REQUEST FOR PROPOSAL
7284 TRAINING & PROCUREMENT REVIEW FOR FTA FUNDED PROJECTS
The City of Fort Collins is seeking an individual or firm who can 1) evaluate the current
City procurement processes, organizational structure, accountabilities alignment and
recommend corrective actions to improve compliance reliability, 2) provide training to
City personnel on all aspects of FTA regulations and compliance requirements to
ensure that it is complying with all Federal regulations, and 3) provide expert
consultative support on an as needed basis to related to future Federal procurement
programs.
The City has an overall DBE goal of 9.9%. There is no specific contract goal for this
project but the City encourages proposals from and the use of DBE firms in this project.
Written proposals, five (5) copies, will be received at the City of Fort Collins' Purchasing
Division, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80524. Proposals will
be received before 3:00 p.m. (our clock), October 6, 2011 and referenced as
Proposal No. 7284. If delivered, they are to be sent to 215 North Mason Street, 2nd
Floor, Fort Collins, Colorado 80524. If mailed, the address is P.O. Box 580, Fort
Collins, 80522-0580.
Questions regarding bid submittal or process should be directed to James B. O'Neill II,
CPPO, FNIGP, Director of Purchasing & Risk Management, at (970) 221-6779 or
ioneillPfcgov.com.
A copy of the Proposal may be obtained as follows:
Download the Proposal/Bid from the BuySpeed Webpage,
www.fcgov.com/eprocurement
The City of Fort Collins is.subject to public information laws, which permit access to
most records and documents. Proprietary information in your response must be clearly
identified and will be protected to the extent legally permissible. Proposals may not be
marked 'Proprietary' in their entirety. Information considered proprietary is limited to
material treated as confidential in the normal conduct of business, trade secrets,
discount information; and individual product or service pricing. Summary price
information may not be designated as proprietary as such information may be carried
forward into other public documents. All provisions of any contract resulting from this
request for proposal will be public information.
Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council,
shall have a financial interest in the sale to the City of any real or personal property,
equipment, material, supplies or services where such officer or employee exercises
directly or indirectly any decision -making authority concerning such sale or any
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 1 of 28
payment, the Professional shall provide the City with reproducible drawings of the project
containing accurate information on the project as constructed. Drawings shall be of archival,
prepared on stable Mylar base material using a non -fading process to provide for long storage
and high quality reproduction. "CD" disc of the as -built drawings shall also be submitted to the
City in an AutoCAD version no older then the established city standard.
9. Monthly Report. Commencing thirty (30) days after the date of execution of this
Agreement and every thirty (30) days thereafter, Professional is required to provide the City
Representative with a written report of the status of the work with respect to the Scope of
Services, Work Schedule, and other material information. Failure to provide any required
monthly report may, at the option of the City, suspend the processing of any partial payment
request.
10. Independent Contractor. The services to be performed by Professional are those
of an independent contractor and not of an employee of the City of Fort Collins. The City shall
not be responsible for withholding any portion of Professional's compensation hereunder for the
payment of FICA, Workers' Compensation, other taxes or benefits or for any other purpose.
11. Personal Services. It is understood that the City enters into this Agreement
based on the special abilities of the Professional and that this Agreement shall be considered as
an agreement for personal services. Accordingly, the Professional shall neither assign any
responsibilities nor delegate any duties arising under this Agreement without the prior written
consent of the City.
12. Acceptance Not Waiver. The City's approval of drawings, designs, plans,
specifications, reports, and incidental work or materials furnished hereunder shall not in any way
relieve the Professional of responsibility for the quality or technical accuracy of the work. The
City's approval or acceptance of, or payment for, any of the services shall not be construed to
operate as a waiver of any rights or benefits provided to the City under this Agreement.
13. Default. Each and every term and condition hereof shall be deemed to be a
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 10 of 28
material element of this Agreement. In the event either party should fail or refuse to perform
according to the terms of this agreement, such party may be declared in default.
14. Remedies. In the event a party has been declared in default, such defaulting
party shall be allowed a period of ten (10) days within which to cure said default. In the event
the default remains uncorrected, the party declaring default may elect to (a) terminate the
Agreement and seek damages; (b) treat the Agreement as continuing and require specific
performance; or (c) avail himself of any other remedy at law or equity. If the non -defaulting
party commences legal or equitable actions against the defaulting party, the defaulting party
shall be liable to the non -defaulting party for the non -defaulting party's reasonable attorney fees
and costs incurred because of the default.
15. Binding Effect. This writing, together with the exhibits hereto, constitutes the
entire agreement between the parties and shall be binding upon said parties, their officers,
employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs,
personal representatives, successors and assigns of said parties.
16. Law/Severability. The laws of the State of Colorado shall govern the
construction, interpretation, execution and enforcement of this Agreement. In the event any
provision of this Agreement shall be held invalid or unenforceable by any court of competent
jurisdiction, such holding shall not invalidate or render unenforceable any other provision of this
Agreement.
17. Prohibition Against Employing Illegal Aliens. Pursuant to Section 8-17.5-101,
C.R.S., et. seq., Professional represents and agrees that:
a. As of the date of this Agreement:
1. Professional does not knowingly employ or contract with an illegal alien
who will perform work under this Agreement; and
2. Professional will participate in either the e-Verify program created in
Public Law 208, 104th Congress, as amended, and expanded in Public Law 156,
108th Congress, as amended, administered by the United States Department of
Homeland Security (the "e-Verify Program") or the Department Program (the
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 11 of 28
"Department Program"), an employment verification program established
pursuant to Section 8-17.5-102(5)(c) C.R.S. in order to confirm the employment
eligibility of all newly hired employees to perform work under this Agreement.
b. Professional shall not knowingly employ or contract with an illegal alien to
perform work under this Agreement or knowingly enter into a contract with a
subcontractor that knowingly employs or contracts with an illegal alien to perform work
under this Agreement.
C. Professional is prohibited from using the e-Verify Program or Department
Program procedures to undertake pre -employment screening of job applicants while this
Agreement is being performed.
d. If Professional obtains actual knowledge that a subcontractor performing work
under this Agreement knowingly employs or contracts with an illegal alien, Professional
shall:
1. Notify such subcontractor and the City within three days that Professional
has actual knowledge that the subcontractor is employing or contracting with an
illegal alien; and
2. Terminate the subcontract with the subcontractor if within three days of
receiving the notice required pursuant to this section the subcontractor does not
cease employing or contracting with the illegal alien; except that Professional
shall not terminate the contract with the subcontractor if during such three days
the subcontractor provides information to establish that the subcontractor has not
knowingly employed or contracted with an illegal alien.
e. Professional shall comply with any reasonable request by the Colorado
Department of Labor and Employment (the "Department") made in the course of an
investigation that the Department undertakes or is undertaking pursuant to the authority
established in Subsection 8-17.5-102 (5), C.R.S.
f. If Professional violates any provision of this Agreement pertaining to the duties
imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If this
Agreement is so terminated, Professional shall be liable for actual and consequential
damages to the City arising out of Professional's violation of Subsection 8-17.5-102,
C.R.S.
g. The City will notify the Office of the Secretary of State if Professional violates this
provision of this Agreement and the City terminates the Agreement for such breach.
