No preview available
HomeMy WebLinkAboutCHANGE ORDER - RFP - 7033 DISCOVERY MUSEUM FACILITY (9)SECTION 00950 CHANGE ORDER NO. PROJECT TITLE: Discovery Museum CONTRACTOR: Hensel Phelps Construction Company BID NUMBER: 7033 DESCRIPTION: The construction of a 46,928 square feet Discovery Museum facility complete with related site work, curb & gutter, paving, sidewalks, utilities and landscaping. Reason for change: Incorporation of various Change Estimates (CE) into the Contract. 2. Description of changes: CE060 Import Additional Fill due to Unsuitable Soils on Site - $10,066.00; CE096R2 Patio Fire Pit Gas Piping - $2,772.00; CE103 Delete Dust Collection System Piping Installation — ($1,729.00); CE119 Delete Polishing Floor at Ramp & Stairs — ($4,711.00); CE153 Steel Support for Bowling Alley Flooring on Walls - $7,284.00; CE162 Descope Site Fence — ($18,681.00); CE236 Add Drywall to Shelled Mezzanine, per Inspector - $5,410.00; CE241 Delete Casework in Workroom 111 — ($783.00); CE243 Reduce Width of Path, Delete Floor in Collection Storage & Silt Fence Removal — ($6,828.00); CE246 Storage Closet at Stair 3 - $3,774.00; CE247 Add Stainless Steel Trim & Cover Plates to Elevator - $1,080.00; CE262 Add Concrete at Base of Stairs in Collection Storage — $255.00; CE320 Additional Work Required for Electrical Duct Bank - $1,849.00. 3. Change in Contract Cost: ($242.00) 4. Change in Contract Time: 0 Days ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER ADJUSTED CONTRACT COST ACCEPTED BY: Contractor's ACCEPTED BY: Facilities Project ACCEPTED BY: APPROVED BY: ( P�" 7 erector of Purchasing cc: Purchasing 7 Architect $11,400,000.00 983,101.00 0.00 -242.00 $12,382,859.00 (City of Fort Collins) (Z' /" - Date 4\ Date II ,3/// Da e PC) Date Risk Management Contractor —q Date Project File