Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CHANGE ORDER - BID - 7206 FOSSIL CREEK TRAIL EXTENSION & UNDERPASS AT COUNTY ROAD 38E
CHANGE ORDER NO. 1 40 -ttictN Een PROJECT TITLE: Fossil Creek Trail Extension & Underpass at County Road 38E CONTRACTOR: Connell Resources PROJECT NUMBER: Bid #7206 PURCHASE ORDER NO.: 9111691 DESCRIPTION: 1. Reason for change: Additional work required and reduction in certain plan quantity items 2. Description of Change Items #3 - #75 Various rectified line items ($15,004.20) Item A gas line relocate $4,625.50 Item B asphalt patching unit price $2,129.40 Item C Topsoil on east harmony $2,454.48 Item D excavation at bridges $5,840.00 Item E grade ditch and add clay blanket $3,926.19 Item F Actual concrete extra work $13,428.50 Item G Luther lane patching $9,520.45 Item H Extra fence Items. / sawcut/ Miniexcavator $2.361.06 Item I Install topsoil on sides of trail South of harmony $5,688.62 3. Change in Contract Cost: $34,970.01 4. Change in Contract Time: add 20 calendar days TOTAL APPROVED CHANGE ORDER TOTAL PENDING CHANGE ORDER TOTAL THIS CHANGE ORDER TOTAL % OF ORIGINAL CONTRACT, THIS C.O. TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S ADJUSTED CONTRACT COST (As Ming all change orde GHI91=121:10111 Contractor's Represent@Ke =571.7 ACCEPTED BY: Project Manager REVIEWED BY: Title: APPROVED BY: Title: QH-�r-o ) Ja on Stutzman, P.M. APPROVED BY: Purchasing Agent over $30,000 cc: City Clerk Architect Contractor Engineer Project File Purchasing $1,485,147.34 DATE: Z;4 DATE: DATE: DATE: DATE: rC� C.O. ITEMS CHANGE ORDER NO. 1 $ (15,004.20) , 202 DEDUCT - Removal of Pie PVC -100 LF $ 6.70 $ 7.25 ($670.00) 0m 203 ADD - Unclassified Excavation (Complete in Place 850 CY $6,162.50 12€ 203 DEDUCT - Muck Excavation -850 CY $ 4.95 ($4,207.50) 1t7 206 DEDUCT - Structure Backfll Flow -Fill -5 CY $ 74.40 ($372.00) M2.1W, 210 DEDUCT - Reset Fence -60 LF $ 1.10 ($66.00) E2.2 212 ADD - Soil Conditioning 1.52 AC $ 2,270.00 $3,450.40 O 212 DEDUCT - Soil conditioner - Credit for reduced app rate 1 LS $2,588.46 $2,588.46 =48=1 212 ADD - Seeding Native 1.82 AC $ 508.00 $924.56 MOM 213 ADD - Mulching Weed Free Ha 1.20 AC $ 1,040.00 $1,248.00 E26= 216 ADD - Soil Retention Blanket Coconut Fiber 1,490 SY $ 1.60 $2,384.00 W217M 304 ADD - Aggregate Base Course Class 6 179.00 CY $ 50.70 $9,075.30 E28= 403 ADD - Hot Mix Asphalt(Grading S 100 PG 64-22 136.95 TON $ 64.70 $8,860.67 %'29 <; 503 DEDUCT - Drilled Caisson 24 Inch -199.5 LF $ 49.70 $9,915.15) €'30F :.' 503 DEDUCT - Drilled Caisson 30 Inch -150.5 LF $ 73.50 $ 350.00 $ 1,020.00 $11,061.75 W8m 601 ADD - Concrete Class D Wall 1.70 CY $595.00 m4 603 ADD - 14x10 Foot Concrete Box Culvert Precast 6 LF $6.120.00 ` 52r-` 607 DEDUCT- Fence Wood Cedar 6 Feet -57 LF $ 18.80 ($1,071.60) t53= 607 ADD - Fence 3 Rail Break -away 27 LF $ 13.30 $359.10 54 608 ADD - Concrete Sidewalk (6 Inch) 73 SY $ 36.60 $2.671.80 ?55: 608 DEDUCT- Concrete Bikeway 5 Inch Colored Concrete -77 SY $ 29.00 $2,233.00 56 608 ADD - Concrete Curb Ramp 4.20 SY $ 124.00 $520.80 =,757,4 608 DEDUCT- Concrete Drainage Pan -99 LF $ 15.40 ($1,524.60 58 608 ADD - Curb and Gutter Type 2 (Section II-B) 10 LF $ 18.60 $186.00 °'59 ' 'r 609 DEDUCT - Curb and Gutter Type 2 Section II-M -28 LF $ 21.50 ($602.00) t64= 619 ADD - Waterline 8 Inch 15 $666.00 66`"" 619 DEDUCT -8Inch Blow Off Valve -1 ($1,680.00) 74, ` 700 DEDUCT- F/A Minor Contract Revisions -0.43 "500.00 ($21,736.26) ,'75 700 DEDUCT - F/A Permit Fee for Electric Service -1 $500.00 Page 1 of 1