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 12 of 28
18. Special Provisions. [Optional] Special provisions or conditions relating to the
services to be performed pursuant to this Agreement are set forth in Exhibit " ", consisting
of ( ) pages, attached hereto and incorporated herein by this reference.
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 13 of 28
THE CITY OF FORT COLLINS, COLORADO
By:
James B. O'Neill II, CPPO, FNIGP
Director of Purchasing & Risk Management
DATE:
ATTEST:
City Clerk
APPROVED AS TO FORM:
Assistant City Attorney
[Insert Professional's name] or
[Insert Partnership Name] or
[Insert individual's name] or
Doing business as [insert name of business]
By:
Title:
CORPORATE PRESIDENT OR VICE PRESIDENT
Date:
ATTEST:
Corporate Secretary
(Corporate Seal)
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 14 of 28
INSURANCE REQUIREMENTS
1. The Professional will provide, from insurance companies acceptable to the City, the
insurance coverage designated hereinafter and pay all costs. Before commencing work under
this bid, the Professional shall furnish the City with certificates of insurance showing the type,
amount, class of operations covered, effective dates and date of expiration of policies, and
containing substantially the following statement:
"The insurance evidenced by this Certificate will not be cancelled or materially altered,
except after ten (10) days written notice has been received by the City of Fort Collins."
In case of the breach of any provision of the Insurance Requirements, the City, at its option,
may take out and maintain, at the expense of the Professional, such insurance as the City may
deem proper and may deduct the cost of such insurance from any monies which may be due or
become due the Professional under this Agreement. The City, its officers, agents and
employees shall be named as additional insureds on the Professional's general liability and
automobile liability insurance policies for any claims arising out of work performed under this
Agreement.
2. Insurance coverages shall be as follows:
A. Workers' Compensation & Employer's Liability. The Professional shall maintain
during the life of this Agreement for all of the Professional's employees engaged in work
performed under this agreement:
Workers' Compensation insurance with statutory limits as required by
Colorado law.
2. Employer's Liability insurance with limits of $100,000 per accident,
$500,000 disease aggregate, and $100,000 disease each employee.
B. Commercial General & Vehicle Liability. The Professional shall maintain during
the life of this Agreement such commercial general liability and automobile liability
insurance as will provide coverage for damage claims of personal injury, including
accidental death, as well as for claims for property damage, which may arise directly or
indirectly from the performance of work under this Agreement. Coverage for property
damage shall be on a "broad form" basis. The amount of insurance for each coverage,
Commercial General and Vehicle, shall not be less than $500,000 combined single limits
for bodily injury and property damage.
In the event any work is performed by a subcontractor, the Professional shall be
responsible for any liability directly or indirectly arising out of the work performed under
this Agreement by a subcontractor, which liability is not covered by the subcontractor's
insurance.
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 15 of 28
[Optional]
EXHIBIT " "
CONFIDENTIALITY
IN CONNECTION WITH SERVICES provided to the City of Fort Collins (the "City") pursuant to
this Agreement (the "Agreement"), the Professional hereby acknowledges that it has been
informed that the City has established policies and procedures with regard to the handling of
confidential information and other sensitive materials.
In consideration of access to certain information, data and material (hereinafter individually and
collectively, regardless of nature, referred to as "information") that are the property of and/or
relate to the City or its employees, customers or suppliers, which access is related to the
performance of services that the Professional has agreed to perform, the Professional hereby
acknowledges and agrees as follows:
That information that has or will come into its possession or knowledge in connection with the
performance of services for the City may be confidential and/or proprietary. The Professional
agrees to treat as confidential (a) all information that is owned by the City, or that relates to the
business of the City , or that is used by the City in carrying on business, and (b) all information
that is proprietary to a third party (including but not limited to customers and suppliers of the
City) . The Professional shall not disclose any such information to any person not having a
legitimate need -to -know for purposes authorized by the City. Further, the Professional shall not
use such information to obtain any economic or other benefit for itself, or any third party, except
as specifically authorized by the City.
The foregoing to the contrary notwithstanding, the Professional understands that it shall have no
obligation under this Agreement with respect to information and material that (a) becomes
generally known to the public by publication or some means other than a breach of duty of this
Agreement, or (b) is required by law, regulation or court order to be disclosed, provided that the
request for such disclosure is proper and the disclosure does not exceed that which is required.
In the event of any disclosure under (b) above, the Professional shall furnish a copy of this
Agreement to anyone to whom it is required to make such disclosure and shall promptly advise
the City in writing of each such disclosure.
In the event that the Professional ceases to perform services for the City, or the City so requests
for any reason, the Professional shall promptly return to the City any and all information
described hereinabove, including all copies, notes and/or summaries (handwritten or
mechanically produced) thereof, in its possession or control or as to which it otherwise has
access.
The Professional understands and agrees that the City's remedies at law for a breach of the
Professional's obligations under this Confidentiality Agreement may be inadequate and that the
City shall, in the event of any such breach, be entitled to seek equitable relief (including without
limitation preliminary and permanent injunctive relief and specific performance) in addition to all
other remedies provided hereunder or available at law.
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 16 of 28
FEDERAL TRANSIT ADMINISTRATION
TABLE OF CONTENTS
Federally Required and Other Model Contract Clauses
1.
NO GOVERNMENT OBLIGATION TO THIRD PARTIES..............................................................18
2.
PROGRAM FRAUD AND FALSE OR FRAUDULENT STATEMENTS AND RELATED
ACTS.....................................................................................................................................................18
3.
ACCESS TO RECORDS AND REPORTS.....................................................................................18
4.
FEDERAL CHANGES...................................................................................................................19
5..
TERMINATION..............................................................................................................................20
6.
CIVIL RIGHTS REQUIREMENTS..................................................................................................20
7.
DISADVANTAGED BUSINESS ENTERPRISE (DBE)...................................................................21
8.
INCORPORATION OF FEDERAL TRANSIT ADMINISTRATION (FTA) TERMS ..........................22
9.
