Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9116249F City of ort Collins Purchasing LETTER OF TRANSMITTAL To: Darin Atteberry, City Manager From: James B. O'Neill II, CPPO, FNIGP / Director of Purchasing & Risk Man&g/erm t Date: October 19, 2011 v Financial Services Purchasing Division 215 N. Mason St. 200 Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707- fax (cgov. com/purchasing Re: North College Westside Sanitary Sewer — Phase II Work Order Attached find three (3) sets each of contract documents regarding the above -mentioned matter. The Connell Resources Inc. is under an annual services contract to Utility work. a. Any issues or concerns (i.e., banana peels) that should be noted as we enter into the contract. None Funding —are all project resources secured (in the bank; in the account)? Are there any contract resources that still need to be secured (from pending grants; pending pledges; etc.) Budget and available in Utility fund. c. Anything unique that should be noted about the contract. See attached memo for explanation of the work. Darin, would you please sign the contract documents. Please call Purchasing, when the contracts have been signed. Thanks. ort Collins MEMORANDUM DATE: October 17, 2011 Utilities electric stormwater wastewater - water 700 Wood Street PO Box 580 Fort Collins, CO 80522 970.221.6700 970,221.6619 - fax 970.224.6003 - TDD utilities CUcgov. com fcgov.com/utitities TO: Darin Atteberry, City Manager FROM: Dean Saye, Special Project Manager�j THRU: Owen Randall, Chief Engineer Jon Haukaas, Water Engineering and Field Operations Manager Brian Janonis, Utilities Executive Director James O'Neill, Director of Purchasing & Risk Mans e�4nt RE: North College Westside Sanitary Sewer— Phase II Attached are three duplicate originals of the construction work order for the North College Westside Sanitary Sewer — Phase II for your execution. The purpose of this work order is to replace an existing sanitary sewer line that is no longer adequately sized for existing development. Major portions of this work order includes the installation of approximately 3,500 lineal feet of 12" diameter sanitary sewer pipe in the Westside of North College Avenue from Alpine Street to Willox Street, reconnection of sanitary sewer services, and restoration of existing surface improvements. Connell Resources Inc. will be the General Contractor for the work order. Connell is currently under contract with the City of Fort Collins for the Utilities' annual services contract. In accordance with the Utilities' APDS policies, an independent estimate of Connell's work order estimate was conducted by Capstone Planning & Control, Inc. After reconciliation the estimates had less than 2% deviation. Please let me know if you have any questions regarding this matter. Call me at 217- 8116 when the agreements have been signed and I will have them picked up. Attachments