Loading...
HomeMy WebLinkAboutRESPONSE - BID - 7277 INTERSECTION IMPROVEMENTS AT HARMONY & LEMAY AND DRAKE & LEMAYSECTION 00300 BID FORM PROJECT: 7277 Intersection Improvements at Harmony & LL1emlIay and Drake & Lemay Place v J �r� L'ollins Date �t4k In compliance with your Invitation to Bid dated August 30, 2011 and subject to all conditions thereof, the undersigned MnLA 0.i v\ Lnsi tAr -nrs Corporation, Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor) aut orized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. AccompannYing this Bid is a c rtified or cashier's check or standard Bid bond in the sum of li vvLcwwr ($ ) in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds are as follows: W iL( is tio lao,:5, G\vd. �penver cb SOa �. 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The, undersigned] Bidder hereby acknowledges receipt of Addenda No. through 0 Rev10/20/07 Section 00300 Page 1 IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this 26th day of September , 20 11, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. PRINCIPAL SURETY Name: Mountain Constructors Inc. Granite Re, Inc. ATTEST: By:� -- (SEAL.) Oklahoma City, OK 73134 By: Title.Ul y nigle, Attomey-in-Fact (SEAL) Rev 10/20/07 Section 00410 Page 3 GRANITE RE, INC. GENERAL POWER OF ATTORNEY Know all Men by these Presents: That GRANITE RE, INC., a corporation organized and existing under the laws of the State of OKLAHOMA and having its principal office at the City of OKLAHOMA CITY in the State of OKLAHOMA does hereby constitute and appoint: ANNE E. HILL; J. R. RICHARDS; SUSAN J. LATTARULO; FRANK C. PENN; DILYNN GUERN; KEVIN W. MCMAHON; DONALD E. APPLEBY; FLORIETTA ACOSTA; TIFFANY MCGONIGLE; MARK SWEIGART; SARAH BROWN its true and lawful Attorney-in-Fact(s) for the following purposes, to wit: To sign its name as surety to, and to execute, seal and acknowledge any and all bonds, and to respectively do and perform any and all acts and things set forth in the resolution of the Board of Directors of the said GRANITE RE, INC. a certified copy of which is hereto annexed and made a part of this Power of Attorney; and the said GRANITE RE, INC. through us, its Board of Directors, hereby ratifies and confirms all and whatsoever the said: ANNE E. HILL; J. R. RICHARDS; SUSAN J. LATTARULO; FRANK C. PENN; DILYNN GUERN; KEVIN W. MCMAHON; DONALD E. APPLEBY; FLORIETTA ACOSTA; TIFFANY MCGONIGLE; MARK SWEIGART; SARAH BROWN may lawfully do in the premises by virtue of these presents. In Witness Whereof, the said GRANITE RE, INC. has caused this instrument to be sealed with its corporate seal, duly attested by the signatures of its President and Secretary/Treasurer, this 13" day of August, 2010. maw �kq Kenneth D. Whittington, President STATE OF OKLAHOMA ) s E A L SS: COUNTY OF OKLAHOMA ) Rodman A. Frates, Secretary/Treasurer On this 13'" day of August, 2010, before me personally came Kenneth D. Whittington, President of the GRANITE RE, INC. Company and Rodman A. Frates, Secretary/Treasurer of said Company, with both of whom I am personally acquainted, who being by me severally duly sworn, said, that they, the said Kenneth D. Whittington and Rodman A. Frates were respectively the President and the Secretary/Treasurer of the GRANITE RE, INC., the corporation described in and which executed the foregoing Power of Attorney; that they each knew the seal of said corporation; that the seal affixed to said Power of Attorney was such corporate seal, that it was so fixed by order of the Board of Directors of said corporation, and that they signed their name thereto by like order as President and Secretary/Treasurer, respectively, of the Company. lF My Commission Expires: May 9, 2012 ;, , � Commission #: 00005708 