GOVERNMENT -WIDE DEBARMENT AND SUSPENSION(NONPROCUREMENT)....................22
10.
BREACHES AND DISPUTE RESOLUTION..................................................................................23
11.
LOBBYING....................................................................................................................................24
12.
CLEAN AIR....................................................................................................................................26
13.
CLEAN WATER REQUIREMENTS...............................................................................................26
14.
FLY AMERICA REQUIREMENTS.................................................................................................26
15.
ENERGY CONSERVATION REQUIREMENTS.............................................................................26
16.
RECYCLED PRODUCTS...............................................................................................................26
17.
Conformance with ITS National Architecture.............................................................................27
18.
ADA Access..................................................................................................................................27
19.
CITY OF FORT COLLINS BID PROTEST PROCEDURES...........................................................27
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 17 of 28
1. NO GOVERNMENT OBLIGATION TO THIRD PARTIES
No Obligation by the Federal Government.
(1) The Purchaser and Contractor acknowledge and agree that, notwithstanding any
concurrence by the Federal Government in or approval of the solicitation or award of the
underlying contract, absent the express written consent by the Federal Government, the Federal
Government is not a party to this contract and shall not be subject to any obligations or liabilities
to the Purchaser, Contractor, or any other party (whether or not a party to that contract)
pertaining to any matter resulting from the underlying contract.
(2) The Contractor agrees to include the above clause in each subcontract financed in whole or
in part with Federal assistance provided by FTA. It is further agreed that the clause shall not be
modified, except to identify the subcontractor who will be subject to its provisions.
2. PROGRAM FRAUD AND FALSE OR FRAUDULENT STATEMENTS AND RELATED
ACTS
Program Fraud and False or Fraudulent Statements or Related Acts.
(1) The Contractor acknowledges that the provisions of the Program Fraud Civil Remedies Act
of 1986, as amended, 31 U.S.C. § 3801 et sec. and U.S. DOT regulations, 'Program Fraud Civil
Remedies," 49 C.F.R. Part 31, apply to its actions pertaining to this Project. Upon execution of
the underlying contract, the Contractor certifies or affirms the truthfulness and accuracy of any
statement it has made, it makes, it may make, or causes to be made, pertaining to the
underlying contract or the FTA assisted project for which this contract work is being performed.
In addition to other penalties that may be applicable, the Contractor further acknowledges that if
it makes, or causes to be made, a false, fictitious, or fraudulent claim, statement, submission, or
certification, the Federal Government reserves the right to impose the penalties of the Program
Fraud Civil Remedies Act of 1986 on the Contractor to the extent the Federal Government
deems appropriate.
(2) The Contractor also acknowledges that if it makes, or causes to be made, a false, fictitious,
or fraudulent claim, statement, submission, or certification to the Federal Government under a
contract connected with a project that is financed in whole or in part with Federal assistance
originally awarded by FTA under the authority of 49 U.S.C. § 5307, the Government reserves
the right to impose the penalties of 18 U.S.C. § 1001 and 49 U.S.C. § 5307(n)(1) on the
Contractor, to the extent the Federal Government deems appropriate.
(3) The Contractor agrees to include the above two clauses in each subcontract financed in
whole or in part with Federal assistance provided by FTA. It is further agreed that the clauses
shall not be modified, except to identify the subcontractor who will be subject to the provisions.
3. ACCESS TO RECORDS AND REPORTS
Access to Records - The following access to records requirements apply to this Contract:
A. Where the Purchaser is not a State but a local government and is the FTA Recipient or
subgrantee of the FTA Recipient in accordance with 49 C.F.R. 18.36(i), the Contractor
agrees to provide the Purchaser, the FTA Administrator, the Comptroller General of the
United States or any of their authorized representatives access to any books,
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 18 of 28
documents, papers and records of the Contractor which are directly pertinent to this
contract for the purposes of making audits, examinations, excerpts and transcriptions.
Contractor also agrees, pursuant to 49 C.F.R. 633.17 to provide the FTA Administrator
or his authorized representatives including any PMO Contractor access to Contractor's
records and construction sites pertaining to a major capital project, defined at 49 U.S.C.
5302(a)1, which is receiving federal financial assistance through the programs described
at 49 U.S.C. 5307, 5309 or 5311.
B. The Contractor agrees to permit any of the foregoing parties to reproduce by any means
whatsoever or to copy excerpts and transcriptions as reasonably needed.
C. The Contractor agrees to maintain all books, records, accounts and reports required
under this contract for a period of not less than three years after the date of termination
or expiration of this contract, except in the event of litigation or settlement of claims
arising from the performance of this contract, in which case Contractor agrees to
maintain same until the Purchaser, the FTA Administrator, the Comptroller General, or
any of their duly authorized representatives, have disposed of all such litigation, appeals,
claims or exceptions related thereto. Reference 49 CFR 18.39(i)(11).
D. FTA does not require the inclusion of these requirements in subcontracts.
Requirements for Access to Records and Reports by Types of Contract
Contract
Characteristics
Operational
Service
Contract
Turnkey
Construction
Architectural
Engineering
Acquisition
of Rolling
Stock
'Professional
Services
I State Grantees
a. Contracts below
None
Those
None
None
None
None
SAT ($100,000)
imposed on
state pass
b. Contracts above
None
thru to
Yes, if non-
None unless
None
None unless
$100,000/Capital
unless' non-
Contractor
competitive
non-
unless non-
non -
Projects
competitive
award or if
competitive
competitive
competitive
award
funded thruZ
award
award
award
5307/5309/53
11
II Non State
Grantees
Those
a. Contracts below
Yes
imposed on
Yes
Yes
Yes
Yes
SAT ($100,000)
non -state
b. Contracts above
Yes3
Grantee
Yes
Yes
Yes
Yes
$100,000/Capital
pass thru to
Projects
Contractor
Sources of Authority: ' 49 USG 5325 (a) ` 49 CFR 633.17 ' 18 CFR 18.36 (i)
4. FEDERAL CHANGES
Federal Changes - Contractor shall at all times comply with all applicable FTA regulations,
policies, procedures and directives, including without limitation those listed directly or by
reference in the Master Agreement between Purchaser and FTA, as they may be amended or
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 19 of 28
supervisory authority over the services to be rendered. This rule also applies to
subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment,
kickback or any items of monetary value from any person who has or is seeking to do
business with the City of Fort Collins is prohibited.
Collusive or sham proposals: Any proposal deemed to be collusive or a sham proposal
will be rejected and reported to authorities as such. Your authorized signature of this
proposal assures that such proposal is genuine and is not a collusive or sham proposal.
The City of Fort Collins reserves the right to reject any and all proposals and to waive
any irregularities or informalities.
