HomeMy WebLinkAboutCHANGE ORDER - BID - 7136 LINCOLN CENTER ADDITION AND RENOVATIONS (9):Collins OPERATION SERVICES Project Management, Planning & Design 300 LaPorte Avenue P.O. Box 580 3erat—lon Fort Collins, CO 80522.0580 ervices 970.221,6610 970.221.6534 . fax Change Order Form PROJECT TITLE: Lincoln Center Additions and Renovations PROJECT NUMBER: Bid #7136 CONTRACTOR: Bryan Construction Company CHANGE ORDER NUMBER: ., 7 In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change 2. Description of change 3. Change in contract cost 4. Change in contract time. 1 &2 See attached sheet for detail. Changes compensation from fixed fee to time and direct cost basis with a not to exceed. . 3 The contract cost will not be effected. 4 There will be no change in contract time ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) $5,514,309.00 $533,162.00 $0.00 $40,678.00 0.74% 10.41 % $6,088,149.00 ACCEPTED BY: AE,4 + (ojsru cr-rs,.rr )�e DATE: (Company Name & Person's Name) APPROVED BY: �dSn �— 04=L�e DATE: y q (City of Ft. Collins 1 APPROVED BY: DATE: (Purchasing Agent over $60,000) cc: Contractor Purchasing Project File t. PFF aoBZRYA1N' o t,- ali CONSTRUCTION INC. NORTHERN COLORADO GROUP Change Request 17 Price Breakdown Continuation Sheet Description: COR #17 - CO #8 Items 161 E. Saturn Drive, Unit 2 Fort Collins, CO 80525 Phone: (970)377-0937 Description Labor Material Equipment Subcontract Other Price Item #97 - Expans Joints in Stucco at N Stair Item #102 -ASI #9a & #24 $1,975.00 $1,975.00 Item #103 - FIR #172 $1,899.00 $1,899.00 Item #104 - RFI #173 $532.00 $532.00 Item #106- AS[ #23 $1,165.00 $1,165.00 Item #107 - RFI #185 $375.00 $375.00 Item #108 - Delete painting scope at $-3,000.00 $-3,000.00 metal roof Item #110 - ASI #25 $3,437.00 $3,437.00 Item #111 - Relocate Bar Outlets $725.00 $725.00 Item #112 - PFA Requests for Area C $1,430.00 $1,430.00 TCO Item #113 - RFI #186 $5,540.00 $5,540.00 Item #116 - Acoustical Fabric in Pert $137,247.00 $137,247.00 Hall Item #118 - Replace damaged ceiling $345.00 $345.00 tiles Item #119 - Paint fence at exist. water $500.00 $500.00 feature Item #115 - Fire Suppression at $1,751.00 $1,751.00 Mezzanine Subtotal: $163,921.00 Bond $156,921.00 1.00% $1,569.21 Insurance $156,921.00 0.50% $784.61 O&P $156,921.00 5.00% $7,846.05 Total: $164,120.87 Page 3 of 3 Nei "ir Bil,"R al\ 1 CONSTRUCTION INC. NORTHERN COLORADO GROUP Change Order Project 10-024 Lincoln Center Addition & Reno 417 West Magnolia Fort Collins, CO 80521 To Contractor: Bryan Construction, Inc. 161 E. Saturn Drive, Unit 2 Fort Collins, CO 80525 The Contract Is changed as follows: CO #7 - Additional ASI & RFI Items, Area A Structural Steel Mods 16 CO#16-CO#7 The original Contract Amount was Change Order: 7 Date: 6/1512011 Architect's Project Net change by previously authorized Charge Orders The Contract Amount poor to this Change Order was The Contract will be increased by this Change Order In the amount of The new Contract Amomt including this Change Order will be The Contract Time will be unchanged. The date of Substantial Completion as of the date of this Change Order therefore is NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACT AND OWNER. Bryan Construction, Inc. ARCHITECT CONTRACTOR 161 E. Saturn Drive, Unit 2 Fort Collins, CO 80525 (SgneNreJ (SgrtatureJ By OWNER (Signature) By Date Dale 161 E. Sarum Drive, Unit 2 Fort Collins, CO 80525 Phone: (970)377-0937 $41,316.68 $5.514,309.00 $993,121.02 $6.507,430.02 $41,316.68 $6.548.746.70 N.,� JRa./ r 1 CONSTRUCTION INC. NORTHERN COLORADO GROUP To: Steve Seefeld City of Fort Collins 300 LaPorte Avenue East Building Fort Collins, CO 80522-0580 Ph: 970-221-6227 Fax: (970) 221-6534 Description: CO#16-CO#7 Change Request Number. 