rA 011,01M GRANITE RE, INC. Certificate THE UNDERSIGNED, being the duly elected and acting Secretary/Treasurer of Granite Re, Inc., an Oklahoma Corporation, HEREBY CERTIFIES that the following resolution is a true and correct excerpt from the July 15, 1987, minutes of the meeting of the Board of Directors of Granite Re, Inc. and that said Power of Attorney has not been revoked and is now in full force and effect. "RESOLVED, that the President, any Vice President, the Secretary, and any Assistant Vice President shall each have authority to appoint individuals as attorneys -in -fact or under other appropriate titles with authority to execute on behalf of the company fidelity and surety bonds and other documents of similar character issued by the Company in the course of its business. On any instrument making or evidencing such appointment, the signatures may be affixed by facsimile. On any instrument conferring such authority or on any bond or undertaking of the Company, the seal, or a facsimile thereof, may be impressed or affixed or in any other manner reproduced; provided, however, that the seal shall not be necessary to the validity of any such instrument or undertaking," IN WITNESS WHEREOF, the undersigned has subscribed this Certificate and affixed the corporate seal of the Corporation this 26th day of September 20 11 0, SoE A,L oR dman A. Frates, Secretary/Treasurer GR0800-1 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional) information he desires. 1. Name of Bidder: / V Q L&42 u r� l-n n�ro-c-4o y-5 ,TYt c . 2. Permanent main office address: a a Ma t r-'. 'si _ . C�4 krI 5� 3. When organized: IV pye-n-Ir S02 tt 4. If a corporation, where incorporated: CalQr'cid p 5. How many years have you been engaged in the contracting business under your present firm or trade name? r-�)q 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) 7. General character of Work performed by your company: 8. Have you ever failed to complete any Work awarded to you? If so, where and why? 9. Have your ever defaulted on a contract? If so, where and why? 10. Are you debarred by any government agency? NO If yes list agency na Rev10/20/07 Section 00420 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. dpo 12. List your major equipment available for this contract. 13. Experience in construction Work similar in importance to this project: cfsc> e 14. Background and experience of the principal members of your organization, including officers: —ao D 15. Credit available: $_�� OQO 16. Bank Reference: f)ayAK CJt Lhol C( `-i70 ) � -2- 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? L 18. Are you licensed as a General CONTRACTOR? yC-S If yes, in what city, county and state? IC What class, license and numbers? ` /n0 19. Do you anticipate subcontracting Work under this �L�Contract? CO,S If yes, what percent of total contract? � (6 and to whom? 'ZU Rev10/20/07 Section 00420 Page 2 20. Are any lawsuits pending against you or your firm at this time? NO IF yes, DETAIL 21. What are the limits of your public liability? DETAIL I . 9 fl� t nr cr r A, 1l What Company?. 22. What are your company's bonding limitations? pc on ,I, ' .3g QQ ,,,^, te a. . 