Sincerely,
James B. O'Neill II, CPPO, FNIGP
Director of Purchasing & Risk Management
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 2 of 28
promulgated from time to time during the term of this contract. Contractor's failure to so comply
shall constitute a material breach of this contract.
5. TERMINATION
a. Termination for Convenience (General Provision) The City may terminate
this contract, in whole or in part, at any time by written notice to the Contractor when it is in the
Government's best interest. The Contractor shall be paid its costs, including contract close-out
costs, and profit on work performed up to the time of termination. The Contractor shall promptly
submit its termination claim to the City to be paid the Contractor. If the Contractor has any
property in its possession belonging to the City, the Contractor will account for the same, and
dispose of it in the manner the City directs.
b. Termination for Default [Breach or Cause] (General Provision) If the Contractor
does not deliver supplies in accordance with the contract delivery schedule, or, if the contract is
for services, the Contractor fails to perform in the manner called for in the contract, or if the
Contractor fails to comply with any other provisions of the contract, the City may terminate this
contract for default. Termination shall be effected by serving a notice of termination on the
contractor setting forth the manner in which the Contractor is in default. The contractor will only
be paid the contract price for supplies delivered and accepted, or services performed in
accordance with the manner of performance set forth in the contract.
If it is later determined by the City that the Contractor had an excusable reason for not
performing, such as a strike, fire, or flood, events which are not the fault of or are beyond the
control of the Contractor, the City, after setting up a new delivery of performance schedule, may
allow the Contractor to continue work, or treat the termination as a termination for convenience.
c. Opportunity to Cure (General Provision) The City in its sole discretion may, in the
case of a termination for breach or default, allow the Contractor [an appropriately short period of
time] in which to cure the defect. In such case, the notice of termination will state the time
period in which cure is permitted and other appropriate conditions
If Contractor fails to remedy to the City's satisfaction the breach or default of any of the terms,
covenants, or conditions of this Contract within [ten (10) days] after receipt by Contractor of
written notice from the City setting forth the nature of said breach or default, the City shall have
the right to terminate the Contract without any further obligation to Contractor. Any such
termination for default shall not in any way operate to preclude the City from also pursuing all
available remedies against Contractor and its sureties for said breach or default.
d. Waiver of Remedies for any Breach In the event that the City elects to waive its
remedies for any breach by Contractor of any covenant, term or condition of this Contract, such
waiver by the City shall not limit the City's remedies for any succeeding breach of that or of any
other term, covenant, or condition of this Contract.
6. CIVIL RIGHTS REQUIREMENTS
Civil Rights - The following requirements apply to the underlying contract:
(1) Nondiscrimination - In accordance with Title VI of the Civil Rights Act, as amended, 42
U.S.C. § 2000d, section 303 of the Age Discrimination Act of 1975, as amended, 42 U.S.C. §
6102, section 202 of the Americans with Disabilities Act of 1990, 42 U.S.C. § 12132, and
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 20 of 28
Federal transit law at 49 U.S.C. § 5332, the Contractor agrees that it will not discriminate
against any employee or applicant for employment because of race, color, creed, national
origin, sex, age, or disability. In addition, the Contractor agrees to comply with applicable
Federal implementing regulations and other implementing requirements FTA may issue.
(2) Equal Employment Ooaortunity - The following equal employment opportunity requirements
apply to the underlying contract:
(a) Race, Color, Creed, National Origin, Sex - In accordance with Title VI of the Civil
Rights Act, as amended, 42 U.S.C. § 2000e, and Federal transit laws at 49 U.S.C. §
5332, the Contractor agrees to comply with all applicable equal employment opportunity
requirements of U.S. Department of Labor (U.S. DOL) regulations, "Office of Federal
Contract Compliance Programs, Equal Employment Opportunity, Department of Labor,"
41 C.F.R. Parts 60 et sec., (which implement Executive Order No. 11246, "Equal
Employment Opportunity," as amended by Executive Order No. 11375, "Amending
Executive Order 11246 Relating to Equal Employment Opportunity," 42 U.S.C. § 2000e
note), and with any applicable Federal statutes, executive orders, regulations, and
Federal policies that may in the future affect construction activities undertaken in the
course of the Project. The Contractor agrees to take affirmative action to ensure that
applicants are employed, and that employees are treated during employment, without
regard to their race, color, creed, national origin, sex, or age. Such action shall include,
but not be limited to, the following: employment, upgrading, demotion or transfer,
recruitment or recruitment advertising, layoff or termination; rates of pay or other forms
of compensation; and selection for training, including apprenticeship. In addition, the
Contractor agrees to comply with any implementing requirements FTA may issue.
(b) Aye - In accordance with section 4 of the Age Discrimination in Employment Act of
1967, as amended, 29 U.S.C. § § 623 and Federal transit law at 49 U.S.C. § 5332, the
Contractor agrees to refrain from discrimination against present and prospective
employees for reason of age. In addition, the Contractor agrees to comply with any
implementing requirements FTA may issue.
(c) Disabilities - In accordance with section 102 of the Americans with Disabilities Act, as
amended, 42 U.S.C. § 12112, the Contractor agrees that it will comply with the
requirements of U.S. Equal Employment Opportunity Commission, "Regulations to
Implement the Equal Employment Provisions of the Americans with Disabilities Act," 29
C.F.R. Part 1630, pertaining to employment of persons with disabilities. In addition, the
Contractor agrees to comply with any implementing requirements FTA may issue.
(3) The Contractor also agrees to include these requirements in each subcontract financed in
whole or in part with Federal assistance provided by FTA, modified only if necessary to identify
the affected parties.
7. DISADVANTAGED BUSINESS ENTERPRISE (DBE)
a. This contract is subject to the requirements of Title 49, Code of Federal Regulations,
Part 26, Participation by Disadvantaged Business Enterprises in Department of
Transportation Financial Assistance Programs. The national goal for participation of
Disadvantaged Business Enterprises (DBE) is 10%. The agency's overall goal for DBE
participation is 9.9%. A separate contract goal[has not] been established for this
procurement.
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 21 of 28
b. The contractor shall not discriminate on the basis of race, color, national origin, or sex
in the performance of this contract. The contractor shall carry out applicable
requirements of .49 CFR Part 26 in the award and administration of this DOT -assisted
contract. Failure by the contractor to carry out these requirements is a material breach
of this contract, which may result in the termination of this contract or such other remedy
as City of Fort Collins deems appropriate. Each subcontract the contractor signs with
a subcontractor must include the assurance in this paragraph (see 49 CFR 26.13(b)).
