HomeMy WebLinkAboutCHANGE ORDER - BID - 6054 ASPHALT SLURRY SEAL PROJECTCity of Fort Collins 2010 Ashpatt SluTn Change Order No,: 1 Date: 10/27/2011 1. Reason For Change: a. Add Quantities to original Contract Quantity Totals 2. Description Of Change: a. Add or subtract actual quantity totals for each pay Item shown below 3. Change in Contract Amount: Item Oty Unit Unit Cost Total Cost a 208.01 Stomlwater Protection -Rock 84.00 Each S92.00 $ 7.728.00 Sock Wattle 409.01 Type II Asphalt Slurry Seal - A2 5,196.00 SY $1.86 $ 9,664.56 Street Locations 409.02 Type II Asphalt Slurry Seal - -3,060 SY $220 S (6,776.00) Parking lots 630.01 'No Parking' Sign With Stand 630 Day/Each SI 20 $ 756.00 630.02 VerBcal Panel Without Light -20 Day/Each $0.47 $ (9.40) 630.03 Channelizing Barrels -20 Day/Each 50.47 $ (9.40) 630.04 Type I it Barricade Without Light -20 Day/Each $0.47 $ (9.40) 630.05 Type III Barricade Without Light 54 Oay/Each S1.30 $ 64.80 630.06 Size A Sign With Stand I Day/Each S1.20 $ 1.20 630.07 Size B Sign With Stand 13 Day/Each SI 20 $ 15.60 630.08 Size A Specialty Sign - Cost of S40.85 S (40.85) Manufacturing .1 Each 630.09 Size B Specialty Sign - Cost of 340,85 S (40.85) Manufacturing .1 Each 630.10 Cone With Reflective Strip 873 Day/Each S0.60 3 523.80 630.11 Safety Fence -10 Day/Each $0.60 $ (6.00) 630.12 Light -10 Day/Each S0.32 $ (3.20) Advance Warning Flashing - or 630.13 Sequencing Arrow Panel .5 Day/Each $2.1.35 S (116.75) 630.14 Variable Message Board .5 Day/Each S151.75 $ (758.75) 630.15 Tic Control Supervisor .7 Per Day S462.00 S (3,234.D0) 630.16 Traffic Control Supervisor -69.25 Per Flour S45.50 $ (3,150.88) 630.17 Flagging -119 Per Hour s22.00 S 12,818.00) TOTAL CHANGE IN CONTRACT AMOUNT 4. To balance encumbrances in the PO a. Increase Street Departments cost to b. _Decrease Utility Departments casts by e. Decrease Parks Departments costs by $ 1,980.48 $ 10,100.28 _ $ 3,424.81 3 4,694.99 S:\Streels\PMP\Common\p,m,p\PROJECTS\2011\Slurry\Pay Estimale\CurrenrCONTRACTORS PAY ESTIMATE City of Fort Collins Planning, Development & Transportation s'6"' Streets 625 Ninth Street P.O. Box 580 Fort Collins, CO 8052ZO580 - 970.221 .661 5 970.221.6270. lax Change Order Form PROJECT TITLE: 2011 Street Maintenance Program, Slurry Seal Project PROJECT NUMBER: ( Bid #6054) CONTRACTOR: A-1 Chipseal (PO #9114634) CHANGE ORDER NUMBER: 1 n propanng cnange oraem snow in order as separate numberact paragraphs the tolloMn5 1. Reason for change. 2. Description of change 3. Change in contract cost. 4. Change in contract time. 1. , See attached document Change Omer No. 1 3. The contract cost will Increase by $1.980.48 4. There is no change In contract time. ORIGINAL CONTRACT COST $368,740.20 TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS $0 00 TOTAL THIS CHANGE ORDER $1 980 48 TOTAL % THIS CHANGE ORDER 0,54% TOTAL C.O. % OF ORIGINAL CONTRACT 0.54% ADJUSTED CONTRACT COST $370,720.68 ACCEPTED BY: DATE: Contractor's Representative APPROVED BY: DATE: Oj�-kI�l'l W ter Utilities Project Manager APPROVED BY: �ill � DATE: _/ / Parks Project Manager APPROVED BY: DATE: . Pavement Management Program Manager cc: Conlraclor Purchasing Protect He City C/v�� Planning, Development & Transportation Streets olfins 625 Ninth th$treat wt Streets Ro. Box 580 Fort Cabins, CO 80522 0580 970.221.6615 970.221,6270 lax Change Order Form PROJECT TITLE: 2011 Street Maintenance Program, Slurry Seal Project PROJECT NUMBER: ( Bid N8054) CONTRACTOR: A-1 Chipseal (PO 09114634) CHANGE ORDER NUMBER: 1 - n preparing change orders snow to order as separate numbered paragraphs the following 1. Reason for change. 2. Description of change 3. Change in contract cost. 4. Change in contract time 1. See attached document Change Order No. 1 3. The contract cost will increase by $1.980.48 4. There is no change In contract time. ORIGINAL CONTRACT COST $368.740.20 TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $1,980.48 TOTAL % OF THIS CHANGE ORDER 0.54% TOTAL C.O. % OF ORIGINAL CONTRACT 0.54% ADJUSTED CONTRACT COST $370,720.68 10/31 /201 1 ACCEPTED BY: DATE: Contractors Representative APPROVED BY: ���1 1 DATE: io 3 I a0 I I Pavement Management Program Manager cc: Contractor Purchasing Project File City Of Collins Planning, Development & Transportation Sh�'° wort Streets 625 Ninth Srreel Ro Box 580 Fon CoN.ns, CO B0522.0580 970.221.6615 970.22r.6270. ta. Change Order Form PROJECT TITLE: 2011 Street Maintenance Program, Slurry Seal Project PROJECT NUMBER: ( Bid #6064) CONTRACTOR: A•1 Chipseal (PO 09114634) CHANGE ORDER NUMBER: 1 1. Reason for change. 2. Description of change 3. Change In contract cost. 4. Change in contract time 1. See attached document Change Order No. 1 3. The contract cost wig increase by $1,980.48 4. There is no change in contract time. ORIGINAL CONTRACT COST $36874020 TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS $0 00 TOTAL THIS CHANGE ORDER $1 980 48 TOTAL % OF THIS CHANGE ORDER 0,S4% TOTAL C.O. % OF ORIGINAL CONTRACT - 0.54% ADJUSTED CONTRACT COST $370.72066 ACCEPTED BY: DATE: c Contractor/s]Reprewnttativee APPROVED BY: .�' L �.�. ,'J47/.,.� DATE: Water Ulili ies Project Manager APPROVED BY: DATE: Parks Project Manager APPROVED BY: DATE: Pavement Management Program Manager cc: Coruracr« Purchasing Pmjm Poe agrN.cx.. arrRym+agarxy.. of rilyr rr art aoMAYxnHfA IwW yry14 tlY Wf� f.wo W YK YIY, RTxY iwAY C.rxrw � � r xrbCr Tn. C�uLLw }u" AYrrw 1 IY o f 'Llmvl+ u. - a mrb L Im Lm 1 wm 1 lu. f f •y...m...r.Yael�. ym, s L TxmLw / ,xMm fLafxr� L 5 A.xLx anx t��.LfYoif.luyle L tl 1 YVTm fuwx� { f .Ox T.W"TUW Ib.a 1 1.1 1 LI%m tLLfm Ym f b L a 1 .w mr.L.m.y, I.w 1 xn l t 1 .tln xx..oxxr.fm. �vm s u t m}x, rm a f ••"^`�'�' awn. u. f u l w nu .� a 1 xLa P. 1 lam x.m.rL...rr.fr+e.. Ta a •u+ f a f x.w.». IYns s o f w LAu L!Tw a a mm a 1 rxw. t u] s u a 1 "Yft-lx�� 4iy0 f t 1}LA f ALA t t . .aV .e.Mnn NIW 1 wib 1 "•xW N4. f .Ib 1 uY r1A \x L VIl f LRq r 1,m t `Jfx f 4x1O 31Y Y a f f •gym { 1Vx11 a RTxp L N 6Yr Mul Mwtlw.. L LY TOTaLC4T { ARfiY L Mw 1 )+Wq rN: f nrtw s 1 w .mwr..w..wolecm.+rnrs�s.�wmnLxlAAwuxw r,m,.,