16 Date: 6/15/11 Job: 10-024 Lincoln Center Addition & Reno Phone: 161 E. Saturn Drive, Unit 2 Fort Collins, CO 80525 Phone: (970)377.0937 We are pleased to offer the following specifications and pricing to make the following changes: 1. Item #60.a: Per ASI #11 - Install Purchased Carpet Material into Columbine Room $3,496.00 2. Item 973 -Area A Steel Modifications due to Gridlines $21,300.00 3. Item #75 - Per ASI 12a: Performance Hall Painting $6 4. Item 976 -'Per ASI #13.1: CP-110 Carpet Specifications $0 5. Item #77- ASI #14 - Mini Theater Storage Demo $350.00 6. Item#83: Per ASI #16-Area B Mechanical Drawing Changes - $5,435.00 7. Item #88: Per RFI #150 -Dedicated High Pressure Landscape Line $4.928.00 8. Item #91: Per RFI #160 -Adding light. receptacle and circuit to CCU-1 $728.00 9. Item #93: Per ASI 019 -Change Three Pieces of Spandrel Glass to Clear Glass (City to Bill to ALMA, not caught an shop drawings) $473.00 10. Item #94: Main Stair Precast Treads - color not shown on prints or in specs - add cost for additional color and flecks to match ID's sample $3,261.00 11. Item #95: Paint Omap( ntal Railing for 2nd floor Patio from LC Artist $639.00 xj__ Total: $41,316.00 The total amount to provide this work is.................................................................. (Please refer to attached sheet for details.) $41,316.68 Page 1 of 3 .AdBrA CONSTRUCTION INC. NORTHERN COLORADO GROUP Change Request 16 Price Breakdown Continuation Sheet Description: CO#16-00#7 161 E. Saturn Drive, Unit 2 Fort Collins, CO 80525 Phone: (970)377-0937 Description Labor Materiel Equipment Subcontract Other Price Item #60.a: Per ASI #11 - Install $3.946.00 $3,946.00 Purchased Carpet Material Into Columbine Room ' Item #73 - Area A Steel Modifications $20,000.00 $20,000.00 due to Gridlines Item #75 - Per ASI 12a: Performance Hall Painting Item #76 - Per ASI #13,1: CP-110 Carpet Specifications Item #77 -ASI #14 - Mini Theater $329.00 $329.00 Storage Demo Item#83: Per AS[ #16-Area B $5,103.00 $5,103.00 Mechanical Drawing Changes Item #88: Per RFI #150 - Dedicated $4,627.00 $4,627.00 High Pressure Landscape Line Item#91: Per RFI#160-Adding light, $684.00 $684.00 receptacle and Circuit to CCU-1 Item#93: Per ASI#19-Change Three $444.00 $444.00 Pleces of Spandrel Glass to Clear Glass Item #94: Main Stalr Precast Treads - $3,062.00 $3,062.00 color not shown on prints or in specs Item #95: Paint Ornamental Railing for $600.00 $600.00 2nd floor Patio from LC Artist Subtotal: $38,795.00 BCI Bond $38,795.00 1.00% $367.95 BCI Insurance $38,795.00 0.50% $193.98 BCI O&P $38,795.00 5.00% $1,939.75 Total: $41,316.66 Page 3 of 3 Lincoln Center Additions & RenovatANN Osenar CO#6 CONSTRUCTION INC. As of 6/9/2011 aoan,aaH cocoanoo owoue Base Contract $5,514,309 c.,,f Van Change Order #1(Pars $46%000 PaNa CO laapd- Seuchora Flom a Parfamnnce Hall Change 0rder 01 a(Partial) $135,000 Remamea N sauctuml Pon at Palannanco Has. .,; Change Order#2 Total .- `` :(,$70732 ;'i ASl#i.2'aM3 Trespe.Olarges .. '- ChangeOrder#3Total$102,744 C.W. FIa Srpprmkd and ML.Asta, RFe,aW. Change OrdeiWTOWI 598123 FP.In PMHolAWOpflcii4:MhcfiFIe&O.RMli, Change 0rder 05 Total - $139.995 RFia. Saver Una, ASI#to,an(b&c). Pad hall Scaffold ;.:�.. ChanglelQidOg#B jotal,Ji .'M v. r $1p1 567 e'Sy3- r�rPcwedca)hvorn ' Change 0idar #7 Total `.