The successful bidder/offeror will be required to report its DBE participation obtained
through race -neutral means throughout the period of performance.
d. The contractor is required to pay its subcontractors performing work related to this
contract for satisfactory performance of that work no later than 30 days after the
contractor's receipt of payment for that work from the City of Fort Collins. In addition,
[is required to return any retainage payments to those subcontractors within 30
days after incremental acceptance of the subcontractor's work by the City of Fort
Collins and contractor's receipt of the partial retainage payment related to the
subcontractor's work.]
e. The contractor must promptly notify City of Fort Collins whenever a DBE
subcontractor performing work related to this contract is terminated or fails to complete
its work, and must make good faith efforts to engage another DBE subcontractor to
perform at least the same amount of work. The contractor may not terminate any DBE
subcontractor and perform that work through its own forces or those of an affiliate
without prior written consent of City of Fort Collins.
8. INCORPORATION OF FEDERAL TRANSIT ADMINISTRATION (FTA) TERMS
Incorporation of Federal Transit Administration (FTA) Terms - The preceding provisions include,
in part, certain Standard Terms and Conditions required by DOT, whether or not expressly set
forth in the preceding contract provisions. All contractual provisions required by DOT, as set
forth in FTA Circular 4220.1 E, are hereby incorporated by reference. Anything to the contrary
herein notwithstanding, all FTA mandated terms shall be deemed to control in the event of a
conflict with other provisions contained in this Agreement. The Contractor shall not perform any
act, fail to perform any act, or refuse to comply with any (name of grantee) requests which
would cause (name of grantee) to be in violation of the FTA terms and conditions.
9. GOVERNMENT -WIDE DEBARMENT AND SUSPENSION (NONPROCUREMENT)
Background and Applicability
In conjunction with the Office of Management and Budget and other affected Federal agencies,
DOT published an update to 49 CFR Part 29 on November 26, 2003. This government -wide
regulation implements Executive Order 12549, Debarment and Suspension, Executive Order
12689, Debarment and Suspension, and 31 U.S.C. 6101 note (Section 2455, Public Law 103-
355, 108 Stat. 3327).
The provisions of Part 29 apply to all grantee contracts and subcontracts at any level expected
to equal or exceed $25,000 as well as any contract or subcontract (at any level) for Federally
required auditing services. 49 CFR 29.220(b). This represents a change from prior practice in
that the dollar threshold for application of these rules has been lowered from $100,000 to
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 22 of 28
$25,000. These are contracts and subcontracts referred to in the regulation as "covered
transactions."
Grantees, contractors, and subcontractors (at any level) that enter into covered transactions are
required to verify that the entity (as well as its principals and affiliates) they propose to contract
or subcontract with is not excluded or disqualified. They do this by (a) Checking the Excluded
Parties List System, (b) Collecting a certification from that person, or (c) Adding a clause or
condition to the contract or subcontract. This represents a change from prior practice in that
certification is still acceptable but is no longer required. 49 CFR 29.300.
Grantees, contractors, and subcontractors who enter into covered transactions also must
require the entities they contract with to comply with 49 CFR 29, subpart C and include this
requirement in their own subsequent covered transactions (i.e., the requirement flows down to
subcontracts at all levels).
Clause Language
The following clause language is suggested, not mandatory. It incorporates the optional method
of verifying that contractors are not excluded or disqualified by certification.
Suspension and Debarment
This contract is a covered transaction for purposes of 49 CFR Part 29. As such, the
contractor is required to verify that none of the contractor, its principals, as defined at 49
CFR 29.995, or affiliates, as defined at 49 CFR 29.905, are excluded or disqualified as
defined at 49 CFR 29.940 and 29.945.
The contractor is required to comply with 49 CFR 29, Subpart C and must include the
requirement to comply with 49 CFR 29, Subpart C in any lower tier covered transaction it
enters into.
By signing and submitting its bid or proposal, the bidder or proposer certifies as follows:
The certification in this clause is a material representation of fact relied upon by {insert agency
name]. If it is later determined that the bidder or proposer knowingly rendered an erroneous
certification, in addition to remedies available to {insert agency name), the Federal Government
may pursue available remedies, including but not limited to suspension and/or debarment. The
bidder or proposer agrees to comply with the requirements of 49 CFR 29, Subpart C while this
offer is valid and throughout the period of any contract that may arise from this offer. The bidder
or proposer further agrees to include a provision requiring such compliance in its lower tier
covered transactions.
10. BREACHES AND DISPUTE RESOLUTION
Disputes - Disputes arising in the performance of this Contract which are not resolved by
agreement of the parties shall be decided in writing by the authorized representative of City's
[title of employee]. This decision shall be final and conclusive unless within [ten (10)] days from
the date of receipt of its copy, the Contractor mails or otherwise furnishes a written appeal to the
[title of employee]. In connection with any such appeal, the Contractor shall be afforded an
opportunity to be heard and to offer evidence in support of its position. The decision of the [title
of employee] shall be binding upon the Contractor and the Contractor shall abide be the
decision.
Performance During Dispute - Unless otherwise directed by City, Contractor shall continue
performance under this Contract while matters in dispute are being resolved.
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 23 of 28
Claims for Damages - Should either party to the Contract suffer injury or damage to person or
property because of any act or omission of the party or of any of his employees, agents or
others for whose acts he is legally liable, a claim for damages therefor shall be made in writing
to such other party within a reasonable time after the first observance of such injury of damage.
Remedies - Unless this contract provides otherwise, all claims, counterclaims, disputes and
other matters in question between the City and the Contractor arising out of or relating to this
agreement or its breach will be decided by arbitration if the parties mutually agree, or in a court
of competent jurisdiction within the State in which the City is located.
Rights and Remedies - The duties and obligations imposed by the Contract Documents and
the rights and remedies available thereunder shall be in addition to and not a limitation of any
duties, obligations, rights and remedies otherwise imposed or available by law. No action or
failure to act by the City, (Architect) or Contractor shall constitute a waiver of any right or duty
afforded any of them under the Contract, nor shall any such action or failure to act constitute an
approval of or acquiescence in any breach thereunder, except as may be specifically agreed in
writing.
11. LOBBYING
Modifications have been made to the Clause pursuant to Section 10 of the Lobbying Disclosure
Act of 1995, P.L. 104-65 [to be codified at 2 U.S.C. § 1601, et seq.]
- Lobbying Certification and Disclosure of Lobbying Activities for third party contractors are
mandated by 31 U.S.C. 1352(b)(5), as amended by Section 10 of the Lobbying Disclosure Act
of 1995, and DOT implementing regulation, "New Restrictions on Lobbying," at 49 CFR §
20.110(d)
- Language in Lobbying Certification is mandated by 49 CFR Part 19, Appendix A, Section 7,
which provides that contractors file the certification required by 49 CFR Part 20, Appendix A.
