Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - P1124 CIVIL ENGINEERING ANNUAL (16)o,7 11bg 5-8 EXHIBIT "A" WORK ORDER FORM PURSUANTTO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND INTERW EST CONSULTING GROUP DATED: July 15, 2008 Work Order Number: Purchase Order Number: Project Title: Stanton Creek Trail Commencement Date: 9-22-11 Completion Date: 4_1-12 Maximum Fee: (time and reimbursable direct costs): $25,t00 Project Description: _ See Attached _ Scope of Services: See Description Acceptance Uslei Professional agrees to perform the services Identified above and on the attached forms In accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (Including the attached forms) the Professional Services Agreement shall control. Professional 9-22-LI The attached forms consisting of _ (_) pages are hereby accepted and incorporated heroin, by this reference, and Notice to Proceed is hereby given. City of Fort Collins By. James B. O'Neill II, CPPO, FNIGP Director of Purchasing and Risk Management (over $30,000,00) Date: Stanton Creek Trail Construction Project Description and Scope of Services Interwest Consulting Group Description: Interwest and King Surveyors will provide engineering and surveying services necessary during construction of the trail including services necessary to close out the Floodplain Use Permit. Scope of Services Surveying — Legal Descriptions — King Surveyors will provide one legal description for the trail segment that has been moved to the west bank of the creek. Estimated Fee: $500 Surveying — Construction Staking — King Surveyors will stake the required grading (slope stake) and then stake the trail for the contractor at 25' intervals in 3 total trips to the site. Estimated Fee: $4,600 Surveying — Bridges — King Surveyors will stake the three pedestrian bridges and culverts on the trail route. Estimated Fee: $1,200 Surveying — Form Check — King Surveyors will survey the forms for the trail within the floodplain in 3 trips to the site and will alert the City of any deviation from the design. Estimated Fee: $2,100 Surveying — As Built — King Surveyors will survey the completed trail (in the foodplain) and provide as built drawings of the trail after construction is completed. Estimated Fee: $2,500 Engineering — Construction Support —Interwest will be available to the city to attend the prebid meeting, preconstruction meeting, construction meetings as requested, and will provide the as built modeling and documentation necessary to close out the Floodplain Use Permit. Estimated Fee: $14,000 Reimbursables— for prints, mileage, and deliveries, etc.. Estimated Fee: $200 Assumptions — Structural engineering provided by others. Specifications, quantities, and contract documents provided by others. Environmental and geotech provided by others.