THE HISTORIC AVERY HOUSE
7259 RE -ROOFING AND INSULATING THE HISTORIC AVERY HOUSE METHODOLOGY General Notes: All required submittals will be collected by Empire Carpentry and given to the Project Manger before installation. Empire Carpentry will also coordinate all subcontractors, supply on site management, check for correct use of safety devices, supply site protection and clean-up, supply or coordinate debris hauling and recycling, and wasp removal. Empire Carpentry will have supervision on site each day, providing carpentry skills, quality control and coordinating subcontractors with the schedule. Empire Carpentry will also work with Bruce Byrne to develop a Schedule of Values and schedule meetings, as needed. Empire Carpentry, as General Contractor, will supply permits, insurance and billing services. Empire Carpentry In-house services will also include archival documentation and mortar analyses. Team members for the job are seen as: Bruce Byrne: City Project Manager Empire Carpentry: General Contractor, Kevin Murray Advanced Roofing Technology: Roofing and flashing services PRO Insulation: Insulation services R&H Heating: Sealing of existing ducts Farquhar Masonry: Stone & brick masonry PO Box 245, Bellvue, Colorado (970) 493-3499 Page 1 7259 RE -ROOFING AND INSULATING THE HISTORIC AVERY HOUSE Old Fort Collins High School, Fort Collins, Colorado Owner: Colorado State University Contractor: G E Johnson Architect: Slater -Paull Architects, Denver, Colorado Work Completed: Rehabilitation of historic Windows. (Spring 2008). Chamberlin Observatory Owner: University of Denver Architect: Slater -Paull Architects, Denver, Colorado Work Completed: Rehabilitate existing doors and windows in Observatory. Build exterior panels to match doors to cover telescope openings. (Summer/Fall 2008). Stover Mansion 503 Remington Street, Fort Collins, Colorado Owner: Sharon Johnson Work Completed: Reroof, and rehabilitation of exterior(Winter 2008,2009). Repair of Cedar roof to stop leaking(Summer 2010). Repair of building after auto accident (Spring 2011). Lincoln Hotel Owner: Charles Salwei Architect: Kreuger& Associates, Loveland, Colorado Work Completed: Exterior window & door rehabilitation. (Summer 2009 thru Spring 2010). WORK COMPLETED ON JOBS NOT LISTED ABOVE (since 2000) Martinez Farm Office remodel Owner: City of Fort Collins, Colorado Architect: AllerLingle, Fort Collins, Colorado Work Completed: Demolish part of office building and expand offices. Complete all finishes. (Winter 2006). Cabin Paint Removal Owner: Rocky Mountain National Park Work Completed: Com blast all interiors of 3 cabins to remove paint. Finish & Clean-up (Spring 2006). Phantom Ranch Owner: Nature Conservancy Work Completed: Install new heat system in four buildings, and remodel area in Interpretive Center into office (Fall/Winter 2006). Supervise building, commission, and turnover of buildings (Spring 1989). PO Box 245, Bellvue, Colorado (970) 493-3499 Page 10 7259 RE -ROOFING AND INSULATING THE HISTORIC AVERY HOUSE Bellvue Store Bellvue, Colorado Owner: Anson & Beverly Perina Engineer: CTL Thompson Work Completed: Stabilize historic building, mitigate rot and rebuild exterior structure, stabilize floor system,Place new foundation under part of buildingand regrade. (Fall 2007) Laupa Residence Fort Collins, Colorado Owner: Tom & Cindy Laupa Work Completed: Remove existing roof, insulate, repair deck, reroof, install new gutters, and repair architectural details as needed (Summer 2009). Foster Ranch Jemez Springs, New Mexico Owner: Manzano Day School, Albequerque, NM Work Completed: Developed a Structural Analysis and Budget for the historic Bunkhouse. Developed Budget for historic hay barn rehabilitation. Stabilization & Rehabilitation of bunkhouse. Replace rotten sill logs and other assorted logs. Copy joinery of original logs. Install chinking and daubing. Reinforce stone foundation and regrade site for drainage.