Modifications have been made to the Lobbying Certification pursuant to Section 10 of the
Lobbying Disclosure Act of 1995.
- Use of "Disclosure of Lobbying Activities," Standard Form-LLL set forth in Appendix B of 49
CFR Part 20, as amended by "Government wide Guidance For New Restrictions on Lobbying,"
61 Fed. Reg. 1413 (1/19/96) is mandated by 49 CFR Part 20, Appendix A.
Byrd Anti -Lobbying Amendment, 31 U.S.C. 1352, as amended by the Lobbying Disclosure
Act of 1995, P.L. 104-65 [to be codified at 2 U.S.C. § 1601, et seq.] - Contractors who apply
or bid for an award of $100,000 or more shall file the certification required by 49 CFR part 20,
"New Restrictions on Lobbying." Each tier certifies to the tier above that it will not and has not
used Federal appropriated funds to pay any person or organization for influencing or attempting
to influence an officer or employee of any agency, a member of Congress, officer or employee
of Congress, or an employee of a member of Congress in connection with obtaining any Federal
contract, grant or any other award covered by 31 U.S.C. 1352. Each tier shall also disclose the
name of any registrant under the Lobbying Disclosure Act of 1995 who has made lobbying
contacts on its behalf with non -Federal funds with respect to that Federal contract, grant or
award covered by 31 U.S.C. 1352. Such disclosures are forwarded from tier to tier up to the
recipient.
RFP 7284 Training & Procure ment,Review for FTA Funded Projects Page 24 of 28
APPENDIX A, 49 CFR PART 20--CERTIFICATION REGARDING LOBBYING
Certification for Contracts, Grants, Loans, and Cooperative Agreements
(To be submitted with each bid or offer exceeding $100,000)
The undersigned [Contractor] certifies, to the best of his or her knowledge and belief, that
(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the
undersigned, to any person for influencing or attempting to influence an officer or employee of
an agency, a Member of Congress, an officer or employee of Congress, or an employee of a
Member of Congress in connection with the awarding of any Federal contract, the making of any
Federal grant, the making of any Federal loan, the entering into of any cooperative agreement,
and the extension, continuation, renewal, amendment, or modification of any Federal contract,
grant, loan, or cooperative agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be paid to any
person for making lobbying contacts to an officer or employee of any agency, a Member of
Congress, an officer or employee of Congress, or an employee of a Member of Congress in
connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned
shall complete and submit Standard Form--LLL, "Disclosure Form to Report Lobbying," in
accordance with its instructions [as amended by "Government wide Guidance for New
Restrictions on Lobbying," 61 Fed. Reg. 1413 (1/19/96). Note: Language in paragraph (2)
herein has been modified in accordance with Section 10 of the Lobbying Disclosure Act of 1995
(P.L. 104-65, to be codified at 2 U.S.C. 1601, etseq.)]
(3) The undersigned shall require that the language of this certification be included in the award
documents for all subawards at all tiers (including subcontracts, subgrants, and contracts under
grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclose
accordingly.
This certification is a material representation of fact upon which reliance was placed when this
transaction was made or entered into. Submission of this certification is a prerequisite for
making or entering into this transaction imposed by 31, U.S.C. § 1352 (as amended by the.
Lobbying Disclosure Act of 1995). Any person who fails to file the required certification shall be
subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such
failure.
[Note: Pursuant to 31 U.S.C. § 1352(c)(1)-(2)(A), any person who makes a prohibited
expenditure or fails to file or amend a required certification or disclosure form shall be subject to
a civil penalty of not less than $10,000 and not more than $100,000 for each such expenditure
or failure.]
The Contractor, certifies or affirms the truthfulness and accuracy of
each statement of its certification and disclosure, if any. In addition, the Contractor understands
and agrees that the provisions of 31 U.S.C. A 3801, et seq., apply to this certification and
disclosure, if any.
Signature of Contractor's Authorized Official
Name and Title of Contractor's Authorized Official
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 25 of 28
Date
12. CLEAN AIR
Clean Air —
(1) The Contractor agrees to comply with all applicable standards, orders or regulations
issued pursuant to the Clean Air Act, as amended, 42 U.S.C. §§ 7401 et sec . The
Contractor agrees to report each violation to the Purchaser and understands and agrees
that the Purchaser will, in turn, report each violation as required to assure notification to FTA
and the appropriate EPA Regional Office.
(2) The Contractor also agrees to include these requirements in each subcontract exceeding
$100,000 financed in whole or in part with Federal assistance provided by FTA.
13. CLEAN WATER REQUIREMENTS
Clean Water - (1) The Contractor agrees to comply with all applicable standards, orders or
regulations issued pursuant to the Federal Water Pollution Control Act, as amended, 33 U.S.C.
1251 et seg. The Contractor agrees to report each violation to the Purchaser and understands
and agrees that the Purchaser will, in turn, report each violation as required to assure
notification to FTA and the appropriate EPA Regional Office.
(2) The Contractor also agrees to include these requirements in each subcontract exceeding
$100,000 financed in whole or in part with Federal assistance provided by FTA.
14. FLY AMERICA REQUIREMENTS
The Contractor agrees to comply with 49 U.S.C. 40118 (the "Fly America" Act) in accordance
with the General Services Administration's regulations at 41 CFR Part 301-10, which provide
that recipients and subrecipients of Federal funds and their contractors are required to use U.S.
Flag air carriers for U.S Government -financed international air travel and transportation of their
personal effects or property, to the extent such service is available, unless travel by foreign air
carrier is a matter of necessity, as defined by the Fly America Act. The Contractor shall submit,
if a foreign air carrier was used, an appropriate certification or memorandum adequately
explaining why service by a U.S. flag air carrier was not available or why it was necessary to
use a foreign air carrier and shall, in any event, provide a certificate of compliance with the Fly
America requirements. The Contractor agrees to include the requirements of this section in all
subcontracts that may involve international air transportation.
15. ENERGY CONSERVATION REQUIREMENTS
Energy Conservation - The contractor agrees to comply with mandatory standards and
policies relating to energy efficiency which are contained in the state energy conservation plan
issued in compliance with the Energy Policy and Conservation Act.
16. RECYCLED PRODUCTS
Recovered Materials - The contractor agrees to comply with all the requirements of Section
6002 of the Resource Conservation and Recovery Act (RCRA), as amended (42 U.S.C. 6962),
including but not limited to the regulatory provisions of 40 CFR Part 247, and Executive Order
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 26 of 28
12873, as they apply to the procurement of the items designated in Subpart B of 40 CFR Part
247.
