CHANGE ORDER NO. 1
PROJECT TITLE: Poudre Fire Authority Station #1 Remodel
CONTRACTOR: Drahota Commercial, LLC
BID NUMBER: P1123
DESCRIPTION: The complete remodel of PFA Fire Station #1, including asbestos removal, deconstruction, an
addition, sitework, utilities and landscaping. Exterior renovation will match the existing as much as practicable.
Interior finishes will include painted gypsum board partitions, ceramic tile, carpet, VCT, sealed concrete,
suspended acoustical ceiling, wood and hollow metal doors and frames.
Reason for change: Incorporation of various Proposed Change Orders (PCO's).
2. Description of change: PCO #1 — Sewer Line Replacement — $21,692.42; PCO#2 — Credit for Window
Well and Grate Reuse — ($269.07); PCO#3 — PR#1 — Building Department Comments — $987.33; PCO#8 —
Rebuild Main Bearing Wall on 1st Floor - $553.24.
3. Change in Contract Cost: $22,963.92
4. Change in Contract Time: 5 Days
ORIGINAL CONTRACT COST $1,189,225.00
TOTAL APPROVED CHANGE ORDERS 0.00
TOTAL PENDING CHANGE ORDERS 0.00
TOTAL THIS CHANGE ORDER $22,963.92
ADJUSTED CONTRACT COST $1,212,188.92
(Assuming all change orders approved)
ACCEPTED BY:
Contractor's Representative
REVIEWED BY:
Facilities Project Manag
APPROVED BY:
Operations Chief
cc: Contractor Purchasing
Architect Project File