HomeMy WebLinkAboutCHANGE ORDER - RFP - P1123 GENERAL CONTRACTOR FOR FIRE STATION EXPANSION AND RENOVATION PROJECT (5)SECTION 00950 CHANGE ORDER NO. 1 PROJECT TITLE: Poudre Fire Authority Station #1 Remodel CONTRACTOR: Drahota Commercial, LLC BID NUMBER: P1123 DESCRIPTION: The complete remodel of PFA Fire Station #1, including asbestos removal, deconstruction, an addition, sitework, utilities and landscaping. Exterior renovation will match the existing as much as practicable. Interior finishes will include painted gypsum board partitions, ceramic tile, carpet, VCT, sealed concrete, suspended acoustical ceiling, wood and hollow metal doors and frames. Reason for change: Incorporation of various Proposed Change Orders (PCO's). 2. Description of change: PCO #1 — Sewer Line Replacement — $21,692.42; PCO#2 — Credit for Window Well and Grate Reuse — ($269.07); PCO#3 — PR#1 — Building Department Comments — $987.33; PCO#8 — Rebuild Main Bearing Wall on 1st Floor - $553.24. 3. Change in Contract Cost: $22,963.92 4. Change in Contract Time: 5 Days ORIGINAL CONTRACT COST $1,189,225.00 TOTAL APPROVED CHANGE ORDERS 0.00 TOTAL PENDING CHANGE ORDERS 0.00 TOTAL THIS CHANGE ORDER $22,963.92 ADJUSTED CONTRACT COST $1,212,188.92 (Assuming all change orders approved) ACCEPTED BY: Contractor's Representative REVIEWED BY: Facilities Project Manag APPROVED BY: Operations Chief cc: Contractor Purchasing Architect Project File DE'R&4 Co►+E'f'J 09as ,1 Date lb Date �D Date