17. Conformance with ITS National Architecture
To the extent applicable, the Contractor agrees to conform to the National Intelligent
Transportation Systems (ITS) Architecture and Standards as required by SAFETEA-LU §
5307(c), 23 U.S.C. § 512 note, and follow the provisions of FTA Notice, "FTA National ITS
Architecture Policy on Transit Projects," 66 Fed. Reg. 1455 et seq., January 8, 2001, and any
other implementing directives FTA may issue at a later date, except to the extent FTA
determines otherwise in writing.
18. ADA Access
Accessibility. Facilities to be used in public transportation service must comply with 42 U.S.C.
Sections 12101 et seq. and DOT regulations, "Transportation Services for Individuals with
Disabilities (ADA)," 49 CFR Part 37; and Joint ATBCB/DOT regulations, "Americans with
Disabilities (ADA) Accessibility Specifications for Transportation Vehicles," 36 CFR Part 1192
and 49 CFR Part 38. Notably, DOT incorporated by reference the ATBCB's "Americans with
Disabilities Act Accessibility Guidelines" (ADAAG), revised July 2004, which include accessibility
guidelines for buildings and facilities, and are incorporated into Appendix A to 49 CFR Part 37.
DOT also added specific provisions to Appendix A modifying the ADAAG, with the result that
buildings and facilities must comply with both the ADAAG and amendments thereto in Appendix
A to 49 CFR Part 37.
19. CITY OF FORT COLLINS BID PROTEST PROCEDURES
Filing of Protest
When to File. Protest is submitted in writing and received by the Director of Purchasing and
Risk Management, 215 N. Mason Street, 2"d Floor, P. O. Box 580, Fort Collins, CO. 80522
within seven (7) working days after the aggrieved person knows or should have known of
the facts giving rise thereto. Protests based upon restrictive specifications or alleged
improprieties in any type of solicitation, which are apparent prior to bid opening or the
closing date for receipt of initial proposals, is filed no later than three (3) working days prior
to bid opening or the closing date for receipt of proposals.
2. Subject of Protest. Protestors may file a protest on any phase of solicitation or award,
including but not limited to specification or award.
3. Form. The protest must be in writing and include, as a minimum, the following:
(a) The name and address of the protestor.
(b) Appropriate identification of the procurement by bid number.
(c) A statement of the reasons for the protest.
(d) Any available exhibits, evidence or documents substantiating the protest.
4. Decision. The Director of Purchasing and Risk Management makes a decision, in writing,
on a protest within seven (7) working days after receiving all relevant, requested
information. The decision of the Director of Purchasing and Risk Management is final.
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 27 of 28
5. Withholding of Award. When a protest has been filed before award, the City will not make
an award prior to the resolution of the protest, and when a protest has been filed before the
opening of bids, the City will not open bids prior to the resolution of the protest, unless the
City determines that:
(a) The items to be procured are urgently required.
(b) Delivery or performance will be unduly delayed by failure to make the award
promptly.
(c) Failure to make prompt award will otherwise cause undue harm to the City.
NOTE: Protests involving Federal Transit Administration (FTA) Funded Projects
• Vendors who protest an FTA funded purchase have an additional remedy if
their protest is denied by the City. They may also protest the award, (after
these administrative processes have been exhausted) directly to the Federal
Transit Administration.
• FTA will only entertain a protest that alleges the grantee failed to follow their
protest procedures and that such a protest must be filed in accordance with the
Circular; and
• Allowance for request for reconsideration (if data becomes available that was
not previously known, or there has been an error of law or regulation).
The City of Fort Collins will notify FTA of any protests received relating to FTA funded projects.
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 28 of 28
SCOPE OF WORK
The City of Fort Collins receives funding from a number of Federal Agencies. The
Federal Transit Agency (FTA) provides the biggest portion of Federal funding including
an $88 million Small Starts Bus Rapid Transit grant. The City also has received a
Department of Energy (DOE) smart grid funding.
In the last two years the City has had two procurement reviews performed by the FTA.
Several deficiencies were noted and the City has been working diligently to rectify and
prevent occurrences of these problems. Copies of the final reports are posted with this
solicitation.
The City wants to ensure all procurement activities across the City organization
associated with FTA funded projects are in full compliance with all FTA regulations.
The City is seeking an individual or firm who can 1) evaluate the current City
procurement processes, organizational structure, accountabilities alignment and
recommend corrective actions to improve compliance reliability, 2) provide training to
City personnel on all aspects of FTA regulations and compliance requirements to
ensure that it is complying with all Federal regulations, and 3) provide expert
consultative support on an as needed basis to related to future Federal procurement
programs. The selection from this proposal may result in contracts with two firms one
for training and one for consultant services.
Firms should provide information on their background and expertise with FTA, other
Federal agencies, and each of the areas below:
Procurement Process Review:
• Organizational assessment and design to ensure compliance
• Process mapping, roles and responsibility alignment to ensure compliance
• Review of procurement process, manuals and methods to ensure compliance
Training:
• FTA Procurement Training course overview and detailed descriptions of the
scope and content of each training module
• Tailored training development and recommendation of the appropriate training
detail required for various groups across the organization.
• Training should include specific areas where the City has been found deficient
such as:
o ICE — Independent Cost Estimates
o Cost Analysis
o Sole Source Justification and Change Oder requirements
o Davis -Bacon Wage Requirements and documentation
Consultant Services:
• Expertise and knowledge
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 3 of 28
The City envisions a general/overview training, perhaps 4 hours for staff who are
peripherally involved in FTA programs and additional specific training, perhaps 12
hours, for individuals i.e. purchasing staff and project managers, who are more involved
with procurement using Federal funds.
Firms should provide separate time and cost estimates plus details on the deliverables
for the 1) Procurement Process Review, and the 2) Training(topics/modules) that they
would recommend to ensure the City's full compliance with all regulations. Firms should
also indicate their willingness and expertise in the area of providing on -going
procurement advice to the City. Separate costs should also be provided for this.
The City would also like to video tape the training for internal use for new personnel.
Timing:
The City would like to have the training completed mid -November. And the
Procurement Process Review completed by the end of the year or sooner if possible.
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 4 of 28
REVIEW AND ASSESSMENT
Professional firms will be evaluated on the following criteria. These criteria will be the
basis for review of the written proposals and optional interview session. At discretion of
the City, interviews of top rated firms may be held.
The rating scale shall be from 1 to 5, with 1 being a poor rating, 3 being an average
rating, and 5 being an outstanding rating.