23. The undersigned hereby authorizes and requests any person, firm Cdr cor oration to 00 furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated atW&Uz� On this day of State of � (C15r o,� o County of 'N,Me (01- V 1c O,.r, being duly vice- Pr2SiJ (2,y't of nsL\m organization) the answers to the foregoing questions a true and correct. orn deposes and says thatShe is r and that (name of all statements therein contained are Subscribed and sworn to before me this day o 20__q. Notary Publi My commission expires S Rev10/20/07 Section 00420 Page 3 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 15% of the contract. ITEM SUBCONTRACTOR Section 00430 Page 1 ITEM #6 aN T Uct rt� WORK ON HAND AS OF SEPTEMBER 2011 CONTRACT ESTIMATED ESTIMATED DATE PERCENT PROJECT NAME OWNER / ARCHITECT PRICE START DATE OF COMPLETION COMPLETE Weld County Public Works WCR 17 / WCR 34 * Dept. $ 123,043.50 9/26/2011 10/21/2011 0% City of Thornton / Felsburg 160th / Bull Canal Bridge Replacement Holt & Ullevig $ 196,984.30 10/15/2011 12/15/2011 1 0% US 287 Replace Dry Creek Bridge JCDOT $ 1,735,850.75 7/25/2011 4/15/2012 10% TOTALS $ 2,055,878.55 MOUNTAIN CONSTRUCTORS, INC. COMPLETED PROJECTS WITHIN FIVE YEARS GENERAL CONTRACTOR ITEM #11, #13 OWNER PROJECT NAME FINAL CONTRACT AMOUNT DATE COMPLETE CONTACT NAME PHONE NUMBER Weld Co. School District West "C" Street Improvements $360,865.00 3/1/2005 Steven Butherus KBN Engineers (970) 395-9880 City of Loveland E. Eisenhower Blvd & Boise $515,838.23 4/30/2005 Tom Knotsman (970) 962-2627 Larimer County CR 46E & CR 21 $1,389,214.12 5/13/2005 Todd Juergens (970) 498-5711 Larimer County LC PN 174 Bridge Replacement $899,918.55 5/23/2005 Todd Juergens (970) 498-5711 Boulder County Mud Lake $102,124.50 6/17/2005 Barry Shook (303) 516-9351 Colo Dept. of Transportation Safety Project R400-180 $778,804.00 11/18/2005 Chris Boespflug (303) 442-5640 Town of Wellington Schedule 1 & 3 $672,213.00 12/6/2005 Tony Willkomm Stantec Consulting (970) 482-5922 Larimer County Blue Sky Trail Underpass $340,548.96 2/3/2006 Todd Juergens (970) 498-5711 City of Greeley Island Grove Parking Lot $189,871.39 4/19/2006 Tom Welch (970) 350-9522 City of Evans Playground Improvements $124,000.00 6/30/2006 Andy McRoberts (970) 475-1129 City of Fort Collins Spring Creek Bike/Pedestrain Trail $1,477,780.62 8/11/2006 Mark Laken (970) 221-6605 Colo Dept. of Transportation SHE 2873-143 US 287 & CR 54G $209,207.88 9/20/2006 Long Nguyen (970) 667-4670 Weld County Public Works STA 2571-009 - SH 257 & WCR 74 $1,330,990.29 10/5/2006 Robert Patrick (970) 304-6496 Boulder County Caribou Trailhead Parkin Lot $97,842.00 10/6/2004 Barry Shook (303) 516-9351 City of Loveland 2006 Capital Stormwater Projects $132,986.52 10/31/2006 Chris Carlson (970) 962-2774 Town of Wellington Schedule 2 $332,407.62 11/20/2006 Don Silar Stantec Consulting (970)482-5922 City of Fort Collins Fossil Creek Bike/Pedestrain Trail $907,357.04 1/8/2007 Mark Laken (970) 221-6605 University of Northern Colo. Parking Lot T Improvements $575,086.26 3/1/2007 Scott McLean (970) 351-1982 Beebe Draw Farms Lake Christina Maintenance Project $232,693.53 5/15/2007 J.L. Walter Consulting (970) 613-2037 MOUNTAIN CONSTRUCTORS, INC. COMPLETED PROJECTS WITHIN FIVE YEARS GENERAL CONTRACTOR ITEM #11, #13 OWNER PROJECT NAME FINAL CONTRACT AMOUNT DATE COMPLETE CONTACT NAME PHONE NUMBER Larimer County CR 80C from CR 8E to Calloway Hill $1,991,432.82 7/13/2007 Todd Juergens 970) 498-5711 City of Longmont 3rd Avenue Entryway $1,424,148.35 9/7/2007 Curtis Ansel (303) 651-8349 CDOT SHE R400-213 FY 07 HES Intersections $743,656.50 11/9/2007 Craig Kuehneman 970 622-1283 City of Greeley US 34 Bypass/11th Ave Intersection $214,585.50 12/20/2007 Rafael Samaniego (970) 336-4122 City of Loveland 2007 Capital Slormwater Projects $184,363.99 12/20/2007 Chris Carlson (970) 962-2774 University of Northern Colo. A -Lot South / Jackson Field Parking Lots $1,565,244.00 7/7/2008 Jimmy Mock (970) 351-1892 City of Greeley North 11th Avenue Streetscape $358,600.65 11/18/2008 Steve Bagley (970) 350-9792 City of Fort Collins US 287/S. College Bike Lanes $385,928.68 11/21/2008 Kyle Lambrecht (970) 221-6605 Weld County Public Works WCR 13; From WCR 8 to SH 52 $2,510,111.15 12/31/2008 Robert Patrick (970) 304-6496 