(Summer/Fall 2010) Burrill Home Fort Collins, Colorado Owner: Jim & Carol Burrill Engineer: Geoffrey Robinson Work Completed: Move existing 2 story home from Loveland, Colorado, to new location in north Ft. Collins, Colorado. Rehabilitate home to new standards, for occupancy by owners. (Spring/Fall 2010) MEMBERSHIPS AND LICENSES • City of Fort Collins Contractor License Cl-2 • Included on Contractor Referral Short List, Landmark Rehabilitation Grant Program, City of Fort Collins. • Included on the "Pre -Qualified Consultants List" for the Design Assistance Program through the City of Fort Collins Landmarks Preservation Committee and Historic Preservation Office. • Included in the Directory of Cultural Resource Management Agencies, Consultants and Personnel for Colorado by the Colorado Historical Society. • Member: Timber Framer's Guild of North America. PO Box 245, Bellvue, Colorado (970) 493-3499 Page 11 7259 RE -ROOFING AND INSULATING THE HISTORIC AVERY HOUSE • Member: National Trust for Historic Preservation • Member: Colorado Preservation Inc. Presenter at 2006 Conference • Member: US Green Building Council • CSU Green Building Certificate, 2008 • Established 1979 REFERENCES Steve Seefeld (970-221-6227) Project Manager City of Fort Collins 117 N. Mason Fort Collins, CO 80521 Karen McWilliams (970-224-6078) Historic Preservation Planner City of Fort Collins PO Box 580 Fort Collins, Colo. 80522 Virginia Dale Community Club Attn: Gladys Ellerman (970-568-7830) PO Box 185 Livermore, Colo. 80536 Charles Mayhugh (970-482-8264) CRM Architects 7770 Red Mountain Road Livermore, Colorado 80536 Richard Hill, Architect (970-221-5388) Hill and Associates 1812 Stover Street Fort Collins, Colo. 80525 James Cherry (970-206-9455) Tom Kalert, Jim Cox, Sylvie Rupp (970-493-1220) CCMK Architects 318 East Oak Street Fort Collins, Colo. 80524 Cheryl Donaldson (970-416-2709) Museum Director Fort Collins Museum 200 Mathews Fort Collins, CO 80524 Cheri Gerou (303-674-4177) Gerou& Associates 3065 Whitman Drive Evergreen, Colorado 80437 Brad Massey/David Lingle (970-223-1820) AllerLingle Massey Architects 712 Whalers Way Bldg B Suite 100 Fort Collins, Colorado 80525 Melanie Short (303- 607-0977) Slaterpaull Architects One Park Central Suite 400 1515 Arapahoe St. Denver, CO 80202 CTL Thompson Engineers 351 Linden Street, Suite 140 PO Box 245, Bellvue, Colorado (970) 493-3499 Page 12 7259 RE -ROOFING AND INSULATING THE HISTORIC AVERY HOUSE Fort Collins, Colorado 80524 DETAILED DESCRIPTIONS OF RELATED WORK 1)Tom& Cindy Laupa Residence 1003 Remington Street Fort Collins, Colorado June, 2009 Scope of Work: Remove existing roof and cover building Remove broken decking and replace Remove decking to allow insulation of the attic and dormers Insulate Redeck as needed Install new roof PO Box 245, Bellvue, Colorado (970) 493-3499 Page 13 7259 RE -ROOFING AND INSULATING THE HISTORIC AVERY HOUSE Flash roof Install new gutters Repair carpentry details as needed. Discussion: This job is very similar to the proposed Avery House Roof and Insulation project. This project was coordinated by Empire Carpentry. The job took two weeks of time. Empire Carpentry coordinated schedules of insulators, roofers, painters and gutter installers, while making sure the building was water tight for the duration of the job. The homeowners resided in the house during the work. Contact: Tom & Cindy Laupa, Owners, (970) 690-5853 2)Seckner Addition, Murdock Block 1401 Maine Street Eads, Colorado Owner: Kiowa County Architect: Zink & Associates, Fort Collins, Colorado Work: Stabilize existing 2 story brick structure, including: demolish and abate roof and 2 floors, rehabilitate exterior masonry walls, and rebuild 2d floor & roof systems. (January 2011 till Present) PO Box 245, Bellvue, Colorado (970) 493-3499 Page 14 7259 RE -ROOFING AND INSULATING THE HISTORIC AVERY HOUSE Scope of Work. - Clean and remove debris from back of building, including removal of collapsed roof, floors and fixtures. Stabilize brick exterior walls Install new 2nd floor and roof systems as per plans Coordinate all subcontractors (except Asbestos) Repair masonry walls by removing stucco, preserving ghost sign and repointing. Discussion: While on hiatus for asbestos mitigation, this job has similarities in the need of fencing the public away, roof system and insulation. The scope goes beyond what we are dealing with at the Avery House, but shows the attention we show to our work. The funding is partially COLA and SHF funding. Our billing must fit the existing Scope of Work (SOW) of the Fund and be submitted through the Kiowa County Government. We also coordinate with the Architect and Funds Coordinator (Colorado Preservation Inc.). In other words, we play well with others. Contact: Belinda Zink, Architect, Zink & Associates (719) 850-6750 PO Box 245, Bellvue, Colorado (970) 493-3499 Page 15 7259 RE -ROOFING AND INSULATING THE HISTORIC AVERY HOUSE 3)Franz-Smith Cabin Fort Collins Museum Courtyard 200 Mathews Fort