WEIGHTING
QUALIFICATION
STANDARD
FACTOR
Does the proposal show an understanding of
2.0
Scope of Proposal
the project objective, methodology to be used
and results that are desired from the project?
Do the persons who will be working on the
2.0
Assigned
project have the necessary skills? Are
Personnel
sufficient people of the requisite skills assigned
to the project?
Can the work be completed in the necessary
time? Can the target start and completion
dates be met? Are other qualified personnel
1.0
Availability
available to assist in meeting the project
schedule if required? Is the project team
available to attend meetings as required by the
Scope of Work?
1.0
Motivation
Is the firm interested and are they capable of
doing the work in the required time frame?
Do the proposed cost and work hours compare
Cost and
favorably with the project Manager's estimate?
2.0
Are the work hours presented reasonable for
Work Hours
the effort required in each project task or
phase?
Does the firm have the support capabilities the
2.0
Firm Capability
assigned personnel require? Has the firm
done previous projects of this type and scope?
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 5 of 28
REFERENCE EVALUATION (TOP RATED FIRM)
The project Manager will check references using the following criteria. The evaluation
rankings will be labeled Satisfactory/Unsatisfactory.
QUALIFICATION
STANDARD
Overall Performance
Would you hire this Professional again? Did
they show the skills required by this project?
Timetable
Was the original Scope of Work completed
within the specified time? Were interim
deadlines met in a timely manner?
Was the Professional responsive to client needs;
Completeness
did the Professional anticipate problems? Were
problems solved quickly and effectively?
Budget
Was the original Scope of Work completed
within the project budget.
a) If a study, did it meet the Scope of Work?
b) If Professional administered a construction
Job Knowledge
contract, was the project functional upon
completion and did it operate properly?
Were problems corrected quickly and
effectively?
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 6 of 28
PROFESSIONAL SERVICES AGREEMENT
THIS AGREEMENT made and entered into the day and year set forth below, by and
between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter
referred to as the "City" and , hereinafter referred to as "Professional'.
W ITNESSETH:
In consideration of the mutual covenants and obligations herein expressed, it is agreed
by and between the parties hereto as follows:
1. Scope of Services. The Professional agrees to provide services in accordance
with the scope of services attached hereto as Exhibit "A", consisting of ( )
page and incorporated herein by this reference.
2. The Work Schedule. (Optional) The services to be performed pursuant to this
Agreement shall be performed in accordance with the Work Schedule attached hereto as
Exhibit "B", consisting of ( ) page, and incorporated herein by this reference.
3. Contract Period. This Agreement shall commence , 200 , and shall
continue in full force and effect until 200 unless sooner terminated as herein
provided. In addition, at the option of the City, the Agreement may be extended for additional
one year periods not to exceed four (4) additional one year periods. Renewals and pricing
changes shall be negotiated by and agreed to by both parties. The Denver Boulder Greeley
CPIU published by the Colorado State Planning and Budget Office will be used as a guide.
Written notice of renewal shall be provided to the Professional and mailed no later than ninety
(90) days prior to contract end.
4. Early Termination by City. Notwithstanding the time periods contained herein,
the City may terminate this Agreement at any time without cause by providing written notice of
termination to the Professional. Such notice shall be delivered at least fifteen (15) days prior to
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 7 of 28
the termination date contained in said notice unless otherwise agreed in writing by the parties.
All notices provided under this Agreement shall be effective when mailed, postage prepaid and
sent to the following addresses:
Professional:
City:
With Copy to:
City of Fort Collins
City of Fort Collins , Purchasing
Attn:
PO Box 580,
PO Box 580
Fort Collins, CO 80522
Fort Collins, CO 80522
In the event of any such early termination by the City, the Professional shall be paid for services
rendered prior to the date of termination, subject only to the satisfactory performance of the
Professional's obligations under this Agreement. Such payment shall be the Professional's sole
right and remedy for such termination.
5. Design, Project Indemnity and Insurance Responsibility. The Professional shall
be responsible for the professional quality, technical accuracy, timely completion and the
coordination of all services rendered by the Professional, including but not limited to designs,
plans, reports, specifications, and drawings and shall, without additional compensation,
promptly remedy and correct any errors, omissions, or other deficiencies. The Professional
shall indemnify, save and hold harmless the City, its officers and employees in accordance with
Colorado law, from all damages whatsoever claimed by third parties against the City; and for the
City's costs and reasonable attorneys fees, arising directly or indirectly out of the Professional's
negligent performance of any of the services furnished under this Agreement. The Professional
shall maintain commercial general liability insurance in the amount of $500,000 combined single
limits and errors and omissions insurance in the amount of $ Optional: according to the
Insurance Requirements attached hereto as Exhibit " ", consisting of one (1) page.
6. Compensation. [Use this paragraph or Option 1 below.] In consideration of
the services to be performed pursuant to this Agreement, the City agrees to pay Professional a
fixed fee in the amount of ($ ) plus reimbursable direct costs. All such fees and
costs shall not exceed ($ ). Monthly partial payments based upon the Professional's
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 8 of 28
billings and itemized statements are permissible. The amounts of all such partial payments
shall be based upon the Professional's City -verified progress in completing the services to be
performed pursuant hereto and upon the City's approval of the Professional's actual
reimbursable expenses. [Optional] Insert Subcontractor Clause Final payment shall be made
following acceptance of the work by the City. Upon final payment, all designs, plans, reports,
specifications, drawings, and other services rendered by the Professional shall become the sole
property of the City.
6. Compensation. [Option 1] In consideration of the services to be performed
pursuant to this Agreement, the City agrees to pay Professional on a time and reimbursable
direct cost basis according to the following schedule:
Hourly billing rates:
Reimbursable direct costs:
with maximum compensation (for both Professional's time and reimbursable direct costs) not to
exceed ($ ). Monthly partial payments based upon the Professional's billings and
itemized statements of reimbursable direct costs are permissible. The amounts of all such
partial payments shall be based upon the Professional's City -verified progress in completing the
services to be performed pursuant hereto and upon the City's approval of the Professional's
reimbursable direct costs. Final payment shall be made following acceptance of the work by the
City. Upon final payment, all designs, plans, reports, specifications, drawings and other
services rendered by the Professional shall become the sole property of the City.
7. City Representative. The City will designate, prior to commencement of work, its
project representative who shall make, within the scope of his or her authority, all necessary and
proper decisions with reference to the project. All requests for contract interpretations, change
orders, and other clarification or instruction shall be directed to the City Representative.
8. Project Drawings. [Optional] Upon conclusion of the project and before final
RFP 7284 Training & Procurement Review for FTA Funded Projects Page 9 of 28