City of Loveland 2008 Capital Stormwater Projects $166,509.00 11/7/2008 Chris Carlson (970) 962-2774 Weld County Public Works SH 52 & WCR 13 Traffic Signal Improvements $1,246,443.60 2/28/2009 Robert Patrick 970 304-6496 Town of Superior S. Original Town Roadway and Drainage Improvements $493,123.83 5/18/2009 Kurt Kowar (303) 961-0456 City of Greeley Bellvue Raw Ponds Toe Drain $485,270.13 5/28/2009 Duane Smith (970) 490-2620 Weld County Public Works WCR 29 Cement Modified Soil $71,838.50 6/19/2009 Wayne Howard (970) 304-6496 Greeley Urban Renewal Auth 6th St. Paving - New Hope Subdivision $77,847.31 10/16/2009 Rick George (970) 350-9382 Colo Dept. of Transportation SHE 1191-028 - SH 119 @ Hover Rd. $71,465.46 7/16/2009 Bill Aldorfer (303) 818-1714 Town of Platteville Platteville Baseball Fields Parking Lot $29,529.72 7/17/2009 Troy Renken (970) 785-2245 CDOT SH 402 & CR 11 Intersection $558,464.60 11/30/2009 Louis Keen 970) 667-4670 City of Loveland US 34 & Wilson Median - ARRA Project $379,487.15 11/24/2009 Dave DeBaere (970) 962-2627 MOUNTAIN CONSTRUCTORS, INC. COMPLETED PROJECTS WITHIN FIVE YEARS GENERAL CONTRACTOR ITEM #11, #13 OWNER PROJECT NAME FINAL CONTRACT AMOUNT DATE COMPLETE CONTACT NAME PHONE NUMBER City of Loveland 2009 Stormwater Maintenance Projects $242,744.00 12/31/2009 Eric Lessard (970) 962-2773 Town of Erie Erie Municipal Airport $316,965.30 4/30/2010 Russell Pennington (303) 926-2700 Boulder County SH 7 & E. County Line Road $627,786.13 8/24/2010 Andy Reed (303) 441-3900 City of Fort Morgan Rainbow Bridge $370,458.14 5/28/2010 Bradley Curtis (970) 542-3901 Larimer County Replace Structure $175,927.56 6/23/2010 Darrell Morrell (970) 498-5728 Town of Berthoud Roundabout at 1st Street & SH 56 $973,060.84 9/30/2010 Stephanie Brothers p (970) 532-2643 City of Greeley 2010 Northside Infrastructure Improvements $58,858.66 10/11/2010 Joe Marcisofsky (970) 336-4124 City of Fort Morgan Fort Morgan Municipal Airport $188,958.25 10/31/2010 Jared Moreng (970) 242-0101 CDOT SH 287 At LCR 21C $409,313.82 11/18/2010 Robert Mjoen (970) 350-2283 City of Greeley SH 257 and 37th Street Intersection $223,372.00 11/23/2010 Rafael Samaniego (970) 336-4122 City of Loveland 2010 Stormwater Maintenance Projects $292,813.19 12/31/2010 Eric Lessard (970) 962-2773 CDOT SH 7 @ York Street $549,145.68 1/13/2011 Stranberg 303 398-6770 City of Greeley Poudre Ponds Recreational Fishery $153,229.31 _Raymond 1/31/2011 Sarah Boyd (970) 336-4180 Larimer County Replacement of Bridge No. 7-0.8-68 $535,809.93 6/15/2011 Todd Juergens (970) 498-5711 Total $28,746,243.26 SIMILAR PROJECTS 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. RESPECTFULLY SUBMITTED: u.. �t I_ � i � i • J • 03•� Vice_ --4�r EA II� Title License Number (If Applicable) (Seal - if Bid is by corporation) Attest: l Address (�';� MAI, �la4zv't Telephone R90 - 7gS-(0 1 (.o Email n4nCVr) D,e.Qy-1Wtn�,1?� Rev10/20/07 Section 00300 Page 3 MOUNTAIN CONSTRUCTORS, INC. CONSTRUCTION EQUIPMENT AVAILABLE QUANTITY DESCRIPTION 12 Pick ups, 3/4 ton 4 Service Fuel Trucks / Mechanic Truck 4 Dump Trucks 1 Water Wagon 5,000 Gal. 3 Water Trucks 2,500 Gal., 3,500 Gal. (2) 4 Truck Tractors - 85,000 GVW 13 Trailers - End Dump (2), Bottom Dump (3), Low Bed (2), Floats (4), Side Dump (2) 1 Crawler Dozer - CAT D7H 3 Motor Graders - CAT 130G, 140G, 140H 6 Rollers - CAT 815, Dynapac 2511, CAT 463B, Bomag, CAT 563C, CAT 563DP 2 Motor Scrapers - CAT 623B, CAT 623E 4 Rubber Tire Backhoes - JD 310D (2), JD 410D, JD 410E 5 Track Backhoes - JD 892D, JD 892E, JD 450, Komatsu PC228US-3, JD 330 CLC 3 Skid Steer - Bobcat (2) JD (1) 1 Air Compressor - 185CFM 2 Welders 200Amp (3), 300 Amp (1) 4 Water Pump - 6 inch, 3 inch, 4 inch (2) 4 Wheel Loaders - CAT 