Collins, Colorado Owner: City of Fort Collins Architect: Gerou& Associates, Evergreen, Colorado Work Completed: Consultant on Historic Structure Assessment Report for the Museum by Anthony & Associates and Colorado State University's Architectural Preservation Institute (Fall 2001). Kenaomtanon of Cabin Including: Place cabin on foundation. Replace rotten log work using similar tool methods. Build roof system similar to original (missing) roof. Rebuild and restore doors and windows. Plaster interior of cabin. Install masonry chimney (Summer 2004). Discussion: This differs in type of building and construction techniques, but shows our recognition of museum standards and care. This awareness to detail and protection of the existing building will be on our mind while working on the Avery House. Contact:Cheryl Donaldson, Museum Director (970) 416-2709. PO Box 245, Bellvue, Colorado (970) 493-3499 Page 16 7259 RE -ROOFING AND INSULATING THE HISTORIC AVERY HOUSE 4) William C Stover House 503 Remington Street, Fort Collins, Colorado Owner: Sharon Johnson Work Completed: Reroof, and rehabilitation of exterior(Winter 2008,2009). Repair of Cedar roof to stop leaking (Summer 2010). Repair of building after auto accident (Spring 2011). Discussion: This is another well-known period house in Fort Collins. We repaired sections of the roof, the integral gutters (similar to the Avery House's) and architectural detail that had shown decay. Completed Mortar Analysis for masonry work. Contact: Sharon Johnson, Owner (970) 493-6851 5) North Campus Architectural Survey Fort Collins, Colorado Owner: City of Fort Collins/OAHP PO Box 245, Bellvue, Colorado (970) 493-3499 Page 17 7259 RE -ROOFING AND INSULATING THE HISTORIC AVERY HOUSE 0 Page 18 7259 RE -ROOFING AND INSULATING THE HISTORIC AVERY HOUSE Work Completed: Surveying of 134 Properties north of ColoradoState University, including 40 Intensive Surveys of individual properties; recording of archival photos for the City and State Office of Archaeology and Historic Preservation (Spring & Fall 2011). Discussion: We are familiar with the requirements of Archival Photography required by the State OAHP Architectural & Cultural Manual (1401). This is a requirement of this project. Contact:Karen McWilliams, CHPO City of Fort Collins (970) 224-6078 Coke Sign (Ghost Sign) Hohnstein Block, Mountain Avenue, Ft. Collins, Colorado Owner: Ed Stoner Work Completed: Mortar Analysis ?4' ir� toc.iL Discussion: Empire Carpentry produced the Mortar Analysis for the upcoming work on the Coke Sign stabilization. Two mortar analyses will be done on the Avery House, and Empire Carpentry can do it! Contact: Carol Tunner, Project Administrator, (970) 484-3957 PO Box 245, Bellvue, Colorado (970) 493-3499 Page 19 7259 RE -ROOFING AND INSULATING THE HISTORIC AVERY HOUSE United Site Servicing: Fencing & Security Enviropest: Wasp Removal A team roster will be developed after acceptance of the bid. As per the Secretary of the Interior's Standards for restoration &stabilization, we realize that it's important to maintain the historic fabric of the Avery House as much as possible. In restoring the roof, we are aware that we will try to keep all the original parts of the house below the wood shingles and felt. Care will be taken to remove any skip decking, to allow reuse, if possible. Although Insulation is new to this House's walls, we understand that stabilization requires it. We have chosen to use a short fiber, fiberglass product to perform our scope of work. We hope this will allow gravity to do its work, and allow a smaller hose to reach inside wall cavities. Some area of the walls has only an inch between stone and plaster, making it hard to gain entry. A week of Discovery time was included to allow time to search for the best method, once the attic is accessed. Included in the bid is mortar work to both the brick chimneys and the stone turret wall. Empire Carpentry will do two mortar analyses (one for the brick & one for the stone) in house. Farquhar Masonry will do their work, including setting up the chimneys for counterflash, before old roof removal. As they wind down, the roof demolition will begin. As the Project Manager has expressed concern, we will open and work on the roof in a series of four. These will consist of each fagade. Each fagade should take a work week to accomplish. As the schedule will show, Advanced Roofing Technology (the roofer, ART) will tear off a section of roof and protect against