Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 7247 WATERPROOFING AT CIVIC CENTER PARKING STRUCTUREBLAZER ql � 7 Waterproofing Systems Inc. vti: (�fi�dur•b� PROVIDING SOLUTIONS GBH �£S J9eNS it November 9, 2011 �£ pf1yLJGiv s�u[�7uI1f«��r��' fG TO: Nis. Eileen Scholl @ City of Fort Collins — Parks Project Manager RE: Re-work/Re-coating of Elevated Level Deck of Concession Building near ball fields @ Fossil Creek Park Subject: Price Proposal Dear Eileen, First of all thank you for the initial call to have Blazer look at and offer our input and pricing regarding the elevated plaza deck of the concession building located west of the ball fields at Fossil Creek Park in Fort Collins. During my walk around of the area I found two random cracks on the elevated plaza area that ran through two of the 4' x 4' concrete topping slab sections. It is our suggestion to remove these two damaged sections of topping slab completely and replace them with a site mixed concrete fill material. At that point we can also do some investigative work to determine whether or not the underlying waterproofing is in good condition. Due to the fact that there is reportedly an underlying waterproofing membrane installed under the topping slab but atop a structural slab that is placed on metal pan formwork, it is our suggestion to use a breathable deck coating system to provide a secondary level of waterproofing as it appears the original waterproofing membrane is beginning to fail allowing water intrusion through the structural slab an into the spaces below the plaza deck. Once the two sections of the topping slab are removed and replaced, the sawcuts, control joints and perimeter sealant cant along the parapet walls would be removed and/or replaced after a heavy duty pedestrian grade "breathable" deck coating is installed to the entire area (color can be selected from the attached manufacturer's standard color chart). Once the new deck coating system is installed a penetrating sealer will be applied as the final step in the process. Blazer's cost to perform the work briefly described in the paragraph above, including labor/burden, equipment, supplies and permanent materials but excluding sales tax would be $8,624.00 Lump Sum. Exclusions: removal and replacement of the picnic tables on the elevated deck; replacement of the trench drain as it appears to be in good condition; replacement of any railing sections; removal of the cut stone "bollards'; winter protection or temporary heating or covers as this work can still be carried out even during this time of year if the temperatures during the day can reach 45-60 degrees for a 4-5 hour period. If a performance and payment bond is required please add S250.00 to our 14102 EAST SMITH DRIVE AURORA, COLORADO 80011 (303) 341-6989 • FAX (303) 341-2848 W W W. BLAZERSTRUCTURES.COM i proposal for the cost of providing the bonds (our'insurance company's minimum charge). Blazer will provide a two-year labor and material warranty upon completion and final payment on the project. Should you have any questions or comments in regards to our evaluation of the situation at Fossil Creek Park's Concession Building or our pricing for the re -coating work please call me at (303) 341-6989, ext. 104 as it is my hope that we can continue to be of service to you and the City of Fort Collins. Sincerely, Jeffrey A. Musser Sr. Cost Estimator