950, CAT 966E, CAT 980F, 966F 2 Demo Hammer 2 Generator - 50KW, 15KW ITEM #12 ITEM #14 MOUNTAIN CONSTRUCTORS, INC. OFFICERS AND PRINCIPALS 622 MAIN STREET PLATTEVILLE, CO 80651 YEARS OF INDUSTRY NAME TITLE EXPERIENCE Sandy Arends Corporate Secretary / Accountant 13 Steve Bisig Foreman 45 Pamela Duncan Vice President / General Manager 25 David Gross Superintendent 13 Joe Kuntz President / Owner/ Safety Officer 45 Bill Tjardes General Superintendent 23 None of the above employees or company officers have ever been convicted of bid related crimes or violations in any jurisdiction. Nor are any of the above employees or company officers under notice of intent to disbar or has ever been debarred in any jurisdiction. COLORADO DEPARTMENT OF TRANSPORTATION Project #: BIDDERS LIST DATA and UNDERUTILIZED L^- -o Location: DBE (UDBE) BID CONDITIONS ASSURANCE � , CDMns - )rkcx-rmor)fLe.rmca Prime Contractor Instructions: This form has two sections, both must be completed and submitted with your bid. Complete Section I to list all subcontract quotes received (non -DBE and DBE). Complete Section II to report only Underutilized DBE (UDBE) participation percentages which qualify under the contract goal specification for this project. Please review CDOT Form #715 instructions before completing Section II. Attach additional sheets as necessary. POLICY It is the policy of the Colorado Department of Transportation that underutilized disadvantaged business enterprises have equal opportunity to participate on projects financed with federal, state or local entity funds. Consistent with 49 Code of Federal Regulations (CFR) Part 26.11, the Bidders List data provided by the Contractors will provide CDOT as accurate data as possible about the universe of DBE and non -DBE firms actively seeking work on its highway construction contracts, for use in setting overall DBE goals. SECTION I: CDOT BIDDERS LIST INFORMATION (Non -DBEs and DBEs) 1) Are all subcontract bids (quotes) received by your firm for this project listed below? ❑ Yes U No 2) If No, make certain any additional subcontract bidding information is submitted to the CDOT Business Programs Office before 4:00 pm on the day after bids are opened to ensure CDOT has the best data possible for setting future DBE goals (use the same table format as below): CDOT Business Programs Office 4201 E. Arkansas Ave., Room 200 Denver, Colorado 80222 FAX: 303-757-9019 EMAIL: eo@dot. state. co. us 3) The most recent CDOT Bidders List will be posted online at: www.dot.state.co.us/EEO/DBEProgramPage.htm Name of firm submitting Bid/Quote Certified DBE firms Yes No Work item(s) description Firm being used? Yes No �a 112(kFF�C ix 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. Page 1 of 2 Previous editions are obsolete and may not be used CDOT Form #714 408 Name of firm submitting B1di000te Certified DBE firm? Yes No Work item(s) description Firm being used? �m Yes No �a 15. 16. 17. 18. 19. 20. SECTION II: UNDERUTILIZED DBE (UDBE) PARTICIPATION COMMITMENT 1) Total eligible Underutilized DBE (UDBE) percentage amount from Box A below: v. C % 2) Will your company's Underutilized DBE (UDBE) participation commitment meet the contract goal? �A Yes ❑ No 3) List the UDBE firms, committed work items, and eligible UDBE percentage of your bid committed to each. UDBE Firm name Certification # Committed work item(s) % Commitment toward DBE Goal' 2. % 3. 4. 