weather. Empire Carpentry will then remove boards that will allow access for the Insulator (PRO Insulation). After discussion and Discovery, PRO will attempt to fill wall cavities with a short fibre, fiberglass. Because it is not known if there is blocking at the first floor level, insulation may be blocked from the first floor walls. Discussion with the Team (Empire Carpentry, PRO Insulation, City Project Manager) will meet to discuss options. As the attic is open, R&H Heating will come in and seal its ducting. Access doors will be weatherstripped and insulated with a hard board insulation. The work will continue with documentation and resealing of the decking. Last, ART will be able to weatherproof, install gutters and roof. Final ridges and finish will be done as allowable. Following the Secretary's Standards, we expect to use existing ridge and finials. This ridge is still being manufactured today, and is readily available. If proof of different ridge exists in documentation, we will give a price to have it fabricated and installed. As the counterflash is installed Farquhar will return to mortar it in. Security will be supplied by United Site Servicing. A gate to allow pedestrian access to the front of the building will be installed, as well as a construction access on the NW side. A key will be left onsite for access of required personnel. Fencing will be six foot driven chain link with screen. At the end, site clean-up will be supervised by Empire Carpentry, including sod and sprinkler check, if possible. PO Box 245, Belivue, Colorado (970) 493-3499 Page 2 7259 RE -ROOFING AND INSULATING THE HISTORIC AVERY HOUSE Empire Carpentry LLC is a historical contractor in Northern Colorado, since 1979. Our hands-on work has included an array from log cabins, foundations, historic finishes, to rebuilding period windows. Our shop can match most existing trims. Our staff averages 20 years of historic experience. Often we help with HSA's in costing and scope. We have experience in both Federal and State projects and funding. Empire Carpentry PO Box 245, Bellvue, Colorado (970) 493-3499 Page 20 7259 RE -ROOFING AND INSULATING THE HISTORIC August AVERY HOUSE Empire Carpentry LLC ATTACHMENTS n PRICING BREAKDOWN PO Box 245, Bellvue, Colorado (970) 493-3499 Page 21 PROPOSAL Empire Carpentry LLC PO Box 245 Bellvue, Colorado 80512 Phone: (970) 493-3499 Fax: (970) 493-2088 empiregverinet.com Date: August 18, 2011 TO: John Stephen City of Fort Collins Purchasing 215 Mason Street Fort Collins, Colorado 80524 Job Location: Avery House 328 West Mountain Avenue Fort Collins, Colorado 80521 Job Scope & Description: RFP 7259 Empire Carpentry LLC proposes to furnish all materials and labor sufficient to perform the following tasks. 1) Re roof and insulate the Avery house according to specifications contained in the RFP 7259 and Addendum # 1. ADD OPTION: Install 16oz copper gutters and downspouts in lieu of galvanized. ADD $11,690.00 Job Total $189,453.30 For the amount of One Hundred Eighty Nine Thousand Four Hundred and Fifty Three dollar and Thirty cents. This proposal is for completing the job as described above. This proposal supersedes all other proposals and is only valid if signed within 30 days from the date above. Date Signature Date General Contracting & Design - Residential & Commercial - Remodeling - Preservation Avery House Roof COST BREAKDOWN TASK Discovery NOTES 4 days 32 hrs @ 60.00/hr COST Carpentry 25 days 3men 200 his @ 60.00/ hr+200 his @ $78.00/hr + 60hrs @ $55.00 x contingency 1.1 =33990.00 $2,208.00 $39,088.50 Fencing driven 6' chainlink with screen 2 -4' man gates, 2-12' Trk gates $3,723.70 Porta John Man lift Genie 45' articulating 2 month $ 5281.16 $345.00$6,074.30' Wasp removal Enviropest Roofing $1,725.00 Gutters Add Option 1602 copper gutter and downspouts $11,690.00 $88,292.40$ 17,117.75 Insulation HVAC$14,950.00 Sealing Masonry Masonry 3 stacks and reglett $1,380.00 Mortar analysis brick and sandstone mortars $6,555.00 Dumpster 10 yrd role off $805.00 obstruction permit $920.00 Building permit Roofing based on $76000.00 .00 $230 State permit $230.00 15 Asbestos testing $0.00 Landscape repair Misc irrigation 850,+sod 650,00 $0 � Plywood for landscape protection 3/4x4x8- 30 $1,7$0.00 Mobilization 3 days 24 his @ 55.00 $287$287. .5 0 On Site Project meetings No cost while KMM on site $ 180 Submitals .00 Documentation 2 sets of archival photos, 2 CD's (400 photos @ .26 ea + 167 cleaves @ 50.00= 169.00+8 