Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7244 LINDEN STREET STREETSCAPEi City of F®it C®Wns nginna�r g Planning, Development 8 Transportation Enalnoonn9 281 Nodh college Arenue _. 'P.O. Box see, ._ ... ... .. .._ _ .. _._._ Far Coelm, CO 60622.0500 070.221.8605 e70.221.6370"lax Change Order Form PROJECT TITLE: Linden St Improvements, Streetscape Project PROJECT NUMBER: 400903707.6 (Old $7244) CONTRACTOR: American Civil Constructors (PO 0114195) CHANGE ORDER NUMBER: 3 n preparing change or oreshow In order as separate numbered paragraphs the following: 11. Reason for change. 2. Descrlptionofchange. 3. Change In contract cost. 4. Change In contract time. 1&2. See attached sheet for detail. 3. The contract cost will decrease by $ (67,888.97) 4. There vAl be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACTCOST (Assuming ell Grange orders approved) ACCEPTED BY: REVIEWED BY: "4.0f % •10.82% $1,fi92,190.90 $0.00 ($67,888.97) $1,605,101.93 ti /b2f cr-oL) t)Izzl7nrr i wool ' i SUBMITTED BY: . - 11 _ _DATE: (Pr J cl Man i APPROVED BY; ti I DATE: G (Project Manager- Utllitles APPROVEDBY: DATE: )`-cZ3•lf_ t (Department Hear) APPROVED BY; DATE: (Purchasing Agent over $60,000) ' ro: ConUeda Purchanne Prolaot Flle I i f Item N CHANGE ORDER a Linden Streetscapa Prolact SUMMARY OF WORK n,mnnty a"a cno.e 202-00220 Removal of Asphalt Mat (6" depth) SY 2109.30 $ 12.00 $ 25,311.60 203-00000 Unclassified Excavation CY 800 $ 19.35 $ 15,480.00 203-00100 Muck Excavation CY -1434.10 $ 47.65 $ 68,334.87 206.00065 Structure Backfill flow -fill CY -67.00 $ 125.00 $ 8,375.00 208-00070 Stabilized Construction Entrance EACH ' -4.00 $ 650.00 $ 2,600.00 306-01000 Reconditioning 12" Depth) SY -4980.50 $ 3.60 $ 17,929.80 420-00300 Geotexlile(Reinforcing) - SY -748.70 $ 2.20 $ 1,647.14 403-00720 Hot Mix Asphalt(Patching) (Asphalt) TON -26.20 $ 145.00 $ 3,799.00 403-32821 Hot Mlx Asphalt(Grading SG 100 PG 58-28 TON -267.70 $ 67.00 $ 17,935.90 412.00805 Concrete Pavement 8 inch Commercial Drive Fast Track 24 SY 96.58 $ 83.00 $ 11 016.14 80a- 002 Concrete Sidewalk 6" Depth) SY 650.00 $ 47.00 $ 30,550.00 626-01000 Public Information Services I HOUR -45.00 1 $ 125.00 1 $ 5,625.00) 700-70010 1 F/A Minor Contract Revisions I F A -0.20 1 $ 80,000.00 1 $ 16,000.00 700-70018 IFIA Asphalt Cement Cost Adjustment I F A -1.00 1 $ 5.000.00 IS(5.000.0011 IUTAL $ (67,888.97) 203-00100, 206-00065, The plan quantities of Muck Excavation, Reconditioning, Structural Backfill (flow011), and Geotexlile were not necessary to 306-01000, address subgrade issues. 420-00300 Asphalt Removal is increased to account for asphalt removal that was not completed by City Utilities Department. 202-00220 Stabilized Construction Entrances are removed from the contract because the construction did not requrle them. The existing millings and roadbase roadway adequately minimized tracking issues. 208-00070 403-00720. I HMA Asphalt quantites are reduced to reflect the final as -constructed quantities. 403-32821 412-00805 608-00000 700-70010 700-70019 Concrete Pavement 8 inch Commercial Drive is Increased for Inaccuracies on the estimated quantity. Concrete Sidewalk (6" depth) is increased for inaccuracies in the estimated quantities and additional sidewalk that was installed at Feeder's Supply, El Burrito, 409 Linden, and 410 Linden Minor Contract Revisions is reduced to reduce retainage and reflect remaining Work items. Asphalt Cost Adjustment is reconciled from the contract. Posted to Pay App he