$41,31fi' 6leH clulgm. AS Ill. 12e.131 t4 i6, i9: RM i568160 Revised Contract $6,683,786 Item # Reference Description of Item Cost Comments APPROVED ITEMS fi0.a Aaatt Imtaf PerehaaedG el Mutation into Columbine Room t$21.300 Man rchesed on CO aS 73.0 FMtl ewe Area A Seel Mod:fce0ms due to Gddfines 750 ASI#12a Performance Han Panting 78.0 Mi0111 CP-110 CalpM Sped0 wore. $0 77.0 ASI#14 nark Theater Storage Demo $350 85.0 ASI016 Area Bfulossiamictil Donsings $5435 880 Isis Dedicated HighPraeeure Lordiscapse tine $4928 91.0 RFIat80 Adcbv fight.mc and circuit W CCU-1 $726 93.0 AS1#19 Charge Three Places of Spandrel Glass to cla> Gass $473 Per SW B09, aer to City Nan City MI bat WALIM 94.0 Sdoillaue Man SWi Precast Traam-color not shown on prime or in splice- ' n 1 IDssam $3,281 95.0 Oivioic- RqV Paint OrnaneMel HeC for grid four Pall. from LC Artist 39 Atrproved MIWI t. ''<•'.+ :F" --"+.i-CO 97-Approved Items Total: 1316 .'. OPEN ITEMS 61.0. AN 012 Peefomlvnea Hd Acaadcal'Nork 6121,587 Pace led m CO a8 a Ass At 2 REVISED- TBD $5.302-Not Accepted, 80.0 $881 - NOT accept . Sea �Adilgtssi !!am sly 499 !oil Ws,ssha�moi 7 264- Not accepted. 96.0 Owner Plaint R.instan adding sound attenuatar at Pert. Han Supply old, - $2.119-Wray P&H to bill to City d1mcL 91.0 Mm.H a AddiHmal E,upoi Jcross in Stucco at North Shour(TWi T&M Tahl 98.0 W,rer Raait �n8o vos haired fortuture door W accommodate cil height T&M a) Md maw Eail Bi n at Now Wan(Described Above) $623 99.0 echl wr Addicabildre ithydrophilclsockerrodattitucco Wamab all TBD 100.0 UxeurR §l LCOust Chowan 4 Performance Hall - - $13.444- Way P&H W bill W city dlr.e. bi MN Theater $8,057-Not Accepted. Cuiumb'Fie Roam $6,771 - Not A..optod. 101.0 0wncR 'el Mwa Tam emly. CmMLe 2MNe3 Ir.m Well Wdli to Gat 1 7777 N9111-SlarowalreA WJllr. Open Items Total: $623 Approved Items Total: $41,316 Contractor: Ovmec Todd 8lwks, Project Manager Steve Seefeld, Project Manager Cay MFM Cabo S City of Fort Collins Operation Services Change Order Form OPERATION SERVICES Project Management, Planning & Design 300 LaPorte Avenue P.O. Box 580 Fort Collins. CO 80522-0580 970.221.6610 970.221.6534 - fax PROJECT TITLE: Lincoln Center Additions and Renovations PROJECT NUMBER: Bid #7136 CONTRACTOR: Bryan Construction Company CHANGE ORDER NUMBER: 8 In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change 2. Description of change 3. Change in contract cost 4. Change in contract time. 1 &2 See attached sheet for detail. Changes compensation from fixed fee to time and direct cost basis with a not to exceed. 3 The contract cost will not be effected. 4 There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) $5,514,309.00 $574,479.00 $0.00 $164,120.00 2.98% 13.39% $6,252,908.00 ACCEPTED BY: /3a ym-+ Co-�srttucna�_a-„sG �c/— DATE:__ ---_- (Company Name & Person's Name) APPROVED BY: �d Le ii� uLr (1 l_ LL DATE: I c� 3 ( it of Ft. Collins) - J APPROVED BY: DATE: (/ rchasing Ag over $60.000) cc: Contractor Purchasing Project File QBZ � m�9 0 Q �l� ®�1 161 E. Satum Drive, Unit 2 IA , � Fort Collins, CO 80525 CONSTRUCTION INC. Phone: (97e)377-0937 NORTHERN COLORADO GROUP Change Order Project: Change Order: 8 10-024 Lincoln Center Addition & Reno Date: 9/1/2011 417 West Magnolia Fort Collins, CO 80521 Architect's Project: To Contractor: Bryan Construction, Inc. 161 E. Saturn Drive, Unit 2 Fort Collins, CO 80525 The Contract is changed as follows: CO #8 - ASIs, RFIs and Misc. Owner Request 17 COR #17 - CO #8 Items $164,120.87 The original Contract Amount was $5,514,309.00 Net change by previously authorized Change Orders $1,169,477.63 