his $506.00 $1,587.00 SUBTOTAL $189,453.30 7259 RE -ROOFING AND INSULATING THE HISTORIC AVERY HOUSE INSURANCE PO Box 245, Bellvue, Colorado (970) 493-3499 Page 22 ACORO CERTIFICATE OF LIABILITY INSURANCE 08/18/2011 °ATE ' 2011 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(les) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER " ° 1INDA DECKER NAME: JOHN C. BECKETT S ASSOCIATES, INC. 220 Smith Street FN.NENo. E.B: (970) 464-2805 j NoI: 070) Aea-zees AIL ADDRESS linda@beckettinsurance.con Ao PRODUCER CUSTOMER 10 SE14PIRE CARPENTRY LLC Ft. Collins CO 80524- INSURER(5) AFFORDING COVERAGE RAID If INSURED EMPIRE CARPENTRY LLC INSURER A ADDISON FARMERS INS CO i10324 INSURER e PO BOX 245 INSURER C INSURER D INSURER E BELLVUE CO 80512-0245 INSURER F THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INS rypE OF INSURANCE ADDL�SUSR POLICY EFF POLICY E%P LTR INSR WVD POLICY NUMBER (MMNDMYq IMM/DDM'WI LIMITS A GENERAL LIABILITY 60378006 0/30/2010 0/30/2011 EACH OCCURRENCE $ 1,000,000 X COMMERGAL GENERAL LIABILITY / / / / DAMAGE TO RENTED 5 100,000 -PREMISES_(Ea ocCmrence $5,000 CI -AIMS -MADE � OCCUR / / / / MED EXP (Any one Person) PERSONAL 8 AGO INJURY $ 1,000,000 GENERAL AGGREGATE S 2,000,000 BERL AGGREGFATjE LIMIT APPLIES PER: PRODUCTS-CDMP/OPAGG $ 2,000,000 / / / / a n / / / / PREM 8 POLICY LOG A AUTOMOBILE LIABILITY 60378006 0/30/2010 10/30/2011 COMBINED SINGLE LIMIT (Ea acaden0 $ 1, 000, 000 ANY AUTO / / / / BODILY INJURY (Per Denson) $ ALL OWNED AUTOS / / / / BODILY INJURY (Per accident) $ X SCHEDULED AUTOS / / / / PROPERTY DAMAGE XI HIRED AUTOS / / / / (Per amdenl) S X NON-0MED AUTOS / / / / I S UMBRELLA LIAO OCCUR NO COVERAGE / / / / EACH OCCURRENCE $ ESOERS LIAB CLAIMS -MADE AGGREGATE g DEDUCTIBLE RETENTION $ $ WORKERS COMPENSATION NO COVERAGE$TATU- OTH- AND EMPLOYERS' LW81tfry TORY-LIMITS ER E.L. EACH ACC IDENT PROPRILTORPARTNFR/EKEOVTIVE OFFICERIMEMBER EXCLUDED? ❑ N/A S (Mandatory In NH) If yes, de anpe under / / / / E.L. DISEASE - EA EMPLOYEES E L. DISEASE -POLICY LIMIT 5 DESCRIPTION OF OPERATIONS A I RENTED EQUIPMENT 160378006 40/30/2010 10/30/2011 60, 00o DESCRIPTION OF OPERATIONS I LOCATIONS / VEHICLES (ARPKh ACORD 101. Ammem i Remake SckWule. If more MOKe Ia ,Wmmd) (970) 416-2740 (970) 224-6134 NEIGHBORHOOD BLDNG 6 SERV CITY OF FORT COLLINS 281 NORTH COLLEGE AVENUE PO BOX 580 FORT COLLINS CO 80522- SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESEWATIVE 1988-2009 ACORD CORPORATION. All rahts ,_.... , ....r .wv.— ..un.o uua rvao arc I .'N.UMIVV 11IYT AS UT Mu,Ur<u ACORD. CERTIFICATE OF LIABILITY INSURANCE DATE (Mw3I201oon ) 01 PRODUCER PINNACOL ASSURANCE THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY 7501 E Lowry Blvd AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS Denver, CO 80230-7006 CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. INSURERS AFFORDING COVERAGE NAIC# INSURED EMPIRE CARPENTRY LLC WSUREBA PINNACOL ASSURANCE 41190 wsURER e. 521.5 SYCAMORE ST WSURER C' FORT COLLINS, CO 80521 WsuRER D: INSURER E' COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDNG ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMMENT WITH RESPECT TO WHICH THIS CERTIFICATEIMAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADD POLICY EFFECTIVE POUCYE%PIFATION LTR INSRDr�GREGATEL E OF INSURANCE POLICYNUMBER DATEIMNJUBIYYYY DATEMMAO,YYYY) LIMITS Y EACH OCCURRENCE DAMAGE TO RENTED NERAL LABILRY E OCCUR PREMISES MED EXPAn one Pmmn) PERSONAL d AOV IWURY LIMIT APPLIERS PER: GENERAL AGGREGATE PRODUCTS � COLPIOP AEG PROJECT LOC AUTOMOBILE LIABILITY COI.®INED SINGLE L W IT ANY AUTO ra A. -I) BOUILYIWURY KL OWNED AUTOS SCNEDULEDAUTOS (PrCarson) GODLY IWURY MIRED AUTOS NONOWNED AUTOS PoeaaataN PROPERTYOAMAGE IPeracciaeml GARAGE LIABILITY AUTOONLY- EA ACCIDENT OTHER THAN EA AGO ANYAUTO AUTO ONLY: AS E%CESSNMBRELLA_LIABILITY EACHOCCURAEWE AGGREGATE OCCUR u CLAIMS MADE DF.OIIfiIBLE RETENTION S WORKERS COMPENSATION AND WE AT-- U OTHER A EMPLOYER'S LIABILITY MY PROPWETOIWARTNER@%ECIRIVE 1519590 09/01/2010 09/01/2011 TORYUMITS EL EACH ACCIDENT $100.000 CFFICERUMEMBEREXCLUDEW E.L DISEASE - EA EMPLOYEE $100.000 BSTPECIAI PRONSION50abx ELOIGEgSE-POLICY LIMIT OTHER DESCRIPTION OF OPERATIONSILOCATIONSNEHICLESIEXCLUSIONS ADDED BY ENDORSEMENTISPECIAL PROVISIONS CERTIFICATE HOLDER CANCELLATION 1323717 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE City of Fort Collins- Purchasing THE EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO 281 North College MAIL 0 