HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9116859EXHIBIT "A"
WORK ORDER FORM
PURSUANTTO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
CTL Thompson
Dated: ll/V2011
Work Order Number:
Purchase Order Number
ql/�9's1
Project Title:
Fossil Creek Trail at Stanton Creek
Commencement Date:
I U1f2011
Completion Date:
Q30/2011
Maximum Fee: (time &
reimbursable direct costs): S14,839.00
Project Description:
Construction Observation and Materiels Testing Services
Scope of Services:
See attached estimate of work
Acceptance
'Park P lining.
Service Provider agrees to perform the services The attached forms consisting of three (3)
identified above and on the attached forms in pages arc hereby accepted and incorporated
accordance with the terns and conditions contained herein by this reference, and Notice to Proceed
herein and in the Services Agreement between the is hereby given.
parties, In the event of a conflict between or
ambiguity in the terms of the Services Agreement
and this work order (including the attached forms)
the Services Agreement shall control.
Service Provider
=+!~`
Date: k ,— Z— I
CC: Purchasing
City of Fort Collins
By:
Date:
Director of Purchasing and Risk Management
if over S60,000
maNca.e: r�ares•r•nrn�•a
November 2, 2011
City of Fort Collins
Park Planning & Development
215 N. Mason Street
P.O. Box 580
Fort Collins, Colorado 80522-0580
Attention: Mr. Craig Kisling
Subject: Fee Estimate for Construction Observation
and Materials Testing Services
Fossil Creek Trail at Stanton Creek
Fort Collins, Colorado
Proposal No. FC-11-0330
At your request, CTLjThompson, Inc. is pleased to provide this fee estimate for Construction
Observation and Materials Testing services for the Fossil Creek Trail at Stanton Creek project
located in Fort Collins, Colorado. We reviewed the plans prepared by Interwest Consulting Group
and CTL Thompson, Inc. in preparation of our proposal.
We anticipate that the city will use our estimate for the basis of establishing a budget for the project
and to issue a purchase order for our services. Our estimated scope of services and associated
fees were prepared according to the terms and conditions of our professional services agreement
with the City of Fort Collins and are presented below.
Earthwork: Compaction testing will be required for utility trench backfill, wall backfill, and bike trail
subgrade. We estimate a total of 30 site visits will be necessary for this project.
Engineering Technician 30 days x 2 hrs/day x $57/hr $3,420.00
Standard Proctor 3 tests x $83/ea $249.00
Atterberg Limits 3 tests x $62/ea $186.00
Gradation 3 tests x $72/ea $216.00
Subtotal: $4,071.00
Helical Pier Observation: Observations will be required during helical pier installation for the
pedestrian bridges. We estimate a total of 8 site visits will be necessary for this project.
Structural Engineering Technician 8 days x 4 hrs/day x $57/hr $1,824.00
Subtotal: $1.824.00
351 Linden Street I Suite 140 i Fort Collins, Colorado 80524
Telephone: 970-206-9455 Fax: 970-206-9441
Concrete Testing: Concrete testing will be required for the walls, storm sewer structures, and bike
trail. We estimate 40 concrete tests consisting of 4 cylinders each will be necessary.
Concrete Cylinders 40 tests x $166/test $6,640.00
Subtotal: $6,640.00
Reinforcing Steel Observation: Reinforcing steel observation may be necessary for the storm sewer
structures and walls. We estimate a total of 9 site visits will be necessary for this project.
Engineering Technician 9 days x 2 hrs/day x $52/hr $936.00
Subtotal: $936.00
Structural Bolt Insoection: Structural bolt inspections will be necessary for the pedestrian bridges
and will be performed by an AWS certified inspector. We estimate a total of 8 site visits will be
necessary.
Engineering Technician 8 days x 3 hrs/day x $57/hr $1,368,00
Subtotal: $1.368.00
TOTAL ESTIMATED FEE: $14,839.00
It should be emphasized that this estimate is based upon assumptions of actual quantities and
contractor's schedule. The fee will be charged only for the actual hours and unit rates presented for
tests and observations requested by the owner, contractor or subcontractors who schedule the
services.
If we can be of further assistance, please contact us at your convenience.
Very truly yours,
CTL I THOMPSON, INC.
Heather Grubb
Field Department Manager
2
FOSSIL CREEK TRAIL AT STANTON CREEK
CTL I T PROPOSAL NO. FC41-0330