Loading...
HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 911602801 %)kr)-8 EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS and CTL Thompson, Inc. DATED: September 28, 2011 Worst Order Nambev 05-400903900-11 Project Title: North College— Vine to Conifer Roadwaylmprovemems Commencement Dale: October 15, 2011 Completion Date: November I, 2012 Maximum Fee: (time and reimbursubie direct costs): not to exceed $37.715.00 Project Description Roadway Improvements —Materials Testing Services Scope of Services: Perform sub-grndc. asphalt and concrete materials testing required b) CDO I1:orm 250 lot Federally runded projects. Service Provider agrees to perform the serwices Identified above and on the attached forms in accordance with the terms And coalitions contnined herein and in the Semices Agreement behvicen the parties. In the event ora conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached farms), the Services Agreement shall control. Service Provider By: Date: September 28, 201 I Approved By: Purchasing Agent over $60,000 The attached forms consisting of four (4) pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is bereby given, City of Fort Collins By: Date: September 28, 2011 INCORENIIIIIIIIII PC R A i■ R September 26, 2011 Revised September 27, 2011 City of Fort Collins Engineering Department 281 N. College Avenue P.O. Box 580 Fort Collins, Colorado 80522-0580 Attention: Mr. Matt Baker Mr. Randy Maizland Subject: Fee Estimate for Construction Observation and Materials Testing Services North College Corridor Improvements — Vine to Conifer Fort Collins, Colorado Fee Estimate No. FC 11-0292R At your request, CTLIThompson, Inc. is pleased to provide this revised fee estimate for Construction Observation and Materials Testing services for the North College Corridor Improvements — Vine to Conifer project located in Fort Collins, Colorado. At your request, we have removed the costs for reinforcing steel observations. We understand that the city will use our estimate for the basis of establishing a budget for the project and to issue a purchase order for our services. Our estimated scope of services and associated fees were prepared according to the terms and conditions of our professional services agreement with the City of Fort Collins and are presented below. Earthwork: Compaction testing will be required for road embankment fill, pavement subgrade, sidewalk subgrade, curb and gutter subgrade, median subgrade, driveway subgrade, ramp subgrade, aggregate base course, and utility trench backfill. We estimate a total of 80 site visits will be necessary. We further understand that modified proctors will be required for this project. Engineering Technician 80 days x 2 hrs/day x $57/hr $9,120.00 Modified Proctor 4 tests x $93/ea $372.00 Atterberg Limits 4 tests x $62/ea $248.00 Gradation 4 tests x $72/ea $288.00 Subtotal: $10,028.00 351 Linden Street I Suite 140 1 Fort Collins, Colorado 80524 Telephone: 970-206-9455 Fax: 970-206-9441 Q Additional Asphalt Testino: If CDOT Form 250 requires, we would be available to perform the following additional laboratory testing for the asphalt: Lottman (1/mix) 2 tests x $332/ea $664.00 Hveem Stability (1/mix) 2 tests x $218/ea $436.00 Test Strip Cores for Gauge Correction 7 cores x $36/ea $252.00 Technician Time during Test Strip 4 hours x $57/hr $228.00 Joint Cores 12 cores x $36/ea $432.00 Technician Time during Joint Coring 2 days x 4 hrs/day x $57/hr $456.00 Subtotal: $2,468.00 It should be emphasized that this estimate is based upon assumptions of actual quantities and contractor's schedule. The fee will be charged only for the actual hours and unit rates presented for tests and observations requested by the owner, contractor or subcontractors who schedule the services. If we can be of further assistance, please contact us at your convenience. Very truly yours, CTL I THOMPSON, INC. Heather Grubb Field Department Manager CITY OF FORT COLLINS 3 NORTH COLLEGE CORRIDOR IMPROVEMENTS- VINE TO CONIFER CTL I T FEE ESTIMATE NO. FC-11-0292R IF