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE Fort Collins CO 80521 LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESENTATIVE C'alies Doggett ACORD 25(2001108) Underwriter ACORD CORPORATION 1988 Empire Carpentry: AVERYHOUSEREROOF/INSULATION Period From: 211111 To: 10-31-11 PROJECT SCHEDULE: AUGUST ©©o©0000mmmmmmmmmmmm NONNI ENIMMI ME IMMIMMI ME IMMINIMIM MMMMIMM- EMEWIMIM MIMEMIM M MEN looms �■���lo■■■si■n SEPTEMBER OCTOBER rnmo©©©o©mo©©©o©®o©©©o© oommmmmmmmmmmmmmmmmmmm mmmmommmmmmmmmmmmmmmmm mommmmmmmmmmmmmm MMEMEMMMMMMMMMMMMMMMMm mmmmmmmmmmmmmmmmmmmmmm ©©©mmmmmmmmmmmmmmmmmmm' mmm■■©©©©©mmmmmmmmmmmm mmm■mmmmmmmm©©©©©mmmmm mmmmmmmmmmmmmmmmmmm©mm MOMMEMMMOMMMMMMMMMOM©© MEMEEMMMMMMMMMMMMMMMMm mommommmmmmmmmmmmmmmmm MMEMEMMMMEMMMMMMOMMMMm mmmmmmmmmommmmmmmmommm mommommmmmmmmmmmmmmmmm MMEMEMMMMOMMMMMMMMMMMm MMMEEMMMMOMMMMMMMMMMMm mmmommmmmmmmmmmmMME■EMMOMEM m MMEMEMMMMEMMMMMMMMMMMm ME■MMMMMM■MMMMMMMMMMMm INSULATING THE HISTORIC AVERY HOUSE Note: With Discovery and masonry taking time from the beginning of the job and having to stage subcontractors over four time periods, the six week window is full. There really is no room for bad weather days or other delays. This should be noted. Empire Carpentry LLC Kevin Murray, Owner, Manager Kevin Murray has been studying and restoring old buildings since 1970. He started Empire Carpentry in 1979. Since that time Kevin has repaired and restored many buildings. A breakdown of him and his Company's related experience can be found below in the RELEVANT WORK HISTORY SUMMARY AND REFERENCES, for Empire Carpentry, found in the next section. Kevin will be on site daily (200 hrs). Terry Schmitz, Lead Carpenter — Estimator — Project Manger Employed by Empire Carpentry since 1997. Has 5 years' experience in logging. Has built numerous pole barn / loafing shed structures and log structures. Concrete form setter for four years. Steel building erection for two years. Terry has attended Architectural Preservation Institute Preservation Technology Workshops for wood preservation, windows, masonry, and agricultural structures preservation. For the past 8 years, Terry has moved to the Estimators chair and has been managing the projects off -site logistics. Terry will manage all off -site logistics, including billing, documentation and scheduling (60 hours). Wm Richard (Rick) Massey, Lead Carpenter, Site Supervisor Rick joined Empire Carpentry in 2002, and has supervised many historic restorations and rehabilitations since. He has been involved with historic jobs with Rocky Mountain National Park, University of Denver, City of Fort Collins and the City & County of Denver. Rick brings his talent of keeping jobs on track to our team. Rick will be on -site when Kevin Murray is not available. Elizabeth Michell, Empire Surveys, Architectural Historian Elizabeth has worked with us as an Architectural Historian, researcher and Photographic Archives Technician on the North Campus Architectural Survey. She meets the requirements of the Secretary of the Interior's Standards as an Architectural Historian (40 hours). Farquhar Masonry PO Box 245, Bellvue, Colorado (970) 493-3499 Page 3 7259 RE -ROOFING AND INSULATING THE HISTORIC AVERY HOUSE -- - , -.._.ly owned by Peter Farquhar with average annual sales of approx. $250,000.00 in the small commercial, custom residential, and historical restoration markets. Our emphasis is on authentic stone work, masonry repair, and historic masonry restoration. Successfully completed projects include numerous historic schools, churches, and turn of the century houses in the northern Colorado area. We feel that in our fields of emphasis we are extremely competitive in both price and quality. PRO Insulation Larry King PO Box 245, Bellvue, Colorado (970) 493-3499 Page 4 7259 RE -ROOFING AND INSULATING THE HISTORIC AVERY HOUSE My name is Larry King. I work for PRO Insulation which is the north branch of RG Insulation. I have 27 years of experience in the insulation industry. I have a very solid understanding of the different methods of installing insulation correctly, as well as the knowledge of the multiple products available to the industry today. I have worked with Empire Carpentry on several jobs thru-out the years, some that where very similar to this project. I will be on site to assist our crews and communicate with Empire Carpentry as we work through this project together. RG Insulation is an insulation sub -contracting company that has serviced the