HomeMy WebLinkAboutWORK ORDER - RFP - 7027 UTILITIES WEB SITE SERVICES (3)rM;,JVIF OFIOLVI IQ;MULL "IOU %IUOV"IQUIVI
...... .... .
PURSUI
Woil(-Order Number. 090911 RJ
Purcbqso Order Number1155 3"
p raj ct'ntl.&� my.ClIrmlaWlse F16
Commencement Date,
. . . . . . . . . . . . . . . . . . . Co . r lotion Date: D co"er 31, 2011
p
-Mamurn Fee:. p'nd'rqjmbursaWi
m used by-,'CllrnateMsep
ion: efforts and :2)..,.'prjaate *a
ix n'
@t0re.'ofa.prpgremthat.15
.--of- Services:., -Designi dw.i
)ber731,,2011:
ilonpl.';qgrees to,lpedbrin. the
ed:gbpve end 6K.-Ifie attached
ance 1 with the' l,erms and -*c
lerma :of. the.Prbf
. amentand this work:
Ih ed"foirns) "the;; Pk
ementshaA control.
aftedi.ed: forms &OW
P.00 V014011 lwnljvl rM w4no&
EEMENT BETWEEN
tT N$
btqraq#ve
0:;: 20'09
18,600.00
new rftwanQ_ oppilca
,ltyofForfCojljR?'....
City of Fort. Collins: Utilities
Software Application Development - myClimateWise
PART ONE
v2 (9/21/2011)
Proposed Scope of Services
In order to meet the desired goals for the MyClimateWise application, Rocket Jones proposes
the following scope items as the base package for this project:
Phase 1— Research/Analyze: $2,000
Review and Analysis of Existing Systems and Data
Phase 2 - Application Design: $8,000
Wire -frames, Mock -Ups, and Application Design
Phase 3 - Build Part One: $38,500
Graphic Design and Application Development Part One
(see Wireframe and Mock -Up Documents)
Total Investment (Part One): $48,500
0
Rocket Jones Interactive I www.roekeljones:com
Budget Detail for "Phase 3 - Build Part One"
SYSTEM:
Design Front End: $1,500
Art Slice - Front End Design: $3,500
Base Application Development: $5,000
User Manager and Login/Authentication: $1,500
Lost Password Reset System: $1,000
Load Data Tables: $3,500
ADMINISTRATOR:
Manage Partners: $7,500
Manage Meetings: $3,500
Manage Tiers: $3,500
Upload Data: $2,000
Manage Info and Messages: $2,000
Data Download Tools: $3,500
Paget
Rocket Jones Interactive I mm.roeketiones com
Project Technical Specifications
The proposed system to be built using standard, current technology and implemented following industry
standards and best practices. Because we are building in a custom development environment, there is "no
limit" to the functionality that can be added in future phases (additional costs to be determined as new
scope develops).
HTML compliant to standards:
XHTML Strict 1.0 1 Cascading Style Sheets (CSS 2.1)
Development Environment:
LAMP - Linux I Apache I mySQL I PHP
CakePHP - Application Development Environment
Supported Browsers:
IE7, IE8, Safari 3.0 and 4.0, FireFox 3.0 and 3.5, Chrome
(does not include mobile browsers)
[Rocket Jones no longer offers IE6 compatibility as a default on projects. This service is
available on request as an addition to scope.]
Project Notes
No other functionality (other than listed) is implied. Additional functionality to be bid upon
request.
All site content (text and graphics) to be delivered to Rocket Jones in digital formats.
Third party costs are not included in this proposal unless otherwise noted (Google Checkout,
PayPal, etc).
Data entry and content loading not included unless otherwise noted.
Bid valid for 90 days.
Page 3
Rocket Jones Interactive I www.rocket ones.com
Proposal Acceptance
City of Fort Collins Utilities
Aeceptrd by Authorized Agenc (pkasc prim name%
Accepci•d by Authorized Agent (please sign)
Oacr
NOTE: Please initial the bottom of each preceding page.
Page 4
Rocket Jones Interactive I www.rocke;iones.com
Contact Rocket Jones
ROCKET JONES INTERACTIVE, LLC
Office Address:
Rocket Jones Interactive
204 Walnut Street
Fort Collins, Colorado 80524-2412
Mailing Address:
Rocket Jones Interactive
PO Box 2091
Fort Collins, Colorado 80522
Phone:
(970)482-5790
Jeff Bristol, Principal
iefKgrocketjones.co m
Jeff Shoemaker, Senior Software Architect
shoe@roc ketjones.com
Marge Norskog, Strategic Partner Relations
marge@rocket' nes.com
Technical Support
support@rockedones.com
Page 5
Rucket Jones Interactive I www.rocket ones.com