5. BOX A: TOTAL ELIGIBLE UDBE PERCENTAGE AMOUNT (Round to nearest hundredth) % Detailed instructions on how to calculate DBE commitment amounts are available on CDOT Form #715 and in the "Counting DBE Participation Toward Contract Goals and CDOT's annual DBE goal' section of the "DBE — Definitions and Requirements" in the Standard Special Provisions. I understand that, if my company is determined to be the low bidder for the contract on this project, I must submit a completed CDOT Form #715 CERTIFICATION OF UNDERUTILIZED DBE PARTICIPATION for each firm listed in Section II of this form to the Transportation Department by 4:00 pm on the third work day after the day bids are opened. The actual amounts submitted on each CDOT Form #715 must equal or exceed the DBE percentage commitments documented on this form. In addition, if my company does not meet the DBE/UDBE goal for this project, I must submit a completed CDOT Form #718 DBE GOOD FAITH EFFORT DOCUMENTATION before 4:00 pm on the day after bids are opened. CDOT Form #715s submitted for firms not included on this form, OR for amounts exceeding those listed on this form, will be accepted but NOT counted as Good Faith Efforts. Only the efforts the contractor made priorto the bid opening will count as Good Faith Efforts. I understand my obligation to abide by the Policy stated above Section 1. 1 shall not discriminate on the basis of race, color, age, sex, national origin, or handicap in the bidding process or the performance of contracts. I DECLARE UNDER PENALTY OF PERJURY IN THE SECOND DEGREE, AND ANY OTHER APPLICABLE STATE OR FEDERAL LAWS, THAT THE STATEMENTS MADE IN THIS DOCUMENT ARE TRUE AND COMPLETE TO THE BEST OF MY KNOWLEDGE. Company Name: Date: Company O ' e gn Title: i e_�>rcsice-ram Page 2 otZ (/,/ rrevious eamons are oosoiete ano may not ue useu I COLORADO DEPARTMENT OF TRANSPORTATION ANTI -COLLUSION AFFIDAVIT "'.) ." r. G LOCAT!C!,� Lt:�y aq Ft . c. C, (I L, Y.5 Har mo r-,y * L e r.-tcad/ I hereby attest that I am the person responsible within my firm for the final decision as to the prices) and amount of this bid or, if not, that I have written authorization, enclosed herewith, from that person to make the statements set out below on his or her behalf and on behalf of my firm. I further attest that: 1. The price(s) and amount of this bid have been arrived at independently, without consultation, communication or agreement for the purpose or with the effect of restricting competition with any other firm or person who is a bidder or potential prime bidder. 2A. Neither the price(s) nor the amount of this bid have been disclosed to any other firm or person who is a bidder or potential prime bidder on this project, and will not be so disclosed prior to bid opening. 28. Neither the prices nor the amount of the bid of any other firm or person who is a bidder or potential prime bidder on this project have been disclosed to me or my firm. 3A. No attempt has been made to solicit, cause or induce any firm or person who is a bidder or potential prime bidder tc refrain from bidding on this project, or to submit a bid higher than the bid of this firm, or any intentionally high or non- competitive bid or other form of complementary bid. 38. No agreement has been promised or solicited for any other firm or person who is a bidder or potential prime bidder on this project to submit an intentionally high, noncompetitive or other form of complementary bid on this project. 4. The bid of my firm is made in good faith and not pursuant to any consultation, communication, agreement or discussion with, or inducement or solicitation by or from any firm or person to submit any intentionally high, noncom- petitive or other form of complementary bid. 5. My firm has not offered or entered into a subcontract or agreement regarding the purchase or sale of materials or services from any firm or person, or offered, promised or paid cash or anything of value to any firm or person, whether in connection with this or any other project, in consideration for an agreement