Residential and the Commercial market needs along the Front Range of Colorado since 1973. They have a retro-fit division with quality crews that are set up to complete retro-fit projects such as the Avery House Project. RG Insulation prides itself in its quality workmanship, and it's commitment to the customers to get the job done correctly and on time. They also have an excellent quality control department that is easy to communicate and well be on site at least once a day. They will inspect the quality of work of the crews, assist with any questions or problems and make sure that our crews pick up after themselves. Advanced Roofing Technologies Bill Steeves I have worked in the roofing Industry for 38 years in both residential and commercial arenas. One of the original owners of Advanced Roofing Technologies, I have worked in the Northern Colorado area since 1982 working for various other roofing contractors in addition to Advanced Roofing. I have in the past worked with the City of Fort Collins on various City projects. I have acted as a Project Manager on the Cunningham Corner Barn Reroof, the Nelson Farm Milk House reroof and repair and maintenance on the Fort Collins Museum roof. I have worked as Project Manager on literally thousands of roof projects in Northern Colorado as well as having tremendous respect for the local history and associated architecture and the preservation thereof. EMPIRE CARPENTRY RELEVANT WORK HISTORY SUMMARY AND REFERENCES PO Box 245, Bellvue, Colorado (970) 493-3499 Page 5 7259 RE -ROOFING AND INSULATING THE HISTORIC AVERY HOUSE PROJECTS WITH FUNDING ASSISTANCE BY THE COLORADO STATE HISTORICAL FUND Virginia Dale Stage Station Virginia Dale, Colorado Owner: Virginia Dale Community Club Architect: CRM Architects, Livermore, Colorado Work Completed: Stabilization & Rehabilitation of building. Raise building and replace rotten logwork with new logs tooled similar to originals. Rebuild stone foundation and stabilize with hidden piers. Stabilize floor system. (Winter 1997,1998) Oliver Touissant Jackson Home Washington Street Dearfield, Colorado Owner: Black American West Museum Architect: Andrews & Anderson, Denver, Colorado Project Manager:Architectural Preservation Institute, Colorado State University Contractor: Wattle & Daub Work Completed: Helped assess the scope of work. Supervised the lifting and moving of house off existing foundation, excavation and placing of new concrete foundation. Supervised re- placement of house on new foundation, parging of foundation, rebuilding of chimneys, and laying of block foundation under addition.Repaired roof, walls, and floor structure to stabilize building. Repaired siding, facia, and other visual aspects. Rebuilt front porch structure. Built new storm windows to cover windows, and repaired window frames to support storms. Other carpentry, as needed by plans. (Fa11,Winter 2001,2002) Harvey J. Parish House 701 Charlotte Johnstown, Colorado Owner: Johnstown Historical Society Work Completed: Consultant on Historic Structure Assessment, by Robert Palmer, Cultural Resource Historians (June 2000). Write Specifications Documents for bidding on work, on building (Spring 2005). Nunn Municipal Hall Building / Northern Drylanders Museum Nunn, Colorado Owner: High Plains Historical Society Contractor: Wattle & Daub Work Completed: Strengthen burned trusses, create ADA bathrooms, create new offices, restore windows and doors while maintaining the historic integrity of the building (Winter 2004). PO Box 245, Bellvue, Colorado (970) 493-3499 Page 6 7259 RE -ROOFING AND INSULATING THE HISTORIC AVERY HOUSE Franz -Smith Cabin Fort Collins Museum Courtyard 200 Mathews Fort Collins, Colorado Owner: City of Fort Collins Architect: Gerou& Associates, Evergreen, Colorado Work Completed: Consultant on Historic Structure Assessment Report for the Museum by Anthony & Associates and Colorado State University's Architectural Preservation Institute (Fall 2001). Rehabilitation of Cabin Including: Place cabin on foundation. Replace rotten log work using similar tool methods. Build roof system similar to original (missing) roof. Rebuild and restore doors and windows. Plaster interior of cabin. Install masonry chimney (Summer 2004). Persse Homestead Owner: Roxborough State Park Architect: Schuber& Darden, Denver, Colorado Littleton, Colorado Work Completed: Consultant on Historic Structure Assessment of the Persse and Cooper Cabins, Colorado State Parks (Fall 2002). Emergency stabilization of the Cooper Cabin including 4 wall stabilization and replacement of rotten logs on 3 sides (Winter 2004-05). 