HomeMy WebLinkAboutCHANGE ORDER - RFP - 7033 DISCOVERY MUSEUM FACILITY (9)SECTION 00950
CHANGE ORDER NO.
PROJECT TITLE: Discovery Museum
CONTRACTOR: Hensel Phelps Construction Company
BID NUMBER: 7033
DESCRIPTION: The construction of a 46,928 square feet Discovery Museum facility complete with related site
work, curb & gutter, paving, sidewalks, utilities and landscaping.
Reason for change: Incorporation of various Change Estimates (CE) into the Contract.
2. Description of changes: CE060 Import Additional Fill due to Unsuitable Soils on Site - $10,066.00;
CE096R2 Patio Fire Pit Gas Piping - $2,772.00; CE103 Delete Dust Collection System Piping Installation —
($1,729.00); CE119 Delete Polishing Floor at Ramp & Stairs — ($4,711.00); CE153 Steel Support for Bowling
Alley Flooring on Walls - $7,284.00; CE162 Descope Site Fence — ($18,681.00); CE236 Add Drywall to
Shelled Mezzanine, per Inspector - $5,410.00; CE241 Delete Casework in Workroom 111 — ($783.00); CE243
Reduce Width of Path, Delete Floor in Collection Storage & Silt Fence Removal — ($6,828.00); CE246 Storage
Closet at Stair 3 - $3,774.00; CE247 Add Stainless Steel Trim & Cover Plates to Elevator - $1,080.00; CE262
Add Concrete at Base of Stairs in Collection Storage — $255.00; CE320 Additional Work Required for Electrical
Duct Bank - $1,849.00.
3. Change in Contract Cost: ($242.00)
4. Change in Contract Time: 0 Days
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
ADJUSTED CONTRACT COST
ACCEPTED BY:
Contractor's
ACCEPTED BY:
Facilities Project
ACCEPTED BY:
APPROVED BY: (
P�" 7 erector of Purchasing
cc: Purchasing 7 Architect
$11,400,000.00
983,101.00
0.00
-242.00
$12,382,859.00