or promise by any firm or person to refrain from bidding or to submit any intentionally high, noncompetitive or other form of complementary bid or agreeing or promising to do so on this project. & My firm has not accepted or been promised any subcontract or agreement regarding the sale of materials or services to any firm or person, and has not been promised or paid cash or anything of value by any firm or person, whether in connection with this or any other project, in consideration for my firm's submitting any intentionally high, noncompetitive or other form of complementary bid, or agreeing or promising to do so, on this project. 7. 1 have made a diligent inquiry of all members, officers, employees, and agents of my firm with responsibilities relating to the preparation, approval or submission of my firm's bid on this project and have been advised by each of them that he or she has not participated in any communication, consultation, discussion, agreement, collusion, or other conduct inconsistent with any of the statements and representations made in this affidavit. 8. 1 understand and my firm understands that any misstatement in this affidavit is and shall be treated as a fraudulent concealment from the Colorado Department of Transportation, of the true facts relating to submission of bids for this contract. I DECLARE UNDER PENALTY OF PERJURY IN THE SECOND DEGREE, AND ANY OTHER APPLICABLE STATE OR FEDERAL LAWS, THAT THE STATEMENTS MADE ON THIS DOCUMENT ARE TRUE AND COMPLETE TO THE BEST OF MY KNOWLEDGE. -cnnac!pr'stnrn orcompeny name By Jain R PIe t _no =tmcbrs A!m o, cpmpany na o it! joint ywure i By Tme Sworn to before me this pi(9 day of,20 Public .ty camr0imon e e � �!tIll This document must be signed in ink. COOT Fom #606 V02 8. BID SCHEDULE (Base Bid) tao For# Collins INTERSECTION IMPROVEMENTS (Harmony & Lemay and Drake & Lemay) City of Fort Collins Bid No.: 1234 CDOT Project No.: AOC M455-091 COOT Project Code: 16603 Prepared By: City of Fort Collins - Capital Projects Harmony & Lemay Quantity -Drake & Lemay Quantity Total Quantity Ref # Item # Item Description r Unit... Unit Cost Total Cost 1 201-00000 Clearing and Grubbing 0.5 0.5 LS 1 2 202-00019 Removal of Inlet 1 0 EA 1 3 202-00090 Removal of Delineator 3 0 EA 3 S.J 4 202-00200 Removal of Sidewalk 0 207 SY 207 5 202-00203 Removal of Curb and Gutter 0 375 LF 375 6 202-00220 Removal of Asphalt Mat 700 163 SY 863 .5Q 3 $•$0 7 202-00250 Removal of Pavement Markings 0.5 0.5 LS 1 8 202-00810 Removal of Ground Sign 2 0 EA 2 9 203-00010 Unclassified Excavation (Complete In Place) 432 643 CY 1,075 �1 7 10 207-00205 Topsoil 0 110 CY 110 11 207-00210 Stockpile Topsoil 0 110 CY 110 i Iq 310. ' 12 208-00005 Erosion Log 20 310 LF 330 13 208-00050 Storm Drain Inlet Protection 0 1 EA 1 '- 14 208-00205 Erosion Control Supervisor 10 10 HR 20 ^ 15 210-04010 Adjust Manhole 0 1 EA 1 �,^ b. 16 212-00006 Seeding (Native) 0 0.3 ACRE 0.3 0, 17 212-00032 Soil Conditioning 10 0 CY 10 3 o.- 18 213-00008 Mulching (Wood Chip) 3,439 0 SF 3,439 , S(j 19 213-00065 Inorganic Mulch (Rock) 3,439 0 SF 3,439 1. /Q qQ 20 213-00070 Landscape Weed Barrier Fabric 382 0 SY 382 g 21 213-00700 Landscape Boulder 53 0 EA 53 ' 22 214-00005 Landscape Maintenance (24 Months) 1 0 LS 1 SJQ,r 23 214-00225 Deciduous Tree (2.5 Inch Caliper) 8 0 EA 8 3 24 214-00230 Deciduous Tree (3 Inch Caliper) 20 0 EA 20 25 214-00350 Deciduous Shrub (5 Gallon Container) 95 0 EA 95 _ (� 0,^ 26 214-00910 Perennials (1 Gallon Container) 436 0 EA 436 27 304-06000 Aggregate Base Course (Class 6) 541 258 TON 799 28 403-32821 Hot Mix Asphalt (Grading SG) (100) (PG58- 28> 255 190 TON 445 29 403-33841 Hot Mix Asphalt (Grading S) (100) (PG64- 28) (Modified Binder) 85 63 TON 148 30 403-00720 