The Contract Amount prior to this Change Order was $6,683,786.63 The Contract will be increased by this Change Order in the amount of $164,120.87 The new Contract Amount including this Change Order will be $6,847,907.50 The Contract Time will be unchanged. The date of Substantial Completion as of the date of this Change Order therefore is NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACT AND OWNER. Bryan Construction, Inc. ARCHITECT CONTRACTOR 161 E. Saturn Drive, Unit 2 Fort Collins, CO 80525 (Signature) (Signature) By Date Date OWNER (Signature) By BRIA"RISE.M.1vALM.&V CONSTRUCTION INC. NORTHERN COLORADO GROUP To: Steve Seefeld City of Fort Collins 300 LaPorte Avenue East Building Fort Collins, CO 80522-0580 Ph: 970-221-6227 Fax: (970) 221-6534 Description: COR #17 - CO #8 Items Change Request Number: 17 Date: 8/29/11 Job: 10-024 Lincoln Center Addition & Reno Phone: We are pleased to offer the following specifications and pricing to make the following changes: 1. Item #97 - Per architect request, add additional Expansion Joints in Stucco at N Stairs $0 161 E. Saturn Drive, Unit 2 Fort Collins, CO 80525 Phone: (970)377-0937 2. Item #102 - Per ASI #9a & #24 - add troffers, exit sign and ACT bulkhead in Hall 189 (no door or frame); relocate two can lights to Women's 101. $2,103.00 3. Item #103 - Per RFI #172 - duct for RTU-5 in Hall a89 was called to demo out, but not shown to replace. Add new duct. $2,022.00 1 4. Item #104 - Per RFI #173, add a dryer vent in Room 128 $567.00 5. Item #106 - Per ASI #23 - Add three cobble swales at downspouts by Admin. $1,241.00 6. Item #107 - Per RFI #185 - Add winterization assembly and water supply line for water feature per City Request. $399.00 7. Item #108 - Per Owner Request, delete painting scope at metal roof - City will replace roof in future. (-$3,000.00) 8. Item #110 - Per ASI #25 - issue comments and changes from the 717/11 punch walk (added sheetrock in light in hallway in Canyon West Room) and the Mechanical Engineer observation report comments on 7/6111 (install registers, diffusers and rebalance). $3,660.00 I i 9. Item #111 - No information provided from Ricca Newmark so caseworker and supplier coordinated directly; countertop heights changed to accomodate equipement and caused outlets on back bars to be relocated. $772.00 10. Item #112 - Per PFA Request, in area C back -of -house new emergency signs, egress lighting and fire extinguishers were installed for TCO. $1,523.00 11. Item #113 - Per RFI #186, removed existing VWC and demo existing ACT in East stairwell. Skimcoat/ finish walls and install new 4x4 ACT. $5,900.00 12. Item #116 - Per Owner Request, include the acoustical fabric scope (Innovative Intenors) under BCI's contract. Owner will manage subcontractor. $146,168.00 13. Item #115 - Per Mike Gebo's request, install fire suppression system at mezzanine area above kitchen. Page 1 of 3 Rk,YA19 ':7: J k. CONSTRUCTION INC. NORTHERN COLORADO GROUP 14. Item #118 - Replace damaged ceiling tiles from H&H Data and City wireless internet install. $367.00 15. Item #119 - Per Owner request, paint fence around existing water feature. $533.00 161 E. Satum Drive, Unit 2 Fort Collins, CC 80525 Phone: (970)377-0937 The total amount to provide this work is.................................................................................................. $164,120.87 (Please refer to attached sheet for details.) The schedule is not affected by this change. If you have any questions, please contact me at . Submitted by: Cc: Approved by: Date: Page 2 of 3