10 Short Street Manitou Springs, Colorado Work Completed: Historic Assessment of 2 log and stone cabins built in the 1920's, for repair. (Spring 2005). Saint Joseph's School Fort Collins, Colorado Owner: Archdiocese of Denver Architect: Aller-Lingle, Fort Collins, Colorado Work Completed: Assist in application for Historic Structure Assessment through the State Historic Fund. (Winter 2007). City of Fort Collins Transportation Center Fort Collins, Colorado Owner: City of Fort Collins Work Completed: Rebuild windows and door on existing building (Spring 2008) Old Trail School Wiggins, Colorado Owner: Wiggins Historic Group Architect: Scheuber, Darden & Associates, Aurora, Colorado PO Box 245, Bellvue, Colorado (970) 493-3499 Page 7 7259 RE -ROOFING AND INSULATING THE HISTORIC AVERY HOUSE Work Completed: Preservation of Schoolhouse: Repair foundation and exterior walls; Rebuild doors and windows of structure; rehabilitate interior finishes; repair roof and chimney. (Fall/Winter 2008, 2009). Seckner Addition, Murdock Block Eads, Colorado Owner: Kiowa County Architect: Zink & Associates, Fort Collins, Colorado Work: Stabilize existing 2 story brick structure, including: demolish and abate roof and 2 floors, rehabilitate exterior masonry walls, and rebuild 2"d floor & roof systems. (Present) 148 North College Avenue (Surfside Seven) Fort Collins, Colorado Owner: Architect: AE Design Work Completed: Remove modern elements from the business fapade and rebuild the storefront similar to original. Echo Lake Lodge Idaho Springs, Colorado Owner: City & County of Denver Architect: Anderson &Hallas Architects Work: Rehabilitate log building using traditional and new techniques. Copy joinery of original logs. Manufacture and install chinking to match(Present). WORK COMPLETED ON NATIONAL REGISTER BUILDINGS and DISTRICTS Earnest Waycott House 1501 West Mountain Ave. Fort Collins, Colorado Work completed: Rehabilitation of the exterior including restoration of front porch rail with original pieces and replacing missing pieces with similar, restoration of trim and soffitt detail, and repair/ repointing of sandstone foundation (Summer 1997). Fort Collins Trolley Barn Owner: City of Fort Collins Architect: AllerLingle, Fort Collins, Colorado 330 N Howes Street Fort Collins, CO 80521 Work Completed: City of Fort Collins managed project. Restoration of offices and restroom to circa 1910.Installation of modem lighting in barn area.Managed Federal monies with Colorado Dept. of Transportation (Spring 2004). Green Mountain Ranch Owner: Rocky Mountain National Park PO Box 245, Bellvue, Colorado (970) 493-3499 Page 8 7259 RE -ROOFING AND INSULATING THE HISTORIC AVERY HOUSE Grand County, Colorado Work Completed: Stabilization & Rehabilitation: Replace rotten sill logs and other assorted logs on 3 cabins. Copy joinery of original logs. Replace floor beams of one cabin. Managed Federal monies with RMNP (Summer 2005). Linden Hotel 201 Linden Street Fort Collins, Colorado Work Completed: Assessment of the second & third floor windows for repair with Edge Architecture of Fort Collins. (Fall 2005) First United Presbyterian Church 400 E 4th Street, Loveland, Colorado Architect: AllerLingle, Fort Collins, Colorado Work Completed: Remove & replace all 12" fascia and repair soffit as needed (Summer 2006). Steamboat Railroad Depot Owner: City of Steamboat Springs, Colorado Work Completed: Repair window sashes to historic standards (Fall 2006). Howe Mortuary (Mapleton Place) Boulder, Colorado Contractor: Deneuve Construction, Boulder, Colorado Work Completed: Rehabilitation of historic windows and custom built storm windows. (Fall 2007). 500 Pearl Street Boulder, Colorado Owner: CJ Davis Contractor: Telemark Homes, Boulder Colorado Work Completed: Rehabilitation of historic Windows. (Fall -Winter 2007). Masonic Building &Rohling Inn Blackhawk, Colorado Owner: Fitzgerald's Casino Architect: Aller-Lingle-Massey, Fort Collins, Colorado Work Completed: Rehabilitate the historic fronts of the buildings to Secretary Of Interior's Standards. (Fall -Spring 2007-8). EDAW Building 240 East Mountain Avenue, Fort Collins, Colorado Owner: EDAW Inc. Architect: EDAW Inc Work Completed: Exterior rehabilitation of 1880's building. USGBC LEED Gold, Existing Building.( Spring 2008). PO Box 245, Bellvue, Colorado (970) 493-3499 Page 9