Hot Mix Asphalt (Patching) (Asphalt) 25 0 TON 25 , 31 420-00300 Geotextile (Reinforcement) 750 500 SY 1.250 5,^ a � 32 605-00040 4 Inch Perforated Pipe Underdraw 657 0 LF 657 -7 gg , 33 608-00000 Concrete Sidewalk 0 188 SY 188 S, 34 608-00010 Concrete Curb Ramp 0 10 SY 10 35 609-21010 Curb and Gutter(Type 2)(Section l-B) 1.382 0 LF 1,382 36 609-21020 Curb and Gutter (Type 2) (Section II-B) 0 359 LF 359 Rev10/20/07 Section 00300 Page 1 37 610-00030 Median Cover Material (Concrete) 2,060 0 SF 2,060 4.50 3 38 613-10000 Wiring 1 0 LS 1 000,- QCQ7 39 620-00020 Sanitary Facility 1 1 EA 2 40 623-00000 Irrigation System 1 0 LS 1 p paD 41 623-09906 Irrigation Tie -In (Preparation and Backfill) 1 0 LS 1 16 z7^ 1 0jo 42 626-00000 Mobilization 0.5 0.5 LS -�7 ._.., - agy,�1- 43 630-00000 Construction Zone Traffic Control (Harmony Road) 1 0 LS 1 44 630-00000 Construction Zone Traffic Control (Drake Roatl) 0 1 LS la �01 A[ dcYi. TOTAL COST:3 TOTAL COST IN WORDS: Z FORCE ACCOUNT ITEMS: 45 700-70010 F/A Minor Contract Revisions 0.5 0.5 F/A 1 $50,000.00 $50,000,00 46 700-70016 F/A Fuel Cost Adjustment 0.5 0.5 F/A 1 $2,000,00 $2,000.00 47 700-70195 F/A Utilities (Traffic) 0.75 0,25 F/A 1 $40,000.00 $40.000.00 48 700-70380 F/A Erosion Control 0.5 0.5 F/A 1 $3,000.00 $3.000,00 49 700-70260 F/A Water Taps 1 0 FIA 1 $15,000,00 $15.000.00 50 700-90006 F/A Signing and Striping 0.5 0.5 F/A 1 $5,000,00 $5,000,00 FORCE ACCOUNT TOTAL: $115,000.00 BASE BID TOTAL (TOTAL COSTAQUS FORCE ACCOUNT): BASE BID TOTAL IN WORDS: Sl 7,7 7 (TOTAL CONTRACT VALUE) The CDOT Form 347, Certification of EEO Compliance, is no longer required to be submitted in the bid package. This form certified that the contractor/proposed subcontractors were in compliance with the Joint Reporting Committee EEO-1 form requirements. The EEO-1 Report must still be submitted to the Joint Reporting Committee if the contractors and subcontractors meet the eligibility requirements (29CFR 1602.7); we will, however, no longer require certification. For additional information regarding these federal requirements, please refer to: http://www.eeoc.gov/stats/iobpat/el instruct.html ACCEPTANCE OF FUEL COST ADJUSTMENTS: Bidders have the option to accept Fuel Cost Adjustments in accordance with the Revision of Section 109 - Fuel Cost Adjustment. To accept this standard special provision, the bidder must fill in an "X" next to "YES' below. No Fuel Cost Adjustment will be made due to fuel cost changes for bidders who answer "NO". If neither line is marked, the Department will assume the bidder rejects Fuel Cost Adjustments for this project. After bids are submitted, bidders will not be given any other opportunity to accept or reject this adjustment. (Mark only one line with an "X"): YES, I choose to accept Fuel Cost Adjustments for this project -- NO, I choose NOT to accept Fuel Cost Adjustments for this project (if neither line is marked, the default is "NO", I choose NOT to accept Fuel Cost Adjustments for this project Rev10/20/07 Section 00300 Page 2 SECTION 00400 SUPPLEMENTS TO BID FORMS 00410 Bid Bond 00420 Statement of Bidder's Qualifications 00430 Schedule of Subcontractors Rev 10/20/07 Section 00410 Page 1 SECTION 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned Mountain' as Principal, and�as Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado. as OWNER in the sum of $ Five*" for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the Cit of Fort Collins. Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, 7277 Intersection Improvements at Harmony & Lemay and Drake & Lemay. NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. ' Constructors, Inc. "Granite Re, Inc- *' Percent of Amount Bid (5%) Rev M20107 Section 00410 Page 2