Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 7150 SMALL LANDSCAPE AND IRRIGATION ANNUAL (3)EXHIBIT "A" WORK ORDER FORM PURSUANT"r0 AN AGREEMENT BETWEEN THE CITY OF FOR]" COLLINS AND Korby Landscaping, LLC Daled; 10/25/2011 Work Order Number: Purchase Order Number: Project Title: Hughes Stadium Disc Golf Irrigation Construction Commencement Date: 10/25/2011 Completion Date: I U15/2011 Maximum Fee: (time & reimbursable direct costs): S56,350.00 Project Description: Construction for disc golf drip irrigation Scope of Services: See attached estimate ofwork Acceptance Parkl hurning, Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms) the Services Agreement shall control. Service, oProLvider 1� By: Yl Aflr L frr� Date: i taa Ili CC: purchasing The attached forms consisting of two (2) pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. City of Fort Collins Director of Purchasing and Risk Management if over 560,000 KORBY LANDSCAPING, LLC 3201 E MULBERRY UNIT #S FT. COLLINS, CO 80524 KORRY R. COLLIMti CO 970-568-7533 I Name / Address I Craig Kisling of Fort Collins hinting Depatment BOX 580 Collins, CO 80522-0580 Landscape Quote Date Estimate # 9/29/2011 20214, P.O. No. Terms Due Date Project Net 30 10f292011 Hughes Stadium Description aty Cost Total Drip irrigation system installed - - -- - - Irrigation Parts t 18,500.00 18,500.00 raise parts 1 575.00 575.00 Sentinel Controller Clock & Pedestal 1' 8,000.00 8,000.00 Irr Wire 14/1 Red for controller l 250.00 250.00 flow sensor cable 1 100.00 100.00 Contract Labor for electrician 1 750.00 750.00 Dustin Controller pad & pedestal mount 1 475.00 475.00 Labor Charge for irrigation supervisor 125 30.00 3,750.00 Hours for sprinkler line trenching 45 50.00 2,250.00 Labor charges for irrigation operations per hour 620 25.00 15,500.00 Labor charges for irrigation operations per hour for 80 25.00 2,000.00 settle trench & cleanup Hydrostatic test/ as built/warranty l 4,200.00 4,200.00 Thank you for your business. Sales TeX (7.55%) $0.00 Total $56,350.00 Signature